Section 214.603 Emission Limitations

IllinoisRegulations

Ask Donna

How this section applies to your facts.

Illinois Administrative Code › Title 35 › › Part › Section 214.603 Emission Limitations

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

TITLE 35: ENVIRONMENTAL PROTECTION

SUBTITLE B: AIR POLLUTION

CHAPTER I: POLLUTION CONTROL BOARD

SUBCHAPTER c: EMISSION STANDARDS AND LIMITATIONS FOR STATIONARY SOURCES

PART 214 SULFUR LIMITATIONS

SECTION 214.603 EMISSION LIMITATIONS

Section

214.603  Emission Limitations

The owner

or operator of a source must comply with the following emission limitations, as

applicable, expressed in terms of pounds of SO

2

emitted per clock

hour.

a)         Aventine Renewable

Energy                                      lb/hr

1)         Cyclone East controlling

First                        0.27

Germ

Drying System

2)         Cyclone West controlling

First                       0.37

Germ

Drying System

3)         Second Germ Drying

System                         0.01

4)         Gluten Dryer 4                                                3.12

5)         Gluten Dryer 9                                                10.50

6)         Germ Dryer 1                                                  4.98

7)         Germ Dryer 3                                                  4.26

8)         Yeast Dryer                                                     1.50

9)         Scrubber controlling

Steep                             1.79

Acid

Tower

10)         Biogas Flare                                                    0.001

11)        Boiler A                                                          0.00

12)        Boiler B                                                          0.00

13)        Boiler C                                                          0.00

b)         Illinois

Power Resources Generating

E.D

1.79

Acid

Tower

10)         Biogas Flare                                                    0.001

11)        Boiler A                                                          0.00

12)        Boiler B                                                          0.00

13)        Boiler C                                                          0.00

b)         Illinois

Power Resources Generating

E.D. Edwards                                                             lb/hr

1)         Units 1 and 2 combined                                  2100.00

2)         Unit

3                                                              2756.00

3)         Unit

3, if both Units 1 and 2                           4000.00

permanently

shut down

c)         Ingredion Bedford Park                                              lb/hr

1)         Feed Transport System                                   24.38

2)         Wet Milling: Inside

In-Process                       107.26

Tanks

3)         Wet Milling: Molten

Sulfur Burner                7.01

and

Absorption System

4)         Wet Milling: Outside

In-Process                    2.69

Tanks

5)         Germ Processing Facility

Channel 1              13.36

System

6)         Germ Processing Facility

Channel 2              7.07

System

7)         Germ Processing Facility

Channel 3              7.07

System

8)         Germ Processing Facility

Channel 4              7.07

System

d)         Midwest Generation

Joliet                                          lb/hr

1)         Joliet 9: Unit 6                                                189.82

2)         Joliet 29: Unit 7                                              323.29

3)         Joliet 29: Unit 8                                              342.15

e)         Midwest Generation

Powerton                                   lb/hr

1)         Boilers 51, 52 (Unit 5)

and 61, 62                  3452.00

(Unit 6) combined

2)         The owner or operator

must comply with the emission limitation set forth in subsection (e)(1) on a

30-operatin

323.29

3)         Joliet 29: Unit 8                                              342.15

e)         Midwest Generation

Powerton                                   lb/hr

1)         Boilers 51, 52 (Unit 5)

and 61, 62                  3452.00

(Unit 6) combined

2)         The owner or operator

must comply with the emission limitation set forth in subsection (e)(1) on a

30-operating day rolling average basis.  For purposes of this Subpart, an

operating day is a

calendar day in which any emission

unit addressed in subsection

(e)(1)

combusts

any fuel;

3)         Within 24 hours after

the end of each averaging period, the owner or operator must use the following

equation to determine the combined SO

2

emission rate of the emission

units addressed in subsection (e)(1) for each averaging period, which concludes

at the end of each operating day.  The SO

2

emission rate must not

exceed the limitation set forth in subsection (e)(1):

Where:

E

avg

=   SO

2

emission rate for the averaging period, in lb/hr.

E

h

=     SO

2

emission rate for stack operating hour "h" in the averaging period.

For purposes of this Subpart, a stack operating hour is a clock hour in which

valid data is obtained, and in which gases flow through the monitored stack or

duct for the emission units addressed in subsection (e)(1) (either for part of

the hour or for the entire hour) while at least one of the units is combusting

fuel.

n =       Number of

stack operating hours in the averaging period in which valid data is obtained.

4)         The SO

2

emission rate for the emission units addressed in subsection (e)(1) must not

exceed 6,000 lb/hr in more than 5% of the stack operating hours ("n"

in the equation in subsection (e)(3)) in any averaging period

the entire hour) while at least one of the units is combusting

fuel.

n =       Number of

stack operating hours in the averaging period in which valid data is obtained.

4)         The SO

2

emission rate for the emission units addressed in subsection (e)(1) must not

exceed 6,000 lb/hr in more than 5% of the stack operating hours ("n"

in the equation in subsection (e)(3)) in any averaging period.

f)         Midwest

Generation Will County                                          lb/hr

1)         Unit 3                                                                          145.14

2)         Unit 4                                                                          5000.00

g)         Owens Corning                                                                       lb/hr

1)         Preheater Incinerator

System 1, including                 44.69

emissions

from: Storage Tanks 9, 9A, 10,

10A,

11, 17, 18, 19, 20, 40, 41, 42, and 43;

Loading

Racks 1, 2, and 9; and Convertors

10

and 11

2)         Preheater

Incinerator System 3, including                  27.23

emissions

from: Converters 8, 9, 12,

13,

14, and 15; and Loading Racks 1, 2,

and

9

3)         Regenerative Thermal

Oxidizer 3                              4.33

controlling:

Storage Tanks 27, 28, 31,

32,

33, 34, 35, and 36

4)         Regenerative Thermal

Oxidizer 4                              6.38

controlling:

Storage Tank 98; Loading

Rack

PV1

5)         Coating Operations

combined                                                0.15

h)         Oxbow Midwest Calcining                                                     lb/hr

All

Calcining Units combined                                                187.00

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.