§ 192.04 Corrective action.
FederalRegulations
Ask Donna
How this section applies to your facts.
Title 40—Protection of Environment > CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY > SUBCHAPTER F—RADIATION PROTECTION PROGRAMS > PART 192—HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS > Subpart A—Standards for the Control of Residual Radioactive Materials from Inactive Uranium Processing Sites
Text
If the groundwater concentration limits established for disposal sites under provisions of § 192.02(c) are found or projected to be exceeded, a corrective action program shall be placed into operation as soon as is practicable, and in no event later than eighteen (18) months after a finding of exceedance. This corrective action program will restore the performance of the system of disposal to the original concentration limits established under § 192.02(c)(3), to the extent reasonably achievable, and, in any case, as a minimum shall:
(a) Conform with the groundwater provisions of § 192.02(c)(3), and
(b) Clean up groundwater in conformance with subpart B, modified as appropriate to apply to the disposal site.
[60 FR 2866, Jan. 11, 1995]