§ 3861.1-1 Application for survey.

FederalRegulations

Ask Donna

How this section applies to your facts.

Title 43—Public Lands: Interior > Subtitle B—Regulations Relating to Public Lands > CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR > SUBCHAPTER C—MINERALS MANAGEMENT (3000) > PART 3860—MINERAL PATENT APPLICATIONS > Subpart 3861—Surveys and Plats

This text was captured on Sep 22, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

The claimant is required, in the first place, to have a correct survey of his claim made under authority of the proper cadastral engineer, such survey to show with accuracy the exterior surface boundaries of the claim, which boundaries are required to be distinctly marked by monuments on the ground. He is required to have a correct survey where patent is applied for and where the mining claim is in vein or lode formation, or covers lands not surveyed in accordance with the U.S. system of rectangular surveys, or where the mining claim fails to conform with the legal subdivisions of the federal surveys. Application for authorization of survey should be made to the appropriate land office (see § 1821.2-1 of this chapter).

[Circ. 2220, 31 FR 16785, Dec. 31, 1966]

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.