Section 13. Physical Location Of Facilities

New MexicoRegulations

Ask Donna

How this section applies to your facts.

NMAC › Title 17 () › Chapter 4 () › Part 2 (REQUIREMENTS FOR OCCUPANCY OF STATE HIGHWAY SYSTEM RIGHT-OF-) › Section 13

This text was captured on Sep 30, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

The following requirements apply to the physical location of utility facilities on non access-controlled highways; additional requirements for access-controlled highway facilities are set-out in Paragraph 17 [now 17.4.2.17 NMAC], "The Accommodation of Utility Facilities Within Freeway or Interstate Right-of-Way." A. Aerial facilities, parallel: The proposed installation of aerial utility facilities parallel to a state highway shall be located no more than .3048 m (1 foot) within the right-of-way line on a uniform alignment, wherever practical. Down guys and anchors shall not project into the cut or fill slopes. Minor variations will be considered on an individual basis upon substantiation submitted by the utility. B. Aerial facilities crossing: Proposed installations of aerial facilities crossing a highway shall cross the highway at an angle near ninety (900) degrees whenever practical. Poles, anchors and other appurtenances shall be located at, near, or outside the highway rights-of-way. No crossing components shall obtrude upon the roadway prism unless approved by the Department, and all vertical clearances shall conform to the National Electric Safety Code as a minimum, but shall not be less than twenty feet (20'). Minor variations will be considered on an individual basis, or upon substantiation submitted by the utility. C. Buried facilities, parallel: The proposed installation of buried utility facilities parallel to a highway shall be located no more than 1.52 m (5 feet) within the right-of-way line, whenever practical. Surface comp onents of buried facilities, i.e., valves, manholes, vents, etc., shall be located as close as possible to the right-of-way line. The high point of structural elements such as manholes, vaults and anchor blocks shall be at or below the grade of the right-of-way surface. Minor variations will be considered on an individual basis, on substantiation submitted by the utility. All buried facilities shall be installed at a minimum depth of .91 m (36 inches) from natural ground elevation to the top of the buried facility. All trenches and ditches will be backfilled and compacted to the satisfaction of the Engineer. All excavations outside the roadway foreslopes shall be compacted to a density equal to the surrounding undisturbed soil. All excavations within the toes of the foreslopes shall be compacted to 95% maximum dry density (modified Proctor method "C" T-99 or equivalent) as determined by an approved standard compaction test. Parallel trenches shall be backfilled and compacted during the some work period in which they are excavated. Excavations on or near the traveled way shall not remain open overnight. D. Buried facilities, crossing: The proposed installation of buried utility facilitiescrossing a highway shall cross the highway at an angle of ninety (900 ) degrees, wherever practical. All Surface components or proposed buried facility crossings shall be located within 1.52 m (5 feet) of the right-of-way line. All buried facility crossings shall be installed at a minimum depth of .91 m (36 inches) or more from the lowest point of the right-of-way surface to the top of the facility. Minor variations will be considered on an individual basis, on substantiation submitted by the utility. (1) Unless otherwise permitted, installation of buried facilities crossing a state highway shall be performed by boring or jacking under the roadway. Installations by open cut of the pavement structure may be permitted only where boring or jacking is not feasible due to soil conditions, or where the pavement structure is aged, deteriorated or in generally poor condition. Open cut installations will be considered on an individual basis, on substantiation submitted by the utility. (2) In cases where the utility owner is allowed an open cut installation, the utility shall be responsible for the restoration and maintenance of the pavement structure, until such time that the Section of roadway is improved by resurfacing, as approved by the Department. (3) All proposed buried carrier pipes crossing a state highway shall be constructed of steel, cast iron, or reinforced concrete and/or shall be cased (or encased), and shall be of such materials and design as may be approved by the Engineer. Each question of carrier pipe material and/or casement pipe requirements shall be considered on an individual basis, on design data submitted by the utility. As a minimum, the casement shall extend at least from just outside the toe of foreslope to just outside the toe of the opposite foreslope. (4) The utility shall be responsible for the backfill, compaction and surface restoration of utility trenches outside the roadway prism, and for the restoration and protection of the pavement structure if open cut trenching across the existing roadway is approved by the Engineer, District Engineer or his/her representative. The utility is also responsible for the safety and progress of the traveling public. All backfill, compaction, materials, and pavement structure restoration shall be performed to the satisfaction of Engineer. Backfill in trenches excavated outside the roadway prism shall be compacted to a density equal to the surrounding undisturbed soil. All excavations within the roadway prism shall be compacted to 95% of maximum dry density (Modified Proctor, method "C", T-99 or 17.4.2 NMAC 16 equivalent) as determined by a standard compaction test. Any portion of the pavement structure which is broken, disturbed, cut or otherwise damaged in any way, shall be removed and replaced to a design equal to or better than the condition that existed prior to the damage to the pavement structure, as determined by the Department. (5) Where the party making the installation either is not equipped or fails to properly repair any damage to the pavement structure, the Department will repair the damage and shall bill the utility the actual cost of restorations, plus administrative costs incurred. (6) All buried utility facilities crossing Department maintained highways shall be identified by the installation of weather proof signs that provide the type of facility, the facility owner and a phone number where maintenance personnel may be contacted. The signs shall be set over the facility at both right-of-way lines. [3/10/71, 11/15/96; Recompiled 12/31/01] 17.4.2.14 DEFINITIVE DESIGN REQUIREMENTS A. Pipeline installations; location and alignment: From the highway viewpoint, there are sound reasons for requiring pipeline crossings at right angles to the roadway alignment. Oblique angle highway crossing pipeline installations have many detrimental characteristics as they increase the interference with traffic during construction, are more liable to conflict with highway drainage and structures, upset distribution of live loads to the subgrade and across pavement joints, are considerably harder to control as to line and grade when boring or jacking the pipeline beneath the highway, and they usually create more damage to the pavement structure and subgrade on open cut installations. Diagonal crossings usually require more maintenance and repairs; therefore, all pipeline crossings shall be at or near ninety (900) degrees. Minor variations will only be considered on a case by case basis, upon justification submitted to the Department by the utility. Conditions which are generally unsuitable for pipeline crossings should be avoided, such as locations in deep cuts, across cuts and fills on steep slopes, near the footings of bridge piers, abutments, retaining walls and other structures, across interSections at grade or entrance and exit ramp terminals, at cross drains (transverse drop inlets) where flow may be obstructed, or in locations requiring extensive rock excavations to provide the minimum bury. B. Pipeline casings; encasement: A carrier pipe is said to be cased (or encased) if it is installed freely inside in a larger diameter pipe. Encasement may also be complete or partial, designed to protect the carrier pipe, lighten its burden, facilitate its insertion and withdrawal and guarantee the integrity of the roadway structure or prism. Common types of casements are those carriers cased or sleeved inside a larger pipe, cradled by a continuous concrete seat fitting the pipe (cradling), walled by a continuous concrete sidefill (walling), boxed or jacketed by concrete completely surrounding the pipe (boxing), capped by a continuous concrete topping or slab (capping)), coated or wrapped by a substantial girdling cover (wrapping), grouted by mortar filling borehole annulus and overbreak (grouting), or tunneled by installation in a utility subway. (1) Of these methods, only the casing, tunnel, utility subway or gallery provide the complete independence of the carrier pipe from the surrounding roadway structure, and adequate protection to the roadway from leakage of the pipeline. These methods also provide means for insertion and replacement of carriers without access or disturbance to through-traffic roadways. (2) The following encasement methods do not provide all of the above benefits, but may be utilized subject to individual approvals, on substantiation submitted by the utility: Concrete cradling enhances the load supporting capability of rigid pipes, but accomplishes little else. Walling does the same for semi-rigid and flexible pipes. Capping strengthens both rigid and flexible pipes, and somewhat protects from highway operations penetrating the overfill. When applied to weak or brittle pipes, concrete boxing or jacketing provides protection to the pipe from earth loads, leakage, corrosion or abrasion to some degree. Adequate coating or wrapping prevents contact with corrosive water, soil or vapors. Grouting aids in restoring the continuity and integrity of the earth supporting the pavement structure. C. Uncased carriers: An uncased carrier crossing a highway becomes an integral part of the embankment supporting the pavement structure. Just as for a culvert, the Department must be assured of adequate structural design. All uncased carriers shall be designed to withstand all combinations of earth and live load, internal pressure, earth and live load plus internal pressure, and earth and live load plus alterations to full and zero internal pressure. Rigid carriers will generally be satisfactory, if they meet culvert design criteria and withstand the internal pressure. Semi-rigid and flexible carrier pipes shall be cased within a rigid pipe encasement. D. Hazardous transmittants: Transmittants which are flammable, corrosive, expansive, unstable, at high pressure, and/or possibly hazardous to the traveling public or the roadway itself, shall be encased on all highway crossings of carrier pipes over 2 inches in diameter. Uncased crossings of welded steel pipelines may be 17.4.2 NMAC 17 permitted, provided additional protective measures are taken in lieu of encasement. Such measures may include higher safety factors in design, materials and construction, coating, and wrapping of carriers in accordance with industry standards, and cathodic protection, subject to the approval of the Engineer, District Engineer or his/her representative. Requirements for uncased carriers: Uncased hazardous or corrosive product pipeline crossings on state highways will be allowed provided they are: (1) welded steel pipelines; (2) cathodically protected; (3) coated in accordance with industry standards; (4) meet requirements of the pipeline safety regulations -- 49 Code of Federal Regulations, Parts 191 and 192, or Parts 191 and 195 with respect to wall thickness; (5) designed for operating stress levels in accordance with federal pipeline safety regulations; (6) appropriately marked with permanent signs at each right-of-way line indicating ownership, type of facility, and an emergency telephone number; and (7) owner provides an official signed written statement certifying that the facility complies with the conditions and provisions required in this Section, Paragraph 14.4.1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.