Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices

Accession Number: 20061218–0139.

Comment Date: 5 p.m. Eastern Time

on Tuesday, January 2, 2007.

Docket Numbers: ER07–322–000.

Applicants: Midwest Independent

Transmission System Operator, Inc.

Description: Midwest Independent

Transmission System Operator, Inc

submits a Facilities Construction

Agreement with Constellation Energy

Commodities Group, Inc et al. Filed

Date: 12/14/2006.

Accession Number: 20061218–0145.

Comment Date: 5 p.m. Eastern Time

on Thursday, January 4, 2007

Any person desiring to intervene or to

protest in any of the above proceedings

must file in accordance with Rules 211

and 214 of the Commission’s Rules of

Practice and Procedure (18 CFR 385.211

and 385.214) on or before 5 p.m. Eastern

time on the specified comment date. It

is not necessary to separately intervene

again in a subdocket related to a

compliance filing if you have previously

intervened in the same docket. Protests

will be considered by the Commission

in determining the appropriate action to

be taken, but will not serve to make

protestants parties to the proceeding.

Anyone filing a motion to intervene or

protest must serve a copy of that

document on the Applicant. In reference

to filings initiating a new proceeding,

interventions or protests submitted on

or before the comment deadline need

not be served on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper, using the

FERC Online links at http://

www.ferc.gov. To facilitate electronic

service, persons with Internet access

who will eFile a document and/or be

listed as a contact for an intervenor

must create and validate an

eRegistration account using the

eRegistration link. Select the eFiling

link to log on and submit the

intervention or protests.

Persons unable to file electronically

should submit an original and 14 copies

of the intervention or protest to the

Federal Energy Regulatory Commission,

888 First St., NE., Washington, DC

20426.

The filings in the above proceedings

are accessible in the Commission’s

eLibrary system by clicking on the

appropriate link in the above list. They

are also available for review in the

Commission’s Public Reference Room in

Washington, DC. There is an

eSubscription link on the Web site that

enables subscribers to receive e-mail

notification when a document is added

to a subscribed dockets(s). For

VerDate Aug<31>2005

20:03 Dec 27, 2006

Jkt 211001

assistance with any FERC Online

service, please e-mail

FERCOnlineSupport@ferc.gov or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–22203 Filed 12–27–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

Combined Notice of Filings #1

December 19, 2006.

Take notice that the Commission

received the following electric corporate

filings:

Docket Numbers: EC07–35–000.

Applicants: Entergy Nuclear

FitzPatrick, LLC; Entergy Nuclear Power

Marketing, LLC.

Description: Entergy Nuclear

Fitzpatrick, LLC and Entergy Nuclear

Power Marketing, LLC submits an

application for authorization to transfer

Power Sales Agreement.

Filed Date: 12/12/2006.

Accession Number: 20061218–0137.

Comment Date: 5 p.m. Eastern Time

on Tuesday, January 2, 2007.

Take notice that the Commission

received the following electric rate

filings

Docket Numbers: ER00–3251–013;

ER99–754–015; ER98–1734–013; ER01–

1919–010; ER01–1147–004; ER01–513–

020; ER99–2404–010

Applicants: Exelon Generating

Company, LLC; AmerGen Energy

Company, LLC; Commonwealth Edison

Company; Exelon Energy Company,

LLC; PECO Energy Company; Exelon

West Medway, LLC; Exelon Wyman,

LLC; Exelon New Boston, LLC; Exelon

Framingham, LLC; Exelon New England

Power Marketing, L.P.

Description: Exelon Generation

Company, LLC et submits a notice of

non-material change in status.

Filed Date: 12/15/2006.

Accession Number: 20061218–0088.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER01–205–016;

ER98–2640–014; ER98–4590–012;

ER99–1610–020; EL05–115–000.

Applicants: Xcel Energy Services Inc.;

Northern States Power Company and

Northern States Power Company

(Wisconsin); Public Service Company of

Colorado; Southwestern Public Service

Company.

Description: Xcel Energy Services, Inc

et al submit a compliance filing in order

PO 00000

Frm 00050

Fmt 4703

Sfmt 4703

78177

to incorporate certain revisions into

their market-based rate tariffs required

by FERC’s 11/9/06 Order.

Filed Date: 12/11/2006.

Accession Number: 20061218–0129.

Comment Date: 5 p.m. Eastern Time

on Tuesday, January 2, 2007.

Docket Numbers: ER01–1385–015.

Applicants: Consolidated Edison

Company of New York.

Description: Ninth Quarterly Report

by NYISO regarding its efforts to

efficiently utilize combined cycle units

in the NYISO markets, under ER04–230,

et al.

Filed Date: 12/15/2006.

Accession Number: 20061215–5019.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER01–1403–005;

ER01–2968–006; ER01–845–005; ER05–

1122–003; ER04–366–004; ER04–372–

006.

Applicants: FirstEnergy Operating

Companies; FirsEnergy Solutions Corp.;

FirstEnergy Generation Corporation;

FirstEnergy Nuclear Generation

Corporation; Jersey Central Power &

Light Company; Metropolitan Edison

Company.

Description: FirstEnergy Operating

Companies et al., submit a non-material

change in status of generation capacity.

Filed Date: 12/12/2006.

Accession Number: 20061218–0126.

Comment Date: 5 p.m. Eastern Time

on Tuesday, January 2, 2007.

Docket Numbers: ER03–821–003.

Applicants: One Nation Energy

Solutions, LLC.

Description: One Nation Energy

Solutions, LLC submits a First Revised

Original Sheet 1 to its FERC Electric

Tariff, Rate Schedule 1st Revised.

Filed Date: 12/15/2006.

Accession Number: 20061218–0086.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER06–451–015.

Applicants: Southwest Power Pool,

Inc.

Description: Southwest Power Pool,

Inc submits revisions to its Open Access

Transmission Tariff, pursuant to the

Commission’s 11/17/06 order.

Filed Date: 12/15/2006.

Accession Number: 20061218–0085.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER06–1094–002.

Applicants: Midwest Independent

Transmission System Operator, Inc.

Description: Midwest Independent

Transmission System Op, Inc. submits

an additional Information and Partial

Waiver Withdrawal request.

Filed Date: 12/13/2006.

Accession Number: 20061213–5054.

E:\FR\FM\28DEN1.SGM

28DEN1

sroberts on PROD1PC70 with NOTICES

78178

Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices

Comment Date: 5 p.m. Eastern Time

on Tuesday, December 26, 2007.

Docket Numbers: ER06–1545–001.

Applicants: Midwest Independent

Transmission System Operator, Inc.

Description: Midwest Independent

Transmission System Operator Inc

submits a compliance filing to confirm

that the current version of the North

American Electric Reliability Council

Transmission Loading Relief are

incorporated in Attachment Q, pursuant

to the Commission’s 11/30/06 order.

Filed Date: 12/13/2006.

Accession Number: 20061218–0138.

Comment Date: 5 p.m. Eastern Time

on Wednesday, January 3, 2007.

Docket Numbers: ER07–64–001.

Applicants: ALLETE, Inc.

Description: ALLETE, Inc submits an

amendment to its 10/23/06 filing to

establish a distribution wheeling rate for

Central MN Ethanol Co-op

interconnection to MP’s distribution

Facilities.

Filed Date: 12/12/2006.

Accession Number: 20061218–0127.

Comment Date: 5 p.m. Eastern Time

on Tuesday, January 2, 2007.

Docket Numbers: ER07–109–002.

Applicants: BTEC Southaven LLC.

Description: BTEC Southaven LLC

submits its Second Substitute Original

Sheet 2 to FERC Electric Tariff, Original

Volume 1.

Filed Date: 12/15/2006.

Accession Number: 20061218–0149.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–110–002.

Applicants: BTEC New Albany LLC.

Description: BTEC New Albany LLC

submits its Second Substitute Original

Sheet 1 et al to FERC Electric Tariff,

Original Volume 1.

Filed Date: 12/15/2006.

Accession Number: 20061218–0150.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–300–001.

Applicants: Connecticut Central

Energy, LLC.

Description: Connecticut Central

Energy, LLC submits Section VII to the

petition of initial rate schedule to

correct the company’s name.

Filed Date: 12/15/2006.

Accession Number: 20061218–0089.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–323–000.

Applicants: Dynegy Power Marketing

Inc.; Dynegy Midwest Generation, Inc.

Description: Dynegy Power Marketing

Inc. et al request waiver of certain

provisions of respective market-based

tariffs so DYPM can make market-based

rate sales, et al.

VerDate Aug<31>2005

20:03 Dec 27, 2006

Jkt 211001

Filed Date: 12/14/2006.

Accession Number: 20061218–0142.

Comment Date: 5 p.m. Eastern Time

on Thursday, January 4, 2007.

Docket Numbers: ER07–324–000.

Applicants: Wisconsin Electric Power

Company; PJM Interconnection, L.L.C.

Description: Wisconsin Electric Power

Co and PJM Interconnection jointly

submits a clean rate schedule sheets of

the Balancing Authority Operations

Coordination Agreement designated as

Rate FERC 117 et al.

Filed Date: 12/15/2006.

Accession Number: 20061218–0128.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–325–000.

Applicants: Allegheny Energy Supply

Gleason Generating Facility, LLC.

Description: Allegheny Energy Supply

Gleason Generating Facility, LLC

submits a notice of cancellation of its

market-based rate tariff.

Filed Date: 12/15/2006.

Accession Number: 20061218–0130.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–326–000.

Applicants: California Independent

System Operator Corporation.

Description: California Independent

System Operator Corporation submits

amendments to its Tariff to reflect Order

676 Waivers.

Filed Date: 12/15/2006.

Accession Number: 20061218–0090.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ER07–327–000.

Applicants: Pacific Gas and Electric

Company.

Description: Pacific Gas and Electric

Company submits revisions to its

Transmission Access Charge Balancing

Account Rate to its Electric Tariff, Sixth

Revised Volume No. 5.

Filed Date: 12/14/2006.

Accession Number: 20061218–0087.

Comment Date: 5 p.m. Eastern Time

on Thursday, January 4, 2007.

Docket Numbers: ER07–328–000.

Applicants: Alcoa Power Generating

Inc.

Description: Alcoa Power Generating

Inc addresses numerous issues

concerning its rate schedule currently

on file.

Filed Date: 12/15/2006.

Accession Number: 20061218–0148.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Take notice that the Commission

received the following electric securities

filings:

Docket Numbers: ES07–11–000.

Applicants: Wolverine Power Supply

Cooperative, Inc.

PO 00000

Frm 00051

Fmt 4703

Sfmt 4703

Description: Wolverine Power Supply

Cooperative, Inc submits an application

for Authorization of the Assumption of

Liabilities pursuant to Section 204(a) of

the FPA.

Filed Date: 12/15/2006.

Accession Number: 20061215–5024.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Docket Numbers: ES07–12–000.

Applicants: Consolidated Edison

Company of New York.

Description: Consolidated Edison

Company of New York submits an

application of requesting authorization

to Issue and Sale of Short-term Debt

pursuant to section 204 of the FPA.

Filed Date: 12/15/2006.

Accession Number: 20061215–5103.

Comment Date: 5 p.m. Eastern Time

on Friday, January 5, 2007.

Any person desiring to intervene or to

protest in any of the above proceedings

must file in accordance with Rules 211

and 214 of the Commission’s Rules of

Practice and Procedure (18 CFR 385.211

and 385.214) on or before 5 p.m. Eastern

time on the specified comment date. It

is not necessary to separately intervene

again in a subdocket related to a

compliance filing if you have previously

intervened in the same docket. Protests

will be considered by the Commission

in determining the appropriate action to

be taken, but will not serve to make

protestants parties to the proceeding.

Anyone filing a motion to intervene or

protest must serve a copy of that

document on the Applicant. In reference

to filings initiating a new proceeding,

interventions or protests submitted on

or before the comment deadline need

not be served on persons other than the

Applicant.

The Commission encourages

electronic submission of protests and

interventions in lieu of paper, using the

FERC Online links at http://

www.ferc.gov. To facilitate electronic

service, persons with Internet access

who will eFile a document and/or be

listed as a contact for an intervenor

must create and validate an

eRegistration account using the

eRegistration link. Select the eFiling

link to log on and submit the

intervention or protests.

Persons unable to file electronically

should submit an original and 14 copies

of the intervention or protest to the

Federal Energy Regulatory Commission,

888 First St., NE., Washington, DC

20426.

The filings in the above proceedings

are accessible in the Commission’s

eLibrary system by clicking on the

appropriate link in the above list. They

are also available for review in the

E:\FR\FM\28DEN1.SGM

28DEN1

Federal Register / Vol. 71, No. 249 / Thursday, December 28, 2006 / Notices

Commission’s Public Reference Room in

Washington, DC. There is an

eSubscription link on the web site that

enables subscribers to receive email

notification when a document is added

to a subscribed dockets(s). For

assistance with any FERC Online

service, please e-mail

FERCOnlineSupport@ferc.gov or call

(866) 208–3676 (toll free). For TTY, call

(202) 502–8659.

Magalie R. Salas,

Secretary.

[FR Doc. E6–22208 Filed 12–27–06; 8:45 am]

BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY

Federal Energy Regulatory

Commission

[Docket No. CP06–433–001]

Northern Natural Gas Company;

Supplemental Notice of Intent To

Prepare an Environmental Assessment

for the Palmyra North Expansion

Project Amendment and Request for

Comments on Environmental Issues

sroberts on PROD1PC70 with NOTICES

December 18, 2006.

The staff of the Federal Energy

Regulatory Commission (FERC or

Commission) will prepare an

environmental assessment (EA) that will

discuss the environmental impacts of

the Palmyra North Expansion Project

involving construction and operation of

new facilities by Northern Natural Gas

Company (Northern) in Nebraska, Iowa,

Kansas, and South Dakota.1 On August

29, 2006, Northern filed an application

with the FERC, in Docket No. CP06–

433–000, for authorization under

sections 7(c) and 7(b) of the Natural Gas

Act (NGA) and Part 157 of the

Commission’s regulations for a

Certificate of Public Convenience and

Necessity (Certificate) to expand the

capacity of its Palmyra North Facilities

(Palmyra). On December 6, 2006,

Northern filed an amendment to their

application with the FERC, in Docket

No. CP06–433–001, for authorization to

include two additional meter stations in

Clay and Sioux Counties, Iowa; the

subject of this Notice. The EA will

encompass all proposed facilities and be

used by the Commission in its decisionmaking process to determine whether

the project is in the public convenience

and necessity.

1 The Commission issued a Notice of Application

on September 6, 2006 for Northern’s August 29,

2006 application. On December 12, 2006, the

Commission issued a Notice of Application for

Northern’s December 6, 2006 amendment.

VerDate Aug<31>2005

20:03 Dec 27, 2006

Jkt 211001

On September 12, 2006, the FERC

issued a Notice of Intent to Prepare an

Environmental Assessment for the

Proposed Palmyra North Expansion

Project and Request for Comments on

Environmental Issues (NOI). The NOI

was published in the Federal Register

and was also mailed to 114 interested

parties, including Federal, State, and

local officials; agency representatives;

conservation organizations; Native

American groups; local libraries and

newspapers; and property owners

affected by the proposed facilities. This

NOI is requesting comments on the two

additional meter stations that Northern

has proposed.

If you are a landowner receiving this

notice, you may be contacted by a

pipeline company representative about

the acquisition of an easement to

construct, operate, and maintain the

proposed facilities. The pipeline

company would seek to negotiate a

mutually acceptable agreement.

However, if the project is approved by

the Commission, that approval conveys

with it the right of eminent domain.

Therefore, if easement negotiations fail

to produce an agreement, the pipeline

company could initiate condemnation

proceedings in accordance with state

law.

A fact sheet prepared by the FERC

entitled ‘‘An Interstate Natural Gas

Facility On My Land? What Do I Need

To Know?’’ was attached to the project

notice Northern provided to

landowners. This fact sheet addresses a

number of typically asked questions,

including the use of eminent domain

and how to participate in the

Commission’s proceedings. It is

available for viewing on the FERC

Internet Web site (http://www.ferc.gov).

Summary of the Proposed Project

Northern proposes to expand the

capacity of its Palmyra North Facilities

in Clay and Sioux Counties, Iowa in

order to transport an additional 12,100

dekatherms per day of natural gas in

order to meet agricultural and ethanol

customer demand and to increase

incremental winter peak day service. By

this Application Amendment, Northern

seeks authority to also:

• Install a new meter station to an

existing Northern line at MP 21.9 in

Clay County, Iowa; and

• install a new meter station to an

existing Northern line at MP 28.3 in

Sioux County, Iowa.

Two nonjurisdictional facilities, a

new ethanol plant and an ethanol plant

expansion, have been proposed in

association with the Palmyra North

Expansion Project. We have made a

preliminary decision to not address the

PO 00000

Frm 00052

Fmt 4703

Sfmt 4703

78179

impacts of these facilities. We will

briefly describe their location and

summarize the status of state and local

environmental reviews in the EA.

The general location of the project

facilities is shown in Appendix 1.2

Land Requirements for Construction

Construction of the proposed facilities

would impact about 1.8 acres of land.

Following construction, approximately

0.4 acre of new land would be

maintained for operation. The

remaining 1.4 acres of land would be

restored and allowed to revert to its

former use.

The EA Process

The National Environmental Policy

Act (NEPA) requires the Commission to

take into account the environmental

impacts that could result from an action

whenever it considers the issuance of a

Certificate of Public Convenience and

Necessity. NEPA also requires us to

discover and address concerns the

public may have about proposals. This

process is referred to as ‘‘scoping.’’ The

main goal of the scoping process is to

focus the analysis in the EA on the

important environmental issues. By this

Notice of Intent, the Commission staff

requests public comments on the scope

of the issues to address in the EA. All

comments received are considered

during the preparation of the EA. State

and local government representatives

are encouraged to notify their

constituents of this proposed action and

encourage them to comment on their

areas of concern.

In the EA, we 3 will discuss impacts

that could occur as a result of the

construction and operation of the

proposed project under these general

headings:

• Soils.

• Land Use.

• Water Resources and Wetlands.

• Cultural Resources.

• Vegetation and Wildlife.

We will also evaluate possible

alternatives to the proposed project, and

make recommendations on how to

lessen or avoid impacts on the various

resource areas.

Our independent analysis of the

issues will be in the EA. Depending on

2 The appendices referenced in this notice are not

being printed in the Federal Register. Copies of all

appendices, other than Appendix 1 (maps), are

available on the Commission’s Web site at the

‘‘eLibrary’’ link or from the Commission’s Public

Reference Room, 888 First Street, NE., Washington,

DC 20426, or call (202) 502–8371. For instructions

on connecting to eLibrary, refer to the last page of

this notice. Copies of the appendices were sent to

all those receiving this notice in the mail.

3 ‘‘We’’, ‘‘us’’, ‘‘our’’ refer to the environmental

staff of the Office of Energy Projects (OEP).

E:\FR\FM\28DEN1.SGM

28DEN1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.