Headgates or other measuring devices required

South DakotaStatutes

Ask Donna

How this section applies to your facts.

SD Code › Title 46 › Chapter 7 › Section 46-7-2

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

Any appropriator may be required to construct and maintain a substantial headgate or other means of measurement at the point of diversion or at any other point or points as required by the Water Management Board and shall construct or install a measuring device of a design approved by the board at the most practical point or points for measuring and apportioning the water as approved in the permit or license or as determined by the board. The board may order the construction or installation of a measuring device by an appropriator and, if it is not completed within twenty days thereafter, the board may refuse to allow diversion by the appropriator. Devices not of a stationary nature shall be so arranged that they can be locked in place.

Source: SDC 1939, § 61.0143; SL 1955, ch 430, § 1; SDC Supp 1960, § 61.0130; SL 1978, ch 324; SL 1983, ch 314, § 116.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Headgates or other measuring devices required · S.D. Codified Laws § 46-7-2 | Frix