Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
2.03s
Federal Register · Notice · May 17, 2017
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. … Construction activities within the project boundary would include installation of an intake pipe and air burst line, placement of rip rap along the stream bank and intake pipe, and installation of intake
82 FR 22659Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Oct 21, 1994
You do not need to re-submit comments if you have already done so. … The more specific your comments, the more useful they will be.
Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 23, 2026
boiloff gas handling systems, LNG pumps, controls and safety systems, a fire water system, electric power generation and purchase power, utility systems (heat transfer, fuel gas, nitrogen, instrument air … If you are filing a comment on a particular project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
91 FR 46421Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 18, 2026
Proposed Gabbs Lateral NASF Relocation Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Gabbs Lateral Naval Air … If you are filing a comment on a particular project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
91 FR 13025Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 20, 2004
Please indicate the project number (P-12187) on any comments or motions filed. … power cables, each connecting the six 32-turbine/generator-sets to six 7.2 kilovolt (kV) transformer and breaker sets on an adjacent pier; (3) lifting/access columns at the end of each module; (4) six air-operated
69 FR 21096Energy DepartmentFederal Energy Regulatory CommissionMorgantown Energy Technology Center, Financial Assistance Award; (Solicitation Announcement)
Federal Register · Uncategorized Document · Aug 1, 1994
Authority for this action is the DOE Organization Act, Public Law 95-91, and the DOE Financial Assistance Regulations 10 CFR 600. … Multiple cooperative agreement awards are anticipated and will consist of a 3-phase effort having a total estimated period of performance of sixty (60) months.
Energy DepartmentAlgonquin Gas Transmission Company, Texas Eastern Transmission Corporation; Notice of Application
Federal Register · Notice · Apr 12, 2001
Algonquin specifies that the benefits to its system and customers include, but are not limited to, a reduction in peak day fuel consumption at the Hanover station, a new reduction in permitted long-term air … Watson, Jr., Acting Secretary. [FR Doc. 01-9030 Filed 4-11-01; 8:45 am] BILLING CODE 6717-01-M
66 FR 18919Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedures for Commercial Clothes Washers
Federal Register · Proposed Rule · Feb 11, 2014
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … The threshold number for NAICS classification code 333312—which applies to commercial laundry, dry cleaning, and pressing machine manufacturers—is 500 employees.
79 FR 8112Energy DepartmentFederal Register · Notice · Mar 11, 2010
Background and Authority Title III of the Energy Policy and Conservation Act sets forth a variety of provisions concerning energy efficiency. … Pursuant to 10 CFR 430.27(b)(1)(iv), any person submitting written comments to DOE must also send a copy of such comments to the petitioner.
75 FR 11522Energy DepartmentStandards for Business Practices for Interstate Natural Gas Pipelines
Federal Register · Proposed Rule · Feb 22, 2012
Clean Up and Miscellaneous Revisions 15. … Regulatory Flexibility Act Certification 34.
77 FR 10415Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 21, 2001
Seminar participants will have the opportunity to provide input and comment on the proposed updates. … We will also issue separate notice of these potential changes for the general public and the regulated industry to comment on outside of the training venue.
66 FR 58465Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 15, 2016
CP15-560-000 requesting Authorization pursuant to section 3 of the Natural Gas Act to construct and operate certain liquefied natural gas (LNG) facilities at the existing Cameron LNG Terminal. … In response to the NOI, the Commission received comments from the U.S. Environmental Protection Agency (EPA).
81 FR 2206Energy DepartmentFederal Energy Regulatory CommissionUnsolicited Application; Central Michigan University
Federal Register · Uncategorized Document · Sep 22, 1994
The minimal usage of other seasonal electric demand, such as air conditioning, is an opportunity to evaluate the effectiveness of SDHW as a demand-side management tool. … The project period for the grant award is 24-months, expected to begin October, 1994. DOE plans to provide funding in the amount of $30,000. for further information contact: Mark Burger, U.S.
Energy DepartmentFederal Register · Notice · Jan 26, 2026
Lessee 1, LLC, Virginia Line Solar, LLC, Sonny Solar, LLC, Bulldog Solar, LLC, Cane Creek Solar, LLC, Moonshot Solar, LLC, Glover Creek Solar, LLC, Catalina Solar, LLC, Old Hayneville Solar, LLC, Fresh Air … Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of BOCA bn, LLC, et al. Filed Date: 1/16/26. Accession Number: 20260116-5191.
91 FR 3175Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Sep 13, 2011
Background and Authority Title III, Part B 1 of the Energy Policy and Conservation Act of 1975 (EPCA or the Act), Public Law 94-163 (42 U.S.C. 6291-6309, as codified) sets forth a variety of provisions … In written comments on the August 2010 NOPR, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) and the Association of Home Appliance Manufacturers (AHAM) asked that DOE consider referencing
76 FR 56347Energy DepartmentFederal Register · Notice · Mar 14, 2024
DATES: Written comments are requested by May 15, 2024. … Jennifer Wilcox, Acting Assistant Secretary, Office of Fossil Energy and Carbon Management, pursuant to delegated authority from the Secretary of Energy.
89 FR 18626Energy DepartmentFederal Register · Rule · Jan 10, 2001
DOE provided a 30-day public comment period for the Interim Final Rule and subsequently received comments to the rule from over 30 parties. … See the Notice of Limited Reopening of the Comment Period, 60 FR 45381, 45384 (Aug. 31, 1995).
66 FR 1810Energy DepartmentMichigan Power Company , et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Jul 26, 1996
of its Scott Air Force Base facilities which will take transmission service pursuant to its open access transmission tariff. … Watson, Jr., Acting Secretary. [FR Doc. 96-18999 Filed 7-25-96; 8:45 am] BILLING CODE 6717-01-P
61 FR 39127Energy DepartmentFederal Register · Proposed Rule · Jul 14, 1999
DATES: To ensure your comments are considered, we must receive 7 copies of your comments on or before September 13, 1999. … The Department has established a period of 60 days following publication of this notice for persons to comment on this notice of proposed rulemaking.
64 FR 37905Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Mar 7, 2017
CP16-496-000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7(c) of the Natural Gas Act to construct and operate certain natural gas pipeline facilities. … The primary issues raised by commenters are impacts associated with the proposed CS 11A site location and alternative site locations, air quality and noise impacts, nighttime lighting, surface water and
82 FR 12813Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.