Section 12. General Utility Construction Requirements
New MexicoRegulations
Ask Donna
How this section applies to your facts.
NMAC › Title 17 () › Chapter 4 () › Part 2 (REQUIREMENTS FOR OCCUPANCY OF STATE HIGHWAY SYSTEM RIGHT-OF-) › Section 12
Text
Disturbance of areas within highway rights of way by utility operations shall be kept to a minimum and restored to the satisfaction of this Department. All utility construction methods used within the highway right-of-way shall be performed in accordance with current Standard Specifications for Highway and Bridge Construction, the provisions of this regulation, and utility accommodation permit requirements. All unsatisfactory installation or construction work performed by the utility on highway right-of-way will be corrected or reconstructed upon written notification by the Department that identifies the deficiencies. The Utility shall promptly initiate the restoration work and shall work continuously until the installation comp lies with the regulations and specifications. If the restoration is not performed within a reasonable specified time, the Department may perform the restoration work and the utility shall be responsible for all costs incurred. A. The utility shall avoid disturbing or damaging existing highway drainage facilities and shall be responsible for repairs and restoration of any damage, including restoration of ditch flow lines, as determined by the Department. Wherever necessary, the utility shall provide drainage away from its own facilities to avoid damage to the highway. Construction or compaction by means of jetting, puddling, or water flooding is prohibited within all highway rights-of-way. B. The utility is prohibited from spraying, cutting or trimming of trees or other landscaping elements, unless specific written permission is given by this Department. The approval of a utility accommodation permit does 17.4.2 NMAC 9 not include approval of such work, unless the cutting, spraying and trimming is clearly indicated on the permit application. In general, when permission is given, only light trimming will be permitted. When tree removal is approved, the stump shall be removed and the hole properly backfilled to natural ground density, and/or other Department approved landscape elements provided. The work site shall be left in a clean and trash free condition and all debris shall be removed. Reseeding shall be performed as per schedule outlined in Paragraph 12.5 [now Subsection E of 17.4.2.12 NMAC]. C. Traffic Control for utility construction and maintenance operations shall conform with the Manual on Uniform Traffic Control Devices (MUTCD). All utility construction and maintenance operations shall be planned to keep interference with traffic to an absolute minimum. On heavily traveled highways, utility operations interfering with traffic shall not be conducted during periods of peak traffic flow. All such work shall be planned so that closure of intersecting streets, road approaches or other access points is held to a minimum. Traffic Control Plans for each installation are mandatory and must be attached to each utility accommodation permit application. No utility installation work shall commence until the permit and Traffic Control Plans are approved by the District Engineer or his/her representative. D. All utility facilities located on public rights-of-way shall be kept in an adequate state of repair. Minor maintenance of existing facilities may be performed without notification. However, any physical revisions, relocations, additions, excavations, impedance of traffic or other disturbances within the right-of-way shall require the submittal of a new utility accommodation permit application. No remedial work may commence until the new utility accommodation permit is approved. Repairs of an emergency nature, necessary for the safety of the traveling public, may be immediately performed without prior approval, to be followed by formal written notification to the appropriate District Engineer or his/her representative. When such emergency repairs may constitute a traffic hazard, the proper District Highway Office and the New Mexico State Police shall be officially notified to coordinate any safety measures required. E. Restoration of the highway right-of-way disturbed by excavations or grading work performed by the utility shall include reseeding. This work shall consist of seeding all areas which are denuded of vegetation during the utility's construction operations. The reseeding work by the utility will be subject to inspection and acceptance by a representative from the Department. All affected areas shall be treated with Class "A" seeding of standard Department specifications. Fertilizer shall be used on all areas at the rate of 200 pounds per acre, Department Specification 16-20-0. The various species, origin and seed required for each Highway District area are shown on the following schedule: (1) Districts 1 and 2 SANDY SOILS Pounds Pure Live Seed Species Origin Per Acre Lehman's Lovegrass Any 2.0 Sand Dropseed New Mexico 2.0 Sideoats Grama Vaughn 4.0 Fourwing Saltbrush New Mexico 3.0 HEAVY CLAY SOILS Blue Grama Lovington 2.0 Sideoats Grama Vaughn 6.0 Fourwing Saltbrush New Mexico 3.0 HIGHER RAINFALL Blue Grama Lovington 2.0 Sideoats Grama Vaughn 6.0 Western Wheatgrass Arriba 6.0 17.4.2 NMAC 10 (2) Districts 3 and 6 SANDY SOILS Pounds Pure Live Seed Species Origin Per Acre Lehman's Lovegrass Any 3.0 Indian Ricegrass Paloma 4.0 Sand Dropseed New Mexico 2.0 HEAVY CLAY SOILS Blue Grama Lovington 2.0 Sideoats Grama Vaughn 6.0 Fourwing Saltbrush New Mexico 3.0 HIGHER RAINFALL Blue Grama Lovington 2.0 Sideoats Grama Vaughn 6.0 Western Wheatgrass Arriba 6.0 (3) Districts 4 and 5 SANDY SOILS Pounds Pure Live Seed Species Origin Per Acre Indian Ricegrass Paloma 3.0 Sand Dropseed New Mexico 2.0 Sideoats Grama Vaughn 5.0 HEAVY CLAYS Blue Grama Lovington 2.0 Sideoats Grama Vaughn 5.0 Alkali Sacaton New Mexico 2.0 Fourwing Saltbrush New Mexico 4.0 HIGHER RAINFALL Western Wheatgrass Arriba 6.0 Blue Grama Pastura 3.0 Sideoats Grama Vaughn 4.0 FERTILIZER REQUIRED: ALL DISTRICTS 200 pounds per acre, Specification 16-20-0. F. Scenic enhancement: The following provisions for scenic enhancement shall apply for utility facility installation in cited areas: (1) The type and size of the utility facilities and the manner and extent to which they are permitted within areas of scenic enhancement and natural beauty may materially alter the scenic quality, appearance and view of highway roadsides and adjacent areas. Such areas include scenic strips, overlooks, rest areas, recreation areas and 17.4.2 NMAC 11 the rights-of-ways and adjacent highways. Also included are Sections of highways which pass through public parks, recreation areas, wildlife and waterfowl refuges and historic sites. Whenever possible, new utility installations within all such strips overlooks and areas shall be avoided. (2) New underground utility installations may be permitted within such strips, overlooks, scenic areas or in the adjacent rights-of-way when they do not require extensive removal or alteration of trees and other shrubbery visible to the highway user, or do not impair the scenic appearance of the area. (3) New overhead (aerial) installations of communication and electric power lines are to be avoided at such locations unless there is no feasible and reasonable alternative. Any such installation shall be fully justified to the Department by demonstrating that: (a) Other utility locations are not available or present unusually difficult construction constraints or are unreasonably costly or are less desirable from the standpoint of visual quality. (b) The placing of underground utility facilities is not technically feasible or economical, or is more detrimental to the scenic appearance of the area. (c) The proposed installation can be made at a location and in a manner that will not detract from the scenic quality of the area being traversed, utilizes suitable design, and uses materials aesthetically compatible to the scenic area. (4) It is within the Department's sole discretion as to whether adequate justification has been demonstrated to it by the utility, which decision shall be final and accepted by the utility. (5) When a utility desires to construct a facility through or within scenic enhancement areas, the request for a utility accommodation permit shall be submitted to the appropriate District Traffic Engineer, providing substantial leadtime, because the permit must be carefully evaluated to determine the impact upon the scenic area involved. (6) Utility accommodation permit applications for installations in scenic enhancement areas must be accompanied by comprehensive and detailed supporting documentation. The design and materials should be aesthetically pleasing to the eye and the installation should not intrude in such a manner as to detract from the Scenic quality presented for viewing by the traveling public. Permits not adequately supported will be rejected by the Department. (7) Utility installations through scenic enhancement areas that are required for highway purposes, such as highway lighting, service to weigh stations, rest and recreation areas, and other official sites shall be located and designed to conform with these scenic enhancement provisions. Such installations shall be coordinated with the utility, the appropriate Department design unit, and included as bid items in the highway construction plans if they involve a new highway project. (8) archaeological or cultural resources clearances: To comply with the New Mexico State Law, The Cultural Properties Act, NMSA 1978, Sections 18-6-1 through 18-6-17 and specific Federal Law Historic Preservation Act of 1966, relating to the protection and preservation of historic and cultural resources, it shall be mandatory for utility facility owners to obtain an archaeological survey prior to any installation within highway right-of-way or property or new right-of-way to be acquired for highway construction. This survey shall be required for utility installations or relocations which include any utility structure, overhead or underground utility systems, either pipeline or ditch and/or any clearing operations, and any or all other ground surface disturbing construction activities across or through any obvious or suspected archaeological site. The survey report shall be submitted to the Department for its review and approval. No utility permit shall be issued without archeological clearance from the Department. No survey will be necessary if the utility has determined by inquiry and written substantiation from the Department that an acceptable archaeological survey was previously done by the Department or others approved by the Department. (9) environmental clearances: It shall be the utility's responsibility to comply with all Federal, State, and local laws and regulations controlling pollution of the environment. Prior to the start of utility construction, the utility shall contact the Department's Environmental Section to establish if any action is necessary by the utility for adhering to air, noise, and water quality control regulations. It shall also be the responsibility of the utility owner to insure compliance with National Pollutant Discharge Elimination System (NPEDS) Regulations on all utility work within highway right-of-way, where any ground disturbance activities involve areas exceeding five (5) acres. A Notice of Intent (NOI) must be filed with the Environmental Protection Agency (EPA) before the utility work can begin, and approval of the sediment control and reclamation plan from the NMSHTD Landscape Architect must be secured. The Landscape Architect shall also be responsible for final acceptance of permanently established 17.4.2 NMAC 12 vegetation as required by NPDES and as provided for by the utility owner. Information on these environmental regulations is available from the Roadside Environment Design Unit of the NMSHTD. G. New Mexico public highway utility accommodation permit: (1) General requirements: A utility owner who desires to install segments of their utility systems, or needs to relocate an existing facility already installed within the rights-of-way of public highways under the jurisdiction of the NMSHTD, must apply for a New Mexico Public Highway Utility Accommodation Permit. No utility construction shall commence on public highways right-of-way until the utility owner has obtained the approved permits, approval of their insurance, with coverages and face amounts shown in Paragraph 12.11
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.