Documents
Briefs, oral arguments, agency decisions and the Federal Register.
497 results
0.14s
Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices
Agency decision · Agency decision
. • Air quality and noise. • Endangered and threatened species. • Hazardous waste. • Public safety. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
Federal Energy Regulatory CommissionFederal Register / Vol. 72, No. 142 / Wednesday, July 25, 2007 / Rules and Regulations
Agency decision · Agency decision
Since this is a routine matter that will only affect air traffic procedures and air navigation, it is certified that this rule, when promulgated, will not have a significant economic impact on a substantial … Trial Period 61.
Federal Energy Regulatory CommissionFederal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices
Agency decision · Agency decision
. • Air quality and noise. • Reliability and safety. • Cumulative impacts. … There will be at minimum a 45 day comment period allotted for review of the draft EIS.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 103 / Tuesday, May 30, 2006 / Rules and Regulations
Agency decision · Agency decision
List of Subjects in 14 CFR Part 97 Air Traffic Control, Airports, Incorporation by reference, and Navigation (Air). Issued in Washington, DC on May 19, 2006. James J. … Most commenters supported the exemption for QFs under 5 MW, while some suggested a higher figure.15 In response to those comments, the Commission raised the threshold to 20 MW.16 The 20 MW threshold strikes
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 12 / Thursday, January 19, 2006 / Notices
Agency decision · Agency decision
00000 Frm 00039 Fmt 4703 Sfmt 4703 3087 proposed project under these general headings: • Soils • Land use • Water resources, fisheries, and wetlands • Cultural resources • Vegetation and wildlife • Air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 73 / Monday, April 17, 2006 / Notices
Agency decision · Agency decision
Such notices, motions, or protests must be filed on or before the comment date. … The AAV facilities will allow Trunkline LNG to regasify LNG by using the surrounding air temperature.
Federal Energy Regulatory CommissionFederal Register / Vol. 72, No. 142 / Wednesday, July 25, 2007 / Proposed Rules
Agency decision · Agency decision
RM07–10–000 and AD06–11– 000] Transparency Provisions of Section 23 of the Natural Gas Act; Transparency Provisions of the Energy Policy Act of 2005 July 17, 2007. … Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 37 / Friday, February 24, 2006 / Notices
Agency decision · Agency decision
The alternative plans will be reviewed under provisions of appropriate laws and regulations, including the Endangered Species Act, Fish and Wildlife Coordination Act, Clean Water Act, and Farmland Protection … Policy Act. d.
Federal Energy Regulatory Commissionmstockstill on PROD1PC68 with NOTICES (2006)
Agency decision · Agency decision
Applicants: PJM Interconnection, Applicants: Air Liquide Large LLC. Industries U.S., LP. … Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contacts: Robert A. Davis, 390 Timber Laurel Lane, Lawrenceville, GA 30043, and Michael P.
Federal Energy Regulatory CommissionFederal Register / Vol. 70, No. 203 / Friday, October 21, 2005 / Notices
Agency decision · Agency decision
Description: Consolidated Edison Energy Massachusetts, Inc. submits a clean revised version of its Reliability Must Run Agreement et al. Filed Date: October 11, 2005. Accession Number: 20051014–0109. … Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Terry P. Jensky, Upper Peninsula Power Company, P.O. Box 130, Houghton, MI 49931–0130. i.
Federal Energy Regulatory Commissionwwhite on PROD1PC65 with NOTICES
Agency decision · Agency decision
DOE also invites public comments on this Notice, as well as on issues to be addressed in the SEA. … operations of the Plant (e.g., reasonably available ambient air quality data and results of air quality modeling), that the Department receives from Mirant, EPA, and DEQ. 3.
Federal Energy Regulatory Commissiondsatterwhite on PROD1PC76 with NOTICES (2006)
Agency decision · Agency decision
Such notices, motions, or protests must be filed on or before the comment date. … The AAV facilities will allow Trunkline LNG to regasify LNG by using the surrounding air temperature.
Federal Energy Regulatory Commissionwwhite on PROD1PC65 with NOTICES (2006)
Agency decision · Agency decision
DOE also invites public comments on this Notice, as well as on issues to be addressed in the SEA. … operations of the Plant (e.g., reasonably available ambient air quality data and results of air quality modeling), that the Department receives from Mirant, EPA, and DEQ. 3.
Federal Energy Regulatory CommissionFederal Register · Notice · Dec 18, 2006
Description: Madison Gas and Electric Company, et al., submit an Application for approval of Intra-Company transfer of Jurisdictional Facilities under Section 203 of the Federal Power Act. … Description: Oklahoma Gas and Electric Co submits a supplement to its 11/1/06 filing and a clean version of its First Revised Rate Schedule 147. Filed Date: 12/05/2006.
71 FR 75748Federal Energy Regulatory Commissionmstockstill on PROD1PC61 with NOTICES
Agency decision · Agency decision
mstockstill on PROD1PC61 with NOTICES Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices and (c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s Regulations, for authorization … Description: Southwest Power Pool, Inc. submits a clean and relined version of Substitute Seventh Revised Sheet 161 to its OATT pursuant to FERC’s 9/1/06 Order. Filed Date: 12/04/2006.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 175 / Monday, September 11, 2006 / Notices
Agency decision · Agency decision
Air and Noise Quality: —Effects on air and noise quality from construction and operation of the Harrisville Compressor Station. … Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contacts: Mr. Philippe Vauthier, UEK Corporation, Box 3124 Annapolis, Maryland 21403, phone: (410) 267–6507. i.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 202 / Thursday, October 19, 2006 / Notices
Agency decision · Agency decision
If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. … FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973.
Federal Energy Regulatory CommissionFederal Register / Vol. 71, No. 13 / Friday, January 20, 2006 / Notices
Agency decision · Agency decision
Description: Duke Electric Transmission submits a clean version of the Affected System Operating Agreement with North Carolina Electric Membership Corp, designated as First Revised Service Agreement No … Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). g. Applicant Contacts: For Teton: Teton Power Funding, LLC, c/o Barry E.
Federal Energy Regulatory CommissionFederal Register / Vol. 72, No. 71 / Friday, April 13, 2007 / Rules and Regulations
Agency decision · Agency decision
entities under the criteria of the Regulatory Flexibility Act. … Posey, Acting Secretary.
Federal Energy Regulatory Commissionsroberts on PROD1PC70 with NOTICES (2006)
Agency decision · Agency decision
Comment Date: 5 p.m. … Description: Wisconsin Electric Power Co and PJM Interconnection jointly submits a clean rate schedule sheets of the Balancing Authority Operations Coordination Agreement designated as Rate FERC 117 et