Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.17s
Federal Register · Notice · Mar 3, 1997
These activities include (as detailed in the October 4, 1993, notice), but are not limited to: ``(a) sampling of air, surface water, groundwater, sediments, surface and deeper soils; sampling of terrestrial … (e.g., installation of flumes and construction of access roads) may require separate floodplain assessments and the implementation of mitigative measures, e.g., construction during low precipitation periods
62 FR 9416Energy DepartmentFederal Register · Notice · Mar 7, 1995
ADDRESSES: Please label your written comments as ``Comments on the Fluorescent Lamp Ballast Engineering Analysis'' and submit to Ms. … Authority Part B of Title III of the Energy Policy and Conservation Act (EPCA), (Pub. L. 94-163) created the Energy Conservation Program for Consumer Products other than Automobiles (Program).
60 FR 12552Energy DepartmentFreeport LNG Development, L.P.; Notice of Schedule for Environmental Review of the Train 4 Project
Federal Register · Notice · Sep 7, 2018
CP17-470-000 requesting an Authorization for siting, construction, and operation of a liquefied natural gas (LNG) facility pursuant to Section 3 of the Natural Gas Act. … The primary issues raised by the commentors are alternative pipeline routes, and impacts on land use, wetlands, protected species, visual landscape, noise environment, air quality, road traffic, marine
83 FR 45426Energy DepartmentFederal Energy Regulatory CommissionANR Pipeline Company, et al.; Natural Gas Certificate Filings
Federal Register · Notice · Aug 23, 1995
maximum deliverability from the Oakford Storage Pool; result in more efficient use of certificated storage capacity; maintain pressures at designated levels within the Oakford Storage Pool; reduce current air … Comment date: September 5, 1995, in accordance with Standard Paragraph F at the end of this notice. Standard Paragraphs: F.
60 FR 43789Energy DepartmentEnergy Conservation Program: Compliance Date for the Dehumidifier Test Procedure
Federal Register · Rule · Feb 7, 2014
6293 must be reasonably designed to produce test results which measure energy efficiency, energy use, or estimated annual operating cost of a covered product during a representative average use cycle or period … These procedures require use of an updated industry dehumidifier test method, which may potentially require manufacturers to install a larger test chamber and different air handling equipment.
79 FR 7366Energy DepartmentAlgonquin Gas Transmission Company, Texas Eastern Transmission Corporation; Notice of Application
Federal Register · Notice · Apr 12, 2001
Algonquin specifies that the benefits to its system and customers include, but are not limited to, a reduction in peak day fuel consumption at the Hanover station, a new reduction in permitted long-term air … Watson, Jr., Acting Secretary. [FR Doc. 01-9030 Filed 4-11-01; 8:45 am] BILLING CODE 6717-01-M
66 FR 18919Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 20, 2014
The draft EIS assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). … Liquefaction facilities, including three liquefaction trains capable of producing 782 million British thermal units (MMBtu) per year of LNG; • vaporization facilities, including two trains of ambient air
79 FR 35344Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 30, 2023
LLC, Bulldog Solar, LLC, PGR 2021 Lessee 9, LLC, Cabin Creek Solar, LLC, PGR 2021 Lessee 12, LLC, Centerfield Cooper Solar, LLC, PGR Lessee O, LLC, Eastover Solar, LLC, PGR 2021 Lessee 17, LLC, Fresh Air … Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of GC PGR HoldCo, LLC, et al. Filed Date: 3/21/23. Accession Number: 20230321-5176.
88 FR 19133Energy DepartmentFederal Energy Regulatory CommissionRH energytrans, LLC; Notice of Schedule for Environmental Review of the Risberg Line Project
Federal Register · Notice · May 8, 2018
A number of individuals submitted more than one comment. … The comments included a variety of topics such as water resources, wetlands, vegetation, wildlife, land use, recreation, and socioeconomics, air quality and noise, reliability and safety, and alternatives
83 FR 20800Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 13, 2010
Description: Duke Energy Commercial Enterprises, Inc submits FERC Electric notice of succession and clean copy of DECE's FERC Electric Rate Schedule 1 effective 11/25/09. … Description: Application by AEP Texas North Company Under Section 204 of the Federal Power Act for Authorization to Issue Securities. Filed Date: 12/29/2009.
75 FR 1761Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Sep 13, 2011
Background and Authority Title III, Part B 1 of the Energy Policy and Conservation Act of 1975 (EPCA or the Act), Public Law 94-163 (42 U.S.C. 6291-6309, as codified) sets forth a variety of provisions … In written comments on the August 2010 NOPR, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) and the Association of Home Appliance Manufacturers (AHAM) asked that DOE consider referencing
76 FR 56347Energy DepartmentFederal Register · Rule · Jan 10, 2001
DOE provided a 30-day public comment period for the Interim Final Rule and subsequently received comments to the rule from over 30 parties. … See the Notice of Limited Reopening of the Comment Period, 60 FR 45381, 45384 (Aug. 31, 1995).
66 FR 1810Energy DepartmentFederal Register · Uncategorized Document · Oct 21, 1994
You do not need to re-submit comments if you have already done so. … The more specific your comments, the more useful they will be.
Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 23, 2026
boiloff gas handling systems, LNG pumps, controls and safety systems, a fire water system, electric power generation and purchase power, utility systems (heat transfer, fuel gas, nitrogen, instrument air … If you are filing a comment on a particular project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
91 FR 46421Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 18, 2026
Proposed Gabbs Lateral NASF Relocation Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Gabbs Lateral Naval Air … If you are filing a comment on a particular project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
91 FR 13025Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 21, 2000
The main impetus for this work is the commercial implementation of efficient, clean, and cost effective advanced industrial gas turbines with advanced material systems that are deployed in distributed … In addition, applicants must satisfy the requirements of the Energy Policy Act in order to be eligible for award.
65 FR 3436Energy DepartmentChicago Operations Office; Office of Industrial TechnologiesFederal Register · Notice · Mar 26, 2020
The primary issues raised by the commentors are alternative compressor station locations, noise, air quality, visual impacts, and impacts on property values. … All substantive comments will be addressed in the EA.
85 FR 17053Energy DepartmentFederal Energy Regulatory CommissionEl Paso Natural Gas Company; Notice of Application
Federal Register · Notice · Mar 13, 2003
CP03-57-000, an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the regulations of the Federal Energy Regulatory Commission (Commission), for permission … SoLoNox simple cycle gas turbine engine, with appurtenances, which have a combined horsepower rating of 18,390 (ISO). 1 The Solar Centaur 50S-T6100 simple cycle gas turbine engine is equipped with air
68 FR 12057Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 15, 2014
draft EIS assesses the potential environmental effects of the construction and operation of the Aguirre Offshore GasPort Project in accordance with the requirements of the National Environmental Policy Act … The Project will help diversify Puerto Rico's energy sources, allow the Aguirre Plant to meet the EPA's Mercury and Air Toxics Standard rule, reduce fuel oil barge traffic in Jobos Bay, and contribute
79 FR 48137Energy DepartmentFederal Energy Regulatory CommissionMorgantown Energy Technology Center, Financial Assistance Award; (Solicitation Announcement)
Federal Register · Uncategorized Document · Aug 1, 1994
Authority for this action is the DOE Organization Act, Public Law 95-91, and the DOE Financial Assistance Regulations 10 CFR 600. … Multiple cooperative agreement awards are anticipated and will consist of a 3-phase effort having a total estimated period of performance of sixty (60) months.
Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.