CBCA 6659 GRANTED IN PART; CBCA 7422 GRANTED:
Agency decision · Agency decision
The company cleaned five items located above the drop ceiling, including the air handler unit, supply duct work, return duct work, and diffusers. They also cleaned the Valent system on the roof. … After review of your responses, we have the following comments and needs to address.” Id. at 1.
Civilian Board of Contract AppealsDISMISSED IN PART FOR LACK OF JURISDICTION: March 1, 2017
Agency decision · Agency decision
Contractors may, after notification that their evaluation is ready, submit comments, rebut statements, or provide additional information in response to the contracting officer’s evaluation. … Army & Air Force Exchange Service, 846 F.2d 746, 748 (Fed. Cir. 1988)). II.
Civilian Board of Contract AppealsAgency decision · Agency decision
Amy Noble, Supervisory Human Resources Specialist, Department of the Air Force, Royal Air Force Mildenhall, UK, appearing for Department of the Air Force. SOMERS, Board Judge. … (UK), to Nellis Air Force Base, Nevada.
Civilian Board of Contract AppealsAgency decision · Agency decision
Amy Noble, Supervisory Human Resources Specialist, Department of the Air Force, Royal Air Force Mildenhall, UK, appearing for Department of the Air Force. SOMERS, Board Judge. … (UK), to Nellis Air Force Base, Nevada.
Civilian Board of Contract AppealsIn the Matter of DAVID R. BIENVENUE
Agency decision · Agency decision
to his duty station for a portion of the TQSA period. … The cost of each meal varies, and the costs for laundry and dry cleaning vary and are intermittent throughout the TQSA period, as one would expect.
Civilian Board of Contract AppealsAgency decision · Agency decision
air into the groundwater. … GSA gave Sverdrup’s comments to MCDA on August 12.
Civilian Board of Contract AppealsAgency decision · Agency decision
be cleaned five times a week. … Prior to joining the CBCA, Jenny served as an active duty Judge Advocate General (JAG) in the United States Air Force and continues to serve as a member of the Air Force JAG reserve component.
Civilian Board of Contract AppealsIn the Matter of KAREN M. STANLEY-WOLFE
Agency decision · Agency decision
Subsequently, from April 19 to 21, 2017, while on temporary duty (TDY) travel for annual training with the United States Air Force (Air Force) at Nellis Air Force Base in Nevada (approximately thirty-five … Stanley-Wolfe acted prudently.” Agency Response at 3.
Civilian Board of Contract AppealsGRANTED IN PART: December 19, 2019
Agency decision · Agency decision
We conclude that Suffolk is entitled to recover a net amount of $12,583,546 plus interest pursuant to the Contract Disputes Act (CDA), 41 U.S.C. §§ 7101-7109 (2012). … Radiant heat panels are made of sheet metal with hot water pipes running through them to heat up the panel and act as a draft-stop.
Civilian Board of Contract AppealsIn the Matter of CITY OF NEW ORLEANS
Agency decision · Agency decision
Part E provides an adjustment for estimated construction costs “to account for inflation during the design and construction period.” CEF Guide at 36. … Miscellaneous, including phase 1 additional items: CNO seeks funds for fire stopping penetrations in rated walls and floors and the replacement of two air compressors and an air separator, vacuum control
Civilian Board of Contract AppealsIn the Matter of FACILITY PLANNING AND CONTROL,
Agency decision · Agency decision
The checklist required the contractor to “consider the possibility of hidden mold” and to “check inside air ducts and air handling units.” … Potentially eligible activities included cleaning contaminated heating and ventilation, including ductwork.
Civilian Board of Contract AppealsIn the Matter of FORREST COUNTY BOARD OF SUPERVISORS
Agency decision · Agency decision
or clean and test 5. Clean, disinfect and HEPA vacuum files–Katrina damage 60%. 6. Clean, disinfect and HEPA vacuum computers–Katrina damage 60%. … The PW provided a breakdown of the costs for cleaning certain parts of the building, including the air conditioning system, and replacing porous surfaces such as upholstered furniture, wallpaper, and carpeting
Civilian Board of Contract AppealsIn the Matter of ROMAN CATHOLIC CHURCH
Agency decision · Agency decision
Stafford Disaster Relief and Emergency Assistance Act (Stafford Act), 42 U.S.C. §§ 5121-5207 (2006). … ducted supply return air handling system.
Civilian Board of Contract AppealsAgency decision · Agency decision
Consequently, claimant canceled the government air ticket. … Therefore, the agency acted correctly in treating claimant’s PCS transfer orders effective as of August 29.
Civilian Board of Contract AppealsIn the Matter of WILLIAM DUNCAN BAKER
Agency decision · Agency decision
Stone, Chief, Civil Law Division, Office of the Staff Judge Advocate, Warner Robins Air Logistics Center, Robins Air Force Base, GA, appearing for Department of the Air Force. GOODMAN, Board Judge. … CBCA 1145-RELO 3 Carpet Cleaning Expense Claimant states that the house was built in 1983 and occupied by the original owners, who smoked heavily. He therefore had the carpets cleaned.
Civilian Board of Contract AppealsIn the Matter of GREGORY P. WALKER
Agency decision · Agency decision
He did drop off his vehicle on June 25, the day of departure by air to Germany. … for the period after which the employee had made his final departure from Las Cruces, we have recognized in similar circumstances that an employee who had been authorized to travel both by air and by
Civilian Board of Contract AppealsAgency decision · Agency decision
The drawings also set forth the specifications for the air conditioning system. … of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer’s failure to act within the time specified
Civilian Board of Contract AppealsTHIS OPINION WAS INITIALLY ISSUED UNDER PROTECTIVE ORDER AND
Agency decision · Agency decision
Discussion This appeal is before the Board pursuant to the Contract Act Disputes Act (CDA), 41 U.S.C. §§ 7101-7109 (2012). … of bleach during that same period.
Civilian Board of Contract AppealsAgency decision · Agency decision
It required, among other things, that the commode and sanitary line be free of sewage and that the unit be “winterized” (defined as removing all water from the system and using air pressure to clean out … However, an unauthorized act can be adopted through ratification.
Civilian Board of Contract AppealsGRANTED IN PART AS TO ENTITLEMENT: January 23, 2009
Agency decision · Agency decision
Delta Air Lines, Inc. … Contract Cleaning Maintenance, Inc. v. United States, 811 F.2d 586, 592 (Fed. Cir. 1987).
Civilian Board of Contract Appeals