Section 935.35  Permits

a)         General. Section 8 of the Act requires that the applicant

submit plans to the Department and obtain a construction permit from the

Department prior to the construction of a new migrant labor camp or a major

alteration or major extension to an existing migrant labor camp.  (B)

b)         Plans. Two sets of plans showing the following information

shall be submitted to the Department by the applicant to obtain a construction

permit:

1)         Identification of the migrant labor camp involved and the

person or organization preparing the drawings and specifications.

2)         A statement describing the scope of the work proposed and the

anticipated time schedule.

3)         A plan showing location of all structures and improvements.

4)         Drawings and/or specifications for proposed buildings or

structures that include all structural components and material specifications.

5)         Detailed drawings and specifications of proposed potable water

source and distribution system, and a general drawing showing distances between

components of the potable water system and sources of potential contamination.

6)         Detailed drawings and specifications of proposed sewage system

construction, a general arrangement drawing showing distances between

components of the sewage system and potable water systems or bodies of surface

water, and data showing estimated volume of sewage flow and soil percolation

rates for absorption fields.  When a permit has been obtained or applied for

from the Environmental Protection Agency or a unit of local government for construction

of a sewage disposal system, a copy of the permit or permit application shall

be submitted.

7)         Detailed drawings and specifications for proposed food service

establishment construction showing interior construction of the building,

floors, walls and ceiling, as well as details of food handling equipment to be

installed

l Protection Agency or a unit of local government for construction

of a sewage disposal system, a copy of the permit or permit application shall

be submitted.

7)         Detailed drawings and specifications for proposed food service

establishment construction showing interior construction of the building,

floors, walls and ceiling, as well as details of food handling equipment to be

installed.

8)         Drawings of proposed electrical distribution system

construction showing general arrangement, size and type of wiring, method of

grounding, over-current protection and type of equipment.

9)         Drawings of proposed sewer and water piping within buildings

showing size and location of piping, fittings, and fixtures, as well as

materials of construction, in accordance with the Illinois Plumbing Code (77

Ill. Adm. Code 890).

10)         The maximum number of persons intended to occupy any new or

remodeled housing unit shall be specified. This figure shall not exceed the

capacity of the water and sewage systems provided.

c)         Flood Hazard. Prior to the issuance of a construction permit,

the permit applicant shall submit a completed "Special Flood Hazard Area

Request Form" provided by the Department. If the site is within a Special

Flood Hazard Area, the applicant shall forward to the Illinois Department of

Natural Resources the plans for the project.  No project to be located in a

Special Flood Hazard Area shall be issued a permit without a statement or a

copy of the statement from the Department of Natural Resources that the

construction complies with the requirements of Executive Order 79-4 dated May

31, 1979. Construction of such items as water wells, septic tanks, underground

utilities, light poles, pavilions, playground equipment, sidewalks and

driveways as specified in Statewide Permit Number 6 issued by the Illinois

Department of Natural Resources, May 13, 1983 are exempt from the above

requirements.  (C)

d)         Local Approval

th the requirements of Executive Order 79-4 dated May

31, 1979. Construction of such items as water wells, septic tanks, underground

utilities, light poles, pavilions, playground equipment, sidewalks and

driveways as specified in Statewide Permit Number 6 issued by the Illinois

Department of Natural Resources, May 13, 1983 are exempt from the above

requirements.  (C)

d)         Local Approval. Prior to construction of a new camp, major

alteration or major extension of an existing camp, permits and zoning approval

required by local health departments and zoning boards as well as other

governmental units having jurisdiction shall be obtained by the permit

applicant.  (C)

e)         Existing Facilities. A permit is not required when existing

facilities are utilized for a migrant labor camp. Plans indicating the general

location of all structures and utilities shall be submitted to the Department.

The existing facilities will be inspected by the Department for compliance with

this Part. Any violations identified during the inspection of the facilities

shall be corrected, and the facilities shall be brought into essential

compliance with this Part prior to the issuance of a license.  (C)

f)         Repairs. A permit is not required to repair a facility in a

licensed migrant labor camp or to correct a violation of this Part when such

repair or correction is made to an existing facility and does not result in

expansion of any existing appurtenance or structure.

g)         Minor Extension and Alterations. Construction at a migrant

labor camp less than a major extension or major alteration shall not require a

permit. However, prior to initiating construction, the applicant shall advise

in writing the regional office of the Department which serves the camp of the

scope of the alteration.  (C)

h)         EPA Approval

y existing appurtenance or structure.

g)         Minor Extension and Alterations. Construction at a migrant

labor camp less than a major extension or major alteration shall not require a

permit. However, prior to initiating construction, the applicant shall advise

in writing the regional office of the Department which serves the camp of the

scope of the alteration.  (C)

h)         EPA Approval. The construction of all community water supply

systems and those surface discharge sewage disposal systems with flows greater

than 1,500 gallons per day requires a construction permit from the Illinois

Environmental Protection Agency.  (C)

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.