Federal Register · Rule · Oct 3, 2008
), the Federal Power Act (FPA), the Interstate Commerce Act (ICA), the Flood Control Act, the Bonneville Power Act, the Northwest Power Planning Act, and other relevant statutes. … Clean Tariff Sheets Filed as Attachments 58.
73 FR 57515Energy DepartmentFederal Energy Regulatory CommissionOil Pipeline Capacity Allocation Issues and Anomalous Conditions
Federal Register · Notice · Dec 10, 2024
contend that shippers cannot rely upon secondary market transactions to restore lost shipper histories 13 and that Airlines have limited ability to ship on behalf of others to maintain history during periods … Clay, Acting Deputy Secretary. [FR Doc. 2024-28960 Filed 12-9-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 99249Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 25, 2020
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
85 FR 75313Energy DepartmentFederal Energy Regulatory CommissionNational Energy Policy; Announcement of Public Meetings
Federal Register · Notice · Jun 11, 2001
ACTION: Notice of public meetings and request for comments. … John Sullivan, Acting Deputy Assistant Secretary, Office of Planning, Budget and Management, Office of Energy Efficiency and Renewable Energy.
66 FR 31224Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Rule · Jun 2, 2023
Table II.3—List of Commenters With Written Submissions to the March 2022 NOPR Commenter(s) Abbreviation Comment No. in the docket Commenter type Air-Conditioning, Heating and Refrigeration … Additionally, some covered products and equipment have most of their energy consumption occur during periods of peak energy demand.
88 FR 36368Energy DepartmentFederal Register · Notice · Sep 10, 2025
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
90 FR 43591Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Jun 2, 2011
Background The Energy Policy and Conservation Act (EPCA), as amended by section 312(c) of the Energy Independence and Security Act (EISA 2007), requires the Department of Energy (DOE) to prescribe a test … See, e.g. 10 CFR part 431, subpart R, Appendix A, Sec. 5.3(a)(2)(i) (specifying the air temperature for freezer internal cooling conditions at -10 °F).
76 FR 31795Energy DepartmentFederal Register · Notice · Aug 5, 1996
During the public comment period, the public was encouraged to provide comments via mail, toll-free fax, electronic bulletin board (Internet), and toll-free telephone recording device. … The Federal Register Notice of Availability for the Final EIS (61 FR 33719) stated that DOE would accept comments on the proposed statement of findings during a 15-day period.
61 FR 40619Energy DepartmentFederal Register · Notice · Jan 26, 2001
Over 6,000 comments were received during the comment period for the Draft NI PEIS. … During the 52-day comment period, DOE held seven hearings to discuss the proposed action and to receive oral and written comments on the Draft NI PEIS.
66 FR 7877Energy DepartmentFederal Register · Notice · Nov 2, 1995
Avoca states that the switch to electric motors would eliminate 180 tons per year of criteria pollutant air emissions that would occur using natural gas-fired engines. … A comment period will be allotted for review if the supplemental EA is published.
60 FR 55709Energy DepartmentLoan Guarantees for Projects That Employ Innovative Technologies
Federal Register · Proposed Rule · Oct 3, 2016
Unfunded Mandates Reform Act of 1995 The Unfunded Mandates Reform Act of 1995 (Act) (Pub. … of 2005 (Act).
81 FR 67924Energy DepartmentFederal Register · Notice · Feb 26, 2004
A 45-day comment period will be allotted for review of the draft EIS. We will consider all timely comments on the draft EIS and revise the document, as necessary, before issuing the final EIS. … Air Quality and Noise • Effects of construction and operation on local air quality and the noise environment. • Effects of LNG ship emissions on air quality.
69 FR 8953Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Uninterruptible Power Supplies
Federal Register · Proposed Rule · Feb 2, 2022
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … Section 4.1.2 of appendix Y specifies maximum air speed requirements within the test room; specifies allowable ambient air temperature conditions; prohibits the use of intentional cooling of the unit under
87 FR 5742Energy DepartmentFederal Register · Notice · Apr 18, 2001
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Effects of the increased compression on noise and air quality. Compressor Stations 4, 6 and 12 have nearby noise-sensitive areas within 0.5 mile.
66 FR 19931Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 13, 2015
Please note that the scoping period will close on April 3, 2015. … A comment period will be allotted when the EA is noticed. We will consider all comments on the EA before we make our recommendations to the Commission.
80 FR 13362Energy DepartmentFederal Energy Regulatory CommissionClean Energy for New Federal Buildings and Major Renovations of Federal Buildings; Stay; Correction
Federal Register · Rule · May 27, 2025
Pursuant to the Administrative Procedure Act, 5 U.S.C. 553(b), DOE finds that there is good cause to not issue a separate notice to solicit public comment on the technical corrections contained in this … Issuing a separate notice to solicit public comment would be unnecessary.
90 FR 22199Energy DepartmentFederal Register · Notice · Nov 9, 2012
Comments Due: 5 p.m. ET 11/13/12. Docket Numbers: RP13-244-000. Applicants: Columbia Gas Transmission, LLC. Description: PFSA Clean Up to be effective 12/1/2012. … Description: Equitrans, L.P. submits Operational Purchases and Sales Report for the twelve month period ended August 31, 2012. Filed Date: 11/1/12. Accession Number: 20121101-5184.
77 FR 67355Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 13, 2024
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed Project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
89 FR 10064Energy DepartmentFederal Energy Regulatory CommissionModification of the Groton Generation Station Interconnection Agreement, Brown County, SD
Federal Register · Notice · Sep 21, 2009
Impacts on human health and safety from additional operating hours, and 2. impacts on air and water resources (including air quality and surface water impacts). … The EIS process will include the public open-house scoping meeting and a scoping comment period to solicit comments from interested parties; consultation and involvement with appropriate Federal, State
74 FR 48067Energy DepartmentWestern Area Power AdministrationFederal Register · Proposed Rule · Aug 27, 2021
air conditioning and heating equipment, packaged terminal air conditioners, packaged terminal heat pumps, warm-air furnaces, packaged boilers, storage water heaters, instantaneous water heaters, and unfired … DOE extended the initial 90-day comment period for an additional 30 days. 84 FR 449 (Jan. 29, 2019).
86 FR 48049Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.