542.030 Report by commission

OregonStatutes

Ask Donna

How this section applies to your facts.

OR Code › Title 45 › Chapter 542 › Section 542.030

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

As soon as practicable after the completion of the surveys and investigations, the Water Resources Commission shall prepare or have prepared a report setting forth the plans, specifications and estimated cost of construction, maintenance and operation of the projects, together with any other information tending to show their feasibility, and may in the discretion of the commission have the report printed in pamphlet form and distributed to those interested. Copies of completed maps, plans, specifications, estimates and reports secured or prepared in connection with any such investigation shall be kept on file in the Water Resources Department at all times, and open for public inspection during business hours. [Amended by 1985 c.673 §131]

Source: Section 542.030 — Report by commission; contents; copies for public inspection , https://www.­oregonlegislature.­gov/bills_laws/ors/ors542.­html (accessed May 26, 2025).

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

542.030 Report by commission · ORS § 542.030 | Frix