9VAC25-790-90. CTC application

VirginiaRegulations

Ask Donna

How this section applies to your facts.

Virginia Administrative Code › Title 9 Environment › Agency 25 State Water Control Board › Chapter 790 › 9VAC25-790-90

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

All applications for a CTC shall be submitted on a form provided by the department and shall be submitted by the owner or authorized agent to the appropriate area engineer as specified at least 30 days of the time an owner desires to be notified of the required procedure for issuance of a CTC, or at least 180 days prior to the date that the owner desires to begin construction. An application for a CTC or a sewerage system shall be accompanied by notification that local government will issue necessary approvals and design data verifying that downstream capacity is available to adequately convey and treat the design flows in accordance with these regulations. An application for a CTC for a sewerage system or treatment works will not be considered complete until evidence is submitted that a complete application has been submitted for a VPDES permit or VPA permit. The owner will be notified by the department within 30 days of receipt of a complete application if a technical evaluation of preliminary or final design documents is required following the preliminary engineering conference, if held.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

9VAC25-790-90. CTC application · 9 Va. Admin. Code § 25-790-90 | Frix