16 TAC § 76.21. Requirements for Issuance of a Driller or Pump Installer License

TexasRegulations

Ask Donna

How this section applies to your facts.

Texas Administrative Code › Title 16 ECONOMIC REGULATION › Part 4 TEXAS DEPARTMENT OF LICENSING AND REGULATION › Chapter 76 WATER WELL DRILLERS AND WATER WELL PUMP INSTALLERS › 16 TAC § 76.21

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

(a) An applicant must submit a completed application, the required fee, and have the required two (2) years of experience drilling wells or installing pumps.

(b) An applicant must complete all requirements within one year of the date the application is filed.

(c) A licensee, not licensed to perform all types of well drilling and pump installation, may apply for endorsements. Applications for additional endorsements shall be accompanied by the appropriate application fee, and must contain all information required by this chapter for an initial license. Upon examination of the applicant's qualifications, the executive director must deny or grant additional endorsements to an existing license.

(d) An applicant must have sufficient installation/drilling experience as set forth in paragraphs (1) and (2) to be eligible to take each applicable endorsement examination.

(1) Drillers Endorsements--Qualifying number of installation/drillings

(A) Water Wells (W)--15

(B) Monitor Wells (M)--50

(C) Injection Wells (N)--50

(D) Dewatering Wells (D)--50

(E) Closed Loop Geothermal Wells (C)--50

(F) Master Driller (A)--All of the above endorsements required.

(2) Pump Installer Endorsements--Qualifying number of installation/drillings

(A) Single Phase Pumps (P)--15

(B) 3 Phase Pumps (K)--15

(C) Turbine Pump (T)--15

(D) Windmill, Pump jack, hand pump--15

(E) Master Installer (I)--All of the above endorsements required.

(e) An applicant who has all of the endorsements in subsection (d)(1)(A) - (E) is qualified to be a master driller.

(f) An applicant who has all of the endorsements in subsection (a)(2)(A) - (D) is qualified to be a master pump installer.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.