Opinion

Total E & P USA, Inc. v. Kerr-McGee Oil & Gas Corp.

  • 711 F.3d 478
  • 2013 WL 949482
Court
Court of Appeals for the Fifth Circuit
Filed
Mar 12, 2013
Status
Published
On the bench
Garza, Dennis, Higginson
Cited by
1 cases
Authority
More cited than 41.1%

The opinion

Case: 11-30038 Document: 00512171964 Page: 1 Date Filed: 03/12/2013

IN THE UNITED STATES COURT OF APPEALS

FOR THE FIFTH CIRCUIT United States Court of Appeals

Fifth Circuit

FILED

March 12, 2013

No. 11-30038 Lyle W. Cayce

Clerk

TOTAL E&P USA, INC.,

Plaintiff - Appellee

STATOIL GULF OF MEXICO, L.L.C.,

Intervenor Plaintiff - Appellee

v.

KERR-MCGEE OIL AND GAS CORP; LYNN BELCHER; C. DAN BUMP;

CATHY ZEORNES GUY; GARY A. HUMMEL; ALLEN D. KEEL; KEVIN A.

SMALL; WAYNE G. ZEORNES,

Defendants - Appellants

LYNN S. BELCHER; C. DAN BUMP; CATHY ZEORNES GUY; GARY A.

HUMMEL; ALLAN D. KEEL; KEVIN A. SMALL; WAYNE G. ZEORNES,

Plaintiffs - Appellants

v.

STATOIL GULF OF MEXICO, L.L.C.,

Defendant - Appellee

Appeals from the United States District Court

for the Eastern District of Louisiana

Case: 11-30038 Document: 00512171964 Page: 2 Date Filed: 03/12/2013

No. 11-30038

Before GARZA, DENNIS, and HIGGINSON, Circuit Judges.

DENNIS, Circuit Judge:

This case involves a contractual interpretation dispute over whether

overriding royalties are payable out of the initial oil and gas production from a

tract of land on the outer continental shelf adjacent to Louisiana. In 1998,

pursuant to the Outer Continental Shelf Lands Act (“OCSLA”),1 the United

States issued a mineral lease of the tract to oil companies for mineral

exploration. In 1999 and 2001, overriding royalty interests (“ORRI”) were

carved out of the lessees’ working interest in all production and assigned to

seven individuals referred to herein as the “Belcher Group” (ORRIs totalling

0.2625% assigned in 1999) and to Kerr-McGee Oil and Gas Corporation (“Kerr-

McGee”) (ORRI of 3.7373% assigned in 2001).

When production under the lease was obtained in 2009, three oil

companies owned the lessees’ working interests: Chevron USA, Inc. (“Chevron”)

(58% share), Total E&P USA, Inc. (“Total”) (17% share), and Statoil Gulf of

Mexico, L.L.C. (“Statoil”) (25% share). Chevron immediately began paying

overriding royalties out of its share of the production to the Belcher Group and

Kerr-McGee. Total and Statoil, however, took the position that they were not

obliged to immediately begin paying overriding royalties out of their shares of

production. They claimed that no overriding royalties were due because the

ORRI assignment contracts contained “calculate and pay” clauses stating that:

“The overriding royalty interest assigned herein shall be calculated and paid in

the same manner and subject to the same terms and conditions as the

landowner’s royalty under the Lease.”2 Total and Statoil asserted that the

“calculate and pay” clauses were intended to suspend their obligation to pay

1

43 U.S.C. § 1331 et seq.

2

Although the two “calculate and pay” clauses vary slightly in wording, it is undisputed

that they are identical in substance.

2

Case: 11-30038 Document: 00512171964 Page: 3 Date Filed: 03/12/2013

No. 11-30038

overriding royalties out of production whenever payments of the United States’

12½% landowner royalty under the lease were to be suspended pursuant to the

Outer Continental Shelf Deep Water Royalty Relief Act (“DWRRA”).3

It is undisputed that, upon the commencement of production under the

lease in 2009, the payment of the government’s 12½% landowner royalties was

determined to be suspended until 87.5 million barrels of oil equivalent had been

produced, pursuant to the DWRRA. Therefore, Total and Statoil argue, no

overriding royalties are due so long as the payment of the U.S. landowner

royalties are suspended. The Belcher Group and Kerr-McGee disagreed,

contending that the “calculate and pay” clauses were not intended to suspend

overriding royalties under any circumstances but were meant to ensure that

overriding royalties would be calculated using the same methods as required by

the lease for measuring and computing the government’s 12½% landowner

royalties. In other words, they argued that the “calculate and pay” clauses were

intended to specify the manner of calculation and payment of overriding

royalties, not to make the accrual of overriding royalties dependent upon the

payment of landowner royalties to the United States. This litigation ensued.

Because Chevron agreed with the ORRI owners’ interpretation of the “calculate

and pay” clauses and continued to pay overriding royalties to them, Chevron has

not been sued or made a party to this case.4

The district court granted a motion for summary judgment by Total and

Statoil, declaring that the “calculate and pay” clauses in the 1999 and 2001

ORRI assignments clearly and explicitly require that the payment of overriding

3

Pub. L. No. 104-58 (1995) (codified at 43 U.S.C. § 1337(a), and with further uncodified

sections present in notes to 43 U.S.C. § 1337).

4

The district court correctly determined that it had jurisdiction over this action

pursuant to OCSLA’s broad jurisdictional grant, 43 U.S.C. § 1349(b)(1). See, e.g., Tidelands

Royalty “B” Corp. v. Gulf Oil Corp., 804 F.2d 1344, 1347 n.1 (5th Cir. 1986).

3

Case: 11-30038 Document: 00512171964 Page: 4 Date Filed: 03/12/2013

No. 11-30038

royalties shall be suspended during the suspension of the U.S. 12½%

landowner’s royalty under the DWRRA. The district court expressly refused to

engage in further interpretation of the assignment contracts in search of the

parties’ intent or to consider any evidence on that issue.

The Belcher Group and Kerr-McGee appealed. The issue on appeal comes

down to whether the language in the “calculate and pay” clauses providing that

the overriding royalties “shall be calculated and paid in the same manner and

subject to the same terms and conditions as the landowner’s royalty under the

lease” clearly, explicitly, and unambiguously was intended to suspend the

payment of overriding royalties if, upon production, the DWRRA were to result

in a threshold suspension of the payment of landowner royalties to the United

States.

We conclude, under the applicable Louisiana law, that the “calculate and

pay” clauses in the ORRI assignment contracts do not clearly and explicitly

express the intent that overriding royalty payments shall be suspended

whenever the U.S. landowner royalties are suspended under the DWRRA; and

that the “calculate and pay” clauses must be interpreted further in search of the

common intent of the parties to the assignment contracts. Assuming without

deciding that the “calculate and pay” clauses may reasonably be interpreted as

Total and Statoil contend, the clauses are at least ambiguous because a

reasonable inference also may be drawn that the “calculate and pay” clauses

merely refer to the lease terms and conditions for the method of calculating

overriding royalties and that they do not intend for the lessees’ obligation to pay

overriding royalties out of production to be suspended altogether under any

circumstances. Because of this ambiguity and permissible inference, there is a

genuine dispute as to a material issue of fact, viz., the assignment contract

parties’ intentions regarding the “calculate and pay” clauses. Therefore,

because, in reviewing the summary judgment de novo, we must resolve all

4

Case: 11-30038 Document: 00512171964 Page: 5 Date Filed: 03/12/2013

No. 11-30038

ambiguities, permissible inferences, and material issues of fact in favor of the

non-moving parties, the Belcher Group and Kerr-McGee, we conclude that

Total and Statoil are not entitled to a judgment as a matter of law. For these

reasons, we reverse the district court’s summary judgment and remand the case

to it for further proceedings.

BACKGROUND

A. Relevant Federal Statutes, Regulations, and Interpretations

To understand the legal context within which the ORRI assignment

contracts must be interpreted, it is helpful to have a general understanding of

the governing federal statutes and regulations, as they have been interpreted by

this court.5

“[OCSLA] authorizes the Secretary of the [Interior] to grant and manage

leases for recovery of oil, gas, and other minerals from submerged lands located

on the Outer Continental Shelf.” Mesa Operating Ltd. P’ship v. U.S. Dep’t of

Interior, 931 F.2d 318, 319 (5th Cir. 1991). “OCSLA thus vests the federal

government with a proprietary interest in the [outer continental shelf] and

establishes a regulatory scheme governing leasing and operations there.” EP

Operating Ltd. P’ship v. Placid Oil Co., 26 F.3d 563, 566 (5th Cir. 1994).

“OCSLA provides that the [Department of the Interior (‘DOI’)] obtains royalties

from lessees based on the ‘amount or value of the production saved, removed, or

sold.’” Mesa Operating Ltd., 931 F.2d at 319-20 (quoting 43 U.S.C. § 1337(a)(1)).

“OCSLA also vests in the Secretary the sole authority and responsibility

to ‘prescribe such rules and regulations as may be necessary to carry out such

5

Section 1 of the lease provides: “This lease is issued pursuant to the Outer Continental

Shelf Lands Act of August 7, 1953, 67 Stat. 462; 43 U.S.C. § 1331 et seq., as amended (92 Stat.

629), (hereinafter called the ‘Act’). The lease is issued subject to the Act; all regulations issued

pursuant to the Act and in existence upon the Effective Date of the this lease; all regulations

issued pursuant to the statute in the future which provide for the prevention of waste and

conservation of all natural resources of the Outer Continental Shelf and the protection of

correlative rights therein; and all other applicable statutes and regulations.”

5

Case: 11-30038 Document: 00512171964 Page: 6 Date Filed: 03/12/2013

No. 11-30038

[leasing] provisions [of OCSLA].’” Id. at 319 (alterations in original) (quoting 43

U.S.C. § 1334(a)). Pursuant to this authority, the DOI has several times issued

regulations governing how royalties on production from OCSLA leases are to be

computed and how lessees are to record and report production information

relevant to those calculations. The regulations in effect when the lease here was

issued in June 1998 were promulgated by the DOI agency then known as the

Mineral and Mining Service (“MMS”). Those regulations provided, inter alia,

that “[a]ll oil (except oil unavoidably lost or used on, or for the benefit of, the

lease, including that oil used off-lease for the benefit of the lease when such off-

lease use is permitted by the [agency], as appropriate) produced from a Federal

. . . lease . . . is subject to royalty,” 30 C.F.R. § 202.100(b)(1) (1997); and that

“[w]hen paid in value, the royalty due shall be the value, for royalty purposes,

[under the regulations] multiplied by the royalty rate in the lease,” id.

§ 202.100(a)(1).6 These provisions apply to the United States’ landowner’s

royalty owed by OCSLA mineral lessees and not to overriding royalties owed by

lessees to third party ORRI owners.

The DWRRA, enacted in 1995 to stimulate deepwater mineral

exploration,7 authorized the DOI to suspend the collection of oil and gas royalties

6

The regulations also set “[t]he value of oil production from [OCSLA] leases” by

reference to “[t]he lessee’s contemporaneous posted prices or oil sales contract prices used in

arms-length transactions for purchases or sales of significant quantities of like-quality oil in

the same field,” or pursuant to one of several alternative formulas. 30 C.F.R. § 206.102(c)

(1997). “Value [was] based on the highest price a prudent lessee can receive through legally

enforceable claims under its contract.” Id. § 206.102(j). “[U]nder no circumstances [was] the

value of production, for royalty purposes, [to] be less than the gross proceeds accruing to the

lessee for lease production, less applicable allowances.” Id. § 206.102(h). Lessees were

required to “make available, upon request to the authorized [government officials], arm’s-

length sales and volume data for like-quality production sold, purchased, or otherwise

obtained by the lessee from the field or area or from nearby fields or areas.” Id. § 206.102(d).

7

See, e.g., 43 U.S.C. § 1337(a)(3)(B) (providing that the DOI may suspend government

royalties “in order to . . . promote development or increased production on producing or non-

producing leases[] or . . . encourage production of marginal resources” on such leases); 63 Fed.

Reg. 2605-1 (Jan. 16, 1998) (“[The DWRRA’s] purpose is to promote development or increased

6

Case: 11-30038 Document: 00512171964 Page: 7 Date Filed: 03/12/2013

No. 11-30038

by the United States as landowner from certain new and preexisting federal,

deepwater leases until specified threshold volumes of production had been

attained, at which time landowner royalty payments would recommence. See

Santa Fe Snyder Corp. v. Norton, 385 F.3d 884, 888-89 (5th Cir. 2004).

Additionally, for new deepwater leases issued between 1996 and 2000 for specific

areas and depths in the Gulf of Mexico, DWRRA § 304 provided qualified lessees

with relief from royalty payments to the United States until a specific volume

of oil or gas had been produced. Id. at 889. However, in issuing federal leases

during this period, MMS by regulation prescribed that “one royalty suspension

volume [would be] shared by all leases producing from a single field” and

“imposed a requirement for policy reasons that no royalty suspension would be

available to leases in fields when any well in that field produced oil or gas prior

to the enactment of the [DWRRA].” Id. at 891. The agency also “impose[d] price

thresholds requiring the payment of royalties on volumes less than the volume

thresholds set by [the DWRRA].” Kerr-McGee Oil & Gas Corp. v. U.S. Dep’t of

Interior, 554 F.3d 1082, 1083 (5th Cir. 2009). When oil and gas prices moved

above those price thresholds, the DOI sought to collect royalties on these leases,

despite the fact that the congressionally set volume thresholds had not yet been

met. Id.

In Kerr-McGee, an oil company challenged the DOI’s order to pay such

royalties, and this court concluded that the agency did not have the authority to

impose price thresholds requiring the payment of royalties to the government on

volumes less than the volume thresholds set by Congress in the DWRRA. Id.

at 1086-87. The court looked to its 2004 decision in Santa Fe Snyder Corp.,

which had held that DWRRA § 304 extends royalty relief to each new lease at

production, or to encourage production of marginal resources, for [Gulf of Mexico] leases lying

west of 87 degrees, 30 minutes West longitude.”).

7

Case: 11-30038 Document: 00512171964 Page: 8 Date Filed: 03/12/2013

No. 11-30038

statutorily-specified locations and water-depths and that the DOI did not have

the authority to limit this royalty relief to new leases that first resulted in

production from a field. See Kerr-McGee, 554 F.3d at 1085-86. Consequently,

until this court’s 2004 and 2009 decisions interpreting and clarifying the

meaning and application of § 304, it could not be predicted with certainty

whether production from a particular new oil and gas well would definitely

qualify for a suspension of the U.S. landowner’s royalty under the DWRRA.

B. The OCSLA Lease and the ORRI Assignment Agreements

MMS issued Lease OCS-G 20082, to Mariner Energy, Inc., and Westport

Oil and Gas Company, Inc. (“Westport”) pursuant to 43 U.S.C. § 1337 and

effective June 1, 1998. The form lease describes the leased property as “[a]ll of

Block 640, Green Canyon, OCS Official Protraction Diagram, NG 15-3.” The

property is located approximately 190 miles south of New Orleans. The lease

was issued with a lessor’s royalty rate of 12½ per cent. A footnote to this royalty

rate provision states: “This lease may be eligible for royalty suspension pursuant

to PL 104-58. If eligible, Sections 5 and 6 [providing for payment of royalty to

Lessor] of this lease instrument will be suspended by 30 C.F.R. Part 26,

published in the Federal Register on January 16, 1998 (63 FR 2626).”8

On November 3, 1999, Westport executed an assignment conveying to six

of the seven of the Belcher Group appellees ORRIs “payable out of all oil, gas,

and casing head gas and associated substances produced, saved, and marketed

from the lease” (emphasis added) in the following percentages: Wayne G.

Zeornes 0.125%; Gary Al Hummel 0.125%; Kevin A. Small 0.125%; C. Dan Bump

8

Sections 5 and 6 of the form lease are boilerplate provisions specifying, inter alia, that

“[t]he Lessee shall pay the Lessor, at the expiration of each lease year which commences after

a discovery of oil and gas in paying quantities, a minimum royalty” of 12½%; that “[t]he Lessee

shall pay [this] fixed royalty . . . in amount or value of production saved, removed, or sold from

the leased area”; that “[t]he Lessor shall determine whether production royalty shall be paid

in amount or value”; and that “[t]he value of production for purposes of computing royalty on

production from this lease shall never be less than the fair market value of the production.”

8

Case: 11-30038 Document: 00512171964 Page: 9 Date Filed: 03/12/2013

No. 11-30038

0.025%; Allan D. Keel 0.025%; Lynn S. Belcher 0.0625%. These individuals were

Westport geoscientists and landmen whom the company chose to reward with

extra compensation by carving overrides for them out of its working interest.

The six Wesport geoscientists and landmen held on to their overrides, except for

Zeornes, who split his override with his ex-wife, Cathy Zeornes Guy. Kerr-

McGee received a 3.7373% ORRI in 2001 pursuant to an assignment containing

a “calculate and pay” provision substantively identical to that in the Belcher

Group assignment, which stated that “[t]he overriding royalties described herein

shall be calculated and paid in the same manner and subject to the same terms

and conditions as the landowner’s royalty under the Lease.”

C. Production Under the Lease and District Court Litigation

Production under the lease began in May 2009. Chevron then began

paying the ORRI owners their designated overriding royalty shares from its

working interest production and has continued to do so ever since. Total began

approving and issuing payments to the override owners but stopped after paying

the Belcher Group about $54,000 in royalties. Statoil made no payments to the

overriding royalty owners. These refusals to pay overriding royalties were

premised on Statoil and Total adopting the position that they were not obligated

to make any payments to appellants until the lease produced 87.5 million barrels

of oil equivalent, on the theory that the “calculate and pay” provisions subjected

appellants’ ORRIs to suspension along with the U.S. landowner’s royalty under

the DWRRA.

On October 2, 2009, Total filed suit against the ORRI owners, the Belcher

Group and Kerr-McGee, in the U.S. District for the Eastern District of Louisiana

seeking a declaratory judgment embracing Total’s interpretation of the ORRI

assignments. In January 2010, the Belcher Group filed suit against Statoil

seeking declaratory judgment that the lessees were obliged to pay overriding

royalties to the ORRI owners from first and all production. The district court

9

Case: 11-30038 Document: 00512171964 Page: 10 Date Filed: 03/12/2013

No. 11-30038

consolidated the cases. Through interventions, third-party claims, and

counterclaims, Total and Statoil became aligned against the Belcher Group and

Kerr-McGee.

Total and Statoil moved for summary judgment, contending that the ORRI

assignment contracts’ “calculate and pay” clauses clearly and explicitly

demonstrate the contracting parties’ intent that overriding royalty payments to

ORRI owners shall be suspended whenever the government’s 12½% landowner

royalty becomes suspended under the DWRRA. Total and Statoil did not submit

any affidavits or other evidence in support of their motion for summary

judgment. Instead, they relied upon what they contend to be the clear and

explicit words of the “calculate and pay” clauses of the assignment contracts.

In opposition to appellees’ motion for summary judgment, appellants

submitted affidavits by the individual members of the Belcher Group and by the

Westport official who approved both of the original ORRI assignments, attesting

that the parties to those assignments intended by the “calculate and pay” clauses

to refer to the lease for the purpose of measuring and computing overriding

royalties and not for the purpose of suspending overriding royalties during the

suspension of the U.S. landowner’s royalty under the DWRRA. Also, the

appellants submitted an expert witness’ survey of representatives of other oil

companies operating in the Gulf of Mexico. This survey purportedly identified

at least eighty other overriding royalty instruments containing “calculate and

pay” provisions like that at issue here and determined that no other company

party to such an instrument interpreted these provisions to subject overriding

royalty interests to “royalty suspension” under the DWRRA. Appellants also

submitted other affidavits and sworn statements from individuals familiar with

the Gulf of Mexico oil industry supporting their reading of the “calculate and

pay” provision. Appellants did not cross-move for summary judgment.

10

Case: 11-30038 Document: 00512171964 Page: 11 Date Filed: 03/12/2013

No. 11-30038

On December 14, 2010, the district court granted summary judgment for

the appellees, concluding that the “calculate and pay” provisions clearly and

explicitly express the common intent of the assignment contract parties that the

payment of overriding royalties shall be suspended whenever the payment of the

government’s 12½% landowner’s royalty is suspended under the DWRRA.9 In

sum, the district court reasoned as follows:

[I]t is undisputed that the DWRRA applies to the subject Lease,

and thus, the federal government’s royalty is suspended during

production of the first 87.5 million barrels of oil equivalent. . . . [T]he

subject “calculate and pay” clauses are not ambiguous because they

clearly provide that the overriding royalties “shall be calculated and

paid in the same manner and subject to the same terms and

conditions as the landowner’s [federal government’s] royalty under

the Lease.” Thus, Total’s and Statoil’s payments of the overriding

royalty interest payments are suspended until production reaches

the 87.5 million barrels of oil equivalent.

Total E&P USA, Inc. v. Kerr-McGee Oil & Gas Corp., Nos. 09-CV-6644 &

10-CV-106, 2010 WL 5207591, at *4 (E.D. La. Dec. 14, 2010) (fourth alteration

in original).

The district court refused to consider the opposing affidavits served and

filed by appellants as extrinsic evidence tending to show the original assignment

parties’ intent that the “calculate and pay” clauses refer to the terms and

conditions of the lease for the purpose of measuring and computing the

overriding royalties and not for the purpose of defeating or deferring overriding

royalties while the government’s 12½% landowner’s royalty is suspended under

9

Appellants argue in the alternative that the contract should be reformed on the basis

of mutual mistake because none of the original contracting parties to the assignment of

overriding royalty interests intended that the clause would have the meaning ascribed to it

by the district court. Because we conclude that the ORRI assignment contracts containing the

“calculate and pay” provisions do not clearly and explicitly require that payment of overriding

royalties from production shall ever be suspended because the government’s landowner royalty

is suspended, and that further interpretation is required in search of the assignment parties’

intent, we reverse and remand the case for further proceedings in that regard, without

reaching the appellants’ alternative contract reformation argument.

11

Case: 11-30038 Document: 00512171964 Page: 12 Date Filed: 03/12/2013

No. 11-30038

the DWRRA. The district court concluded that the provision regarding words of

art and technical terms set forth in Louisiana Civil Code article 204710 did not

apply because “there is no one word or group of words in the subject ‘Calculate

and Pay’ provisions that is subject to a technical meaning.” Total, 2010 WL

520791, at *4. The district court thus stated that it “need not consider extrinsic

evidence to give the words of these provisions their generally prevailing

meaning.” Id. After quoting Civil Code article 2046,11 the district court further

reasoned:

Here, there are no absurd consequences of tying the overriding

royalty owners’ payments to those of the federal government as

landowner, and treating the overriding royalty owner no better or

worse than the federal government. The DWRRA was enacted

several years before either assignment here was executed, and the

original parties to the assignments were charged with the

knowledge of that law before the assignments were executed. If the

original parties to the assignments had intended to provide for

payment of the overriding royalties on the first 87.5 million barrels

when federal royalties on the same production was suspended by

the DWRRA, they were obligated to “expressly state their intent in

[their] agreement.”

Id. at *5 (alteration in original) (citations omitted) (quoting Kenner Indus., Inc.

v. Sewell Plastics, Inc., 451 So. 2d 557, 560 (La. 1984)).

The Belcher Group and Kerr-McGee timely appealed.

DISCUSSION

We review the district court’s grant of summary judgment de novo,

affirming only if the moving party has demonstrated that there is no genuine

issue as to any material fact and that judgment as a matter of law is warranted.

10

Article 2047 provides in part: “Words of art and technical terms must be given their

technical meaning when the contract involves a technical matter.” La. Civ. Code art. 2047.

11

Article 2046 provides: “When the words of a contract are clear and explicit and lead

to no absurd consequences, no further interpretation may be made in search of the parties’

intent.” La. Civ. Code art. 2046.

12

Case: 11-30038 Document: 00512171964 Page: 13 Date Filed: 03/12/2013

No. 11-30038

McMurray v. ProCollect, Inc., 687 F.3d 665, 669 (5th Cir. 2012); see Fed. R. Civ.

P. 56(c). In determining whether a case presents triable issues of fact, we, like

the district court, may not make credibility determinations or weigh the evidence

and we must resolve all ambiguities and draw all permissible inferences in favor

of the non-moving party. See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 255

(1986); Int’l Shortstop, Inc. v. Rally’s, Inc., 939 F.2d 1257, 1263 (5th Cir. 1991).

“Under the OCSLA, the law to be applied to the [outer continental shelf]

is exclusively federal, albeit the law of the adjacent state is adopted as surrogate

federal law to the extent that such law is applicable and not inconsistent with

federal law.” EP Operating Ltd. P’ship, 26 F.3d at 566. Here, the parties agree

that Louisiana contract law governs the interpretation of the ORRI assignment

contracts at issue, “[t]o the extent that [law is] applicable and not inconsistent

with [OCSLA] or with other Federal laws and regulations,” because Louisiana

is the state adjacent to the portion of the outer continental shelf where the

oilfield is located. See 43 U.S.C. § 1333(a)(2)(A); see also Gardes Directional

Drilling v. U.S. Turnkey Exploration Co., 98 F.3d 860, 865 (5th Cir. 1996)

(explaining that “OCSLA uses state law to fill gaps in federal law”).

“In order to determine state law, federal courts look to final decisions of

the highest court of the state. When there is no ruling by the state’s highest

court, it is the duty of the federal court to determine as best it can, what the

highest court of the state would decide.” Transcont’l Gas Pipe Line Corp. v.

Transp. Ins. Co., 953 F.2d 985, 988 (5th Cir. 1992) (citing, inter alia, Comm’r of

Internal Revenue v. Estate of Bosch, 387 U.S. 456 (1967)).

Under Louisiana law, the essential quality of an overriding oil and gas

royalty is that of a real right to receive and collect a fraction or a percentage of

the production of minerals, carved out of the mineral lessee’s or the servitude

owner’s working interest in production, free of drilling and production costs.

The Louisiana Supreme Court has explained that “[t]he lessor’s royalty is

13

Case: 11-30038 Document: 00512171964 Page: 14 Date Filed: 03/12/2013

No. 11-30038

distinguished from the mineral royalty and the overriding royalty. The former

is the right to participate in the production of mineral from land or a servitude

belonging to another, La. Rev. Stat. § 31:80, while the latter is carved out of the

lessee’s working interest in the lease.” Frey v. Amoco Prod. Co., 603 So. 2d 166,

171 n.8 (La. 1992); see Plaquemines Parish Comm’n Council v. Delta Dev. Co.,

Inc., 486 So. 2d 129, 134 (La. Ct. App. 1986) (“The overriding mineral royalty is

a passive, non-cost bearing mineral interest carved out of the lessee’s working

interest and is dependent upon the continued existence of the mineral lease.”

(citing, inter alia, Fontenot v. Sun Oil Co., 243 So. 2d 783 (La. 1971)), rev’d on

other grounds, 502 So. 2d 1034 (La. 1987)); Williams & Meyers, Manual of Oil

& Gas Terms (2009) (defining an “overriding royalty” as “[a]n interest in oil and

gas produced at the surface, free of the expense of production, and in addition to

the usual landowner’s royalty reserved to the lessor in an oil and gas lease”).

The Louisiana Supreme Court has consistently applied the Louisiana Civil

Code articles on the interpretation of contracts, along with other applicable

provisions of state law, in deciding cases involving oil and gas lease and royalty

questions. See, e.g., Frey, 603 So. 2d at 172. The court has summarized the

relevant principles as follows:

The purpose of interpretation is to determine the common intent of

the parties. See La. Civ. Code art. 2045. Words of art and technical

terms must be given their technical meaning when the contract

involves a technical matter, see La. Civ. Code art. 2047, and words

susceptible of different meanings are to be interpreted as having the

meaning that best conforms to the object of the contract. See La.

Civ. Code art. 2048. A doubtful provision must be interpreted in

light of the nature of the contract, equity, usages, the conduct of the

parties before and after the formation of the contract, and other

contracts of a like nature between the same parties. La. Civ. Code

art. 2053. When the parties made no provision for a particular

situation, it must be assumed that they intended to bind themselves

not only to the express provisions of the contract, but also to

whatever the law, equity, or usage regards as implied in a contract

14

Case: 11-30038 Document: 00512171964 Page: 15 Date Filed: 03/12/2013

No. 11-30038

of that kind or necessary for the contract to achieve its purpose. La.

Civ. Code art. 2054.

Frey, 603 So. 2d at 172.

In Louisiana, “[p]arol or extrinsic evidence is generally inadmissible to

vary the terms of a written contract unless there is ambiguity in the written

expression of the parties’ common intent.” Blanchard v. Pan-OK Prod. Co., Inc.,

755 So. 2d 376, 381 (La. Ct. App. 2000). “A contract is considered ambiguous on

the issue of intent when it lacks a provision bearing on that issue or when the

language used in the contract is uncertain or is fairly susceptible to more than

one interpretation.” Id.; accord CLK Co., LLC v. CXY Energy, Inc., 972 So. 2d

1280, 1287 (La. Ct. App. 2007); see Dixie Campers, Inc. v. Vesely Co., 398 So. 2d

1087, 1089 (La. 1981) (“[W]e conclude that the contract in this case is susceptible

to more than one reasonable interpretation rendering it ambiguous and

uncertain as to the intention of the parties.”). “These rules are applicable even

to contracts involving rights in immovable property, such as mineral rights.”

Blanchard, 755 So. 2d at 381.

Accordingly, when a contract provision relating to mineral rights is

ambiguous on a pivotal issue, the Louisiana Supreme Court and Courts of

Appeal have interpreted the provision as having the meaning that best conforms

to the object of the contract, in light of the nature of the contract, equity, and

usages, including extrinsic evidence as to custom and practices in the oil and gas

industry. See, e.g., Musser Davis Land Co. v. Union Pac. Res., 201 F.3d 561, 565-

67 (5th Cir. 2000); Henry v. Ballard & Cordell Corp., 418 So. 2d 1334, 1339-40

(La. 1982).12

12

In Henry, the Louisiana Supreme Court explained: “In ascertaining [the contracting

parties’] intention (where it cannot be adequately discerned from the contract or agreement

as a whole) the circumstances surrounding the parties at the time of contracting are a relevant

subject of inquiry.” Henry, 418 So. 2d at 1339-40 (citing Cooley v. Meridian Lumber Co., 197

So. 255, 258 (La. 1940)); see Frey, 603 So. 2d at 173 (“[In Henry,] we reasoned the ambiguity

in the royalty provision could not be resolved without consideration of the practical and

15

Case: 11-30038 Document: 00512171964 Page: 16 Date Filed: 03/12/2013

No. 11-30038

Applying the foregoing principles, we conclude that the “calculate and pay”

clauses do not clearly and explicitly show that the parties to the assignment

contracts intended that the lessees’ obligation to pay overriding royalties out of

production would ever be suspended under any circumstances. There is no

reference whatsoever to “royalty suspension” or “overriding royalty suspension”

in the assignment contracts. The “calculate and pay” clauses clearly and

explicitly provide only that overriding royalties “shall be calculated and paid in

the same manner and subject to the same terms and conditions as the

landowner’s royalty under the Lease.” Those clauses do not clearly and explicitly

state that payment of overriding royalties shall be suspended during the

temporary or threshold suspension of the payment of the government’s

landowner royalty under the DWRRA. Consequently, under Civil Code article

2046 and the Louisiana cases, a court may not find that the parties intended to

suspend the overriding royalty obligation based exclusively on the words of the

calculate and pay clauses but must interpret the overriding royalty contracts

further in search of the parties’ common intent. See CLK, 972 So. 2d at 1286 (“A

contract is considered ambiguous . . . when it lacks a provision bearing on [a

particular] issue or when the language used in the contract is uncertain or is

economic realities of the oil and gas industry at the time the leases were negotiated . . . .”);

Cooley, 197 So. at 258 (“[W]e must give consideration to the surrounding circumstances

existing at the time the contract was made[.]”). “In interpreting a contract ‘it should be

construed in the light of the circumstances surrounding [the parties] at the time it is made,

it being the duty of the court to place itself as nearly as may be in the same situation of the

parties at the time, so as to view the circumstances as they viewed them, and so to judge the

meaning of the words and the correct application of the language of the contract.” Henry, 418

So. 2d at 1339 n.12 (alteration in original) (quoting C. A. Andrews Coal Co. v. Bd. of Dirs. of

Pub. Schools, Parish of Orleans, 92 So. 303, 304 (La. 1922)). “The custom of the industry may

also be considered in determining the true intent of the parties as to ambiguous contract

provisions.” Id. at 1340 (citing, inter alia, Fee v. Vancouver Plywood Co., Inc., 331 So. 2d 151,

155 (La. Ct. App. 1976)); cf. Wadkins v. Wilson Oil Corp., 6 So. 2d 720, 724-25 (La. 1942)

(affirming cancellation of mineral lease for lessee’s failure to develop leased premises

according to recognized custom and progressive practices among operators in the field).

16

Case: 11-30038 Document: 00512171964 Page: 17 Date Filed: 03/12/2013

No. 11-30038

fairly susceptible to more than one interpretation.” (quoting Blanchard, 755 So.

2d at 381)).

Our conclusion is further supported by the well-recognized distinction

between overriding royalty interests and a lessor’s royalty. Unlike the

government’s royalty reserved under OCSLA, “[a]n overriding royalty [interest]

is a fractional interest in the gross production of oil and gas under a lease, in

addition to the usual royalties paid to the lessor.” Meeker v. Ambassador Oil Co.,

308 F.2d 875, 882 (10th Cir. 1962) (emphasis added), rev’d on other grounds, 375

U.S. 160 (1963). Thus, an overriding royalty interest “is an interest carved out

of the lessee’s share of the oil and gas, ordinarily called the working interest, as

distinguished from the owner’s reserved royalty interest.” Id. (emphasis added);

see also Frey, 603 So. 2d at 171 n.8 (explaining that “[t]he lessor’s royalty is

distinguished from the . . . overriding royalty” interest, which “is carved out of

the lessee’s working interest in the lease”). Particularly in light of this

longstanding distinction drawn between overriding royalty interests and the

royalties reserved by the landowner, we disagree with the district court’s

reasoning that the contracting parties were obligated to expressly state that

royalty suspension would not apply to appellants’ overriding royalty interests.

See Total, 2010 WL 5207591, at *5. Rather, the absence of any clear indication

anywhere in the assignment contracts, lease, or relevant statutory scheme that

statutory suspension of government royalties was also, counterintuitively,

intended to apply to the overriding royalty interests renders the contracts at

least ambiguous on this issue.

Moreover, the syntax of the ORRI assignments and lease provisions,

without further interpretation or evidence, do not clearly or explicitly require the

reading of them argued for by Total and Statoil. The ORRI assignment contracts

state that the overriding royalty percentages shall be “payable out of all oil, gas,

and casing head gas and associated substances produced, saved, and marketed

17

Case: 11-30038 Document: 00512171964 Page: 18 Date Filed: 03/12/2013

No. 11-30038

from the lease” (emphasis added); and it is undisputed that the lessees’ share of

production begins with and is payable throughout production from the lease.

This reasonably can be read to signify that the overriding royalty shall be

payable from the lessees’ share of production over its entirety, and not only

during periods in which the landowner is entitled to a royalty share of

production. Likewise, the simple affirmative declaration that the overriding

royalty shall be calculated and paid in the same manner and subject to the same

terms and conditions as the landowner’s royalty is calculated and paid under the

lease does not indicate that the overriding royalties paid out of the lessees’ share

of production shall ever be suspended during that production. To require a

suspension of overriding royalties payable from the lessees’ production before the

lessees actually cease to receive production from the lease would add an

exception or condition to the grants of overriding royalties upon which the

lessees and override owners in those contracts did not clearly or explicitly agree.

Furthermore, Total and Statoil tacitly concede that they cannot completely

and finally rely on what they contend to be the clear and explicit words of the

“calculate and pay” clauses. They ultimately contend that reading these clauses

of the assignment contracts together with a footnote in the underlying lease

shows that the assignment parties intended to suspend the override obligation

during any suspension of the United States’ right to collect landowner’s royalty.

This alternative argument’s reading together of three different contracts, one to

which none of the ORRI owners was a party, however, does not produce clear

and explicit words showing an intent by the original lessees and the ORRI

owners to suspend the lessees’ obligation to pay them overriding royalties out of

the lessees’ share of production. It simply adds an indefinite, unclear, and

ambiguous footnote from the lease to the interpretative problem facing the

courts in this case.

18

Case: 11-30038 Document: 00512171964 Page: 19 Date Filed: 03/12/2013

No. 11-30038

The footnote that Total and Statoil seek to rely upon in the underlying

lease between the United States, as lessor, and Mariner Energy and Westport,

as lessees, states: “This lease may be eligible for royalty suspension pursuant to

PL 104-58. If eligible, Sections 5 and 6 of the lease instrument will be

superseded by 30 CFR, Part 26, published to the Federal Register on January

16, 1998 (63 FR 2626).” The footnote does not clearly and explicitly express an

intention by the lessor and lessees that the lease “shall be eligible” for royalty

relief under the DWRRA. Therefore, royalty suspension was not clearly and

explicitly made a term or condition of the lease that was binding on the lease

parties or third parties. For these reasons, and also because the Belcher Group

and Kerr-McGee were not parties to the lease, the footnote expresses no clear

and explicit agreement or intent by the overriding royalty owners to forfeit or

defer any of their rights to overriding royalties payable by the lessees out of any

future production under the lease.13 Furthermore, as we have discussed earlier

in this opinion, in 1999 and 2001 when the ORRI assignments were made,

13

The dissent’s reliance on Petrohawk Properties, L.P. v. Chesapeake Louisiana, L.P.,

689 F.3d 380 (5th Cir. 2012), for the proposition that overriding royalty suspension was

incorporated by reference is unpersuasive, in part because that case is clearly distinguishable.

In Petrohawk, the parties to a new mineral lease explicitly incorporated by reference all but

specifically designated provisions from an earlier lease. We held that the parties thereby

adopted an express exclusion of warranty of title clause from the old lease because it was not

designated for change or deletion in the new lease. Essentially, the same parties expressly

re-adopted the exclusion of warranty of title clause that they had agreed to in their previous

lease contract. See id. at 394. Here, the parties to the ORRI assignments are not the same

as the parties to the mineral lease, and they did not expressly incorporate the subjunctive

footnote in the mineral lease. JS&H Const. Co. v. Richmond Cnty. Hosp. Auth., 473 F.2d 212

(5th Cir. 1973), is inapposite as well. There, a construction sub-contractor entered an

agreement with the prime contractor expressly incorporating by reference the “General

Conditions” of the prime contract which included a provision that the parties would submit

contract disputes to arbitration. We held that the sub-contractor was bound by the arbitration

provision because a strong policy favors arbitration and the subcontractor’s express agreement

to incorporate the “General Conditions” of the prime contract is generally effective when the

provisions so adopted have a reasonably clear and ascertainable meaning. Id. at 214-16.

Here, the situation is different. This case does not involve arbitration of public contract

disputes and the ORRI assignment contract parties did not expressly agree to incorporate any

lease term dictating suspension of overriding royalties.

19

Case: 11-30038 Document: 00512171964 Page: 20 Date Filed: 03/12/2013

No. 11-30038

whether production from a particular eligible lease would receive landowner’s

royalty suspension under the DWRRA, regardless of the fluctuating prices of oil

and gas or of whether the well was the first in its field, was not reasonably

foreseeable until the decisions of this court in Santa Fe Snyder Corp. v. Norton,

385 F.3d 884 (5th Cir. 2004), and Kerr-McGee Oil & Gas Corp. v. U.S. Dep’t of

Interior, 554 F.3d 1082 (5th Cir. 2009). “In interpreting a contract ‘it should be

construed in the light of the circumstances surrounding [the parties] at the time

it is made, it being the duty of the court to place itself as nearly as may be in the

same situation of the parties at the time, so as to view the circumstances as they

viewed them, and so to judge the meaning of the words and the correct

application of the language of the contract.” Henry, 418 So. 2d at 1339 n.12

(alteration in original). Even if we were to presume that the parties to the

assignment contracts could foresee that the lessees would be entitled to

landowner royalty relief under the DWRRA, they still did not subscribe to any

words that clearly and explicitly state any intent to suspend, forfeit, or defer

overriding royalty rights. Consequently, reading the “calculate and pay” clauses

of the ORRI assignment contracts together with the underlying lease’s footnote

does not clearly and explicitly show that the assignment contract parties

intended to suspend the lessees’ obligation to pay overriding royalties to the

ORRI owners whenever the government’s 12½% landowner’s royalty is

suspended under the DWRRA or that the lessees’ obligations to pay overriding

royalties out of production to the override owners would be suspended under any

circumstances.14

14

Moreover, as discussed above, under the implementing regulations in force on the

dates the lease was issued and the assignment contracts were entered, “when production

occur[red] from an eligible lease, the Interior [Department would] determine[] from what field

the lease [was] producing and what royalty suspension volume (if any) applie[d] to the lease,”

and “[n]ew [l]eases only received the benefit of royalty suspension if the lease was determined

to be in a field that had not produced prior to the enactment of the [DWRRA].” Santa Fe

Snyder Corp., 385 F.3d at 889-90. Thus, at the time the form lease was issued, royalty

20

Case: 11-30038 Document: 00512171964 Page: 21 Date Filed: 03/12/2013

No. 11-30038

Accordingly, we disagree with the district court, which reached the

opposite result based on the following reasoning:

[I]t is undisputed that the DWRRA applies to the subject Lease, and

thus, the federal government’s royalty is suspended during

production of the first 87.5 million barrels of oil equivalent. Now,

having examined the four corners of the subject Assignments and

interpreting each provision “in light of the other provisions so that

each is given the meaning suggested by the contract as a whole” (La.

Civil Code Art. 2050), the court finds that the subject “Calculate and

Pay” clauses are not ambiguous because they clearly provide that

the overriding royalties “shall be calculated and paid in the same

manner and subject to the same terms and conditions as the

landowner’s [federal government’s] royalty under the Lease.” Thus,

Total’s and Statoil’s payments of the overriding royalty interest

payments are suspended until production reaches the 87.5 million

barrels of oil equivalent.

Total, 2010 WL 5207591, at *4 (second alteration in original).

Of course, the district court is correct that it is now undisputed that the

DRWWA landowner’s royalty relief applies to the subject lease. But as we have

pointed out, that was not so when the subject lease was issued in 1998 or when

the ORRI assignment contracts were entered in 1999 and 2001. Prior to the

litigation that culminated in our decisions in Santa Fe Snyder Corp. in 2004 and

Kerr-McGee in 2009, it was at most speculative whether the lessees under the

subject lease would receive the benefit of DRWWA landowner’s royalty relief if

and when production were obtained. That is likely why the footnote in the lease

suspension was one possible outcome of an administrative process, provided for not by the

lease but by statute and regulation, and which in turn depended on whether the lease was

deemed “eligible” and whether the relevant field had produced prior to the effective date of the

DWRRA. See id. The lease nowhere indicates whether the field in which it is located is one

that had produced prior to that date. Thus, it cannot be said that the footnote constitutes a

clear and explicit term or condition of the lease requiring a suspension of landowner’s royalty.

21

Case: 11-30038 Document: 00512171964 Page: 22 Date Filed: 03/12/2013

No. 11-30038

is indefinite and says only that the lessees “may” be eligible for landowner

royalty relief.15

Furthermore, simply because a lessee is entitled to DRWWA relief from

paying the government landowner royalties until a specified quantity of

production has occurred does not relieve the lessee from the obligation of

measuring, calculating, and accounting for its production of oil and gas from the

leased property. OCSLA and applicable DOI regulations continue to specify how

that production is measured, calculated, and accounted for. See, e.g., 43 U.S.C.

§ 1337(a)(C) (limiting government royalty relief to specific production volumes);

30 C.F.R. §§ 250.1201-03 (setting forth and incorporating by reference

requirements for measuring oil and gas production from OCSLA leases); 30

C.F.R. §§ 1206.100-60 (“explain[ing] how [OCS] lessee[s] must calculate the

value of production for royalty purposes consistent with the mineral leasing

laws, other applicable laws, and lease terms”); cf. Abraham v. BP Am. Prod. Co.,

685 F.3d 1196, 11991203 (10th Cir. 2012) (noting that there are “specific and

comprehensive federal regulations” setting forth “federal royalty calculation

requirements”).16 The lease here was, of course, expressly “issued subject to

15

The dissent contends that there is no “lack of clarity regarding whether the royalty

suspension period was a term of the lease that the overriding royalties became subject to

through the ‘calculate and pay’ clauses.” As already explained, however, the only reference

to the DWRRA in the lease is the indefinite and ambiguous statement that the lease “may” be

eligible for suspension of government royalties under the DWRRA. Moreover, neither the

DWRRA nor its implementing regulations have ever purported to suspend or affect lessees’

obligations to pay overriding royalties to ORRI owners out of production. In arguing that this

“footnote negates the lessee’s duty to make royalty payments,” such that “royalty suspension

is a term or condition of the landowner’s royalty under the lease,” the dissent conflates

overriding royalty with landowner royalty and refuses to acknowledge the crucial legal

distinctions in source and nature of the two kinds of royalty. See, e.g., Frey, 603 So. 2d at 171

n.8.

16

All of this tends to bolster the ORRI owners’ argument that the “calculate and pay”

clauses reasonably can be construed to refer to the federal methods of measuring, calculating

and paying overriding royalties, rather than to any suspension of overriding royalties, and that

the “calculate and pay” clauses are therefore ambiguous and require further interpretation.

22

Case: 11-30038 Document: 00512171964 Page: 23 Date Filed: 03/12/2013

No. 11-30038

[OCSLA] . . . and all . . . applicable statutes and regulations,” including

specifically “all regulations issued pursuant to [OCLSA] . . . which provide for . . .

the protection of correlative rights.” Without clearly stated methods of

measurement, calculation, and accounting, the federal government as landowner

would not have certain knowledge of how much production had occurred or when

its rights to collect landowner’s royalty would recommence. Consequently, the

“calculate and pay” clauses may reasonably be interpreted as intended to entitle

the ORRI owners to their share of the lessees’ production under these same

methods of measurement, calculation, and accounting without relieving the

lessees of their obligation to pay overriding royalties to the ORRI owners out of

the entirety of the lessees’ working interest production.

In other words, the “calculate and pay” clauses reasonably may be

interpreted to mean that the overriding royalty payments shall be calculated and

paid by using the same methods prescribed for the measurement and

computation of the landowner’s royalty under the terms and conditions of the

lease, which is specifically subject to the federal regulations’ provisions for

measuring, calculating, and accounting for production, instead of meaning that

the payment of overriding royalties shall be suspended if the landowner’s royalty

were to be suspended under the DWRRA. Although we have assumed that Total

and Statoil’s contrary interpretation is equally as reasonable for purposes of

their summary judgment motion, we conclude that the clauses are ambiguous

and require further interpretation in search of the parties’ intent.

The district court, on the other hand, did not specifically address the

ORRI owners’ reasonable interpretation of the clauses, despite the ORRI owners’

extensive arguments for it in their opposition to summary judgment.

Consequently, the district court erroneously concluded that the clauses are not

ambiguous but that they clearly and explicitly are meant to suspend overriding

royalties during any suspension of the landowner’s royalty, as well as, or,

23

Case: 11-30038 Document: 00512171964 Page: 24 Date Filed: 03/12/2013

No. 11-30038

instead of, to prescribe the methods for their calculation. The district court

stated that it had examined the assignment contracts, and each of their

provisions together with the others, and had found “that the subject ‘Calculate

and Pay’ clauses are not ambiguous because they clearly provide that the

overriding royalties ‘shall be calculated and paid in the same manner and

subject to the same terms and conditions as the landowner’s [federal

government’s] royalty under the Lease.’” Total, 2010 WL 5207591, at *4

(alteration in original). We do not find the district court’s reasoning persuasive

because the words of the “calculate and pay” clauses are not clear, explicit, and

unambiguous, and the district court did not offer any other reason for finding

these provisions unambiguous.

Because the ORRI owners, the Belcher Group and Kerr-McGee, did not

file a cross motion for summary judgment or ask for any relief here other than

a reversal of the district court’s judgment, we do not reach the parties’ other

arguments or consider the affidavits submitted in opposition to summary

judgment below. Under Louisiana law, interpretation of a contract is the

determination of the common intent of the parties, La. Civ. Code art. 2045, and

when the words of a contract are clear and explicit and lead to no absurd

consequences, no further interpretation may be made in search of the parties’

intent, id. art. 2046. However, the inverse of Article 2046 is also true: when the

words of the contract are not clear and explicit, but are ambiguous, a court

should engage in further interpretation in search of the parties’ intent by

applying the Louisiana Civil Code articles on contractual interpretation and

pertinent Louisiana cases. See, e.g., Henry, 418 So. 2d at 1339-40 (“In

ascertaining th[e] [contracting parties’] intention (where it cannot be adequately

discerned from the contract or agreement as a whole) the circumstances

surrounding the parties at the time of contracting are a relevant subject of

inquiry. . . . The custom of the industry may also be considered in determining

24

Case: 11-30038 Document: 00512171964 Page: 25 Date Filed: 03/12/2013

No. 11-30038

the true intent of the parties as to ambiguous contract provisions.”); Russell v.

City of New Orleans, Dep’t of Prop. Mgmt., 732 So. 2d 66, 70 (La. Ct. App. 1999)

(“The words of the contract are not clear and explicit . . . , so further

interpretation may be made in search of the common intent.”). That is the

situation here. Therefore, we reverse the district court’s grant of summary

judgment and remand the case to it for further proceedings in which it should

consider relevant evidence in interpreting the disputed provisions in accordance

with applicable principles of Louisiana law on the interpretation of contracts.

CONCLUSION

For these reasons, the district court’s judgment is reversed and the case

is remanded to it for further proceedings consistent with this opinion.

25

Case: 11-30038 Document: 00512171964 Page: 26 Date Filed: 03/12/2013

No. 11-30038

HIGGINSON, Circuit Judge, concurring:

I agree with Judge Dennis’ reasoning and outcome, but write to explain in

further detail why I believe the contracts’ language is ambiguous.

The overriding royalty interest (“ORRI”) assignment contracts contain

“calculate and pay” clauses stating: “The overriding royalty interest assigned

herein shall be calculated and paid in the same manner and subject to the same

terms and conditions as the landowner’s royalty under the Lease.” Like many

complex sentences, ambiguity exists in this one’s structure. ORRI is the subject,

and one predicate is the “calculate[ ] and pay” verb phrase.

Appellants imply that the prepositional phrase and subordinate clause

that follow—i.e., “in the same manner and subject to the same terms and

conditions”—modify that verb phrase, cf. Int’l Primate Prot. League v. Adm’rs of

Tulane Educ. Fund, 500 U.S. 72, 79-80 (1991), and because the verb phrase

“calculate[ ] and pay” is affirmative, it logically does not imply its opposite,

nonpayment or suspension. Manners and terms and conditions all contemplate

payment in the first place. In simpler terms, this reading would be less

ambiguous if written as follows: “The ORRI shall be calculated and paid in the

same manner as the landowner’s royalty under the Lease,” persuasively,

therefore, not contemplating suspension altogether, but just regulating payment.

Contrastingly, Appellees’ argument points to meaning from a different

grammatical arrangement, where ORRI itself is modified by the final clause

“subject to the same terms and conditions as the landowner’s royalty,” hence,

plausibly, subject even to nonpayment or suspension altogether. In simpler, less

ambiguous terms: “The ORRI shall be subject to the same terms and conditions

as the landowner’s royalty under the Lease,” even if that condition is suspension

altogether. Indeed, had the sentence separated that dependent clause by

26

Case: 11-30038 Document: 00512171964 Page: 27 Date Filed: 03/12/2013

No. 11-30038

commas—thus: “, and subject to the same terms and conditions,”—Appellees

would have a stronger argument as to clarity of meaning.

Given the language of the contracts, however, I cannot say that, for the

reasons above, the sentence is free of ambiguity.

27

Case: 11-30038 Document: 00512171964 Page: 28 Date Filed: 03/12/2013

No. 11-30038

EMILIO M. GARZA, Circuit Judge, dissenting:

I

Because royalty suspension is a term or condition of royalty payment under

the lease and the “calculate and pay” clauses of the assignment contracts make

the overriding royalty interests subject to the same terms and conditions as the

landowner’s royalty under the lease, I respectfully dissent from the majority’s

conclusion that the assignment contracts are ambiguous.

Royalty suspension is unambiguously a term or condition of the

landowner’s royalty under the lease. The first footnote of the lease states, “This

lease may be eligible for royalty suspension pursuant to PL 104-58.” PL 104-58

refers to Public Law No. 104-58, which includes the Outer Continental Shelf Deep

Water Royalty Relief Act (hereinafter “DWRRA”). According to the DWRRA,

“suspension of royalties shall be set at a volume of not less than . . . 87.5 million

barrels of oil equivalent for leases in water depths greater than 800 meters.”

Pub. L. No. 104-58. It is undisputed that because this lease covered a block of

property located in water depths greater than 800 meters, the landowner’s

royalty is suspended on the first 87.5 million barrels of oil produced under the

lease. The footnote next states, “If eligible, Sections 5 and 6 [providing for

payment of royalty to Lessor] of this lease instrument will be suspended by 30

C.F.R. Part 26 . . . .” 30 CFR Part 2601 refers to Outer Continental Shelf Oil and

Leasing, 43 U.S.C. § 1331 et seq, where the provisions of the DWRRA are

codified. The footnote thus clearly requires that if the lease is eligible for royalty

suspension under the DWRRA, Sections 5 and 6 of the lease will be suspended.

As Sections 5 and 6 of the lease provide instructions for calculating and paying

the landowner’s royalty under the lease, the footnote unambiguously makes

1

Because 30 CFR Part 260 refers to Outer Continental Shelf Oil and Leasing, 43 U.S.C.

§ 1331 et seq, and 30 CFR Part 26 does not exist, the footnote likely intended to refer to 30

CFR Part 260.

28

Case: 11-30038 Document: 00512171964 Page: 29 Date Filed: 03/12/2013

No. 11-30038

royalty suspension a term or condition of payment of the landowner’s royalty

under the lease.

The majority, however, finds it ambiguous whether the footnote is a term

or condition of the lease because the footnote states the lease “may be eligible”

rather than “shall be eligible.” The majority might be correct if the footnote did

not also state, “If eligible, Sections 5 and 6 of this lease instrument will be

superseded by 30 CFR Part 26. . . .” (emphasis added). Black’s Law Dictionary

defines a “term” as a “contractual stipulation,” BLACK’S LAW DICTIONARY 1608

(9th ed. 2009), and a “condition” as “a future and uncertain event on which the

existence or extent of an obligation or liability depends; an uncertain act or event

that triggers or negates a duty to render a promised performance.” Id. at 333.

The footnote clearly stipulates that the lease’s provisions for payment of

royalties are superseded by the DWRRA if the lease is eligible for royalty

suspension, thus qualifying the lessee’s contractual duty to make royalty

payments to the United States. Where the lease is eligible for royalty

suspension, the footnote negates the lessee’s duty to make royalty payments. As

such, royalty suspension is a term or condition of the landowner’s royalty under

the lease.

The “calculate and pay” clauses in the assignment contracts

unambiguously make the overriding royalty interests subject to the same terms

and conditions as the landowner’s royalty under the lease. The “calculate and

pay” clauses of the Westport Assignment to the Belcher Group state, “The

overriding royalty interest assigned herein shall be calculated and paid in the

same manner and subject to the same terms and conditions as the landowner’s

royalty under the Lease.” The “calculate and pay” clause in the Westport to

Chevron Assignment contains nearly identical language. The majority holds

“the ‘calculate and pay’ clauses in the ORRI assignment contracts do not clearly

and explicitly express the intent that overriding royalty payments shall be

29

Case: 11-30038 Document: 00512171964 Page: 30 Date Filed: 03/12/2013

No. 11-30038

suspended whenever the U.S. landowner royalties are suspended under the

DWRRA.” Ante, at 4. The majority thus finds it ambiguous whether the

assignment contracts apply royalty suspension to overriding royalty interests.

The plain language of the “calculate and pay” clauses state, however, that

payment of the overriding royalties must be subject to the same terms and

conditions as the landowner’s royalty under the lease. The Oxford English

dictionary defines “subject to” as “dependent or conditional upon.” OXFORD

ENGLISH DICTIONARY 1427 (10th ed. 1999); see also WEBSTER’S THIRD NEW

INTERNATIONAL DICTIONARY 2275 (1993) (defining “subject to” as “to be

conditioned, affected, or modified in some indicated way: having a contingent

relation to something and usually dependent on such relation for final form,

validity, or significance”). Thus, the “calculate and pay” clauses clearly and

explicitly import terms and conditions from the lease as limitations on the scope

of the overriding royalty rights.

The majority, emphasizing the longstanding distinction between

overriding royalty interests and royalties reserved by the landowner, holds it is

ambiguous whether the “calculate and pay” clauses require application of royalty

suspension to the overriding royalty interests. Ante at 18–19. The majority

holds the assignment contracts lack “any clear indication” that royalty

suspension was intended to apply to the overriding royalty interests. Id. The

majority is correct that overriding royalty interests are generally paid in

addition to the usual landowner’s royalty reserved to the lessor. 38 AM. JUR. 2D

GAS AND OIL § 201. As such, the parties to overriding royalty interest

assignment contracts are free to set terms for the calculation and payment of

such interests that are distinct from the terms of payment of the landowner’s

royalty. See id. Here, however, the assignment contracts contain a clear

directive that the overriding royalty interests “shall be calculated and paid in the

same manner and subject to the same terms and conditions as the landowner’s

30

Case: 11-30038 Document: 00512171964 Page: 31 Date Filed: 03/12/2013

No. 11-30038

royalty under the Lease.” If the parties did not intend the clear import of the

contracts’ language, they may seek to reform the contract. Agurs v. Holt, 95 So.

2d 644, 645 (1957). Where, however, the language of a contract is clear and

unambiguous, we lack the authority to look beyond the four corners of the

document in search of the parties’ intent. LA. CIV. CODE ANN. art. 2046; Taita

Chem. Co., v. Westlake Styrene Corp., 246 F.3d 377, 386 (5th Cir. 2001).

The majority relies on the fact that it was not certain the lease would

qualify for suspension of the United States’ landowner royalty under the

DWRRA at the time the lease at issue in this case was signed as a core source

of ambiguity in the “calculate and pay” clauses. The majority correctly notes

that prior to our decisions in Santa Fe Snyder Corp. v. Norton, 385 F.3d 884 (5th

Cir. 2004), and Kerr-McGee Oil & Gas Corp. v. U.S. Dep’t of Interior, 554 F.3d

1082 (5th Cir. 2009), there was some uncertainty surrounding whether a

particular lease would qualify for royalty suspension.2 Nonetheless, this

uncertainty does not translate into ambiguity as to whether the assignment

contracts require the overriding royalty payments to be subject to the same

terms and conditions as the landowner’s royalty under the lease. The majority

assumes that because it was debatable whether royalty suspension would apply,

the parties to the assignment contracts did not intend royalty suspension to be

one of the terms and conditions of payment that the overriding royalties are

subject to. Ante, at 21.

This assumption is unwarranted. The parties to the assignment contract

may have intended exactly what the plain language of the “calculate and pay”

2

See Santa Fe Snyder Corp., 385 F.3d at 892–93 (holding Department of Interior

regulation restricting the DWRRA’s royalty suspension provisions to fields that had not

produced prior to enactment of Act was invalid); Kerr-McGee Oil & Gas Corp., 554 F.3d at

1083 (holding Department of Interior regulation requiring payment of royalties on volumes

less than volume thresholds set by the DWRRA when gas prices reached certain levels was

invalid).

31

Case: 11-30038 Document: 00512171964 Page: 32 Date Filed: 03/12/2013

No. 11-30038

clauses state: to make the calculation and payment of the overriding royalties

subject to the same terms and conditions as the landowner’s royalty under the

lease. A lack of clarity surrounding when the royalty suspension period would

apply does not evince a lack of clarity regarding whether the royalty suspension

period was a term of the lease that the overriding royalties became subject to

through the “calculate and pay” clauses.

The majority also concludes the “granting” clauses of the assignment

contracts make the meaning of the “calculate and pay” clauses ambiguous. The

granting clause in the Westport Assignment to the Belcher Group states, “The

undersigned . . . does hereby CONVEY, TRANSFER, ASSIGN, AND SET OVER

unto the following parties . . . the interest set out opposite their names, as an

overriding royalty interest payable out of all oil, gas, casinghead gas and

associated substances produced, saved and marketed from the lease.” (emphasis

added). The granting clause in the Westport to Chevron Assignment states,

“The interest assigned herein is subject to . . . an overriding royalty interest

totaling one percent (1%) of 8/8ths . . . of oil and gas production saved, removed,

or sold from the Lease.” (emphasis added). The majority implies that if the

parties intended to require the overriding royalty owners to wait until the lease

produced 87.5 million barrels of oil before receiving royalty payments, the

phrasing of the granting clauses would not have explicitly granted the overriding

royalty owners an interest in all or 8/8ths of production. This is unconvincing.

Even within the four corners of the assignment contract to the Belcher group,

the “granting” clause was clearly never meant to be unqualified. In the ORRI

assignment to the Belcher group, exceptions to royalty due on production are

listed explicitly in the assignment contract. For example, the assignment

contract states,

The overriding royalty interest conveyed shall not, in any event, be

paid or accrued upon any oil, gas, casinghead gas and other

hydrocarbon substances used for operation, development or

32

Case: 11-30038 Document: 00512171964 Page: 33 Date Filed: 03/12/2013

No. 11-30038

production purposes or unavoidably lost; and no overriding royalty

shall be paid upon gas used in repressuring or recycling operations

or pressure maintenance operations.

Moreover, the clear language of the “calculate and pay” clauses in both of the

assignment contracts qualify the granting clauses by stating that the overriding

royalty interests are to be calculated and paid “subject to the same terms and

conditions as the landowner’s royalty under the lease.” (emphasis added).

The majority also finds the assignment contracts ambiguous because there

is no reference to royalty suspension in the assignment contracts. The lack of

the explicit reference to royalty suspension in the assignment contracts proves

nothing. The “calculate and pay” clauses incorporate the terms and conditions

of the landowner’s royalty under the lease. Even under the proposed

interpretation of the “calculate and pay” clauses that the majority urges, the

terms and conditions the “calculate and pay” clauses allegedly refer to, the so-

called “mechanics” of payment, are not explicitly stated in the assignment

contracts. The fact that the assignment contracts do not both incorporate the

royalty suspension provision by reference to the terms and conditions of the

landowner’s royalty under the lease and mention the royalty suspension

provision by name does not an ambiguity make. Where a term is incorporated

by reference to an extrinsic agreement, the contract need not also mention the

incorporated term within the four corners of the contract. See Petrohawk Props.,

L.P. v. Chesapeake La., L.P., 689 F.3d 380, 394 (5th Cir. 2012) (holding

provisions incorporated by reference have identical force and effect to provisions

within the contract itself).3

3

The majority’s attempt to distinguish Petrohawk Properties is unavailing. Ante at 20

n.13. In that case we held the parties adopted a provision of an earlier lease that was

incorporated by reference in the new lease. Petrohawk Props., 689 F.3d at 394. Importantly,

the new lease did not explicitly mention the provision at issue, an exclusion of the warranty

of title. Id. Rather, the new lease merely incorporated all provisions other than those

explicitly designated. Id. The majority attempts to distinguish Petrohawk Properties on two

grounds. First, the majority notes that in Petrohawk Properties the parties to the new lease

33

Case: 11-30038 Document: 00512171964 Page: 34 Date Filed: 03/12/2013

No. 11-30038

The majority also finds support for concluding the “calculate and pay”

clauses are ambiguous in the fact that the overriding royalty interest owners

were not a party to the lease. This is puzzling. It is well-established that when

a contract incorporates terms of an extrinsic agreement by reference, the parties

to the contract may not rely on the fact that they are not parties to the extrinsic

agreement as a source of ambiguity. See JS & H Constr. Co. v. Richmond Cnty.

Hosp. Auth., 473 F.2d 212, 216 (5th Cir. 1973) (holding subcontractor bound by

arbitration provision incorporated by reference from the general conditions of

contract between primary contractor and principal).4 Despite the majority’s

were the same parties as the parties to the old lease. This is a distinction without a difference.

Nowhere in Petrohawk Properties did we state or imply the fact the parties to the new lease

and the old lease were identical was relevant to our holding that the exclusion of the warranty

of title was incorporated by reference. Id. Moreover, the majority cites no authority for the

proposition that incorporation by reference is more effective where the parties to both

contracts are identical. Second, the majority states that, unlike here, the parties in Petrohawk

Properties “expressly re-adopted the exclusion of warranty of title clause.” Ante at 20 n13.

This assertion is false. In Petrohawk Properties the new lease stated, “In conjunction with this

correction of the description of the leased premises, of the primary term and with the

additional provisions, Lessor ratifies, adopts, and confirms the Lease, as corrected. . . .”

Record Excerpt of Appellant Petrohawk Properties, L.P. at 80, Petrohawk Props., (No. 11-

30576). Nowhere did the new lease mention the exclusion of warranty of title provision of the

old lease. Id. at 79–81. Moreover, the exclusion of the warranty of title “provision” in the old

lease was hardly a model of clarity. The district court held the old lease had no implied

warranty of title provision because it contained “a scratched through warranty of title

provision.” Chesapeake La., L.P. v. Petrohawk Props., L.P., 5:09-cv-01385-DEW-MLH, No. 09-

1385, Ruling on Merits at 6 (E.D. La. May 27, 2011). Therefore, Petrohawk Properties

supports the proposition I rely on it for: the fact the assignment contracts here did not mention

royalty suspension by name is not a convincing reason for finding it ambiguous whether the

contracts incorporated the royalty suspension provision of the lease.

4

The majority emphasizes that in JS & H Constr. Co. the provision at issue was an

agreement to arbitrate disputes arising under the contract. Ante at 21 n.13. We thus based

our holding that the sub-contractor was bound to arbitrate both on (1) the strong

Congressional policy favoring arbitration and (2) “[t]he . . . undisputed proposition . . . that as

a matter of contract law, incorporation by reference is generally effective to accomplish its

intended purpose where, as here, the provision to which reference is made has a reasonably

clear and ascertainable meaning.” JS & H Const. Co., 473 F.2d 212 at 215. In JS & H Const.

Co. we correctly recognized that under Louisiana law where a contract incorporates terms of

an extrinsic agreement by reference, the fact the identity of the parties to the contract differ

from the parties to the extrinsic agreement does not render the incorporation ineffective. See

34

Case: 11-30038 Document: 00512171964 Page: 35 Date Filed: 03/12/2013

No. 11-30038

assertions to the contrary, the assignment contracts make a clear and

unambiguous statement that payments of the overriding royalties will be limited

by the terms and conditions of the landowner’s royalty under the lease.

Finally, Judge Higginson’s concurring opinion contends the grammatical

structure of the “calculate and pay” clauses support a finding of ambiguity.

Although I agree with Judge Higginson that grammatically the clauses are

susceptible to two different interpretations, under either reading the “calculate

and pay” clauses unambiguously require application of royalty suspension to the

overriding royalty interests. Admittedly, the prepositional phrase and

subordinated clause “in the same manner and subject to the same terms and

conditions” may modify the “calculate and pay” verb phrase, as Appellants imply,

or may modify the subject of the sentence, “The overriding royalty interest,” as

Total and Statoil urge. Judge Higginson thus asserts it is ambiguous whether

the “calculate and pay” clauses answer the question of whether the overriding

royalty owners are entitled to a royalty payment, or merely provide instructions

for the how to calculate and pay the royalty payments that are due under the

assignment contract. Regardless of whether the lease is eligible for royalty

suspension and the payment due is zero or the lease is ineligible for royalty

suspension and a monetary payment is due, however, royalty suspension is

inextricably linked to the calculation of the amount of payment due to the

landowner under the lease. Thus, even if “terms and conditions” modifies

“calculated and paid,” “terms and conditions” modifies entitlement to the

royalties vel non.

also Harper v. Home Indem. Co., 140 So. 2d 653, 657 (La. Ct. App. 1962) (“[W]e conclude that

all the provisions of the initial contract have been incorporated into and form a part and

portion of the subcontract just as effectively as if fully written and incorporated therein.”).

35

Case: 11-30038 Document: 00512171964 Page: 36 Date Filed: 03/12/2013

No. 11-30038

II

Appellants also claim that in the event we reject their interpretation of the

“calculate and pay” clauses as unreasonable, the original parties to the

assignment contracts made a mutual mistake in drafting the “calculate and pay”

clauses. The district court cited two reasons for denying Appellants’ claim for

reformation. First, the district court held Appellants were attempting “to make

an end-run around the parole-evidence rule by framing [their] argument as a

request for reformation.” The district court held that because the assignment

contracts were unambiguous, parole evidence is not admissible to create

ambiguity. Second, the district court held that because Total and Statoil, as

non-parties to the original contracts, were entitled to rely on the integrity of the

assignment contracts, reformation would impermissibly prejudice Total and

Statoil. The district court misconstrued Louisiana’s reformation law on both

points.

The district court erred by failing to admit Appellants’ extrinsic evidence

of mutual mistake. When making a claim for reformation the claimant may offer

parole evidence, not to vary the terms of the written instrument, but to show the

“writing does not express the true intent or agreement of the parties.” First

State Bank & Trust Co. of E. Baton Rouge Parish v. Seven Gables, Inc., 501 So.

2d 280, 289 (La. Ct. App. 1986) (citing Valhi, Inc. v. Zapata Corp., 365 So. 2d

867, 870 (La. Ct. App. 1978)). “Even if the language utilized is clear and

unambiguous, parol evidence is admissible to establish that the language does

not embody the essence of the agreement to which there was mutual assent.”

Valhi, Inc., 365 So. 2d at 870. The district court thus erred by refusing to admit

extrinsic evidence of mutual mistake simply because the contract is

unambiguous.

The district court also erred by denying Appellants’ reformation claim on

the grounds that Total and Statoil, as third parties, were entitled to rely on the

36

Case: 11-30038 Document: 00512171964 Page: 37 Date Filed: 03/12/2013

No. 11-30038

integrity of the assignment contracts. Under Louisiana law, reformation of a

contract is impermissible once third parties have relied on the integrity of the

written instrument. Lewis, 653 So. 2d at 1260. Where, however, the rights of

third parties would not be prejudiced by reformation, reformation is permissible.

See Samuels v. State Farm Mut. Auto. Ins. Co., 939 So. 2d 1235, 1241 (La. 2006);

M.R. Bldg. Corp. v. Bayou Utils., Inc., 637 So. 2d 614, 617 (La. Ct. App. 1994)

(permitting reformation where rights of third party successor in chain of title

would not be prejudiced by reformation). While Louisiana law is clear that third

parties are entitled to rely on the integrity of the contracts, third parties must

have actually relied on the erroneous contract language to be prejudiced. See

Samuels, 939 So. 2d at 1241 (“There are simply no rules of contractual

interpretation that would lead us to ignore the clear intent of the parties to the

fortuitous benefit of a third party insurance company who did not even rely on

this error in issuing its own policy.”); cf. Am. Elec. Power Co. v. Affiliated FM Ins.

Co., 556 F.3d 282, 288 (5th Cir. 2009) (denying claim for reformation where third

party assumed and relied on contract and there was no indication third party

would have known of error). The district court thus erred in denying Appellants’

claim for reformation on the basis that Total and Statoil were entitled to rely on

the unambiguous contract language.

III

Accordingly, I would affirm the district court’s holding that the

assignment contracts unambiguously apply the royalty suspension provision of

the DWRRA to the overriding royalty interest owners. I would reverse the

district court’s grant of summary judgment on Appellants’ claim for reformation,

but only on the grounds specifically stated by the district court.

Respectfully, I dissent.

37

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.