WAC 296-17A-0108. Classification 0108
WashingtonRegulations
Ask Donna
How this section applies to your facts.
Washington Administrative Code › Title 296 › Chapter 296-17A › Section 296-17A-0108
Text
0108-00 Ditches and canals, N.O.C.
Applies to:
Contractors engaged in the construction of ditches and canals not covered by another classification (N.O.C.).
A ditch or canal consists of a long trench dug in the ground that will remain uncovered to serve as an artificial waterway or artificially improved river such as for irrigation, drainage, or a boundary line.
Work activities include, but are not limited to:
• Digging of main irrigation canals or drainage ditches;
• Digging all laterals extending from the canal or ditch;
• Installation of pipe and making connections as needed;
• Filling or backfilling as needed.
Equipment used include, but are not limited to:
• Backhoes;
• Bulldozers;
• Dump trucks;
• Mechanical or hand tool trench diggers;
• Power shovels.
Exclusions:
• Asphalt surfacing/resurfacing is classified in 0210 or 0212; and
• Concrete construction is classified in the applicable concrete construction classification(s).
0108-01 Sewer construction; septic tank installation
Applies to:
Contractors engaged in the construction or repair of new or existing sewer lines and systems.
Types of systems installed include, but are not limited to:
• Cesspools;
• Drainpools;
• Septic tanks including the drainfield construction;
• Sewers;
• Storm drains.
Work activities include, but are not limited to:
• Installation and maintenance of all types of storm, sanitary or sewage lines and systems;
• Excavation and trench digging;
• Leveling trenches with fill material such as sand or gravel, including filling or backfilling;
• Installation of force main type sewage work;
• Installation of storm sewer lines including the outfall construction of drain concrete boxes, catch basins, manholes, and handling and laying of pipe (regardless of the size of pipe or depth below the ground);
• Making connections.
Equipment used include, but are not limited to:
• Backhoes;
• Bulldozers;
• Dump trucks;
• Manual digging equipment;
• Power shovels;
• Trenchless or directional boring equipment
on of storm sewer lines including the outfall construction of drain concrete boxes, catch basins, manholes, and handling and laying of pipe (regardless of the size of pipe or depth below the ground);
• Making connections.
Equipment used include, but are not limited to:
• Backhoes;
• Bulldozers;
• Dump trucks;
• Manual digging equipment;
• Power shovels;
• Trenchless or directional boring equipment.
Exclusions:
• Side sewer hookups (street to house) when performed by a plumbing contractor as part of a plumbing contract is classified in 0306;
• Sewer pipe cleaning including services engaged in line cleaning and unplugging of waste lines is classified in 0306.
0108-02 Tanks, N.O.C. - Underground: Installation, repair, or removal
Applies to:
Contractors engaged in the installation, repair or removal of underground tanks not covered by another classification (N.O.C.) such as those used to store gas or oil.
This classification makes no distinction as to the size of tank being placed or removed
Work activities include, but are not limited to:
• Excavating or digging of holes;
• Placement or removal of tank;
• Filling or backfilling.
Equipment used include, but are not limited to:
• Backhoes;
• Bulldozers;
• Dump trucks;
• Front end loaders;
• Power shovels.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.