Duties during drilling and construction of well

IndianaStatutes

Ask Donna

How this section applies to your facts.

Indiana Code › Title 14 › Article 39 › Chapter 2 › Section 14-39-2-5.3

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

Sec. 5.3. During the drilling and construction of a Class VI injection well, a storage operator must:

(1) perform appropriate logs;

(2) perform surveys and tests to determine or verify the:

(A) depth;

(B) thickness;

(C) porosity;

(D) permeability;

(E) lithology; and

(F) salinity;

of any formation fluids in all relevant geologic formations to ensure conformance with the injection well construction requirements of the department; and

(3) establish accurate baseline data against which future measurements may be compared.

The storage operator must submit to the department a report prepared by a log analyst that includes an interpretation of the results of each log and test.

As added by P.L.161-2026, SEC.56.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.