Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.38s
Limiting Authorizations To Proceed With Construction Activities Pending Rehearing
Federal Register · Rule · May 13, 2021
Notably, no commenters appear to argue that authorizations to proceed with construction should be allowed during the 30-day rehearing period following a Commission order issuing or amending a section 7 … Often this involves finalizing the pipeline route, completing Endangered Species Act or National Historic Preservation Act consultation, and/or obtaining state certifications under the Clean Water Act
86 FR 26150Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Jun 21, 1994
Following this scoping period, the Department will issue an Implementation Plan which will describe, among other things, the scope of the PEIS, the alternatives that will be analyzed, and the schedule … To ensure consideration of comments in preparing the draft PEIS, written comments must be postmarked by October 17, 1994. Late comments will be considered to the extent practicable.
Energy DepartmentFederal Register · Notice · Dec 26, 2007
Description: Avista Corp submits a clean version and a blackline version of Substitute Original Sheet 1-21 of their FERC Electric Tariff, Seventh Revised Volume 9. … Description: Bicent (California) Malburg LLC submits an application for approval under section 204 of the Federal Power Act and request for expedited consideration.
72 FR 73016Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 8, 2009
Description: Application for Authorization Under Section 203 of the Federal Power Act, Request for Waivers of Filing Requirements and Expedited Treatment of Application of PPL Shoreham Energy, LLC, … Comment Date: 5 p.m. Eastern Time on Thursday, April 16, 2009. Docket Numbers: ER06-743-002. Applicants: Air Liquide Large Industries U.S. LP.
74 FR 15961Energy DepartmentFederal Energy Regulatory CommissionERI Enterprises, L.L.C., et al. Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Dec 31, 1998
The PX also proposes several clarifying or clean-up changes. … Watson, Jr., Acting Secretary. [FR Doc. 98-34588 Filed 12-30-98; 8:45 am] BILLING CODE 6717-01-P
63 FR 72303Energy DepartmentFederal Energy Regulatory CommissionNorth American Energy Services Company, et al. Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Nov 7, 1996
CMS Ensenada S.A. is currently constructing a 128 megawatt natural gas-fired electric co- generation facility on the grounds of a refinery owned by YPF S.A. in Ensenada, province of Buenos Aires, Argentina … ER96-2573-002] Take notice that on October 25, 1996, Southern Company Services, Inc. acting on behalf of Georgia Power Company has filed a Service Agreement by and among itself, as agent for Georgia
61 FR 57667Energy DepartmentEnergy Conservation Program: Test Procedures for Distribution Transformers
Federal Register · Rule · Apr 27, 2006
On June 23, 1999, the Department reopened the comment period on the 1998 proposed rule, 64 FR 33431, (the “1999 reopening notice”) to provide an opportunity for additional public comment on the following … Make temperature measurements in protected areas where the air temperature is stable and there are no drafts.
71 FR 24972Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Jan 5, 2010
proposed information collection described in this notice, as required by the Paperwork Reduction Act of 1995. … The Energy Policy Act of 1992 (EPACT 1992) and the Energy Policy Act of 2005 (EPACT 2005) amended EPCA and included new standards and test procedures for additional consumer products and commercial and
75 FR 676Energy DepartmentCommission Information Collection Activities, Proposed Collection; Comment Request; Extension
Federal Register · Notice · Mar 7, 2007
compare each fuel type by quality determinants, in the study of developments in fuel supply which may affect the reliability of electric service, (2) in environmental improvement programs for the different air … Statutory Authority: Statutory provisions of sections 205 (a) and (e) of the Federal Power Act, 16 U.S.C. 824d. Magalie R. Salas, Secretary. [FR Doc.
72 FR 10191Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 9, 2024
Description: Form 556 of Eco Green Generation LLC [Kalaeloa Clean Energy]. Filed Date: 2/5/24. Accession Number: 20240205-5018. Comment Date: 5 p.m. ET 2/26/24. … Reese, Acting Secretary. [FR Doc. 2024-02723 Filed 2-8-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 9144Energy DepartmentFederal Energy Regulatory CommissionEl Paso Natural Gas Co., et al.; Natural Gas Certificate Filings
Federal Register · Uncategorized Document · Feb 14, 1994
SoCalGas says that these customers presently use propane-air, liquefied petroleum gas, diesel fuel, high sulfur fuel oil and other petroleum products. … SoCalGas says that the replacement of these products by natural gas will result in a reduction in air pollution in the U.S.-Mexico border area.
Energy DepartmentFederal Register · Proposed Rule · Jun 4, 2021
Life-Cycle Cost and Payback Period Analysis 3. Manufacturer Impact Analysis III. Submission of Comments I. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
86 FR 29954Energy DepartmentFederal Register · Notice · Oct 16, 2012
Location: At the confluence of Sweetheart Creek and Gilbert Bay, about 30 air miles and 33 nautical miles southeast of the City of Juneau, Alaska. … Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O.
77 FR 63301Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 24, 2014
(Archon) filed and amended, respectively, an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the proposed Purisima Point Wave … For a simpler method of submitting text only comments, click on “Quick Comment.”
79 FR 10141Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 6, 2014
Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Waivers and Expedited Action of Grays Harbor Energy LLC. Filed Date: 7/29/14. … Description: 2014-07-30 Attachment P GFA Clean-up to be effective 9/29/2014. Filed Date: 7/30/14. Accession Number: 20140730-5045. Comments Due: 5 p.m. ET 8/20/14.
79 FR 45793Energy DepartmentFederal Energy Regulatory CommissionNotice of Cases Filed During the Week of June 24 Through July 1, 1994
Federal Register · Uncategorized Document · Sep 7, 1994
All such comments shall be filed with the Office of Hearings and Appeals, Department of Energy, Washington, DC 20585. Dated: August 30, 1994. Thomas O. … Mann, Acting Director, Office of Hearings and Appeals.
Energy DepartmentHearings and Appeals Office, Interior DepartmentEI Services Canada Limited, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Uncategorized Document · Mar 14, 1994
, ventilating and air conditioning company. … Watson, Jr., Acting Secretary. [FR Doc. 94-5830 Filed 3-11-94; 8:45 am] BILLING CODE 6717-01-P
Energy DepartmentFederal Register · Notice · Jul 17, 1996
DATES: The public scoping period begins with the publication of this NOI and will continue until August 16, 1996. … Potential impacts on soil, water, and the air. 3. Sensitive Environmental Resources.
61 FR 37247Energy DepartmentEnergy Conservation Program: Test Procedure for Electric Motors
Federal Register · Proposed Rule · Jun 3, 2020
a representative average use cycle or period of use. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
85 FR 34111Energy DepartmentFederal Register · Notice · Sep 27, 2016
The draft EIS assesses the potential environmental effects of the construction and operation of the MVP and EEP in accordance with the requirements of the National Environmental Policy Act (NEPA). … regulation stations and interconnections (Mobley, Sherwood, WB, and Transco); • 2 new taps (Webster and Roanoke); • 5 pig 1 launchers and receivers; and 1 A “pig” is a device used to clean
81 FR 66268Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.