Section 020. Fees And Compensation

IdahoRegulations

Ask Donna

How this section applies to your facts.

Idaho Administrative Code › IDAPA 20 (Lands, Department of) › Chapter 20.03.09 › Section 020

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

01. Administrative Fee. Applications for easements must be accompanied by a one-tim e nonrefundable administrative fee of five hundred dollars ($500). No supplemental compensation in excess of this fe e is required for the following: (3-18-22) a. An easement for a use, facility, or structure for which the navigable waterway poses an obstacle o r barrier for construction or operation of the use, facility, or structure, or where the applicant demonstrates, and th e Director or Board concurs, that the impact of the use, facility, or structure on the navigable waterways is less than th e impact on the other values associated with the adjacent upland such as conservation of resources, significant cost savings to the public, or accessibility. (3-18-22) b. An easement for a dam that does not produce hydroelectric power and is less than ten (10) feet i n height as measured from the natural bed at the downstream side. (3-18-22) 02. Supplemental Compensation. In addition to the fee in Subsection 020.01, supplemental compensation is required for: (3-18-22) a. New and renewed easements for all dams of any size that produce hydroelectric power and all dam s that are ten (10) feet and higher as measured from the natural bed at the downstream side. Supplemental compensation for all such easements is one thousand dollars ($1,000), and hydroelectric facilities will also have a n additional payment of five dollars ($5) per megawatt of installed capacity as determined by the nameplate rating o f that facility. If the facility is situated on a Snake River segment that is a common border with the state of Oregon o r the state of Washington, the installed capacity will be prorated based on the location of the common border across th e dam’s centerline for the purpose of calculating the compensation. Total compensation for a new or renewed easemen t for a hydroelectric facility is a maximum of twenty thousand dollars ($20,000)

ituated on a Snake River segment that is a common border with the state of Oregon o r the state of Washington, the installed capacity will be prorated based on the location of the common border across th e dam’s centerline for the purpose of calculating the compensation. Total compensation for a new or renewed easemen t for a hydroelectric facility is a maximum of twenty thousand dollars ($20,000). If an easement for a hydroelectri c facility has been issued prior to relicensing, the fee will be prorated based on a fifty (50) year use period. The fee fo r annual extensions that are frequently issued by United States Federal Energy Regulatory Commission (FERC) because of permitting delays prior to issuance of the major FERC license will be prorated based on a fifty (50) yea r use period. (3-18-22) b. An easement over navigable waterways for any use, facility, or structure, that is not a dam o r hydroelectric facility, and would use navigable waterways as a substitute for, or to reduce or eliminate the use of , uplands. Supplemental compensation for such easements will be a one-time payment based on the market value of the adjacent uplands on which the use is avoided. In the case of filled lands, the value will be based on the highest an d best use of the adjacent uplands. The compensation will be determined by appraisal. (3-18-22) 03. Appraisal. The easement appraisal will be conducted by a licensed appraiser selected by th e Department, although the applicant may propose an appraiser to the Department. The Department will provid e appraisal instructions. The appraisal will be performed in a timely manner, and a copy sent to the Department and th e applicant. The expense of the appraisal will be borne by the applicant. (3-18-22) 021. -- 029. (RESERVED)

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.