DEPARTMENT OF ENERGY

[Docket No. EG97-5-000, et al.]

North American Energy Services Company, et al. Electric Rate and

Corporate Regulation Filings

October 31, 1996.

Take notice that the following filings have been made with the

Commission:

1. North American Energy Services Company

[Docket No. EG97-5-000]

Take notice that on October 21, 1996, North American Energy

Services Company, a Washington corporation, 999 Lake Drive, Suite 310,

Issaquah, Washington 98027 (the ``Applicant''), filed with the Federal

Energy Regulatory Commission an application for determination of exempt

wholesale generator (EWG) status pursuant to Part 365 of the

Commission's regulations.

The Applicant will be engaged in managing daily operations and

maintenance of eligible facilities to be constructed in Argentina: the

77 MW Central Termica Patagonia power plant located near Comodoro

Rivadavia, Argentina, consisting of two General Electric Frame-6 simple

cycle gas turbine-generator sets and associated equipment and real

estate. The turbines are natural gas-fired only.

Comment date: November 22, 1996, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application

2. Jorf Lasfar Energy Company SCA

[Docket No. EG97-6-000]

On October 23, 1996, Jorf Lasfar Energy Company SCA

(``Applicant''), with its principal office at c/o CMS Generation Co.,

Fairlane Plaza South, 330 Town Center Drive, Suite 1000, Dearborn,

Michigan 48126, filed with the Federal Energy Regulatory Commission an

application for determination of exempt wholesale generator status

pursuant to Part 365 of the Commission's regulations.

Applicant states that it is a company in the process of formation

under the laws of Morocco, and will operate two existing 330 MW coal-

fired units and construct and operate two additional 348 MW units.

Electric energy produced by the Facility will be sold at wholesale to

the state-owned Office National de l'Electricite. In no event will any

electric energy be sold to consumers in the United States.

Comment date: November 22, 1996, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application.

3. CMS Ensenada S.A.

[Docket No. EG97-7-000]

On October 29, 1996, CMS Ensenada S.A., Alsina 495, piso 5 (1087),

Capital Federal, Buenos Aires, Argentina, filed with the Federal Energy

Regulatory Commission an application for determination of exempt

wholesale generator status pursuant to Part 365 of the Commission's

regulations.

CMS Ensenada S.A. is a subsidiary of CMS Generation Co., a Michigan

corporation, which is a wholly-owned indirect subsidiary of CMS Energy

Corporation, also a Michigan corporation. CMS Ensenada S.A. is

currently constructing a 128 megawatt natural gas-fired electric co-

generation facility on the grounds of a refinery owned by YPF S.A. in

Ensenada, province of Buenos Aires, Argentina.

Comment date: November 22, 1996, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration

[[Page 57668]]

of comments to those that concern the adequacy or accuracy of the

application.

4. P.H. Don Pedro, S.A.

[Docket No. EG97-8-000]

On October 29, 1996, P.H. Don Pedro, S.A., a corporation (sociedad

anonima) organized under the laws of Costa Rica (``Applicant''), with

its principal place of business at Santo Domingo de Heredia del Hotel

Bouganville 200 Mts. al Este de la Iglesia Catolica (Primera Entrada

Porton con Ruedas de Artilleria) Heredia, Costa Rica, filed with the

Federal Energy Regulatory Commission an application for determination

of exempt wholesale generator status pursuant to Part 365 of the

Commission's regulations.

Applicant intends to own and operate an approximately 14 megawatt

(net), hydroelectric power production facility located in the District

of Sarapiqui, Canton of Alajuela, Province of Alajuela, Costa Rica.

Comment date: November 22, 1996, in accordance with Standard

Paragraph E at the end of this notice. The Commission will limit its

consideration of comments to those that concern the adequacy or

accuracy of the application.

5. Wholesale Power Services, Inc. Koch Power Services, Inc. Proven

Alternatives, Amoco Energy Trading Corporation, Entergy Power Marketing

Corp., Questar Energy Trading Company, SCANA Energy Marketing, Inc.

[Docket Nos. ER93-730-004, ER95-218-007, ER95-473-006, ER95-1359-005,

ER95-1615-004, ER96-404-003, ER96-1086-002 (not consolidated)]

Take notice that the following informational filings have been made

with the Commission and are on file and available for inspection and

copying in the Commission's Public Reference Room:

On October 23, 1996, Wholesale Power Services, Inc. filed certain

information as required by the Commission's September 22, 1995, order

in Docket No. ER93-730-000.

On October 29, 1996, Koch Power Services, Inc. filed certain

information as required by the Commission's January 4, 1995, order in

Docket No. ER95-218-000.

On October 28, 1996, Proven Alternatives filed certain information

as required by the Commission's March 29, 1995, order in Docket No.

ER95-473-000.

On October 29, 1996, Amoco Energy Trading Corporation filed certain

information as required by the Commission's November 29, 1995, order in

Docket No. ER95-1359-000.

On October 28, 1996, Entergy Power Marketing Corp. filed certain

information as required by the Commission's February 14, 1996, order in

Docket No. ER95-1615-000.

On October 29, 1996, SCANA Energy Marketing, Inc. filed certain

information as required by the Commission's May 13, 1996, order in

Docket No. ER96-1086-000.

On October 23, 1996, Questar Energy Trading filed certain

information as required by the Commission's January 29, 1996, order in

Docket No. ER96-404-000.

6. InterCoast Power Marketing Company, Rainbow Energy Marketing

Corporation, Electrade Corporation, JPower, Vantus Power Services,

Bonneville Fuels Management Corp., Power Providers, Inc.

[Docket Nos. ER94-6-005, ER94-1061-010, ER94-1478-009, ER95-1421-006,

ER95-1614-007, ER96-659-003, ER96-2303-001 (not consolidated)]

Take notice that the following informational filings have been made

with the Commission and are on file and available for inspection and

copying in the Commission's Public Reference Room:

On October 28, 1996, InterCoast Power Marketing Company filed

certain information as required by the Commission's June 10, 1994,

order in Docket No. ER94-6-000.

On October 28, 1996, Rainbow Energy Marketing Corporation filed

certain information as required by the Commission's June 10, 1994,

order in Docket No. ER94-1061-000.

On October 28, 1996, Electrade Corporation filed certain

information as required by the Commission's August 25, 1994, order in

Docket No. ER94-1478-000.

On October 24, 1996, JPower filed certain information as required

by the Commission's August 25, 1995, order in Docket No. ER95-1421-000.

On October 25, 1996, Vantus Power Services filed certain

information as required by the Commission's October 20, 1995, order in

Docket No. ER95-1614-000.

On October 25, 1996, Bonneville Fuels Management Corp. filed

certain information as required by the Commission's February 28, 1996,

order in Docket No. ER96-659-000.

On October 28, 1996, Power Providers, Inc. filed certain

information as required by the Commission's September 3, 1996, order in

Docket No. ER96-2303-000.

7. Vitol Gas and Electric, L.L.C. NorAm Energy Services, Inc. Phibro

Inc. El Paso Energy Marketing Company Heath Petra Resources, Inc.

LISCO, Inc. Mid-American Power, LLC

[Docket Nos. ER94-155-015, ER94-1247-011, ER95-430-007, ER96-118-005,

ER96-381-004, ER96-1406-001, ER96-1858-002 (not consolidated)]

Take notice that the following informational filings have been made

with the Commission and are on file and available for inspection and

copying in the Commission's Public Reference Room:

On October 28, 1996, Vitol Gas and Electric, L.L.C. filed certain

information as required by the Commission's January 14, 1994, order in

Docket No. ER94-155-000.

On October 25, 1996, NorAm Energy Services, Inc. filed certain

information as required by the Commission's July 25, 1994, order in

Docket No. ER94-1247-000.

On October 24, 1996, Phibro Inc. filed certain information as

required by the Commission's June 9, 1995, order in Docket No. ER95-

430-000.

On October 25, 1996, El Paso Energy Marketing Company filed certain

information as required by the Commission's November 28, 1995, order in

Docket No. ER96-118-000.

On October 25, 1996, Heath Petra Resources, Inc. filed certain

information as required by the Commission's December 20, 1995, order in

Docket No. ER96-381-000.

On October 21, 1996, LISCO, Inc. filed certain information as

required by the Commission's June 10, 1996, order in Docket No. ER96-

1406-000.

On October 25, 1996, Mid-American Power, LLC filed certain

information as required by the Commission's June 16, 1996, order in

Docket No. ER96-1858-000.

8. Tenaska Power Services Company Energy Source Power, Inc. Southern

Energy Marketing, Inc. J Power J.D. Loock & Associates Energyonline,

Inc. Paragon Gas Marketing

[Docket Nos. ER94-389-009, ER94-1168-010, ER95-976-006, ER95-1421-005,

ER95-1826-003, ER96-138-002, ER96-380-004 (not consolidated)]

Take notice that the following informational filings have been made

with the Commission and are on file and available for inspection and

copying in the Commission's Public Reference Room:

On October 25, 1996, Tenaska Power Services Company filed certain

information as required by the Commission's May 26, 1994, order in

Docket No. ER94-389-000.

[[Page 57669]]

On October 16, 1996, Energy Source Power, Inc. filed certain

information as required by the Commission's July 8, 1994, order in

Docket No. ER94-1168-000.

On October 25, 1996, Southern Energy Marketing, Inc. filed certain

information as required by the Commission's September 29, 1995 order in

Docket No. ER95-976-000.

On October 21, 1996, JPower filed certain information as required

by the Commission's August 25, 1995 order in Docket No. ER95-1421-000.

On October 21, 1996, J.D. Loock & Associates filed certain

information as required by the Commission's October 27, 1995 order in

Docket No. ER95-1826-000.

On October 21, 1996, Energyonline, Inc. filed certain information

as required by the Commission's January 5, 1996 order in Docket No.

ER96-138-000.

On October 25, 1996, Paragon Gas Marketing filed certain

information as required by the Commission's December 20, 1995 order in

Docket No. ER96-380-000.

9. Florida Power & Light Company

[Docket Nos. ER96-495-001 and ER96-1001-001]

Take notice that on October 23, 1996, Florida Power & Light Company

(FPL), filed a refund report in the above-captioned dockets.

Comment date: November 14, 1996, in accordance with Standard

Paragraph E at the end of this notice.

10. Southern Company Services, Inc.

[Docket No. ER96-2573-002]

Take notice that on October 25, 1996, Southern Company Services,

Inc. acting on behalf of Georgia Power Company has filed a Service

Agreement by and among itself, as agent for Georgia Power company and

the City of Hampton, Georgia pursuant to which Georgia Power will make

wholesale power sales to the City of Hampton for a term in excess of

one (1) year. This filing is submitted in compliance with the letter

order issued in this proceeding by the Federal Energy Regulatory

Commission on September 25, 1996. Southern Company Services, Inc., 76

FERC para. 61,321 (1996).

Comment date: November 14, 1996, in accordance with Standard

Paragraph E at the end of this notice.

11. Central Louisiana Electric Company

[Docket No. ER96-2677-001]

Take notice that on October 21, 1996, Central Louisiana Electric

Company tendered for filing its compliance filing in the above-

referenced docket.

Comment date: November 14, 1996, in accordance with Standard

Paragraph E at the end of this notice.

12. PECO Energy Company

[Docket No. ER96-2883-000]

Take notice that on September 20, 1996, PECO Energy Company filed a

request to withdraw the filing of a letter dated August 2, 1996 in this

docket.

Comment date: November 14, 1996, in accordance with Standard

Paragraph E at the end of this notice.

13. Louisville Gas and Electric Company

[Docket No. ER97-141-000]

Take notice that on October 21, 1996, Louisville Gas and Electric

Company (LG&E) tendered for filing a correction to its initial filing

of October 8, 1996, in the above-cited docket.

Comment date: November 14, 1996, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraph

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,

in accordance with Rules 211 and 214 of the Commission's Rules of

Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 96-28643 Filed 11-06-96; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

North American Energy Services Company, et al. Electric Rate and Corporate Regulation Filings · 61 FR 57667 | Frix