Atlantic Gas Systems, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Myer Compressor Station and Request for Comments on Environmental Issues
Federal RegisterFeb 21, 1995
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
[Docket No. CP95-92-000]
Atlantic Gas Systems, Inc.; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Myer Compressor Station and
Request for Comments on Environmental Issues
February 15, 1995.
The staff of the Federal Energy Regulatory Commission (FERC or the
Commission) will prepare an Environmental Assessment (EA) that will
discuss environmental impacts of the construction and operation of the
proposed Myer Compressor Station.\1\ This EA will be used by the
Commission in its decision-making process to determine whether an
environmental impact statement is necessary and whether to approve the
project.
\1\Atlantic Gas Systems, Incorporated's application was filed
with the Commission under Section 7 of the Natural Gas Act and Part
157 of the Commission's regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
Atlantic Gas Systems, Incorporated (Atlantic) wants Commission
authorization to construct and operate a new 825-horsepower (hp)
compressor station on the site of an existing compressor foundation in
Cabell County, West Virginia.
Atlantic would construct the following facilities:
One skid-mounted 825-hp reciprocating engine-driven compressor
unit leased from Cardinal Compression, Inc.;
An insulated compressor building; and
An office/control building.
The location of these facilities is shown in appendix 1.\2\
\2\The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, Room
3104, 941 North Capitol Street, NE., Washington, DC 20426, or call
(202) 208-1371. Copies of the appendices were sent to all those
receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Atlantic purchased a 3.42-acre site in Cabell County that was
previously used for a compressor station. Atlantic would keep all
construction disturbance within this site.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are taken into account during the preparation of the EA. State and
local government representatives are encouraged to notify their
constituents of this proposed action and encourage them to comment on
their areas of concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils [[Page 9674]]
Water resources, fisheries, and wetlands
Vegetation and wildlife
Endangered and threatened species
Public safety
Land use
Cultural resources
Air quality and noise
Hazardous waste
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we
recommend that the Commission approve or not approve the project.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the information provided by Atlantic. Keep in mind that this is a
preliminary list. The list of issues will be added to, subtracted from,
or changed based on your comments and our analysis. Issues are:
The Myer Compressor Station would be a new source of air
pollutant emissions.
The operating noise of the proposed facility may impact the
surrounding residences. The nearest noise-sensitive area is a residence
810 feet south of the Myer Compressor Station.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal, and measures to avoid or lessen environmental impact. The
more specific your comments, the more useful they will be. Please
follow the instructions below to ensure that your comments are received
and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 825 North Capitol St., NE., Washington,
DC 20426;
Reference Docket No. CP95-92-000;
Send a copy of your letter to: Mr. Steven G. Grape, EA Project
Manager, Federal Energy Regulatory Commission, 825 North Capitol St.,
NW., room 7312, Washington, DC 20426; and
Mail your comments so that they will be received in
Washington, DC on or before March 15, 1995.
If you wish to receive a copy of the EA, you should request one
from Mr. Grape at the above address.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become in intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) attached
as appendix 2.
The date for filing timely motions to intervene in this proceeding
has passed. Therefore, parties now seeking to file late interventions
must show good cause, as required by section 385.214(b)(3), why this
time limitation should be waived. Environmental issues have been viewed
as good cause for late intervention. You do not need intervenor status
to have your scoping comments considered.
Additional information about the proposed project is available from
Mr. Steven G. Grape, EA Project Manager, at (202) 208-1046.
Lois D. Cashell,
Secretary.
[FR Doc. 95-4146 Filed 2-17-95; 8:45 am]
BILLING CODE 6717-01-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.