a) Highwalls, pits and spoil banks; plans; filing of plan.
1) Each operator shall establish and follow a ground control plan
for the safe control of all highwalls, pits and spoil banks which shall be
consistent with prudent engineering design and will insure safe working
conditions. The mining methods employed by the operator shall be selected to
insure highwall and spoil bank stability.
2) The operator shall file a copy of such plan, and revisions
thereof, with the Department, shall identify the name and location of the mine,
and the name and address of the mine operator.
b) Stripping; loose material.
Loose hazardous material shall be stripped for a safe
distance from the top of pit or highwalls, and the loose unconsolidated
material shall be sloped to the angle of repose, or barriers, baffle boards,
screens, or other devices be provided that afford equivalent protection; or a
combination of the preceding be used to assure the safety of the workmen.
c) Box cuts; spoil material placement.
When box cuts are made, necessary precautions shall be taken
to minimize the possibility of spoil material rolling into the pit.
d) Benches.
To insure safe operation, the width and height of benches
shall be governed by the type of equipment to be used and the operation to be
performed.
e) Ground control; inspection and maintenance; general.
1) Highwalls, banks, benches, and terrain sloping into the
working areas shall be examined by a certified person at least once each
working shift, and additionally after every rain, freeze, or thaw before men
work in such areas. The examination of highwalls shall include the checking
for cracks which may develop into slides. Such examinations shall be made and
recorded in a book supplied by the operator and signed by the person making the
examination in ink or indelible pencil
ed by a certified person at least once each
working shift, and additionally after every rain, freeze, or thaw before men
work in such areas. The examination of highwalls shall include the checking
for cracks which may develop into slides. Such examinations shall be made and
recorded in a book supplied by the operator and signed by the person making the
examination in ink or indelible pencil. Such books shall be kept in a secure
place and shall remain at the mine for a period of three (3) years.
2) Overhanging highwalls and banks shall be taken down and other
observed unsafe ground conditions shall be corrected promptly and no persons
shall enter the hazardous area except those engaged in making the corrections.
Adequate barricades or posting shall be used to keep all other persons out.
3) Men shall examine their working places before starting work
and frequently thereafter and any unsafe condition shall be reported
immediately to the supervisor.
f) Scaling highwalls; general.
Hazardous areas shall be scaled before any other work is performed
in the hazardous area. When scaling of highwalls is necessary to correct
conditions that are hazardous to persons in the area, a safe means shall be
provided for performing such work.
g) Highwalls; men working.
1) Men, other than those necessary to correct unsafe conditions,
shall not work near or under dangerous highwalls or banks.
2) Except as provided in subparagraph (g)(3) of this Section,
persons shall not work between equipment and the highwall or spoil bank where
the equipment may hinder escape from falls or slides.
3) Special safety precautions shall be taken when persons are
required to perform repair work between immobilized equipment and the highwall
or spoil bank and such equipment may hinder escape from falls or slides
ded in subparagraph (g)(3) of this Section,
persons shall not work between equipment and the highwall or spoil bank where
the equipment may hinder escape from falls or slides.
3) Special safety precautions shall be taken when persons are
required to perform repair work between immobilized equipment and the highwall
or spoil bank and such equipment may hinder escape from falls or slides.
4) Should a slide occur, a certified person with knowledge of
highwalls, will examine the area of the slide for danger of more slides, and no
person will work in the area until the examination is complete and declared
safe by the certified person conducting the examination. Areas on top of
highwalls where persons are required to work shall be sufficiently cleared to
assure safe working conditions and adequate visibility.
h) Drilling; general.
1) Equipment that is to be used during a shift shall be inspected
each shift by a competent person. Equipment defects affecting safety shall be
reported.
2) Equipment defects affecting safety shall be corrected before
the equipment is used.
i) Relocation of drills; safeguards.
1) When a drill is being moved from one drilling area to another,
drill steel, tools, and other equipment shall be secured and the mast placed in
a safe position.
2) When a drill helper is used, his location shall be made known
to the operator at all times when the drill is being moved.
j) Drill; operation.
1) While in operation, drills shall be attended at all times.
2) Persons shall not drill from positions that hinder their
access to the control levers, or from insecure footing or staging or from atop
equipment not designed for this purpose.
3) Persons shall not be on a mast while the drill bit is in
operation unless a safe platform is provided and safety belts are used.
4) Drill crews and others shall stay clear of augers or drill
stems that are in motion
ot drill from positions that hinder their
access to the control levers, or from insecure footing or staging or from atop
equipment not designed for this purpose.
3) Persons shall not be on a mast while the drill bit is in
operation unless a safe platform is provided and safety belts are used.
4) Drill crews and others shall stay clear of augers or drill
stems that are in motion. Persons shall not pass under or step over a moving
stem or auger.
5) When churn drills or vertical rotary drills are used, drillers
shall not be permitted to work under suspended tools, and when collaring holes,
inspecting, or during any operation in which tools are removed from the hole,
all tools shall be lowered to the ground or platform.
6) Where horizontal holes are drilled in the overburden, a certified
person shall make a careful inspection of the face of the highwall before
drilling operations begin, and all loose hazardous material shall be removed
before other work is done, or the area shall be vacated and posted.
7) In the event of power failure, drill controls shall be placed
in the neutral position until the power is restored.
8) Receptacles or racks shall be provided for drill steel stored
on drills.
9) Tools and other objects shall not be left loose on the mast or
mast platform.
10) Bit wrenches or bit knockers shall be used to remove detachable
bits from drill steel.
k) Collaring holes.
1) Starter steels shall be used when collaring holes with hand
held drills.
2) Men shall not hold the drill steel while collaring holes or
rest their hands on the chuck or centralizer while drilling.
l) Drill holes; guarding.
Drill holes large enough to constitute a hazard shall be
covered or guarded.
m) Jackhammers; operation; safeguards
Collaring holes.
1) Starter steels shall be used when collaring holes with hand
held drills.
2) Men shall not hold the drill steel while collaring holes or
rest their hands on the chuck or centralizer while drilling.
l) Drill holes; guarding.
Drill holes large enough to constitute a hazard shall be
covered or guarded.
m) Jackhammers; operation; safeguards.
Men operating or working near jackhammers or jackleg drills,
or other drilling machines shall position themselves so that they will not be
struck or lose their balance if the drill steel breaks or sticks.
n) Air drills; safeguards.
Air shall be turned off and bled from the air hoses before
hand-held air drills are moved from one working area to another.