Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices

and (c) of the Natural Gas Act (NGA)

and Part 157 of the Commission’s

Regulations, for authorization to

abandon and modify certain pipeline

and appurtenant facilities on its 22-inch

North Main Loop Line and for a

certificate of public convenience and

necessity authorizing the construction,

installation, and operation of certain

pipeline facilities on its 24-inch 2nd

Northern Main Loop Line located in

Tuscaloosa County, Alabama, all as

more fully set forth in the application

which is on file with the Commission

and open to public inspection. This

filing is accessible online at http://

www.ferc.gov, using the ‘‘eLibrary’’ link

and is available for review in the

Commission’s Public Reference Room in

Washington, DC. There is an

‘‘eSubscription’’ link on the Web site

that enables subscribers to receive email notification when a document is

added to a subscribed docket(s). For

assistance with any FERC Online

service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

In its application, Southern states that

it is currently involved in an extensive

pipeline integrity program (PIP). As part

of the PIP, Southern has identified for

replacement, certain sections of pipe

which were constructed using a

mechanical coupling methodology. One

of these areas is the North Main Loop

Line from 271.65 to Milepost 281.27

(9.62 miles) located in Tuscaloosa

County, Alabama. Southern proposes to

abandon in place a portion of the North

Main Loop Segment from Milepost

278.48 to Milepost 281.27 (2.79 miles).

Also, Southern proposes to abandon and

remove a portion of the North Main

Loop Segment from Milepost 271.65 to

Milepost 278.48 (6.83 miles). Southern

proposes to install a new 22-inch

mainline gate assembly at Milepost

278.48 and install a new 12-inch blind

flange to close the 12-inch crossover

value at Milepost 281.02. Southern

proposes to install a new 20-inch

crossover connection at the Black

Warrior River West Header at Milepost

281.23 between the 22-inch North Main

Line and the 22-inch North Main Loop

Line. The crossover connection will be

accomplished by installing a new 20inch tap on the 22-inch Northern Main

Line and a short segment of new 20-inch

crossover pipe for connection to the 22inch North Main Loop Line.

Also, Southern requests authority to

extend its 24-inch 2nd North Main Loop

Line, by constructing, installing and

operating 6.83 miles of 24-inch pipeline

from Milepost 148.93 to Milepost 155.75

in Tuscaloosa County, Alabama. This

VerDate Aug<31>2005

15:47 Dec 14, 2006

Jkt 211001

new segment of 24-inch pipeline will be

installed in the current location of the

22-inch pipeline proposed to be

abandoned. Southern stated that the

installation of this segment of the 24inch 2nd North Main Loop Line provide

the sufficient capacity and the level of

service necessary to continue to serve its

existing customers in this area. The cost

of constructing the 2nd North Main

Loop Segment is estimated to be $10.4

million.

Any questions regarding this

application should be directed to

Patrick B. Pope, Vice President and

General Counsel or Patricia S. Francis,

Senior Counsel for Southern, Post Office

Box 2563, Birmingham, Alabama

35202–2563, at (205) 325–7126 or (205)

325–7696, respectively.

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date

stated below, file with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

a motion to intervene in accordance

with the requirements of the

Commission’s Rules of Practice and

Procedure (18 CFR 385.214 or 385.211)

and the Regulations under the NGA (18

CFR 157.10). A person obtaining party

status will be placed on the service list

maintained by the Secretary of the

Commission and will receive copies of

all documents filed by the applicant and

by all other parties. A party must submit

14 copies of filings made with the

Commission and must mail a copy to

the applicant and to every other party in

the proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

comments in opposition to the project

provide copies of their protests only to

the party or parties directly involved in

the protest.

Persons who wish to comment only

on the environmental review of this

project should submit an original and

two copies of their comments to the

Secretary of the Commission.

PO 00000

Frm 00055

Fmt 4703

Sfmt 4703

75529

Environmental commentors will be

placed on the Commission’s

environmental mailing list, will receive

copies of the environmental documents,

and will be notified of meetings

associated with the Commission’s

environmental review process.

Environmental commentors will not be

required to serve copies of filed

documents on all other parties.

However, the non-party commentors

will not receive copies of all documents

filed by other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

Comments, protests and interventions

may be filed electronically via the

Internet in lieu of paper. See 18 CFR

385.2001(a)(1)(iii) and the instructions

on the Commission’s Web site under the

‘‘e-Filing’’ link at http://www.ferc.gov.

The Commission strongly encourages

intervenors to file electronically.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

Comment Date: 5 p.m. eastern

standard time, January 2, 2007.

Magalie R. Salas,

Secretary.

[FR Doc. E6–21413 Filed 12–14–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket Nos. CP07–27–000]

Tuscarora Gas Transmission

Company; Notice of Application

December 8, 2006.

Take notice that on November 30,

2006, Tuscarora Gas Transmission

Company (Tuscarora), 1140 Financial

Blvd. Suite 900 Reno, NV 89502, filed

in Docket No. CP07–27–000, an

application pursuant to Section 7(c) of

the Natural Gas Act (NGA), as amended,

for authorization to construct, install,

own, operate and maintain a new

compressor station and appurtenant

facilities in Modoc County, California to

render up to 40,000 dekatherms per day

of additional firm natural gas

transportation service pursuant to Rate

Schedule FT to Sierra Pacific Power

Company (2008 Expansion Project), all

as more fully set forth in the application

which is on file with the Commission

E:\FR\FM\15DEN1.SGM

15DEN1

mstockstill on PROD1PC61 with NOTICES

75530

Federal Register / Vol. 71, No. 241 / Friday, December 15, 2006 / Notices

and open to public inspection. This

filing may also be viewed on the

Commission’s Web site at http://

www.ferc.gov using the ‘‘eLibrary’’ link.

Enter the docket number, excluding the

last three digits, in the docket number

field to access the document. For

assistance, call (202) 502–8659 or TTY,

(202) 208–3676.

Any questions regarding this

application should be directed to

Gregory L. Galbraith, Tuscarora Gas

Transmission Company, 1140 Financial

Blvd., Suite 900, Reno, NV 89502, or

call (775) 336–3210, or fax (775) 336–

3465 (Facsimile).

There are two ways to become

involved in the Commission’s review of

this project. First, any person wishing to

obtain legal status by becoming a party

to the proceedings for this project

should, on or before the comment date

stated below, file with the Federal

Energy Regulatory Commission, 888

First Street, NE., Washington, DC 20426,

a motion to intervene in accordance

with the requirements of the

Commission’s Rules of Practice and

Procedure (18 CFR 385.214 or 385.211)

and the Regulations under the NGA (18

CFR 157.10). A person obtaining party

status will be placed on the service list

maintained by the Secretary of the

Commission and will receive copies of

all documents filed by the applicant and

by all other parties. A party must submit

14 copies of filings made with the

Commission and must mail a copy to

the applicant and to every other party in

the proceeding. Only parties to the

proceeding can ask for court review of

Commission orders in the proceeding.

However, a person does not have to

intervene in order to have comments

considered. The second way to

participate is by filing with the

Secretary of the Commission, as soon as

possible, an original and two copies of

comments in support of or in opposition

to this project. The Commission will

consider these comments in

determining the appropriate action to be

taken, but the filing of a comment alone

will not serve to make the filer a party

to the proceeding. The Commission’s

rules require that persons filing

comments in opposition to the project

provide copies of their protests only to

the party or parties directly involved in

the protest.

Persons who wish to comment only

on the environmental review of this

project should submit an original and

two copies of their comments to the

Secretary of the Commission.

Environmental commentors will be

placed on the Commission’s

environmental mailing list, will receive

copies of the environmental documents,

VerDate Aug<31>2005

15:47 Dec 14, 2006

Jkt 211001

and will be notified of meetings

associated with the Commission’s

environmental review process.

Environmental commentors will not be

required to serve copies of filed

documents on all other parties.

However, the non-party commentors

will not receive copies of all documents

filed by other parties or issued by the

Commission (except for the mailing of

environmental documents issued by the

Commission) and will not have the right

to seek court review of the

Commission’s final order.

The Commission strongly encourages

electronic filings of comments protests

and interventions via the Internet in lieu

of paper. See 18 CFR 385.2001(a)(1)(iii)

and the instructions on the

Commission’s Web (http://

www.ferc.gov) site under the ‘‘e-Filing’’

link.

Comment Date: December 29, 2006.

Magalie R. Salas,

Secretary.

[FR Doc. E6–21396 Filed 12–14–06; 8:45 am]

BILLING CODE 6717–01–P

need not serve motions to intervene or

protests on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper using the

‘‘eFiling’’ link at http://www.ferc.gov.

Persons unable to file electronically

should submit an original and 14 copies

of the protest or intervention to the

Federal Energy Regulatory Commission,

888 First Street, NE., Washington, DC

20426.

This filing is accessible on-line at

http://www.ferc.gov, using the

‘‘eLibrary’’ link and is available for

review in the Commission’s Public

Reference Room in Washington, DC.

There is an ‘‘eSubscription’’ link on the

Web site that enables subscribers to

receive e-mail notification when a

document is added to a subscribed

docket(s). For assistance with any FERC

Online service, please e-mail

FERCOnlineSupport@ferc.gov, or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–21390 Filed 12–14–06; 8:45 am]

DEPARTMENT OF ENERGY

BILLING CODE 6717–01–P

Federal Energy Regulatory

Commission

[Docket No. RP03–323–012]

DEPARTMENT OF ENERGY

Williston Basin Interstate Pipeline

Company; Notice of Negotiated Rate

Federal Energy Regulatory

Commission

December 8, 2006.

Combined Notice of Filings #1

Take notice that on December 4, 2006,

Williston Basin Interstate Pipeline

Company (Williston Basin), tendered for

filing with the Commission a revised

negotiated Rate Schedule IT–1 Service

Agreement. The proposed effective date

of the revised Service Agreement is

December 2, 2006.

Any person desiring to intervene or to

protest this filing must file in

accordance with Rules 211 and 214 of

the Commission’s Rules of Practice and

Procedure (18 CFR 385.211 and

385.214). Protests will be considered by

the Commission in determining the

appropriate action to be taken, but will

not serve to make protestants parties to

the proceeding. Any person wishing to

become a party must file a notice of

intervention or motion to intervene, as

appropriate. Such notices, motions, or

protests must be filed in accordance

with the provisions of Section 154.210

of the Commission’s regulations (18 CFR

154.210). Anyone filing an intervention

or protest must serve a copy of that

document on the Applicant. Anyone

filing an intervention or protest on or

before the intervention or protest date

PO 00000

Frm 00056

Fmt 4703

Sfmt 4703

December 8, 2006.

Take notice that the Commission

received the following electric corporate

filings:

Docket Numbers: EC07–32–000.

Applicants: ESI Cherokee MGP, Inc.;

ESI Cherokee County, L.P., Caithness

Cherokee GP, LLC; Caithness Cherokee,

LLC.

Description: ESI Cherokee MGP, Inc.

et al. submit a joint application for

authorization to acquire interests in an

electric utility company.

Filed Date: 12/04/2006.

Accession Number: 20061206–0090.

Comment Date: 5 p.m. Eastern Time

on Tuesday, December 26, 2006.

Take notice that the Commission

received the following electric rate

filings:

Docket Numbers: ER04–1232–005.

Applicants: Southwest Power Pool,

Inc.

Description: Southwest Power Pool,

Inc. submits a clean and relined version

of Substitute Seventh Revised Sheet 161

to its OATT pursuant to FERC’s 9/1/06

Order.

Filed Date: 12/04/2006.

E:\FR\FM\15DEN1.SGM

15DEN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.