Design-build and performance-based asset maintenance contracts - Selection criteria - Funding - Notice

TennesseeStatutes

Ask Donna

How this section applies to your facts.

TN Code › Title 54 › Chapter 1 › Section 54-1-119

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

(a) As used in this section: (1) "Design-build contract" means: (A) An agreement that provides for the design and construction of a project under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation, and the construction, reconstruction, repair, or maintenance of the project; or (B) An agreement that provides for the design and reconstruction, repair, or maintenance of highway facilities under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation services, and the reconstruction, repair, or maintenance of highway facility components along specific roadway corridors or within a geographic area; and (2) "Performance-based asset maintenance contract" means an agreement, typically long-term, that provides for managing and performing the inspection and reconstruction, repair, or maintenance of multiple highway facility components for specific roadway corridors or within a geographic area, where the contract sets specific performance standards, rather than prescriptive work tasks and deadlines, and may include incentive or disincentive provisions to promote achievement of the desired outcomes. Such contracts may also include third-party damage repair and claim management services, and may also provide for design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation activities. Types of projects not suited for performance-based asset maintenance contracts include, but are not limited to, resurfacing and bridge repair projects. (b) Notwithstanding another law to the contrary, the department may award design-build contracts and performance-based asset maintenance contracts in accordance with this section. (c) Selection criteria for a design-build contract or a performance-based asset maintenance contract must include the cost, and may include qualifications, time of completion, innovation, design and construction quality, design innovation, or other technical or quality related criteria, as determined by the department. (d) The department may award a stipulated fee to design-build firms that submit responsive proposals but are not awarded the design-build contract. The department is not required to award a stipulated fee, but if it elects to award the fee, the amount of the stipend and the terms under which stipends are to be paid must be stated in the request for proposals. (e) Prior to executing a design-build contract under this section, the commissioner shall send written notice to the chair of the transportation and safety committee of the senate and the chair of the transportation committee of the house of representatives. (f) If a proposed design-build contract has a total estimated contract amount in excess of one hundred million dollars ($100,000,000), the department shall specifically identify the project as a design-build project in the transportation improvement program submitted annually to the general assembly in support of the commissioner's annual funding recommendations. (g) The department may establish agency policy, or the department may promulgate rules in accordance with the Uniform Administrative Procedures Act, compiled in title 4, chapter 5, or both, in furtherance of this part. Amended by 2023 Tenn. Acts, ch. 159, s 2, eff. 4/17/2023. Amended by 2013 Tenn. Acts, ch. 236, s 90, eff. 4/19/2013. Acts 2007, ch ch 274, § 1.

ner's annual funding recommendations. (g) The department may establish agency policy, or the department may promulgate rules in accordance with the Uniform Administrative Procedures Act, compiled in title 4, chapter 5, or both, in furtherance of this part. Amended by 2023 Tenn. Acts, ch. 159, s 2, eff. 4/17/2023. Amended by 2013 Tenn. Acts, ch. 236, s 90, eff. 4/19/2013. Acts 2007, ch ch 274, § 1.

(a) As used in this section: (1) "Design-build contract" means: (A) An agreement that provides for the design and construction of a project under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation, and the construction, reconstruction, repair, or maintenance of the project; or (B) An agreement that provides for the design and reconstruction, repair, or maintenance of highway facilities under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation services, and the reconstruction, repair, or maintenance of highway facility components along specific roadway corridors or within a geographic area; and (2) "Performance-based asset maintenance contract" means an agreement, typically long-term, that provides for managing and performing the inspection and reconstruction, repair, or maintenance of multiple highway facility components for specific roadway corridors or within a geographic area, where the contract sets specific performance standards, rather than prescriptive work tasks and deadlines, and may include incentive or disincentive provisions to promote achievement of the desired outcomes. Such contracts may also include third-party damage repair and claim management services, and may also provide for design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation activities. Types of projects not suited for performance-based asset maintenance contracts include, but are not limited to, resurfacing and bridge repair projects.

(1) "Design-build contract" means: (A) An agreement that provides for the design and construction of a project under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation, and the construction, reconstruction, repair, or maintenance of the project; or (B) An agreement that provides for the design and reconstruction, repair, or maintenance of highway facilities under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation services, and the reconstruction, repair, or maintenance of highway facility components along specific roadway corridors or within a geographic area; and

(A) An agreement that provides for the design and construction of a project under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation, and the construction, reconstruction, repair, or maintenance of the project; or

(B) An agreement that provides for the design and reconstruction, repair, or maintenance of highway facilities under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation services, and the reconstruction, repair, or maintenance of highway facility components along specific roadway corridors or within a geographic area; and

des for the design and reconstruction, repair, or maintenance of highway facilities under a single contract, which may include, but is not limited to, design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation services, and the reconstruction, repair, or maintenance of highway facility components along specific roadway corridors or within a geographic area; and

(2) "Performance-based asset maintenance contract" means an agreement, typically long-term, that provides for managing and performing the inspection and reconstruction, repair, or maintenance of multiple highway facility components for specific roadway corridors or within a geographic area, where the contract sets specific performance standards, rather than prescriptive work tasks and deadlines, and may include incentive or disincentive provisions to promote achievement of the desired outcomes. Such contracts may also include third-party damage repair and claim management services, and may also provide for design, right-of-way acquisition, regulatory permit review and approvals, or utility relocation activities. Types of projects not suited for performance-based asset maintenance contracts include, but are not limited to, resurfacing and bridge repair projects.

(b) Notwithstanding another law to the contrary, the department may award design-build contracts and performance-based asset maintenance contracts in accordance with this section.

(c) Selection criteria for a design-build contract or a performance-based asset maintenance contract must include the cost, and may include qualifications, time of completion, innovation, design and construction quality, design innovation, or other technical or quality related criteria, as determined by the department.

(d) The department may award a stipulated fee to design-build firms that submit responsive proposals but are not awarded the design-build contract. The department is not required to award a stipulated fee, but if it elects to award the fee, the amount of the stipend and the terms under which stipends are to be paid must be stated in the request for proposals.

(e) Prior to executing a design-build contract under this section, the commissioner shall send written notice to the chair of the transportation and safety committee of the senate and the chair of the transportation committee of the house of representatives.

(f) If a proposed design-build contract has a total estimated contract amount in excess of one hundred million dollars ($100,000,000), the department shall specifically identify the project as a design-build project in the transportation improvement program submitted annually to the general assembly in support of the commissioner's annual funding recommendations.

(g) The department may establish agency policy, or the department may promulgate rules in accordance with the Uniform Administrative Procedures Act, compiled in title 4, chapter 5, or both, in furtherance of this part.

Amended by 2023 Tenn. Acts, ch. 159, s 2, eff. 4/17/2023.

Amended by 2013 Tenn. Acts, ch. 236, s 90, eff. 4/19/2013.

Acts 2007, ch ch 274, § 1.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Design-build and performance-based asset maintenance contracts - Selection criteria - Funding - Notice · Tenn. Code Ann. § 54-1-119 | Frix