Federal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices

Agency decision

Ask Donna

What actually matters in this document.

Text

Federal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices

Persons unable to file electronically

should submit an original and 14 copies

of the intervention or protest to the

Federal Energy Regulatory Commission,

888 First St. NE., Washington, DC

20426.

The filings in the above proceedings

are accessible in the Commission’s

eLibrary system by clicking on the

appropriate link in the above list. They

are also available for review in the

Commission’s Public Reference Room in

Washington, DC. There is an

eSubscription link on the Web site that

enables subscribers to receive e-mail

notification when a document is added

to a subscribed docket(s). For assistance

with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or

call (866) 208–3676 (toll free). For TTY,

call (202) 502–8659.

Nathaniel J. Davis, Jr.,

Acting Deputy Secretary.

[FR Doc. E7–21650 Filed 11–2–07; 8:45 am]

BILLING CODE 6717–01–P

A copy of the EA is attached to a

Commission order titled ‘‘Order

Amending License,’’ issued October 29,

2007, and is available for review in the

Commission’s Public Reference Room.

A copy of the EA may also be viewed

on the Commission’s Web site at

http://www.ferc.gov using the

‘‘eLibrary’’ link. Enter the docket

number (P–2233) in the docket number

field to access the document. For

assistance, contact FERC Online

Support at

FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,

(202) 502–8659.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–21660 Filed 11–2–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. PF07–13–000]

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Project No. 2233–066 Oregon]

Portland General Electric Company;

Notice of Availability of Environmental

Assessment

ycherry on PRODPC74 with NOTICES

October 29, 2007.

An environmental assessment (EA) is

available for public review. The EA was

prepared for an application filed by

Portland General Electric Company

(licensee) on December 29, 2006, and

supplemented on February 26, 2007,

requesting Commission approval of an

amendment of license to increase the

height of temporary flashboards on the

concrete dam along the crest of

Willamette Falls from 2.0 feet to 3.5 feet,

in addition to other modifications, at the

Willamette Falls Hydroelectric Project.

The project is located on the Willamette

River near the cities of West Linn and

Oregon City in Clackamas County,

Oregon. The project does not occupy

any federal lands.

The EA evaluates the environmental

impacts that would result from

approving the licensee’s proposed

increase in flashboard height and

installation of temporary adult lamprey

passage structures. The EA finds that

approval of the amendment application,

combined with Commission

modifications, would not constitute a

major federal action significantly

affecting the quality of the human

environment.

VerDate Aug<31>2005

15:04 Nov 02, 2007

Jkt 214001

Palomar Gas Transmission, LLC;

Notice of Intent To Prepare an

Environmental Impact Statement for

the Proposed Palomar Gas

Transmission Project; Request for

Comments on Environmental Issues

and Notice of Public Meetings

October 29, 2007.

The Federal Energy Regulatory

Commission (FERC or Commission) is

in the process of preparing an

environmental impact statement (EIS)

on the environmental impacts of the

Palomar Gas Transmission Project

involving the construction and

operation of a new underground natural

gas pipeline proposed by Palomar Gas

Transmission, LLC (PGT). This Notice of

Intent (NOI) explains the scoping

process that will be used to gather input

from the public and interested agencies

on the project. Your input will help

determine which issues will be

evaluated in the EIS. Please note that

the scoping period for this project will

close on November 28, 2007.

Comments on the project may be

submitted in written form or verbally. In

lieu of or in addition to sending written

comments, we1 also invite you to attend

the public scoping meetings that have

been scheduled in the project area. The

meetings are scheduled for Monday,

November 12 in Maupin, Oregon;

Tuesday, November 13 in Molalla,

Oregon; Wednesday, November 14 in

1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the

environmental staff of the FERC’s Office of Energy

Projects.

PO 00000

Frm 00038

Fmt 4703

Sfmt 4703

62465

McMinnvile, Oregon; and Thursday,

November 15 in Forest Grove, Oregon.

Further details on how to submit

comments and additional details of the

public scoping meetings are provided in

the Public Participation section of this

notice.

The FERC will be the lead federal

agency in the preparation of an EIS that

will satisfy the requirements of the

National Environmental Policy Act

(NEPA) and will be used by the FERC

to consider the environmental impacts

that could result if the Commission

issues PGT a Certificate of Public

Convenience and Necessity under

section 7 of the Natural Gas Act.

This NOI is being sent to Federal,

State, and local government agencies;

elected officials; affected landowners;

environmental and public interest

groups; Indian tribes and regional

Native American organizations;

commentors and other interested

parties; and local libraries and

newspapers. We encourage government

representatives to notify their

constituents of this planned project and

encourage them to comment on their

areas of concern.

If you are a landowner receiving this

notice, you may be contacted by a PGT

representative about the acquisition of

an easement to construct, operate, and

maintain the proposed facilities. The

pipeline would seek to negotiate a

mutually acceptable agreement.

However, if the project is approved by

the FERC, that approval conveys with it

the right of eminent domain. Therefore,

if easement negotiations fail to produce

an agreement, the pipeline company

could initiate condemnation

proceedings in accordance with state

law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility on My Land? What Do I Need

To Know?’’ is available for viewing on

the FERC Internet Web site (http://

www.ferc.gov/for-citizens/citizenguides.asp). This fact sheet addresses a

number of typically asked questions,

including the use of eminent domain

and how to participate in FERC’s

proceedings.

Summary of the Proposed Project

PGT has announced its proposal to

construct and operate a new natural gas

pipeline and associated structures with

a bi-directional flow capacity of 1.4

billion cubic feet per day. The project

would be located in northwest Oregon

and consist of a 211-mile-long, 36-inchdiameter pipeline running from near

Shaniko, Wasco County, Oregon to near

Wauna, Clatsop County, Oregon. The

pipeline would travel across Wasco,

E:\FR\FM\05NON1.SGM

05NON1

ycherry on PRODPC74 with NOTICES

62466

Federal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices

Clackamas, Marion, Yamhill,

Washington, Columbia, and Clatsop

Counties in Oregon. The pipeline would

connect the existing Gas Transmission

Northwest Corporation (GTN) mainline

pipeline system in central Oregon to the

Northwest Natural Gas Company (NW

Natural) distribution system near

Molalla in Clackamas County. The

pipeline is also proposed to extend to

other potential interconnections with

NW Natural’s system and to an

interconnection with NorthernStar

Energy LLC’s proposed Bradwood

Landing pipeline near Wauna in Clatsop

County, Oregon. The proposed project

would also include a 3.8-mile-long, 36inch-diameter lateral pipeline 2 near

Molalla, Clackamas County, Oregon, to

connect the Palomar Project mainline to

an existing NW Natural city gate.

Certain associated aboveground

facilities are also proposed, i.e.,

mainline valves spaced at intervals

along the pipeline as defined by U.S.

Department of Transportation

regulations per the Code of Federal

Regulations (CFR) 49 Part 192, at least

three meter stations, and pig launcher

and receiver facilities. At this time, PGT

does not anticipate that compression

will be required for this project.

More specifically, PGT proposes the

following primary project components:

b A 211-mile-long, 36-inch diameter

underground natural gas mainline

consisting of two segments:

b Segment 1: a 108.5-miles of

mainline from TransCanada’s GTN

pipeline system northwest of Madras in

Wasco County to a location southwest of

Molalla in Clackamas County; and a 3.8mile, 36-inch diameter accessory lateral

pipeline, the Molalla Lateral, which will

connect the main pipeline to NW

Natural’s distribution system;

b Segment 2: a 102.5-mile segment

commencing at the Molalla Lateral

interconnect and terminating at the

proposed connection to the Bradwood

Landing pipeline near Wauna, Clatsop

County; there is potential for additional

interconnections with NW Natural along

this route;

b two meter stations, eight mainline

valves, and two pig launchers/receivers

on Segment I; one pig launcher/receiver

on the Molalla Lateral; and one meter

station, eight mainline valves, and one

pig launcher/receiver on section II;

b temporary pipe storage and

contractor yards at various locations

along the pipeline for office trailers,

parking, and pipe and equipment

storage during construction; and

2 A lateral pipeline typically takes gas from the

main system to deliver it to a customer, local

distribution system, or another interstate

transmission system.

VerDate Aug<31>2005

15:04 Nov 02, 2007

Jkt 214001

b temporary construction roadways

and short permanent roads from existing

roads to meter station sites and other

aboveground facilities.

A location map depicting PGT’s

proposed facilities is attached to this

NOI as Appendix 1.3

The EIS Process

NEPA requires the Commission to

take into account the environmental

impacts that could result from an action

when it considers whether or not a

natural gas pipeline should be

approved. FERC will use the EIS to

consider the environmental impacts that

could result if it issues project

authorizations to PGT under sections 3

and 7 of the Natural Gas Act. NEPA also

requires us to discover and address

concerns the public may have about

proposals. This process is referred to as

‘‘scoping.’’ The main goal of scoping is

to focus the analysis in the EIS on the

important environmental issues. With

this NOI, the Commission staff is

requesting public comments on the

scope of the issues to be addressed in

the EIS. All comments received will be

considered during preparation of the

EIS.

In the EIS we will discuss impacts

that could occur as a result of the

construction, operation, and

maintenance of the proposed project

under these general headings:

• Geology and soils.

• Water resources.

• Aquatic resources.

• Vegetation and wildlife.

• Threatened and endangered

species.

• Land use, recreation, and visual

resources.

• Cultural resources.

• Socioeconomics.

• Air quality and noise.

• Reliability and safety.

• Cumulative impacts.

In the EIS, we will also evaluate

possible alternatives to the proposed

project or portions of the project, and

make recommendations on how to

lessen or avoid impacts on affected

resources.

Our independent analysis of the

issues will be included in a draft EIS.

The draft EIS will be mailed to federal,

state, and local government agencies;

elected officials; affected landowners;

3 The appendices referenced in this notice are not

being printed in the Federal Register. Copies can

be obtained from the Commission’s Web site

(excluding maps) at the ‘‘eLibrary’’ link, from the

Commission’s Public Reference Room, or by calling

(202) 502–8371. For instructions on connecting to

eLibrary, refer to the end of this notice. Copies of

the appendices were sent to all those receiving this

notice in the mail.

PO 00000

Frm 00039

Fmt 4703

Sfmt 4703

environmental and public interest

groups; Indian tribes and regional

Native American organizations;

commentors; other interested parties;

local libraries and newspapers; and

FERC’s official service list for this

proceeding. There will be at minimum

a 45 day comment period allotted for

review of the draft EIS. We will consider

all comments on the draft EIS and revise

the document, if necessary, before

issuing a final EIS. We will consider all

comments on the final EIS before we

make our recommendations to the

Commission. To ensure that your

comments are considered, please follow

the instructions in the Public

Participation section of this NOI.

Although no formal application has

been filed, FERC has already initiated

its NEPA review under its pre-filing

process. The purpose of the pre-filing

process is to encourage early

involvement of interested stakeholders

and to identify and resolve issues before

an application is filed with FERC.

With this NOI, we are asking Federal,

State, and local agencies with

jurisdiction and/or special expertise

with respect to environmental issues to

formally cooperate with us in the

preparation of the EIS. These agencies

may choose to participate once they

have evaluated the proposal relative to

their responsibilities. Additional

agencies that would like to request

cooperating agency status should follow

the instructions for filing comments

provided under the Public Participation

section of this NOI.

The EIS will examine the proposed

action and alternatives that require

administrative or other actions by other

Federal agencies. The U.S. Department

of Agriculture Forest Service has

identified the possible need to amend

the existing Mt. Hood National Forest

Land and Resource Management Plans.

The U.S. Department of Interior Bureau

of Land Management has identified the

possible need to amend the existing

Resource Management Plans of the

Salem and Prineville Districts.

Currently Identified Environmental

Issues

We have already identified issues that

we think deserve attention based on our

previous experience with similar

projects in the region. This preliminary

list of issues, which is presented below,

may be revised based on your comments

and our continuing analyses specific to

the Palomar Gas Transmission Project.

• Potential for disturbance to

residents along pipeline construction

route, including noise and aesthetics;

E:\FR\FM\05NON1.SGM

05NON1

Federal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices

• Potential for geological hazards,

including seismic activity, to have

impacts on the pipeline;

• Potential impacts of the pipeline on

water bodies and wetlands, including

issues of erosion control;

• Potential impacts of the pipeline on

vegetation, including the clearing of

forested areas;

• Potential impacts of the pipeline on

threatened and endangered species and

wildlife habitat;

• Potential impacts of the pipeline on

cultural resources; and

• Potential impacts of the pipeline on

recreation and scenic resources.

Public Participation

You are encouraged to become

involved in this process and provide

your specific comments or concerns

about PGT’s proposal. By becoming a

commentor, your concerns will be

addressed in the EIS and considered by

the Commission. Your comments

should focus on the potential

environmental effects, reasonable

alternatives (including alternative

facility sites and pipeline routes), and

measures to avoid or lessen

environmental impacts. The more

specific your comments, the more useful

they will be. To expedite the FERC

Staff’s receipt and consideration of your

comments, electronic submission of

comments is strongly encouraged. For

information on electronically filing

comments, please see the instructions

on the Commission’s Web site at

http://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s

Guide as well as information in 18 CFR

385.2001(a)(1)(iii). Before you can file

comments, you will need to create a free

account, which can be accomplished

online by clicking on ‘‘Sign-up’’ under

‘‘New User.’’ This type of submission is

considered a ‘‘Comment on Filing.’’

Comments submitted electronically

must be submitted by November 28,

2007.

If you wish to mail comments, please

mail your comments so that they will be

received in Washington, DC on or before

November 28, 2007 and carefully follow

these instructions to ensure that your

comments are timely and properly

recorded:

• Send an original and two copies of

your letter to: Kimberly D. Bose,

Secretary, Federal Energy Regulatory

Commission, 888 First St., NE.,

Washington, DC 20426.

• Label one copy of your comments

for the attention of OEP/DG2E/Gas

Branch 2, PJ–11.2.

• Reference Docket No. PF07–13–000

on the original and both copies.

• Mail your comments so that they

will be received in Washington, DC on

or before November 28, 2007.

The public scoping meetings (dates,

times, and locations listed below) are

designed to provide another opportunity

to offer comments on the proposed

project. Interested groups and

individuals are encouraged to attend the

meetings and to present comments on

the environmental issues that they

believe should be addressed in the EIS.

A transcript of the meetings will be

generated so that your comments can be

accurately recorded. All meetings will

begin at 7 p.m., and are scheduled as

follows:

Date

Location

Monday, November 12, 2007 ...................................................................

Imperial River Company, 304 Bakeoven Road, Maupin, OR 97037,

541–395–2404.

Molalla Adult Center, 315 Kennel Street, Molalla, OR 97038, 503–829–

4214.

Patton Middle School, 1175 East 19th Street, McMinnville, OR 97128,

503–565–4503.

Pacific University, 2043 College Way, Forest Grove, OR 97116, 503–

352–6151.

Meeting will be held in the Multipurpose Room located on ground floor

of Washburne Hall. Optimum parking would be in lot ‘‘D’’ off of

Cedar Street and on College Way.

Tuesday, November 13, 2007 ..................................................................

Wednesday, November 14, 2007 .............................................................

Thursday, November 15, 2007 .................................................................

Once PGT formally files its

application with the Commission, you

may want to become an ‘‘intervenor,’’

which is an official party to the

proceeding. Intervenors play a more

formal role in the process and are able

to file briefs, appear at hearings, and be

heard by the courts if they choose to

appeal the Commission’s final ruling.

An intervenor formally participates in a

Commission proceeding by filing a

request to intervene. Instructions for

becoming an intervenor are included in

the User’s Guide under the ‘‘e-filing’’

link on the Commission’s Web site.

Please note that you may not request

intervenor status at this time. You must

wait until a formal application is filed

with the Commission.

ycherry on PRODPC74 with NOTICES

62467

Environmental Mailing List

Everyone who responds to this notice

or provides comments throughout the

EIS process will be retained on the

VerDate Aug<31>2005

15:04 Nov 02, 2007

Jkt 214001

mailing list. If you do not want to send

comments at this time but want to stay

informed and receive copies of the draft

and final EISs, you must return the

Mailing List Retention Form (Appendix

2). If you do not send comments or

return the Mailing List Retention Form

asking to remain on the mailing list, you

will be taken off the mailing list.

Additional Information

Additional information about the

project is available from the

Commission’s Office of External Affairs

at 1–866–208–FERC (3372), or on the

FERC Internet Web site (http://

www.ferc.gov) using the ‘‘eLibrary link.’’

Click on the eLibrary link, select

‘‘General Search’’ and enter the project

docket number, excluding the last three

digits (i.e., PF07–13) in the ‘‘Docket

Number’’ field. Be sure you have

selected an appropriate date range. For

assistance with eLibrary, the eLibrary

PO 00000

Frm 00040

Fmt 4703

Sfmt 4703

helpline can be reached at 1–866–208–

3676, TTY (202) 502–8659, or by e-mail

at FERCOnlineSupport@ferc.gov. The

eLibrary link on the FERC Web site also

provides access to the texts of formal

documents issued by the Commission,

such as orders, notices, and rule

makings.

In addition, FERC now offers a free

service called eSubscription that allows

you to keep track of all formal issuances

and submittals in specific dockets. This

can reduce the amount of time you

spend researching proceedings by

automatically providing you with

notification of these filings, document

summaries, and direct links to the

documents. To register for this service,

go to http://www.ferc.gov/

esubscribenow.htm.

Public meetings or site visits will be

posted on the Commission’s calendar

located at http://www.ferc.gov/

E:\FR\FM\05NON1.SGM

05NON1

62468

Federal Register / Vol. 72, No. 213 / Monday, November 5, 2007 / Notices

EventCalendar/EventsList.aspx along

with other related information.

Finally, PGT has established a Web

site for this project at http://

www.palomargas.com/project.html. The

Web site includes a project overview,

timeline, safety and environmental

information, and answers to frequently

asked questions. You can also request

additional information by e-mailing

PGT directly at info@palomargas.com or

by writing to: Palomar Gas

Transmission, 1400 SW. Fifth Avenue,

Suite 900, Portland, OR 97201.

Kimberly D. Bose,

Secretary.

[FR Doc. E7–21651 Filed 11–2–07; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[FFP Project 54, LLC; Project No. 12915–

000]

Notice of Application Accepted for

Filing and Soliciting Comments,

Motions to Intervene, and Protests

ycherry on PRODPC74 with NOTICES

October 29, 2007.

Take notice that the following

hydroelectric applications have been

filed with the Commission and are

available for public inspection:

a. Type of Application: Preliminary

Permit.

b. Project No.: P–12915–000.

c. Date Filed: August 6, 2007.

d. Applicant: FFP Project 54, LLC.

e. Name of the Project: Flora Creek

Light Project.

f. Location: The project would be

located on the Mississippi River in Cape

Girardeau County, Missouri and

Alexander County, Illinois. The project

uses no dam or impoundment.

g. Filed Pursuant to: Federal Power

Act, 16 U.S.C. 791a–825r.

h. Applicants Contact: Mr. Dan Irvin,

FFP Project 54, LLC, 69 Bridge Street,

Manchester, MA 01944, phone (978)

232–3536.

i. FERC Contact: Patricia W. Gillis,

(202) 502–8735.

j. Deadline for filing comments,

protests, and motions to intervene: 60

days from the issuance date of this

notice.

All documents (original and eight

copies) should be filed with: Kimberly

D. Bose, Secretary, Federal Energy

Regulatory Commission, 888 First

Street, NE., Washington, DC 20426.

Comments, protests, and interventions

may be filed electronically via the

Internet in lieu of paper; see 18 CFR

VerDate Aug<31>2005

17:17 Nov 02, 2007

Jkt 214001

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link. The Commission

strongly encourages electronic filings.

Please include the project number (P–

12915–000) on any comments or

motions filed.

The Commission’s Rules of Practice

and Procedure require all intervenors

filing documents with the Commission

to serve a copy of that document on

each person in the official service list

for the project. Further, if an intervenor

files comments or documents with the

Commission relating to the merits of an

issue that may affect the responsibilities

of a particular resource agency, they

must also serve a copy of the document

on that resource agency.

k. Description of Project: The

proposed project would consist of: (1)

3100 proposed 20-kilowatt Free Flow

generating units having a total installed

capacity of 62-megawatts, (2) a proposed

transmission line; and (3) appurtenant

facilities. The project would have an

average annual generation of 271.56gigawatt-hours and be sold to a local

utility.

l. Location of Application: A copy of

the application is available for

inspection and reproduction at the

Commission in the Public Reference

Room, located at 888 First Street, NE.,

Room 2A, Washington, DC 20426, or by

calling (202) 502–8371. This filing may

also be viewed on the Commission’s

Web site at http://www.ferc.gov using

the ‘‘eLibrary’’ link. Enter the docket

number excluding the last three digits in

the docket number field to access the

document. For assistance, call toll-free

1–866–208–3676 or e-mail

FERCOnlineSupport@ferc.gov. For TTY,

call (202) 502–8659. A copy is also

available for inspection and

reproduction at the address in item h

above.

m. Individuals desiring to be included

on the Commission’s mailing list should

so indicate by writing to the Secretary

of the Commission.

n. Competing Preliminary Permit—

Anyone desiring to file a competing

application for preliminary permit for a

proposed project must submit the

competing application itself, or a notice

of intent to file such an application, to

the Commission on or before the

specified comment date for the

particular application (see 18 CFR 4.36).

Submission of a timely notice of intent

allows an interested person to file the

competing preliminary permit

application no later than 30 days after

the specified comment date for the

particular application. A competing

preliminary permit application must

conform with 18 CFR 4.30 and 4.36.

PO 00000

Frm 00041

Fmt 4703

Sfmt 4703

o. Competing Development

Application—Any qualified

development applicant desiring to file a

competing development application

must submit to the Commission, on or

before a specified comment date for the

particular application, either a

competing development application or a

notice of intent to file such an

application. Submission of a timely

notice of intent to file a development

application allows an interested person

to file the competing application no

later than 120 days after the specified

comment date for the particular

application. A competing license

application must conform with 18 CFR

4.30 and 4.36.

p. Notice of Intent—A notice of intent

must specify the exact name, business

address, and telephone number of the

prospective applicant, and must include

an unequivocal statement of intent to

submit, if such an application may be

filed, either a preliminary permit

application or a development

application (specify which type of

application). A notice of intent must be

served on the applicant(s) named in this

public notice.

q. Proposed Scope of Studies Under

Permit—A preliminary permit, if issued,

does not authorize construction. The

term of the proposed preliminary permit

would be 36 months. The work

proposed under the preliminary permit

would include economic analysis,

preparation of preliminary engineering

plans, and a study of environmental

impacts. Based on the results of these

studies, the Applicant would decide

whether to proceed with the preparation

of a development application to

construct and operate the project.

r. Comments, Protests, or Motions to

Intervene—Anyone may submit

comments, a protest, or a motion to

intervene in accordance with the

requirements of Rules of Practice and

Procedure, 18 CFR 385.210, .211, .214.

In determining the appropriate action to

take, the Commission will consider all

protests or other comments filed, but

only those who file a motion to

intervene in accordance with the

Commission’s Rules may become a

party to the proceeding. Any comments,

protests, or motions to intervene must

be received on or before the specified

comment date for the particular

application.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See 18 CFR

385.2001 (a)(1)(iii) and the instructions

on the Commission’s Web site at

http://www.ferc.gov under the

‘‘e-Filing’’ link.

E:\FR\FM\05NON1.SGM

05NON1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.