section.

A site’s phosphorus export must

be calculated and compared to

the Project Phosphorus Budget

(PPB) to determine the extent of

phosphorus reductions needed

and the best method for

achieving these reductions.

PPE = Project Phosphorus Export = amount of phosphorus that

will reach the lake from a new development.

Pre-treatment PPE = Raw Phosphorus that the new

development will create.

Post-treatment PPE = Phosphorus that will be discharged after

treatment by all stormwater management treatment practices.

For all project development and subdivisions projects where the

land use and impact has been determined and lot development

will be restricted, the pre-treatment export is estimated by:

1. Dividing the project into various land use types (i.e. parking,

roads, roofs, lawns by soil type),

2. Determining the area within each land use in acres and to

the second decimal place,

3. Multiplying that area by the appropriate phosphorus export

factor from Table 3.1 or Table 3.2 as is appropriate, and

4. Summing the resulting phosphorus exports to get the Pre-

PPE.

Use the first four columns in Worksheet 2 in Appendix D to

calculate the Pre-PPE.

The amount of phosphorus exported

from a project site will depend on the

land use and soil type, with greatest

exports from impervious surfaces as

the one shown here.

Table 3.1 gives pre-treatment phosphorus export for new commercial/industrial development and for

roads in residential subdivision projects. Table 3.2 should be used for lots in residential subdivisions

unless the dimensions and locations of buildings, driveways and lawns have been pre-determined,

specifically restricted, and all construction and landscaping on the lot will be done by the developer, in

which case the High Export Option from Table 3.1 may be used.

Table 3.2 gives pre-treatment phosphorus export for single family residential lots. In most cases, the

specific area of the development on a lot (houses, garages, driveways, lawns) within the subdivision is

usually not known

mined,

specifically restricted, and all construction and landscaping on the lot will be done by the developer, in

which case the High Export Option from Table 3.1 may be used.

Table 3.2 gives pre-treatment phosphorus export for single family residential lots. In most cases, the

specific area of the development on a lot (houses, garages, driveways, lawns) within the subdivision is

usually not known. Table 3.2 must be used to determine the export from each lot unless the developer:

•

Has pre-determined the area of each land use on each lot

•

Will be constructing the buildings and driveways and landscaping the lots, and

•

Will be restricting any further expansion of these land uses. A deed restriction will be required for

each lot that incorporates an area restriction.

- 5 -

The Low Export Option factors may be selected for commercial/industrial development and roads if all of

the following are incorporated in the project:

•

A deed restriction prohibiting the use of fertilizers containing phosphorus except when establishing

new turf or vegetation on bare soil will be established for all lots. It is recommended that the use of

fertilizer containing phosphorus always be limited.

•

All roads, driveways and parking areas are paved.

•

All ditches and drainage ways are designed, constructed and maintained as stable vegetated swales

in accordance with the specifications in Volume III, Chapter 9, or as riprapped swales where required

by steep slopes. The algal available phosphorus export for ditches and swales is based on soil type

and is the same as the export from a lawn.

If all of these elements are not clearly and permanently incorporated in the project design, use the High

Export Option factors of Table 3.1

getated swales

in accordance with the specifications in Volume III, Chapter 9, or as riprapped swales where required

by steep slopes. The algal available phosphorus export for ditches and swales is based on soil type

and is the same as the export from a lawn.

If all of these elements are not clearly and permanently incorporated in the project design, use the High

Export Option factors of Table 3.1.

Table 3.1

Algal Available Phosphorus Export (pre-treatment) for Commercial Development and

Subdivisions

Low Export Option

High Export Option

Land Use

Hydrologic

Soil Group

P Fertilizers restricted,

roads and drives paved

and constructed with

stable swales (lb/acre/yr)

No restrictions on fertilizer

use, road surface or ditch

design and construction

(lb/acre/yr)

Landscaped Areas,

Lawns & Ditches

A

0.1

0.2

B

0.2

0.4

C

0.3

0.6

D

0.4

0.8

Roads/Driveways

N/A

1.25

1.75

Parking

N/A

1.25

1.25

Roofs/Other

N/A

0.5

0.5

Riprap/crushed rock

N/A

0.3

0.6

- 6 -

Table 3.2

Algal Available Phosphorus Export from Single Family Residential Lots

(pre-treatment)

Hydrologic Soil

Group

With Area Restrictions

Without Area Restrictions

Cleared Area < 12,000 sq ft

Driveway/Park < 1,750 sq ft

(lb/lot/year)

No Restriction on cleared area or

driveway/parking area

(lb/lot/year)

w/ 75%

drive/park

area to buffer

w/o 75%

drive/park

area to buffer

w/ 75%

drive/park

area to buffer

w/o 75% drive/park

area to buffer

A

0.09

0.14

0.12

0.18

B

0.12

0.17

0.17

0.24

C

0.15

0.20

0.22

0.29

D

1.08

0.23

0.27

0.34

Note: Driveways and parking are considered to be draining directly to a buffer if the flow path to the buffer is 50 feet or less

and if the runoff reaches the buffer in well distributed overland flow.

Note: phosphorus export values in this table assume a driveway of 150 feet in length, or less. If driveways will likely exceed

150 feet, the excess driveway length should be considered a road and its export calculated using Worksheet 2 and Table 3.1

raining directly to a buffer if the flow path to the buffer is 50 feet or less

and if the runoff reaches the buffer in well distributed overland flow.

Note: phosphorus export values in this table assume a driveway of 150 feet in length, or less. If driveways will likely exceed

150 feet, the excess driveway length should be considered a road and its export calculated using Worksheet 2 and Table 3.1.

Example 2: Pre-treatment PPE Calculation for Commercial Development

Problem: 'Good Intention Business Mall' is proposing a business mall on 6 acres. The development

will consist of 3.5 acres of paved parking; a 0.5 acre paved access road, 1.5 acres of buildings and

0.5 acre of lawn. A deed restriction is proposed, prohibiting the use of fertilizers containing

phosphorus. Soils on the site are classified as Hydrologic Soil Group C. Calculate the pre-treatment

PPE for the proposed project.

Solution: Use Table 3.1 and Worksheet 2 to calculate the pre-treatment Algal Average Phosphorus

Export.

Worksheet 2

Pre-PPE Calculations

Project Name:

Good Intention Business Mall

Development Type:

Commercial

Land Surface Type of Lot

#(s) with description

Acres or

# of lots

Export

Coefficient

from Table 3.1

Pre-treatment

Algal Av. P Export

(lbs P/year)

Parking (pavement)

3.50

1.25

4.375

Access Road (low export)

0.50

1.25

0.625

Buildings

1.50

0.50

0.750

Lawn

0.50

0.30

0.150

Pre-PPE

(lbs P/year)

5.900

Based on these calculations, the pre-treatment PPE is 5.9 lbs P/year.

- 7 -

Example 3: Pre-PPE Calculation for Subdivision Development

Problem: The 'Homesweet Home Subdivision' in Example 1 involves the development of 12 lots and

0.5 acres of road. Four lots will be constructed on HSG B soils with no restrictions on cleared area or

driveway/ parking area. Eight of the lots will be constructed on HSG C soils and will have restrictions

to minimize site clearing to <12,000 square feet each and to minimize driveway/parking areas to

<1,750 square feet

esweet Home Subdivision' in Example 1 involves the development of 12 lots and

0.5 acres of road. Four lots will be constructed on HSG B soils with no restrictions on cleared area or

driveway/ parking area. Eight of the lots will be constructed on HSG C soils and will have restrictions

to minimize site clearing to <12,000 square feet each and to minimize driveway/parking areas to

<1,750 square feet. Six of the restricted lots will not direct 75% of the driveway and parking area

runoff to a buffer. Two of the restricted lots will direct the stormwater runoff from 75% or more of the

driveways and parking areas to a buffer. Driveways from two of the lots will exceed 150 feet in length,

with an anticipated 0.056 acres of driveway over the 150 length. The proposed road will be paved.

Calculate the pre-treatment PPE for the proposed subdivision.

Solution: Use Tables 3.1 and 3.2 and Worksheet 2 to calculate the pre-treatment Algal Average

Phosphorus Export.

Worksheet 2

Pre-PPE Calculations

Project Name:

Homesweet Home

Development Type:

Residential

Land Surface Type of Lot

#(s) with description

Acres or

# of lots

Export

Coefficient

from Table 3.1

Pre-treatment

Algal Av. P Export

(lbs P/year)

Lots 1-4 (HSG B) no

restriction, w/o 75% to buffer

4

0.24

0.96

Lots 5-10 (HSG C)

<12,000 sqft clearing,

w/o 75% to buffer

6

0.20

1.2

Lots 11 & 12 (HSG C)

<12,000 sqft clearing,

w/ 75% to buffer

2

0.15

0.30

Lots 2 & 3 driveway access

> 150 feet

0.056

1.25

0.07

Subdivision Road

(low export)

0.50

1.25

0.625

Pre-PPE

(lbs P/year)

3.155

Since two of the driveways exceeded 150 feet in length, the excess driveway length was considered a

road and its export calculated as such.

Based on these calculations, the Pre-treatment PPE is 3.155 lbs P/year.

- 8 -

3.1 - Redevelopment or Expansion of Existing Uses

Phosphorus export need not be estimated for any land uses that were in existence prior to 1997 (prior to

1980 for projects that require a Site Location of Development Act (SLODA) Permit from the DEP)

riveway length was considered a

road and its export calculated as such.

Based on these calculations, the Pre-treatment PPE is 3.155 lbs P/year.

- 8 -

3.1 - Redevelopment or Expansion of Existing Uses

Phosphorus export need not be estimated for any land uses that were in existence prior to 1997 (prior to

1980 for projects that require a Site Location of Development Act (SLODA) Permit from the DEP). For any

proposed project that will be built within a parcel having existing development (built before 1997 or 1980

for SLODA projects) that will be enlarged, upgraded or expanded, the phosphorus export should only be

estimated for the net increase. This would apply to the redevelopment or expansion of any existing

buildings, parking, roads and lawns. Any existing development or land disturbance that was created after

1997 (1980 for SLODA Projects) must be included as a new phosphorus export. This includes logging

roads, new access roads, and all other projects created from an undisturbed condition that did not require

a phosphorus design and permit at the time of construction.

For example, if a proposed subdivision is served by an existing 2000 foot gravel road, which was built

before 1997, and will be upgraded and expanded from a width of 14 feet to a width, with shoulders, of 24

feet, the phosphorus export should only be estimated for the net increase in road area, or 10 feet x 2000

feet = 20,000 square feet.

3.2 - Reduction of Phosphorus Export

Most projects will generate more phosphorus than the project's phosphorus budget (PPB) will allow. In

order to meet the budget, the excess phosphorus export must be reduced. Comparison of the pre-

treatment PPE with the PPB will determine how much export will need to be reduced. This section

describes options for reducing phosphorus export and how to estimate phosphorus export after treatment.

There are two basic options for reducing long term phosphorus export.

Option 1

udget (PPB) will allow. In

order to meet the budget, the excess phosphorus export must be reduced. Comparison of the pre-

treatment PPE with the PPB will determine how much export will need to be reduced. This section

describes options for reducing phosphorus export and how to estimate phosphorus export after treatment.

There are two basic options for reducing long term phosphorus export.

Option 1. Redesign to Reduce Phosphorus Export: The first option is to redesign the project so that

initial phosphorus export is minimized. This can be accomplished by:

•

Limiting the size or intensity of the project (i.e. reducing the number of lots, the length of roads, the

size of a parking area),

•

Locating the developed portion of the project on the best soils and shallowest slopes, and

•

Incorporating such measures as clearing restrictions and limitations on the use of phosphorus

fertilizers.

These reductions in phosphorus export will be reflected in the calculation of pre-treatment PPE described

in the previous section.

Option 2. Implement Best Management Practices (BMPs): The second option for reducing a project's

stormwater phosphorus export is to incorporate stormwater best management practices (BMPs) to

remove phosphorus from the stormwater before it leaves the site. Some examples of BMPs are vegetated

buffer areas, wet ponds, soil filters and infiltration beds. Volume III presents detailed design standards for

a number of commonly used BMPs.

All BMPs are not created equal. Some BMPs do a better job of removing phosphorus from stormwater

than others. Also, within a given type of BMP, differing designs or locations may result in different levels

of effectiveness is removing phosphorus. For example, a broad, wooded buffer on permeable soils with a

shallow slope will retain much more phosphorus than a narrow, field buffer on tight soils and steeper

slopes. For stormwater treatment ponds, such as wetponds, the size of the pond relative to its

contributing watershed, its depth, and its shape determine its effectiveness

ult in different levels

of effectiveness is removing phosphorus. For example, a broad, wooded buffer on permeable soils with a

shallow slope will retain much more phosphorus than a narrow, field buffer on tight soils and steeper

slopes. For stormwater treatment ponds, such as wetponds, the size of the pond relative to its

contributing watershed, its depth, and its shape determine its effectiveness.

In this Volume, a BMP's effectiveness in treating stormwater runoff is described in terms of a "treatment

factor". The Treatment Factor (TF) indicates the fraction of stormwater phosphorus that will pass through

the BMP and not be retained. For example, if a wooded buffer was projected to retain 60% and

discharges 40% of the inflow phosphorus, it would have a treatment factor of 0.4 and a removal efficiency

of 0.6. A simple way of estimating treatment factors for a variety of BMPs based on an adjustment of the

standard sizing specifications for BMPs described in Volume III of this manual is presented in Chapter 4

of this volume.

- 9 -

When planning the project, the project designer should look for opportunities to locate the most effective

BMPs (those with the highest removal efficiency) to collect runoff from the portions of the project which

produce the most phosphorus export (i.e. roads, parking areas, driveways, house lots). If the project site

is large enough, the preferred BMP is a natural wooded buffer area located immediately downhill of the

stormwater source area. Buffers are preferred because they are natural and they require little, if any,

maintenance (just don't cut the trees or disturb the ground cover). The critical element in siting buffers is

to insure that the stormwater runoff enters the buffer in overland, non-channelized flow that will not

concentrate into a channelized flow within the buffer. By comparison, other BMPs require site specific

design and careful construction as well as regular inspection and maintenance

f any,

maintenance (just don't cut the trees or disturb the ground cover). The critical element in siting buffers is

to insure that the stormwater runoff enters the buffer in overland, non-channelized flow that will not

concentrate into a channelized flow within the buffer. By comparison, other BMPs require site specific

design and careful construction as well as regular inspection and maintenance.

RE = Removal efficiency = The fraction of stormwater phosphorus that will be removed by the

BMP. The higher the removal efficiency, the more effective it will be at retaining phosphorus from

reaching the resource.

TF= Treatment factor = (1.0 - RE) = The fraction of the stormwater phosphorus that will pass

through a BMP and not be retained. The lower the treatment factor, the more effective the BMP.

When phosphorus from a project draining to a BMP is multiplied by that BMP's Treatment factor

(1.0 - RE), the resulting product is the amount of phosphorus that, after treatment, will still be

exported to the lake.

3.3 - Estimating Project Phosphorus Export after Treatment (Post-PPE)

In order to determine if the BMPs incorporated into the project are adequate to meet the PPB

(Project Phosphorus Budget), the pre-treatment PPE must be revised to reflect the treatment capabilities

of those BMPs. This is accomplished by multiplying the phosphorus export from each source area (i.e. a

parking lot, a house lot, a segment of road) by the treatment factor (1.0 - RE) of the BMP to which it

drains. See Section 4.1 BMP Rules of Thumb, if the individual source areas (or subcatchments) drain

cumulatively to more than one BMP. The export values for all source areas, both treated and untreated,

are then added together to get the total phosphorus export for the project using Worksheet 2.

For large projects or projects where the natural topography divides the site drainage into a number of

sub-drainage areas, this process may not be as straight forward. For instance, often the entire length of a

road will not drain to the same BMP

rt values for all source areas, both treated and untreated,

are then added together to get the total phosphorus export for the project using Worksheet 2.

For large projects or projects where the natural topography divides the site drainage into a number of

sub-drainage areas, this process may not be as straight forward. For instance, often the entire length of a

road will not drain to the same BMP. The local topography will result in one segment of road being treated

by one BMP, other segments by other BMPs, and still other segments receiving no treatment at all. In the

case of a crowned road, the uphill side of the road might drain to a road ditch that flows to a wet pond,

while sheet runoff from the downhill side of the road may drain to a wooded buffer, which for part of the

road length is 75 feet wide, meadow and on shallow slopes and for the remaining length is only 50 feet

wide, wooded on steep slopes. Since all three BMPs, the wetpond and the two buffers, have different

treatment factors, it is necessary to break the road surface area into three discreet subcatchments based

on the BMP(s) to which each road segment drains to calculate treated phosphorus export from the road.

This is true not only for roads but for all other types of development as well.

- 10 -

Summarize the project's phosphorus export and treatment as follows:

1. Show, on a topographic site plan, all the BMPs that will be incorporated into the project.

2. Delineate all subcatchments for which each BMP is providing treatment.

3. Identify all portions of the developed area (i.e. buildings, road segments, parking, lawns, house

lots) which are being treated by a given BMP or combination of BMPs on Worksheet 2.

4. List on the worksheet each subcatchment and export area with the pre-treatment phosphorus

export factor from Table 3.1 or Table 3.2 and the treatment factor(s) for the BMP(s) to which the

area drains. If the runoff from a subcatchment receives no treatment, enter 1.0 in the treatment

factor column.

5

awns, house

lots) which are being treated by a given BMP or combination of BMPs on Worksheet 2.

4. List on the worksheet each subcatchment and export area with the pre-treatment phosphorus

export factor from Table 3.1 or Table 3.2 and the treatment factor(s) for the BMP(s) to which the

area drains. If the runoff from a subcatchment receives no treatment, enter 1.0 in the treatment

factor column.

5. BMP treatment factors and removal efficiencies can be calculated from Chapter 4 of this volume

and Volume III. Enter these values on the worksheet.

6. Multiply each export area with its export factor and treatment factor to obtain the post-treatment

phosphorus export value. For areas receiving no treatment, use a treatment factor of 1.0.

7. See “Section 4.1. BMP Rules of Thumb”, if the source area drains to more than one BMP.

8. Sum the export from all treated and untreated areas to obtain the total post- treatment

phosphorus export (Post-PPE) from the project.

3.4 - Evaluating Project Overall Phosphorus Export

For an acceptable site development, the Post- PPE needs to be smaller than the PPB for the parcel. The

calculations can be summarized in Worksheet 4. If the resulting project phosphorus export (Post-PPE) is

less than or equal to the project phosphorus budget (PPB) from Worksheet 1 than the project meets its

budget. If not, further reductions in stormwater phosphorus are required. Credits for mitigation of existing

sources may be another option for reducing the net project phosphorus export (Post-PPE) or paying a

compensation fee may be an option (See Chapter 5, Credits for Mitigation and Compensation Fee for

guidance).

Using Worksheet 4, summarize the Net Project Phosphorus Export as follows:

1. Bring in the Project Phosphorus Budget (PPB) from Worksheet 1

2. Bring in any Mitigation Credits from Worksheet 3

3. Bring in the total Pre-Treatment Phosphorus Export (Pre-PPE) as calculated on

Worksheet 2

4. Bring in the total Post-Treatment Phosphorus Export (Post-PPE) as calculated on

Worksheet 2

5

Fee for

guidance).

Using Worksheet 4, summarize the Net Project Phosphorus Export as follows:

1. Bring in the Project Phosphorus Budget (PPB) from Worksheet 1

2. Bring in any Mitigation Credits from Worksheet 3

3. Bring in the total Pre-Treatment Phosphorus Export (Pre-PPE) as calculated on

Worksheet 2

4. Bring in the total Post-Treatment Phosphorus Export (Post-PPE) as calculated on

Worksheet 2

5. If the Post PPE is less than or equal to the site's PPB, the project meets its

phosphorus budget.

6. If the Post-PPE is larger than the site's PPB but the Post-PPE is less than or equal to

0.4 times the Pre-PPE, then paying a compensation fee may be an option in certain

lake watersheds. That list is available in Appendix F.

7. If the Post-PPE is larger than the site's PPB and the Post-PPE is more than 0.4 times

the Pre-PPE, then more phosphorus treatment needs to be provided or less

development must occur.

- 11 -

Example 4: Post-PPE Calculation for Subdivision Development

Problem: The 'Homesweet Home Subdivision' project described in Example 1 and 3 is proposing to

treat a portion of the stormwater runoff from the subdivision through the use of buffers. Lots 1-4 will

not receive any treatment. Lots 5 through 12, the excess driveway lengths from Lots 2 and 3, and the

access road is super-elevated and will be directed to a downgradient buffer sized in accordance with

Chapter 5 of Volume III of this manual. Calculate the post-treatment PPE for the proposed

subdivision.

Solution: The pre-treatment PPE was calculated in Example 3. A forested buffer treating stormwater

runoff that meets the standard sizing as provided in Chapter 5 of Volume III will achieve a Removal

Efficiency of 0.6. Thus, the corresponding Treatment Factor is 0.4, which should be entered into

Worksheet 2 as shown below. Note that 1.0 has been entered into the treatment factor column for

lots 1 through 4 for which no BMPS are providing stormwater treatment

A forested buffer treating stormwater

runoff that meets the standard sizing as provided in Chapter 5 of Volume III will achieve a Removal

Efficiency of 0.6. Thus, the corresponding Treatment Factor is 0.4, which should be entered into

Worksheet 2 as shown below. Note that 1.0 has been entered into the treatment factor column for

lots 1 through 4 for which no BMPS are providing stormwater treatment.

Worksheet 2

Pre-PPE and Post-PPE Calculations

Project Name:

Homesweet Home Subdivision

Development Type: Residential

Sheet #

Land

Surface

Type of

Lot #(s)

with

description

Acres

or #

of

lots

Export

Coefficient

from

Table 3.1

Table 3.2

Pre-treatment

Algal Av.

P Export

(lbs P/year)

Treatment

Factor for

BMP(s)

from

Chapter 6

Post-

treatment

Algal Av.

P Export

(lbs P/year)

Description

of BMPs

Lots 1-4 (HSG

B) no

No

restriction,

4.00

0.24

0.96

1.0

0.96

treatment

w/o 75% to

provided

buffer

Lots 5-10

(HSG C)

<12,000 sqft

clearing,

6.00

0.20

1,2

0.4

0.48

75 ft forest

buffer

w/o 75% to

buffer

Lots 11 & 12

(HSG C)

<12,000 sqft

clearing,

2.00

0.15

0.30

0.4

0.012

75 ft forest

buffer

w/ 75% to

buffer

Lots 2 & 3

driveway

access > 150

feet

0.056

1.25

0.07

0.4

0.028

55 ft

roadside

forest buffer

Access Road

(low export)

0.50

1.25

0.625

0.4

0.25

Pre-PPE

(lbs P/year)

3.155

Post-PPE

(lbs P/year)

1.838

Based on these calculations, the Post-treatment PPE is 1.838 lbs P/year.

- 12 -

Example 5: Project Phosphorus Export Summary for Subdivision Development

Problem: Summarize the Project Phosphorus Export for the 'Homesweet Home Subdivision' project

described in Example 1, 3 and 4. Determine whether the project as proposed meets its phosphorus

budget.

Solution: Use Worksheet 4 to summarize the Project Phosphorus Export as shown below

st-treatment PPE is 1.838 lbs P/year.

- 12 -

Example 5: Project Phosphorus Export Summary for Subdivision Development

Problem: Summarize the Project Phosphorus Export for the 'Homesweet Home Subdivision' project

described in Example 1, 3 and 4. Determine whether the project as proposed meets its phosphorus

budget.

Solution: Use Worksheet 4 to summarize the Project Phosphorus Export as shown below.

Worksheet 4

Project Phosphorus Export Summary

Summarizing the project’s algal available phosphorus export (PPE)

Project name: Homesweet Home Subdivision

Project Phosphorus Budget

PPB

1.995

lbs P/year

Mitigation Credit - Source Elimination Credit

SEC

0.00

lbs P/year

Source Treatment Credit

STC

0.00

lbs P/year

Total Phosphorus Mitigation Credit (SWC+STC)

TMC

0.00

lbs P/year

Total Pre-treatment Phosphorus Export Worksheet 2

Pre-PPE

3.155

lbs P/year

Total Post-treatment Phosphorus Export Worksheet 2

Post-PPE

1.838

lbs P/year

Project Phosphorus Export (Post-PPE - TMC)

PPE

1.838

lbs P/year

Since the calculated PPE of 1.838 lbs P/year is less than the PPB of 1.995 lbs P/year, the

project meets its phosphorus budget and no further treatment or reduction actions are

necessary.

- 13 -

IMPORTANT:

Best Management Practices (BMPs)

must be designed to meet the

required phosphorus reductions

based on the Project Phosphorus

Budget (PPB). The lowest

maintenance BMP that meets the

PPB should be selected.

Chapter 4 - Treatment Factors for Phosphorus BMPs

This chapter presents the treatment factors that the Department recommends using for the design of a

variety of phosphorus control BMPs.

4.1 - Rules of Thumb for BMP Selection

Consider these rules before selecting a BMP:

1. Given a choice, select the lowest maintenance BMP

that will provide the required phosphorus removal.

For example, natural wooded buffers require much less

long term inspection and maintenance than most other

BMPs, so, if space and topography allow, buffers are

the preferred BMP.

2

ety of phosphorus control BMPs.

4.1 - Rules of Thumb for BMP Selection

Consider these rules before selecting a BMP:

1. Given a choice, select the lowest maintenance BMP

that will provide the required phosphorus removal.

For example, natural wooded buffers require much less

long term inspection and maintenance than most other

BMPs, so, if space and topography allow, buffers are

the preferred BMP.

2. The buffer and source area (lawn, parking lot, etc.)

should be laid out for runoff to pass in non-

channelized sheet flow from the source area and be

evenly distributed across the face of the buffer. If

this design is not possible, runoff may first be

concentrated and then redistributed into the buffer using

a level spreader or ditch turnout, but care must be taken

not to hydrologically overload the buffer and to maintain

the level spreader (see design standards for level lip

spreaders in Volume III, Chapter 9).

4.2 - Common BMPs and their Standard Sizing

Volume III of this manual, BMP Technical Design Manual,

presents the standard designs for the most commonly used

BMPs. These standard BMP designs are sized to provide

retention of approximately 60% of the annual stormwater

phosphorus export, and thus would have a treatment factor

Natural wooded buffers are preferred

of 0.40. The standard sizing of these BMPs is as follows:

over other BMPs due to their low

•

Wetponds: Standard sizing for wet ponds requires a

maintenance.

storage volume below the permanent pool elevation of at

least 2.0 inch of runoff times the subcatchment's impervious area plus 0.8 inch of runoff times the

subcatchment's non-impervious developed area. The pond must have a mean depth of at least three

feet, and a length to width ratio of 2:1 or greater. See Chapter 4 of Volume III.

•

Underdrained vegetated soil filter or other approved filter: Standard sizing for filters requires

storage of a runoff volume equal to 1.0 inch times the subcatchment's impervious area plus 0.4 inch

times the subcatchment's non-impervious developed area

veloped area. The pond must have a mean depth of at least three

feet, and a length to width ratio of 2:1 or greater. See Chapter 4 of Volume III.

•

Underdrained vegetated soil filter or other approved filter: Standard sizing for filters requires

storage of a runoff volume equal to 1.0 inch times the subcatchment's impervious area plus 0.4 inch

times the subcatchment's non-impervious developed area. Filter examples are underdrained

vegetated soil filters having a single outlet with a diameter no greater than eight inches, or proprietary

filter systems approved by the department. See Chapter 7 of Volume III.

•

Infiltration Systems: Standard sizing for infiltration systems requires storage of a runoff volume

equal to 1.0 inch times the subcatchment's impervious area plus 0.4 inch times the subcatchment's

non-impervious developed area. Pre-treatment of stormwater must occur prior to discharge to the

infiltration area. See Chapter 6 of Volume III.

•

Vegetated Buffers: Standard sizing of flow path lengths for buffers depends on the type of buffer, the

soil type and slope of the buffer, and the nature and extent of land use in the contributing watershed

for phosphorus export reduction. Standard sizing for a given buffer type in a given landscape and

development setting can be determined using the tables found in Chapter 5, of Volume III.

- 14 -

4.3 - Determining BMP Phosphorus Treatment Factors

In designing the stormwater management system, the treatment factor of the selected BMPs for the

project can be adjusted based on their sizing. A BMP's treatment factor may be reduced or enhanced by

modifying either the volume of stormwater runoff it will store and treat or the length of flow path through a

buffer. The two formulas presented below provide a way of (1) adjusting the standard sizing of BMPs

described in Volume III and in Section 4.2 of this volume to provide a desired treatment factor, or (2)

determining the treatment factor of a given size BMP

tor may be reduced or enhanced by

modifying either the volume of stormwater runoff it will store and treat or the length of flow path through a

buffer. The two formulas presented below provide a way of (1) adjusting the standard sizing of BMPs

described in Volume III and in Section 4.2 of this volume to provide a desired treatment factor, or (2)

determining the treatment factor of a given size BMP.

Wetponds, underdrained soil filters, infiltration systems may be sized to provide various degrees of

treatment by adjusting the storage and treatment volume. In the case of buffers, the flow path length may

be adjusted (Volume III, Chapter 5). There is, however, a point at which further increase in sizing of a

BMP is not likely to significantly improve the BMP's ability to retain phosphorus. This limit is expressed as

a minimum treatment factor for each type of BMP. Treatment factors may not be adjusted below this

minimum. Minimum treatment factors are discussed later in this chapter and are presented in Table 4.1.

(1) If you know the treatment factor that is needed and can adjust your BMP design to meet

it, use the following equation to determine either the volume of runoff that must be

stored and treated or the necessary buffer flow path length to provide a required

treatment factor:

BMPTF = 0.4*(BMPST /TF)

Where:

TF

= Desired treatment factor (1-Removal Efficiency of the BMP)

BMPST = Standard sizing for the BMP, as described in Section 4.2

BMPTF = Required sizing to achieve the desired treatment factor

BMP sizing is based on either volume of runoff stored and treated or buffer flow path length.

Example 6: Alternative BMP Sizing

Problem: 5.0 pounds per year of phosphorus is created from the runoff of a four acre parking lot.

The owner wishes to design a wetpond to achieve a desired maximum phosphorus export from the

parking lot of 1.8 pounds/year to meet the project’s phosphorus budget for that area

sizing is based on either volume of runoff stored and treated or buffer flow path length.

Example 6: Alternative BMP Sizing

Problem: 5.0 pounds per year of phosphorus is created from the runoff of a four acre parking lot.

The owner wishes to design a wetpond to achieve a desired maximum phosphorus export from the

parking lot of 1.8 pounds/year to meet the project’s phosphorus budget for that area. What size

pond will be needed to achieve this export?

Solution: The desired treatment factor is calculated as:

TF = Desired Export/Existing Export = 1.8/5.0 = 0.36 or

Using the Volume III sizing criteria, 60% removal efficiency can be achieved with a wetpond, or a

0.4 TF. This requires a minimum permanent pool volume of 2.0 inches times the impervious area

(parking lot). Since this project requires a 36% TF (64% removal efficiency), the permanent pool

volume must be larger by an equally proportional amount. Thus, the wetpond can be sized as

follows:

BMPTF = 0.4*(BMPST/TF)

= 0.4*(2.0/0.36)

= 2.22 inch of runoff for the impervious area

The permanent pool of the pond must be sized for 2.22 inches of runoff over the impervious area.

If the pond is discharging to a stream before reaching the lake, then the channel protection volume

needs to be provided per Volume III.

- 15 -

(2) If, on the other hand, you know the size of a given BMP, and need to determine its

treatment factor, use the following formula:

TF = 0.4 BMPST / BMPTF

Where:

TF

= Treatment Factor (1-Removal Efficiency of the BMP) of the BMP

BMPST = Standard sizing for the BMP as described in Section 4.2

BMPTF = Actual sizing of the given BMP

BMP sizing is based on either volume of runoff stored and treated or buffer flow path length.

Example 7: Alternative Treatment Factor and Minimum Treatment Factor

Problem: The available downgradient meadow buffer for a one acre parking lot has 150 feet of

sheet flow on a 6% slope and on HSG C soil (sandy loam)

rd sizing for the BMP as described in Section 4.2

BMPTF = Actual sizing of the given BMP

BMP sizing is based on either volume of runoff stored and treated or buffer flow path length.

Example 7: Alternative Treatment Factor and Minimum Treatment Factor

Problem: The available downgradient meadow buffer for a one acre parking lot has 150 feet of

sheet flow on a 6% slope and on HSG C soil (sandy loam). What would be the allowable

treatment factor for this buffer?

Solution: According to the buffer table, “Buffer Flow Path Length Downgradient of Residential,

Largely Pervious or Small Impervious Areas” (Chapter 5 in Volume III, the required forested

buffer length on sandy loam C soils to adequately treat stormwater runoff is 100 feet. Thus, the

treatment factor for the available buffer on this project is:

TF = 0.4 BMPST/BMPTF

= 0.4 (100/150)

= 0.27

However, according to Table 4.1, the minimum treatment factor that may be used for a forested

buffer on C sandy loam soil is 0.3. Therefore, the treatment factor is limited to 0.3.

4.4 - Minimum Treatment Factors

There is a limit to the amount of phosphorus removal a BMP can accomplish, no matter how large one

makes it. The physical, chemical, and biological processes that a BMP relies on to remove pollutants

have limitations and making a BMP larger generally does not change the limits on the effectiveness of

these processes. It only means that the BMP will treat a larger fraction of the runoff generated by

infrequent storms. Hence, upper limits have been placed for BMP sizing. Table 4.1 presents the minimum

treatment factors that are allowed for selected BMPs. BMPs may be enlarged from their standard sizing

criteria as outlined in Volume III to reduce their treatment factors to a point, but treatment factors may not

be reduced below the minimums in Table 4.1.

4.5 - Multiple BMPs Placed in Series

If multiple BMPs are being used in series, make sure that the last BMP in the series has the ability to

remove the types of pollutants which are likely to reach it

s may be enlarged from their standard sizing

criteria as outlined in Volume III to reduce their treatment factors to a point, but treatment factors may not

be reduced below the minimums in Table 4.1.

4.5 - Multiple BMPs Placed in Series

If multiple BMPs are being used in series, make sure that the last BMP in the series has the ability to

remove the types of pollutants which are likely to reach it. For example, treatment credit should not be

taken for a filter located downstream of an efficient forested buffer. The filter will not add significant

additional treatment because the buffer will most likely have already removed all the fractions of

stormwater phosphorus that the filter could.

If multiple BMPs are being used appropriately in series, the net treatment factor for the series of BMPs is

the product of the lowest (most efficient) treatment factor of the individual BMPs in the series and the

square root of the treatment factor(s) of the less effective BMP(s). For example, if a small wetpond with a

treatment factor of 0.6 drained to an engineered infiltration area with a treatment factor of 0.4, the net

treatment factor for the two BMPs would be 0.4 x (0.6)1/2 = 0.31.

- 16 -

Table 4.1

Minimum Treatment Factors for Selected BMPs

BMPs

Treatment Factor

(1-RE)

Wetponds

Single Pond

0.3

Two ponds in series (per Volume III, Chapter 4)

0.25

Three ponds in series (per Volume III, Chapter 4)

0.2

Underdrained Soil Filters and Other Approved Filters

On sand, loamy sand or sandy loam

0.15

All other filters (including filters with an impermeable liner)

0.25

Infiltration

All infiltration BMPs

0.1

Vegetated Buffers *

Hydrologic Soil Group (and Texture)

Forest

Meadow

A or B

0.15

0.2

C (sandy loam or loamy sand)

0.2

0.3

C (silt loam, clay loam or silty clay loam)

0.3

0.4

D (non-wetland)

0.4

N/A

The maximum allowed flow path length in a buffer is 150 feet unless the runoff is redistributed by a midcourse stone

bermed level lip spreader

0.25

Infiltration

All infiltration BMPs

0.1

Vegetated Buffers *

Hydrologic Soil Group (and Texture)

Forest

Meadow

A or B

0.15

0.2

C (sandy loam or loamy sand)

0.2

0.3

C (silt loam, clay loam or silty clay loam)

0.3

0.4

D (non-wetland)

0.4

N/A

The maximum allowed flow path length in a buffer is 150 feet unless the runoff is redistributed by a midcourse stone

bermed level lip spreader.

RE= Removal Efficiency

N/A = not applicable

Example 8: Maximum Treatment

Problem: Using the minimum treatment factors in Table 4.1, calculate the maximum amount of

runoff that can be treated using an underdrained filter that has less than 2 feet of separation

between the bottom of the system and the restrictive layer and that is treating runoff from an

impervious area.

Solution: For this situation, the minimum treatment factor from Table 4.1 is 0.25. Standard BMP

sizing calls for treatment of 1.0 inch of runoff over the impervious surface. The maximum runoff

that can be treated in such a filter is calculated as follows:

BMPTF = 0.4*(BMPST/TF)

= 0.4*(1.0/0.25)

= 1.6 inch of runoff

The filter bed can only be expanded by area and not depth.

- 17 -

Chapter 5 - Credits for Mitigation and Compensation

Fees

Phosphorus reduction

The objective of this project planning process is to limit increases in

can also be achieved

phosphorus loading to the lake resulting from development. The

through mitigation

methods discussed thus far have focused on limiting the scope of the

measures that focus on

development or reducing its phosphorus export by incorporating

eliminating or reducing

BMPs. Phosphorus load to the lake can also be limited by reducing

phosphorus loads from

export from long standing, existing sources of phosphorus, a trade off

existing sources.

usually referred to as mitigation.

5.1 - Types of Mitigation

Mitigation can take a number of forms. It can involve the elimination of an historical source or a reduction

of the source, usually by treatment with BMPs

educing

BMPs. Phosphorus load to the lake can also be limited by reducing

phosphorus loads from

export from long standing, existing sources of phosphorus, a trade off

existing sources.

usually referred to as mitigation.

5.1 - Types of Mitigation

Mitigation can take a number of forms. It can involve the elimination of an historical source or a reduction

of the source, usually by treatment with BMPs.

Phosphorus loads can also be limited by reducing export from existing sources of phosphorus

on a site, a trade-off usually referred to as mitigation. Mitigation credits can be achieved

through two means:

•

Elimination of existing phosphorus sources (e.g., elimination of an old gravel road so it can

revert back to a forested condition); or

•

Reduction of existing phosphorus sources through treatment (e.g., diverting stormwater

flows from an existing road to a treatment device for phosphorus removal).

However, the following must also be true:

•

To be considered an existing source, it must be in existence prior to 1980.

Elimination: A wood lot being developed as a subdivision can provide a good example of elimination.

An old, gravel road passes through the wood lot. It will not, however, be used by the developer, who

plans to eliminate the old road and construct a new road in a different location to access the new house

lots. The old road has been exporting phosphorus to the lake for the last 50 years.

Elimination of the road and return to a forested condition will result in a reduction of phosphorus loading

to the lake. This reduction in historical phosphorus export can be used to balance, or mitigate, some of

the project's new phosphorus export. In this chapter we will discuss various ways of mitigating new

phosphorus export by reducing or eliminating historical phosphorus sources, and how credit for this

mitigation can be applied to a project's phosphorus budget.

Reduction by Treatment: Suppose the developer actually wants to use the old road in his

subdivision scheme

to balance, or mitigate, some of

the project's new phosphorus export. In this chapter we will discuss various ways of mitigating new

phosphorus export by reducing or eliminating historical phosphorus sources, and how credit for this

mitigation can be applied to a project's phosphorus budget.

Reduction by Treatment: Suppose the developer actually wants to use the old road in his

subdivision scheme. In order to reduce phosphorus export from other parts of his development he is

constructing a wet pond BMP down gradient of the development. The old road, which formerly drained

directly to the lake, now drains first to the wet pond, which has a treatment factor of 0.40. This means that

only 40% of the old road's phosphorus export is now reaching the lake, with the remainder retained in the

wet pond. Phosphorus export from the road has now been reduced by 60%. This reduction in

phosphorus, called a credit, can now be subtracted from the phosphorus export associated with newly

developed portions of the project.

- 18 -

Another variation on this example illustrates an even more common situation. Suppose the old gravel

road is not wide enough to meet current town standards for subdivision roads and it must be widened

from 12 feet to 24 feet. This expansion of road width means that half of the 24 foot road must be

considered new in terms of phosphorus export. Its export, as modified by the wet pond's treatment factor,

would be included in the list of phosphorus exports in Worksheet 2. Stormwater from the half of the road

which can be considered old, however, is now being treated and the resulting reduction in phosphorus

export is a credit that can be subtracted from the project's total phosphorus export.

Problems with Estimating Credit for Mitigation: But how does one estimate the amount of

phosphorus export that is being reduced or eliminated? Phosphorus export from old, preexisting sources

can be estimated in the same way as new sources, using the export factors in Table 3.1

he resulting reduction in phosphorus

export is a credit that can be subtracted from the project's total phosphorus export.

Problems with Estimating Credit for Mitigation: But how does one estimate the amount of

phosphorus export that is being reduced or eliminated? Phosphorus export from old, preexisting sources

can be estimated in the same way as new sources, using the export factors in Table 3.1. However, in

doing so two important issues must be considered.

•

Comparability of existing and proposed phosphorus export sources: Let us

return to the road example. Suppose the old gravel road has seen only very light use as a woods

road over the last 50 years. It has started to revert with vegetation encroaching on the sides and in

the middle between the tire tracks. It is unlikely that it currently exports nearly as much phosphorus

per square foot as will the new subdivision road, which will receive comparably heavy use. So

treatment or elimination of this export will not provide equivalent mitigation for the new road which

replaces it. To avoid this problem, this evaluation process automatically cuts the estimated

phosphorus export from preexisting sources in half unless it is clearly demonstrated that the old

source is equivalent in both structure and use to the new sources being mitigated. A multiplier of 0.5

is included in Worksheet 3 for this purpose.

•

Historic drainage patterns of the phosphorus export: If the runoff from the historic

road immediately drained into a road ditch and continued, untreated, to the lake there is no problem

with taking credit for elimination or treatment of the old road. But often the runoff from old roads

sheets into the woods or fields adjacent to the road where much of its phosphorus export is retained

in a natural buffer, and never reaches the lake. In this case credit should not be taken for treatment of

the road's stormwater runoff because it was already receiving treatment, unless the new BMP has a

much better treatment factor than the historic BMP

ld road. But often the runoff from old roads

sheets into the woods or fields adjacent to the road where much of its phosphorus export is retained

in a natural buffer, and never reaches the lake. In this case credit should not be taken for treatment of

the road's stormwater runoff because it was already receiving treatment, unless the new BMP has a

much better treatment factor than the historic BMP. In that case, credit may be taken for treatment,

but only for the difference between the old and new phosphorus export. If the road is being

eliminated, credit should only be taken for an amount of export which has been reduced by the

treatment factor of the historic buffer.

Mitigation Dos and Don’ts

Don't take credit for mitigation of relatively

recent phosphorus sources. Credit should

not be allowed on sources, which were not in

existence prior to 1980.

Do halve the phosphorus export from mitigation

sources unless it is clearly demonstrated that the

old source is equivalent in both structure and use

to the new sources being mitigated.

Don't take mitigation credit for the treatment

of sources which have been historically

treated by adjacent buffers or treatment

ponds.

Do adjust the credit for any source elimination to

reflect historical treatment by buffers or ponds.

Do insure - through property owner agreements,

deed covenants and restrictions, conservation

easements, endowments and/or long term

agreements with maintenance contractors - that

eliminated sources will be allowed to revert and

remain in a forested condition and that BMPs will

be properly maintained.

- 19 -

5.2 Estimating Credits for Mitigation

Worksheet 3 may be used to calculate mitigation credits. The upper portion of the worksheet is used

to calculate credit when a pre-existing source is being eliminated. The lower portion is used when a

pre-existing, historically untreated source is being treated by new BMPs. Credits are determined as

follows:

1

and that BMPs will

be properly maintained.

- 19 -

5.2 Estimating Credits for Mitigation

Worksheet 3 may be used to calculate mitigation credits. The upper portion of the worksheet is used

to calculate credit when a pre-existing source is being eliminated. The lower portion is used when a

pre-existing, historically untreated source is being treated by new BMPs. Credits are determined as

follows:

1. List the size of the source area (in acres and to the second decimal place) and phosphorus

export coefficient from Table 3.1 for each pre-existing mitigation source in the appropriate

spaces.

2. If the source is being eliminated, enter the estimated treatment factor for historical BMPs that

provided treatment of the source or enter 1.0 if the source drains directly to the lake.

3. If the source is being treated, enter the treatment factor for the new BMP which will be treating

each mitigation source in the worksheet. Also enter the estimated treatment factor for any natural

buffers or other BMPs that historically provided treatment of the source or enter 1.0 if the source

drained directly to the lake.

4. For source elimination and treatment multiply the source area with the phosphorus export factor

and by the modifier 0.5 (unless it has been clearly demonstrated that the old source is equivalent

in both structure and use to the new sources being mitigated) to calculate the creditable pre-

treatment historical phosphorus export from each source area. The modifier can be selected as

1.0 only if it is clearly demonstrated that the old source is equivalent in both structure and use to

the new source being mitigated. Then the pre-treatment historical phosphorus export is

multiplied with any treatment factors for historical BMPs to obtain the historical phosphorus

export.

5. For each source that is being eliminated, the mitigation credit value is equivalent to the historical

phosphorus export value (from Step 3)

rated that the old source is equivalent in both structure and use to

the new source being mitigated. Then the pre-treatment historical phosphorus export is

multiplied with any treatment factors for historical BMPs to obtain the historical phosphorus

export.

5. For each source that is being eliminated, the mitigation credit value is equivalent to the historical

phosphorus export value (from Step 3). For sources being treated by new BMP(s), subtract the

treatment factor for the new BMP from 1.0 and multiply this times the source's historical

phosphorus export (from Step 3) to get the mitigation credit value for each source.

6. Sum the phosphorus export credit values for all mitigation sources to obtain the total credit value

in Worksheet 3.

5.3 On-site vs. Off-site Mitigation

Another important mitigation consideration is whether the mitigation source and, in the case of treatment,

the BMP, are located on the parcel (on-site) or elsewhere in the lake's watershed (off-site). If the

treatment source and the treatment BMP are located ”on-site”, the developer can insure - through

property owner agreements, deed covenants and restrictions, conservation easements, endowments

and/or long term agreements with maintenance contractors - that eliminated sources will be allowed to

revert and remain in a forested condition and that BMPs will be properly maintained. Essentially these

mitigation measures are treated no differently than the buffers and other BMPs incorporated in the project

to address new sources of phosphorus export.

If the mitigation measures are being implemented elsewhere in the watershed, it is a much greater

challenge, for both the developer and any regulating body which is requiring the mitigation, to insure that

the measures are maintained over the long term. In the case of elimination or reduction of off-site

mitigation sources by change of land use (i.e. conversion of road to forest), these areas can be

reasonably protected by deed restrictions and conservation easements

shed, it is a much greater

challenge, for both the developer and any regulating body which is requiring the mitigation, to insure that

the measures are maintained over the long term. In the case of elimination or reduction of off-site

mitigation sources by change of land use (i.e. conversion of road to forest), these areas can be

reasonably protected by deed restrictions and conservation easements. However, insuring long term

maintenance of offsite BMPs is much more problematic. Because of these difficulties, it is recommended

that treatment of on-site mitigation sources with “off-site” BMPs be allowed only if the property on which

the off-site mitigation is taking place and the project parcel are in common ownership, and that owner is a

permanent entity, such as a town or a school district, that is not likely to transfer ownership of either

- 20 -

parcel. Treatment of off-site mitigation sources is only allowed as described in section 3.C.2 of the

Chapter 501 Stormwater Management Compensation Fees and Mitigation Credit Rules.

5.4 Compensation Fees

The Maine Stormwater Management Law (38 MRSA § 420-D) and its accompanying regulations (DEP

Chapter 500 and 501) address some of the problems associated with off-site mitigation discussed above

by allowing an alternative known as the Compensation Fee Program. The law recognizes the difficulties a

state agency would have in tracking and insuring the maintenance of off-site BMPs used for mitigation on

a project

ormwater Management Law (38 MRSA § 420-D) and its accompanying regulations (DEP

Chapter 500 and 501) address some of the problems associated with off-site mitigation discussed above

by allowing an alternative known as the Compensation Fee Program. The law recognizes the difficulties a

state agency would have in tracking and insuring the maintenance of off-site BMPs used for mitigation on

a project. The regulations therefore allow mitigation credit only for the elimination or reduction (by land

use change) of off-site sources of phosphorus (Chapter 501, Section 3.C.1) and the limited off-site

treatment options described in Chapter 501, Section C.3.2.As an alternative to project based off-site

treatment mitigation, the Compensation Fee Program allows the department to let the developer offset a

portion of the phosphorus reduction required for the project to meet its phosphorus budget by paying a

compensation fee to an approved regional organization that performs watershed management activities.

The authorized local entity accumulates compensation fee funds in accounts for each individual lake

watershed, and uses these funds to provide long term solutions to priority chronic phosphorus sources

within the watershed.

The Compensation Fee option is only available on some lakes. Lakes for which the option is not

available include many small, relatively undeveloped lake watersheds that happen to be in a region of

high growth. In these cases there are few if any opportunities to address existing problems in the

watershed. It may also include watersheds where a large amount of restoration work has already been

performed and any problems remaining to be addressed are more expensive than what the compensation

rate can cover. Lastly, it includes areas where there are no local watershed management agencies (i.e.

soil and water conservation districts, watershed districts, etc.) interested in developing and implementing

mitigation projects

e watersheds where a large amount of restoration work has already been

performed and any problems remaining to be addressed are more expensive than what the compensation

rate can cover. Lastly, it includes areas where there are no local watershed management agencies (i.e.

soil and water conservation districts, watershed districts, etc.) interested in developing and implementing

mitigation projects. The regional organizations which the Department has approved for management of

compensation funds and implementation of compensation projects have each developed a list of lakes for

which they will accept compensation fees. Developers should not assume that the compensation fee is

an option until they have checked with the Department to be sure it is available in the lake watershed in

which the proposed development is located.

The Compensation Fee option is only available if the project incorporates onsite treatment and mitigation

measures that reduce the pre-treatment phosphorus export by at least 60%. To express this in terms of

the worksheets used to calculate project phosphorus export, the sum of post-treatment export expressed

on Worksheet 2 must be less than or equal to 0.4 times the sum of pre-treatment export expressed on

Worksheet 2 in order for a project to offset any additional phosphorus reductions through payment of a

compensation fee.

In addition to the above limitations, the Compensation Fee option is not available for residential

subdivision projects unless the wooded or meadow buffers are the only BMPs used to provide the

reduction in pre-treatment phosphorus export.

Compensation Fee Calculations: Projects in lake watersheds regulated by the state under the

Stormwater Management Law may have the opportunity to use compensation fees to help meet their

project's phosphorus budget as required by that law. These projects may, however, also come under local

regulation, which may or may not recognize compensation fee payment as an alternative to on-site

reduction of phosphorus export

alculations: Projects in lake watersheds regulated by the state under the

Stormwater Management Law may have the opportunity to use compensation fees to help meet their

project's phosphorus budget as required by that law. These projects may, however, also come under local

regulation, which may or may not recognize compensation fee payment as an alternative to on-site

reduction of phosphorus export. If it is available for the lake in question, the Compensation Fee option

allows the developer to off-set the difference between the projects phosphorus export and the project’s

phosphorus budget by paying a compensation fee based on the amount, in pounds of phosphorus, of that

difference.

The current compensation rate (August 2015) is $25,000 per pound for a project that provides on-site

reduction of pre-treatment phosphorus export by 60%. The fee becomes progressively less as on-site

- 21 -

reduction of pre-treatment export is reduced, as shown in Table 5.1 below. This means that if a project's

phosphorus budget was 0.6 lb P/yr and, after application of reasonable BMPs, the project export could

only be reduced 60% to 1.0 lb P/yr, the remaining 0.4 lb reduction required to meet the project's budget

could be offset by a compensation fee payment of $10,000 (0.4 lb x $25,000 /lb). Exemptions to the

compensation fee application are stated in Chapter 501(3)(C)(3).

Table 5.1

Compensation Fee per Pound of Phosphorus Export

Percentage

Of Project Phosphorus Export

Additional Phosphorus

Compensation Fee

($/pound)- fees are prorated

60%

$25,000

75%

$12,500

100%

$0

Note:

a.

25,000 per pound fee is reduced by $500 per percentage point of project’s

phosphorus export between 60 and 75%.

b.

$12,500 per pound fee is reduced by $834 per percentage point of project’s

phosphorus export over 75%

Fee per Pound of Phosphorus Export

Percentage

Of Project Phosphorus Export

Additional Phosphorus

Compensation Fee

($/pound)- fees are prorated

60%

$25,000

75%

$12,500

100%

$0

Note:

a.

25,000 per pound fee is reduced by $500 per percentage point of project’s

phosphorus export between 60 and 75%.

b.

$12,500 per pound fee is reduced by $834 per percentage point of project’s

phosphorus export over 75%.

Example 9: Project Phosphorus Export Summary for Subdivision Development

Problem: The Project Phosphorus Export for a subdivision project called ‘Sunnydays’ is similar to the

‘Homesweet Home Subdivision’, but it can only meet its post-treatment phosphorus export for some

of the lots. Determine whether the project as proposed meets its phosphorus budget and what will

the compensation fee be.

Solution: Use Worksheet 4 to summarize the Project Phosphorus Export as shown below.

Worksheet 4

Project Phosphorus Export Summary

Summarizing the project’s algal available phosphorus export (PPE)

Project name: Sunnydays Subdivision

Project Phosphorus Budget – Worksheet 1

PPB

0.995

lbs P/year

Total Pre-treatment Phosphorus Export Worksheet 2

Pre-PPE

3.155

lbs P/year

Total Post-treatment Phosphorus Export – Worksheet 2

Post-PPE

1.213

lbs P/year

Total Phosphorus Mitigation Credit - Worksheet 3

TMC

0.0

lbs P/year

Project Phosphorus Export (Post-PPE - TMC)

PPE

1.213

lbs P/year

The calculated PPE of 2.213 lbs P/year is more than the PPB of 0.995 lbs P/year by

1.218lbP/year; and the project does not meet its phosphorus budget.

A compensation fee is available to off-set the 1.218 lb P/year difference because treatment is

buffer only, and the treatment level is more than 60% (Post-PPE/Pre-PPE).

The PPE has been reduced by 61.55% (1 - (1.213/3.155)). The fee is prorated at 1.55% less than

the fee for 60% or $25000 – 1.55($12,500/15) or $23,708 per pound.

The compensation fee for Sunnydays Home Project is $5,168 ($23,708x0.218).

- 22 -

Alternative performance standards

may be used for certain smaller,

residential projects

only, and the treatment level is more than 60% (Post-PPE/Pre-PPE).

The PPE has been reduced by 61.55% (1 - (1.213/3.155)). The fee is prorated at 1.55% less than

the fee for 60% or $25000 – 1.55($12,500/15) or $23,708 per pound.

The compensation fee for Sunnydays Home Project is $5,168 ($23,708x0.218).

- 22 -

Alternative performance standards

may be used for certain smaller,

residential projects. These generally

include specific development

restrictions and the use of Low

Impact Development (LID) practices.

Chapter 6 - Performance Standards for Smaller

Projects

6.1 - Single Family Residences and Small

Subdivisions with No New Road

There are some kinds of relatively low impact, residential

development where the level of analysis applied in the

previous sections may be inappropriate or unreasonable.

This section prescribes comparatively simple, alternative

performance standards which may be applied to: (1) new

single family residences or duplexes on existing lots which

are not part of a subdivision that has already incorporated

appropriate phosphorus controls; and (2) subdivisions of five

or fewer lots that do not involve the construction of a new

road or expansion of an existing road. New residential

developments which fall into either of these categories may

meet their phosphorus control obligations by incorporating

the phosphorus control measures listed either under Basic

Single Family Residential Lot Standards or Alternative Single

Family Residential Lot Standards below; and by maintaining

these measures over the long term.

Basic Single Family Residential (SFR) Lot Standards. The

Smaller residential development

following basic Single Family Residence Lot Standard is the

projects can use alternative

preferred way of addressing new development of individual

performance standards to meet their

residential lots or small residential subdivisions that do not

phosphorus control obligations.

include a new road. A project must meet all provisions of the

These generally involve restrictions

standard

al development

following basic Single Family Residence Lot Standard is the

projects can use alternative

preferred way of addressing new development of individual

performance standards to meet their

residential lots or small residential subdivisions that do not

phosphorus control obligations.

include a new road. A project must meet all provisions of the

These generally involve restrictions

standard. The standards for appropriate buffer design and

on disturbance, buffers and

maintenance are presented below.

impervious area or the incorporation

of Low Impact Development (LID)

Alternative Single Family Residential Lot Standards. A

techniques.

property owner or developer may choose not to meet the

Basic Single Family Residential Lot Standard due to site

constraints or design preference. In situations where the Basic Standard is not met on a project, the

project must meet the following Alternative Single Family Residential Lot Standards.

Meeting this standard may require the use of more than one LID practice on the site, due to existing site

topography and the layout of the property. For example, half of the roof may drain to the front of a building

while the other half drains to the back of the building, and the lawn and driveway/parking area drain off to

one side of the property. Drainage in each of these directions must be captured and treated using an LID

practice. The selection, size, and location of the LID practices used on a given site will depend on the size

of the area draining to each practice and the impervious area versus lawn area. While this may not

always be feasible, applicants are encouraged to maintain natural buffers to the extent possible as a

primary LID technique, which can then be augmented by other practices on the site. Guidance on how to

size each LID practice is found in section 6.2 below

used on a given site will depend on the size

of the area draining to each practice and the impervious area versus lawn area. While this may not

always be feasible, applicants are encouraged to maintain natural buffers to the extent possible as a

primary LID technique, which can then be augmented by other practices on the site. Guidance on how to

size each LID practice is found in section 6.2 below.

- 23 -

Requirements for New Single Family Lot Development

Basic SFR Lot Standard

Alternative SFR Lot Standards

Disturbance on an individual lot must be less than

Low Impact Development (LID) practices are used

15,000 square feet (including building, driveway,

and sized to treat 0.5 inches of runoff from all

walkways, lawn area, construction access,

impervious surfaces on the site, and 0.2 inches o

grading). And, no more than 7,500 square feet of

runoff from all disturbed pervious areas of the site

impervious cover is located on the property.

(lawn).*

A minimum natural vegetated buffer must be

The LID practices installed on the site are

maintained downgradient of all developed area on

maintained in perpetuity. If necessary, LID

the lot. This buffer shall be 35 feet deep if naturally

practices may be replaced with new LID practices

forested or 50 feet deep if maintained as a natural

as long as the overall site treatment standard

meadow.*

above is met.

A minimum of 25 percent of the lot area must be

maintained as undisturbed natural area.*

* If the lot or a portion of the lot is located within a watershed of

a Lake Most at Risk from New Development, an Urban Impaired

Stream, or other impaired or sensitive waterbodies as

designated by the municipality for the purposes of this standard,

a minimum of:

•

50 feet if naturally forested buffer, or 75 feet if maintained

as meadow must be maintained downgradient of all

developed area on the lot,

•

A minimum of 40% of the lot area must be maintained as

undisturbed natural area

isk from New Development, an Urban Impaired

Stream, or other impaired or sensitive waterbodies as

designated by the municipality for the purposes of this standard,

a minimum of:

•

50 feet if naturally forested buffer, or 75 feet if maintained

as meadow must be maintained downgradient of all

developed area on the lot,

•

A minimum of 40% of the lot area must be maintained as

undisturbed natural area.

If the existing land has been disturbed by prior activities, a

natural vegetated buffer and/or undisturbed natural area may be

proposed through restoration and revegetation.

* If the lot or a portion of the lot is located within watersheds of

Lakes Most at Risk from New Development or other impaired or

sensitive waterbodies as designated by the municipality for the

purposes of this standard, the project must treat one inch of

runoff from impervious surfaces and 0.4 inch from disturbed

pervious surfaces.

6.2 – Low Impact Development Practices

Low Impact Development (LID) practices can be used to capture and treat runoff from residential

rooftops, non-rooftop impervious areas such as paved driveways, patios and walkways, and maintained

lawn areas. While there are a number of practices considered to be LID practices, a lengthy discussion of

these is not practicable for this volume but can be found in Volume III of this manual. The most popular

LID practices are the following:

•

Buffers,

•

Underdrain soil filters (rain gardens and swales),

•

Infiltration practices (dry wells and infiltration trench),

•

Pervious pavements.

The design and maintenance standard for Buffer are presented below, and should be applied to projects

meeting the Basic SFR Lot Standard. Design and maintenance standards for other LID practices (i.e

l. The most popular

LID practices are the following:

•

Buffers,

•

Underdrain soil filters (rain gardens and swales),

•

Infiltration practices (dry wells and infiltration trench),

•

Pervious pavements.

The design and maintenance standard for Buffer are presented below, and should be applied to projects

meeting the Basic SFR Lot Standard. Design and maintenance standards for other LID practices (i.e.

underdrain soil filters, dry wells and infiltration trenches, pervious pavements, rain barrels and cisterns,

green roofs, stormwater planters, micro bio-inlets) are described in detail in the Maine LID Guidance

Manual (September 2007), http://www.maine.gov/dep/land/watershed/materials/lid-guidance-manual.pdf,

and these should be applied to projects meeting the Alternative SFR Lot Standards.

Vegetative Buffers

Vegetative buffers are areas of dense forest or meadow vegetation located adjacent and downgradient of

developed areas that provide storage and treatment for stormwater that enters them in diffuse overland

flow. They should be designed, implemented and maintained in accordance with the following:

•

Discharge of stormwater to the buffer: It is essential that the stormwater entering the buffer not be

channelized prior to discharge into the buffer. Grading of developed areas upgradient of the buffer

must be done in a way that maintains diffuse overland flow and avoids concentration of the runoff.

- 24 -

•

Topography: The topography of a buffer area must maintain well-distributed stormwater runoff and

cannot allow stormwater runoff to concentrate as it flows across the buffer. Flow paths of runoff

through a buffer must not converge, but must be essentially parallel or diverging.

•

Vegetative cover: The vegetative cover of a buffer must be either forest or meadow. In most

instances the sizing of a buffer varies depending on vegetative cover type.

•

Forest buffer: A forest buffer must have a well distributed stand of trees with essentially complete

canopy cover, and must be maintained as such

through a buffer must not converge, but must be essentially parallel or diverging.

•

Vegetative cover: The vegetative cover of a buffer must be either forest or meadow. In most

instances the sizing of a buffer varies depending on vegetative cover type.

•

Forest buffer: A forest buffer must have a well distributed stand of trees with essentially complete

canopy cover, and must be maintained as such. A forested buffer must also have an undisturbed

layer of duff covering the mineral soil. Activities that may result in disturbance of the duff layer are

prohibited in a buffer

•

Meadow buffer: A meadow buffer must have a dense cover of grasses, or a combination of grasses

and shrubs or trees. A buffer must be maintained as a meadow with a generally tall stand of grass,

not as a lawn. It must not be mown more than twice per calendar year. If a buffer is not located on

natural soils, but is constructed on fill or reshaped slopes, a buffer surface must either be isolated

from stormwater discharge until a dense sod is established, or must be protected by a three inch

layer of erosion control mix or other wood waste material approved by the department before

stormwater is directed to it, with vegetation established using an appropriate seed mix.

•

Mixed meadow and forest buffer: If a buffer is part meadow and part forest, the required sizing of the

buffer must be determined as a weighted average, based on the percent of the buffer in meadow and

the percent in forest.

•

Deed restrictions and covenants: Areas designated as vegetated buffers must be clearly identified on

site plans and protected from disturbance by deed restrictions and covenants.

- 25 -

Appendix A - Phosphorus and Lake Water Quality

The Relationship between Phosphorus and Lake Water Quality: Lakes are biological

systems that are clearly affected by changes in water quality. They are most noticeably affected by an

increase in nutrients, particularly phosphorus

uffers must be clearly identified on

site plans and protected from disturbance by deed restrictions and covenants.

- 25 -

Appendix A - Phosphorus and Lake Water Quality

The Relationship between Phosphorus and Lake Water Quality: Lakes are biological

systems that are clearly affected by changes in water quality. They are most noticeably affected by an

increase in nutrients, particularly phosphorus. Increases in phosphorus usually result in more noticeable

changes to water quality than increases in other nutrients. Algae, which are microscopic organisms

common in lakes, need phosphorus in order to grow. Consequently, when phosphorus is abundant in lake

water, algal populations soar in number, causing a decline in water transparency. In some cases, algal

blooms may occur causing the growth of billions of algae to color the lake water green and release strong

odors as they decay.

Beyond the aesthetic impacts, algal blooms have serious impacts on a lake's biological community.

Through a complex chain of events, algal blooms lead to depletion of the lake water's oxygen supply,

usually resulting in the eventual loss of trout and salmon (cold water) fisheries. In addition, large algal

populations cause odor, taste, and treatment problems in lakes used for public water supplies.

The biological term for the process described above is eutrophication, which can manifest itself over time

as a gradual increase in the lake nutrient concentrations under natural conditions. Lake eutrophication

can be dramatically accelerated by human activities, causing the noticeable changes described above in

a relatively short period of time. Many lakes in Maine have already experienced dramatic declines in

water quality as a result of human disturbances.

How Phosphorus Gets into Lakes: Understanding how phosphorus gets into lake water requires

an understanding of where lake water comes from. Precipitation and stormwater runoff are significant

sources of water in rivers and lakes

es described above in

a relatively short period of time. Many lakes in Maine have already experienced dramatic declines in

water quality as a result of human disturbances.

How Phosphorus Gets into Lakes: Understanding how phosphorus gets into lake water requires

an understanding of where lake water comes from. Precipitation and stormwater runoff are significant

sources of water in rivers and lakes. Rain and melting snow flow downhill over the land surface into

streams and lakes or seep into the ground becoming groundwater, which also ultimately discharges to

streams and lakes.

The land area that contributes water to a particular lake is known as its watershed. Watershed boundaries

can be identified by connecting points of highest elevation around a lake and its tributaries. All rain and

snow falling within this area eventually flow by gravity in surface runoff, streams, and groundwater to the

lake, which is the lowest point in the watershed.

The quality of water in a lake depends on the condition of the land in its watershed. Phosphorus is

abundant in the environment, but in an undisturbed environment it is tightly bound up by soil and organic

matter for eventual use by plants. Natural systems conserve and recycle nutrients, water, and other

materials needed to sustain plant growth. Water is stored in depressions on the uneven forest floor and

seeps into the ground to become groundwater, thereby preventing it from running over the land surface

and exporting valuable nutrients from the system.

Land development changes the natural landscape in ways that alter the normally tight cycling of

phosphorus. The removal of vegetation, smoothing of the land surface, compaction of soils, and creation

of impervious surface combine to reduce the amount of precipitation stored and retained onsite,

dramatically increasing the amount of water running off the land as surface runoff.

These changes to the land surface and the associated increase in surface runoff dramatically increase

phosphorus export

sphorus. The removal of vegetation, smoothing of the land surface, compaction of soils, and creation

of impervious surface combine to reduce the amount of precipitation stored and retained onsite,

dramatically increasing the amount of water running off the land as surface runoff.

These changes to the land surface and the associated increase in surface runoff dramatically increase

phosphorus export. Land disturbance upsets the environment's ability to retain phosphorus.

Stormwater flowing over the land surface picks up phosphorus and transports it in soluble form or

attached to eroded soil particles. The phosphorus in stormwater comes from natural and human sources,

including eroded soil, road dust, plants, lawn fertilizer, and detergents. The smooth surfaces, closely

cropped lawns, and compacted soils common in developed areas do not retain phosphorus, and only

speed its export by generating surface runoff. The end result is more phosphorus is stormwater, and thus

more phosphorus in lakes.

- 26 -

A study in Maine has documented the elevated levels of phosphorus exported from developed land

(Dennis, 1985). In adjacent watersheds, one developed and one undisturbed, phosphorus export from the

developed watershed was up to 10 times greater than the export from the forested watershed.

Because the built watershed was developed years ago, these figures represent the permanent increase

in phosphorus export caused by alteration of the landscape. This permanent increase in the phosphorus

supply of the lake creates an equally permanent and irreversible decline in water quality.

Though in most lakes the majority of phosphorus comes from the watershed, there is another source of

phosphorus that can be very significant in some lakes. Over the centuries phosphorus rich organic

sediments have accumulated on the bottom of our lakes. In most cases, the phosphorus in these

sediments is trapped there by a blanket of iron hydroxide and or aluminum hydroxide, which makes the

sediments a sink for, rather than a source of, phosphorus

es from the watershed, there is another source of

phosphorus that can be very significant in some lakes. Over the centuries phosphorus rich organic

sediments have accumulated on the bottom of our lakes. In most cases, the phosphorus in these

sediments is trapped there by a blanket of iron hydroxide and or aluminum hydroxide, which makes the

sediments a sink for, rather than a source of, phosphorus. However, in lakes with sufficient algal

production to cause a severe loss of oxygen concentrations above the sediments, the iron hydroxide

blanket dissolves and large amounts of phosphorus may be recycled into the lake water. The "surges" of

phosphorus feed algal growth which further depletes dissolved oxygen, thus creating a vicious cycle of

very rapid, internally driven eutrophication. This process, which can be initially triggered by relatively small

increases in phosphorus input from the watershed, may drive a lake from apparently good, clear water

quality to having intense algal blooms in a matter of years. It is particularly important to limit any increases

in phosphorus input from the watershed to lakes with a high potential for sediment phosphorus recycling.

How Stormwater Phosphorus can be controlled: All land disturbance and development in a

lake's watershed increases phosphorus export to a lake. Although some increase must be accepted as

the inevitable and unavoidable effect of development, a variety of measures can substantially reduce

phosphorus export to lakes and help to preserve good water quality.

The simplest way to reduce phosphorus export is to limit clearing of vegetation and minimize the area

developed, especially road length. Beyond this, a variety of control measures are available. They

generally focus on detaining and storing stormwater where it can be treated and released or infiltrated

into the soil.

Buffer areas are naturally vegetated areas preserved downslope of developed areas

The simplest way to reduce phosphorus export is to limit clearing of vegetation and minimize the area

developed, especially road length. Beyond this, a variety of control measures are available. They

generally focus on detaining and storing stormwater where it can be treated and released or infiltrated

into the soil.

Buffer areas are naturally vegetated areas preserved downslope of developed areas. These buffers

intercept and store surface runoff, allowing it to infiltrate rather than flow off-site as surface flow.

Infiltration systems are more sophisticated. Runoff is collected from rooftops, driveways and/or impervious

parts of a lot and then directed to surface or underground storage, similar to a subsurface disposal area,

from which wastewater infiltrates into the soil. Soils must be fairly deep, coarse, and permeable for

infiltration systems to work.

Underdrained soil filters are similar to infiltration systems in that runoff is collected and directed to

a storage depression, but the depression is vegetated with flood and drought tolerant species and is lined

with a specific soil filter media which is underlain with a pipe system to discharge the filtered runoff.

Wet ponds are generally used to treat runoff from a large area. They receive and retain stormwater from

large drainage areas, allowing sediment to settle out and dissolve phosphorus to be removed by

biological activity.

Development can proceed in lake watersheds without generating more phosphorus than the lake can

tolerate by limiting the extent of development and incorporating one or more of these phosphorus

controls. Once a lake has accepted more phosphorus than it can tolerate, there will be a noticeable

decline in water quality.

- 27 -

Appendix B - DEP’s Method for Defining Watershed

per Acre Phosphorus Allocations

The Department defines per acre phosphorus allocations (P) for lake watersheds and these are

presented in Appendix C

ent of development and incorporating one or more of these phosphorus

controls. Once a lake has accepted more phosphorus than it can tolerate, there will be a noticeable

decline in water quality.

- 27 -

Appendix B - DEP’s Method for Defining Watershed

per Acre Phosphorus Allocations

The Department defines per acre phosphorus allocations (P) for lake watersheds and these are

presented in Appendix C. The list in Appendix C is not complete, so if a per acre allocation for a town's

portion of a lake watershed is needed and it is not listed in Appendix C, request the Division of Watershed

Management to provide a per acre allocation for the desired watershed. The Department will continually

update Appendix C, both by adding new lakes to the list and by revising allocations for lakes already on

the list as new information becomes available. This Appendix describes the process the Department uses

to define watershed per acre phosphorus allocations.

Step 1. Defining the Acceptable Increase in Lake Phosphorus Concentration (C)

The first step is to determine how much the lake's phosphorus concentration could be increased without

risking a perceivable increase in its algal production or a decline in its healthy, natural fish community.

This value, the acceptable increase in lake phosphorus concentration (C), is a function of two variables:

Water Quality Category of the lake and the Level of Protection appropriate for the lake. The Department

has assigned Water Quality Categories to each lake for which sufficient water quality data is available

based on the information in the following table. If insufficient data is available, the lake is assigned a

default water quality category of Moderate Sensitive

is a function of two variables:

Water Quality Category of the lake and the Level of Protection appropriate for the lake. The Department

has assigned Water Quality Categories to each lake for which sufficient water quality data is available

based on the information in the following table. If insufficient data is available, the lake is assigned a

default water quality category of Moderate Sensitive.

Lake Water Quality Categories

Category

Conditions

Outstanding

Exceptional clarity; very low phosphorus and

chlorophyll concentrations; low risk of internal

recycling from sediments

Good

Average to better than average clarity,

phosphorus and chlorophyll; low risk of internal

recycling from bottom sediments

Moderate Sensitive

Average clarity, phosphorus and chlorophyll;

high potential for internal recycling from the

bottom sediments

Poor (Restorable)

Poor clarity; high phosphorus and chlorophyll

concentrations; supports blue green algal

blooms; good prospects for restoration

Poor (Natural)

Poor clarity; high phosphorus and chlorophyll

concentrations; supports blue green algal

blooms; poor prospects for restoration because

lake is naturally very productive

- 28 -

Step 2. Determine the Allowable Increase in Annual Phosphorus Load

The next step is to determine how much the annual phosphorus load to the lake could be increased

without risking an increase in lake phosphorus concentration greater than the acceptable increase (C)

defined in Step 1.

This is accomplished by multiplying "C" by a lake specific coefficient (F) that

estimates the amount of increase in annual phosphorus load to the lake that will

result in a 1.0 ppb lake phosphorus concentration. Where a lake has upstream

lakes draining to it, "F" represents the direct watershed's (that portion of the total

watershed that does not first pass through an upstream lake) share of this load.

Where a lake's direct watershed is located in more than one town, "F" reflects the

given town's portion of the load

l phosphorus load to the lake that will

result in a 1.0 ppb lake phosphorus concentration. Where a lake has upstream

lakes draining to it, "F" represents the direct watershed's (that portion of the total

watershed that does not first pass through an upstream lake) share of this load.

Where a lake's direct watershed is located in more than one town, "F" reflects the

given town's portion of the load. "F" is derived using a steady state solution of

Vollenweider's 1976 phosphorus loading model and is expressed in lbs/ppb/year.

Allowable increase in annual phosphorus load = F x C or FC

Step 3. Determine the Per Acres Phosphorus Budget (P)

The next and final step is to determine the per acre phosphorus budget (P, in lbsP/acre/year) by

allocating the allowable increase in annual phosphorus load (FC) over the portion of the direct watershed

This is accomplished by projecting how much of the direct watershed area is likely to be

developed (D, in acres) and dividing FC by this acreage.

P = FC / D

"D" is estimated by:

•

Determining the area available for development within the town's share of the direct

watershed by subtracting undevelopable acreage (i.e. wetlands, steep slopes, state

parks) and already developed land from direct watersheds area.

•

Projecting how much of the area available for development will be developed over time

based on:

o The general growth rate in the town or region

o The quality, density and distribution of the road network within the town's share of the

direct watershed

o Other lake specific, locally identified information

- 29 -

Appendix C - Per Acre Phosphorus Allocations for

Selected Maine Lakes

The attached spreadsheet presents per acre phosphorus allocations (P) for all the lake/town

combinations that have been calculated to this point. This Appendix will be modified on a regular basis as

additional lake/town combinations are added and allocations are amended as new information becomes

available

ed information

- 29 -

Appendix C - Per Acre Phosphorus Allocations for

Selected Maine Lakes

The attached spreadsheet presents per acre phosphorus allocations (P) for all the lake/town

combinations that have been calculated to this point. This Appendix will be modified on a regular basis as

additional lake/town combinations are added and allocations are amended as new information becomes

available. If you do not find the lake watershed/town combination you are looking for in the appendix,

contact Jeff Dennis at the DEP Division of Environmental Assessment (207-287-7847 or

jeff.dennis@maine.gov) to request an allocation.

- 30 -

Appendix D - Worksheets

The Excel spreadsheet provides four worksheets to assist in the calculations required to determine:

•

Worksheet 1, Project Phosphorus Budget (PPB)

•

Worksheet 2, Pre-treatment and Post-treatment Phosphorus Export Calculations

•

Worksheet 3, Mitigation Credits

•

Worksheet 4, Project Phosphorus Export Summary

The spreadsheets have the calculations built into them and can be used either as active excel

spreadsheets or may be printed out as worksheets for use by hand.

- 31 -

Appendix E - Alternative Method for Small

Commercial-type Developments Located within

Designated Growth Areas

It can be difficult for densely developed projects on small parcels to meet their phosphorus budgets.

Because of the density of high phosphorus producing surfaces like parking lots and lawns, the stormwater

draining these projects carries relatively large amounts of phosphorus. The small parcel size, however,

means that the phosphorus budget for the parcel will also be small. As a result, highly intensive

phosphorus control measures, which are often fairly costly, may be required for the project to meet its

phosphorus budget

gh phosphorus producing surfaces like parking lots and lawns, the stormwater

draining these projects carries relatively large amounts of phosphorus. The small parcel size, however,

means that the phosphorus budget for the parcel will also be small. As a result, highly intensive

phosphorus control measures, which are often fairly costly, may be required for the project to meet its

phosphorus budget.

In these cases it may cost less to develop outside the designated growth area where land is more readily

available for larger parcel sizes (and hence larger project phosphorus budgets) and for less intensive, and

less expensive, phosphorus control measures like natural wooded buffers. If a municipality is concerned

that the phosphorus budget will counter local planning efforts by being a disincentive for locating

development within designated growth areas, they may request that the department allow commercial

developers within their designated growth areas to use an alternative means of defining the project

phosphorus budget. This alternative is described below.

To prevent sprawl and encourage building within designated growth areas, a municipality may request

that projects with no more than 1.0 acre of impervious surfaces (building, parking, driveways, both paved

and gravel) located on a small parcel with less than 5 acres within an area specifically designated for

commercial growth in the municipality's DEP approved comprehensive plan be allowed to calculate the

site's PPB as follows:

Alternative PPB Calculation for a Small Commercial-type Development (as defined by having

less than 1 acre of impervious area and on a parcel that is less than 5 acres and located

within a designated growth area)

The alternative PPB shall be the lesser of the following:

•

Option A = PPB = PPB as calculated (using Worksheet 1) multiplied by 5, or

•

Option B = PPB = Project's proposed impervious area multiplied by 0.5 lb per acre

Example: PPB for Small Commercial Development

Problem: 'Parking for Rent' is proposing a one acre impervious p

that is less than 5 acres and located

within a designated growth area)

The alternative PPB shall be the lesser of the following:

•

Option A = PPB = PPB as calculated (using Worksheet 1) multiplied by 5, or

•

Option B = PPB = Project's proposed impervious area multiplied by 0.5 lb per acre

Example: PPB for Small Commercial Development

Problem: 'Parking for Rent' is proposing a one acre impervious parking lot on a 1.5 acre lot

within the identified growth zone of a watershed with a phosphorus allocation of 0.03

lb/acre/year. The proposed treatment is through a buffer. Calculate the Project Phosphorus

Budget.

Solution: The standard PPB would be 1.5 acre X 0.03 lb/acre/year = 0.045 lb P /year.

However, since the project is a small commercial-type development with no more than 1 acre

of impervious area and on a parcel that is less than 5 acres and is located in a municipality's

designated growth area, the alternative method for calculating the PPB may be used upon

request by the municipality. The alternative PPB calculation is the lesser of:

•

Option A. Standard PPB (as calculated on Worksheet 1) X 5 = 0.045 lb P /year X 5 =

0.225 lb P /year

•

Option B. Project's Proposed Impervious Area X 0.5 lb P /acre / year = 1 acre X 0.5 = 0.5

lb P /year

Thus, the PPB is 0.225 lb P /year as in Option A.

- 32 -

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.