Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.78s
Federal Register · Notice · Oct 13, 2004
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Air Quality and Noise. — Effects on air quality and the noise environment from construction and operation of the proposed facilities. • Reliability and Safety.
69 FR 60854Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 23, 2024
Background On December 14, 2023, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Westbound Compression Expansion Project (Notice of … Wyoming Department of Environmental Quality comments requested thorough analysis of groundwater and surface water impacts of the Project. All substantive comments will be addressed in the EA.
89 FR 4296Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Uncategorized Document · Nov 3, 1994
The proposed Controlled Air Incinerator is currently being permitted and undergoing National Environmental Policy Act review for operation at production capacity. … DOE will make a final determination after considering the comments received during a 30-day public comment period. Issued at Washington DC, this 27th day of October 1994.
Energy DepartmentFederal Register · Proposed Rule · Jun 2, 2015
ACTION: Reopening of public comment period. SUMMARY: On March 11, 2015, the U.S. … The Air-Conditioning, Heating, and Refrigeration Institute (AHRI) requested an extension of the public comment period, stating that additional time is necessary to conduct product testing and review supporting
80 FR 31324Energy DepartmentEnergy Conservation Program: Test Procedures for Consumer Refrigeration Products
Federal Register · Proposed Rule · Dec 23, 2019
Review Under the Regulatory Flexibility Act D. Review Under the Paperwork Reduction Act of 1995 E. Review Under the National Environmental Policy Act of 1969 F. … AHAM commented to reiterate its proposal that DOE include the stabilization period as part of the test period.
84 FR 70842Energy DepartmentFederal Register · Notice · Aug 7, 1995
Each session will have an introductory presentation, a question and answer period, and a public comment segment. … The meeting facilitator will begin the public comment portion of the scoping meeting after the question and answer period.
60 FR 40164Energy DepartmentFederal Register · Notice · Apr 14, 2022
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … Clean Water Act, 33 U.S.C. 1341(a)(1).
87 FR 22201Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 14, 2022
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … Clean Water Act, 33 U.S.C. 1341(a)(1).
87 FR 22202Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 16, 2009
Please note that the scoping period will close on April 8, 2009. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
74 FR 11094Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 18, 2007
Summary and Request for Comments I. Background and Authority Title III of the Energy Policy and Conservation Act (EPCA) sets forth a variety of provisions concerning energy efficiency. … Grounds for the Petition Daikin seeks a waiver from the test procedures applicable to central air conditioners and heat pumps under Title III of the Energy Policy and Conservation Act (EPCA), Part B of
72 FR 53237Energy DepartmentEnergy Efficiency and Renewable Energy OfficeEnergy Conservation Program: Energy Conservation Standards for Battery Chargers
Federal Register · Proposed Rule · Sep 1, 2015
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). … Air Act provision that provides statutory authority for CSAPR. 51 See Georgia v.
80 FR 52850Energy DepartmentFederal Register · Notice · May 5, 2017
Applicants: ALLETE Clean Energy, Inc., ALLETE, Inc. Description: Application for Authorization Under Section 203 of the Federal Power Act of ALLETE, Inc., et al. … Description: § 205(d) Rate Filing: Rate Filing for Rate Period 31 to be effective 7/1/2017. Filed Date: 4/27/17. Accession Number: 20170427-5167. Comments Due: 5 p.m.
82 FR 21226Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 25, 1999
Air Quality and Noise. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
64 FR 28170Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 5, 2008
DATES: The public is invited to comment on the Draft EIS, and all comments received which are postmarked no later than the end of the public comment period, June 8, 2009, will be addressed in preparing … All comments received or postmarked during the comment period will be considered during preparation of the Final EIS. Late comments will be considered to the extent practicable.
73 FR 74160Energy DepartmentFederal Register · Notice · Jan 21, 2014
Applicants: Clean River Power MR-1, LLC; Clean River Power MR-2, LLC; Clean River Power MR-3, LLC; Clean River Power MR-5, LLC; Clean River Power MR-6, LLC; and Clean River Power MR-7, LLC (Clean River … Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r) h.
79 FR 3362Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 6, 2011
The air lost from dryer exhaust vent can impose a significant load on the space-conditioning unit as cool or hot outdoor air is drawn inside the room or home to replace the exhausted air. … The basic purpose of the Energy Policy and Conservation Act, as amended by the National Appliance Energy Conservation Act, is to foster purchase of energy-efficient appliances, not hinder such purchases
76 FR 19087Energy DepartmentEnergy Efficiency and Renewable Energy OfficeSite-Wide Environmental Impact Statement Los Alamos National Laboratory
Federal Register · Notice · May 12, 1995
The public is welcome to comment further on this issue during the scoping period. … [[Page 25703]] Controlled Air Suspend the NEPA review for 17 comments received. 2 concurred No--this subject, Incinerator treatment operations and address with the recommendation
60 FR 25697Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Direct Heating Equipment
Federal Register · Rule · Nov 23, 2021
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act D. Review Under the National Environmental Policy Act of 1969 E. Review Under Executive Order 13132 F. … Air circulation fan. Sealed combustion.
86 FR 66403Energy DepartmentFederal Register · Notice · Feb 21, 1995
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we recommend that the Commission approve or not approve the project. … The list of issues will be added to, subtracted from, or changed based on your comments and our analysis. Issues are: The Myer Compressor Station would be a new source of air pollutant emissions.
60 FR 9673Energy DepartmentFederal Register · Proposed Rule · Apr 8, 2013
A public comment period of at least 110 days must be provided. 42 U.S.C. 6295(p)(4). … and room air conditioners that, in the commenters' view, satisfied the EPCA requirements in 42 U.S.C. 6295(o).
78 FR 20842Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.