SECTION R401, GENERAL

MinnesotaRegulations

Ask Donna

How this section applies to your facts.

Minnesota Administrative Rules › DEPARTMENT OF LABOR AND INDUSTRY › Chapter 1322 › Part 1322.0401

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

IECC section R401.3 is amended to read as follows: R401.3 Certificate (mandatory). A building certificate shall be completed and posted on or in the electrical distribution panel by the builder or registered design professional. The certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect label, or other required labels. The certificate shall list: the date the certificate is installed; the dwelling address; residential contractor name and contractor license number, or homeowner name, if acting as the general contractor; the predominant installed R-values, their location, and type of insulation installed in or on ceiling/roof, walls, rim/band joist, foundation, slab, basement wall, crawl space wall or floor, and ducts outside conditioned spaces; U-factors for fenestration and the solar heat gain coefficient (SHGC) of fenestration; and the results of any required duct system and building envelope air leakage testing done on the building. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the types, input ratings, manufacturers, model numbers and efficiencies of heating, cooling, and service water heating equipment. The certificate shall also list the structure's calculated heat loss, calculated cooling load, and calculated heat gain. Where an electric furnace or baseboard electric heater is installed in the residence, the certificate shall list "electric furnace" or "baseboard electric heater," as appropriate. An efficiency shall not be listed for electric furnaces or electric baseboard heaters. The certificate shall list the mechanical ventilation system type, location, and capacity, and the building's designated continuous and total ventilation rates. The certificate shall also list the type, size, and location of any make-up air system installed and the location or future location of the radon fan.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.