Ch. 8, § 7. Installation of Wells for Collection of Baseline Information

WyomingRegulations

Ask Donna

How this section applies to your facts.

Wyoming Administrative Code › Agency 020 Environmental Quality, Dept. of › Program 0007 Land Quality - Non Coal › Chapter 8 Exploration by Drilling › § 7

This text was captured on Sep 30, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

(a) Construction of wells may be authorized by the Administrator under a Drilling Notification for the purpose of collecting ground water baseline data in preparation of a mine permit application.

(b) Prior to installation, the discoverer is encouraged, but not required, to submit a plan for review by the Administrator that describes the location and completion details of each proposed well. The Administrator shall review the plan and respond within 30 days.

(c) Wells shall be permitted in accordance with requirements of the State Engineer's Office, in accordance with W.S. 35-11-404 (c)(iv).

(d) Wells shall be constructed according to the standards contained in Chapter 11, Sections 6(b), 6(c), 6(d), 6(e), and 6(f), Land Quality Noncoal Rules and Regulations.

(e) Provisions shall be made such that each well is secured to prevent contaminant entry.

(f) Adequate bond shall be provided to assure that all wells are properly plugged and sealed and the sites restored.

(g) Well plugging and sealing and site reclamation shall follow the procedures outlined in Sections 2 and 3. Well casing shall be cut off at least two (2) feet below ground surface and any pump and associated appurtenances removed, as applicable, before the well is plugged and sealed.

(h) Well abandonment reports shall be filed with the Administrator and the State Engineer's Office within 12 months of abandonment.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Ch. 8, § 7. Installation of Wells for Collection of Baseline Information · Land Quality - Non Coal Rules, Ch. 8, § 7 | Frix