Ch. 14, § 3. Public Notice of Blasting Schedule
WyomingRegulations
Ask Donna
How this section applies to your facts.
Wyoming Administrative Code › Agency 020 Environmental Quality, Dept. of › Program 0007 Land Quality - Non Coal › Chapter 14 Blasting for Noncoal Surface Mining Operations › § 3
Text
(a) At least 30 days, but not more than 180 days before beginning a blasting program and for all existing permits, in which more than five pounds of explosives or blasting agent are detonated, the permittee shall publish a blasting schedule in a newspaper of general circulation in the locality of the proposed site. The blasting schedule shall be republished when there are changes to the blasting schedule. Copies of the schedule shall be distributed by mail to local governments, public utilities and to each residence or owner of a man-made dwelling or structure within one-half mile of the blasting sites described in the schedule. The residents or owners within one-half mile shall also be notified of the manner for requesting a preblasting survey. Blasting schedules shall identify as accurately as possible the location of the blasting sites and the time periods when blasting will occur. The blasting schedule shall contain at a minimum:
(i) Name, address and telephone number of the operator;
(ii) Identification of the specific areas in which blasting will take place;
(iii) Dates and time periods when explosives are to be detonated;
(iv) Methods to be used to control access to the blasting area; and
(v) Types and patterns of audible warnings and all-clear signals to be used before and after blasting.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.