Section 611.363 Small Supplier Compliance Flexibility
IllinoisRegulations
Ask Donna
How this section applies to your facts.
Illinois Administrative Code › Title 35 ENVIRONMENTAL PROTECTION › CHAPTER I: POLLUTION CONTROL BOARD › Part 611 PRIMARY DRINKING WATER STANDARDS › Section 611.363 Small Supplier Compliance Flexibility
Text
Section 611.363
S
mall Supplier Compliance Flexibility
T
his section gives
compliance
flexibility
options
applying to
a small CWS
supplier serving 10,000 or fewer persons or an
NTNCWS supplier.
A
CWS or NTNCWS supplier
having corrosion control treatment
in place must
continue operating and maintaining
OCCT until
the Agency issues a SEP determining this no longer
necessary
,
and the supplier must comply with any
conditions the Agency are appropriate
before implementing
an Agency-approved compliance flexibility option under
this Section
.
a) A
small CWS or NTNCWS supplier
exceeding
the lead trigger level but neither the lead nor copper action level
must
collect samples for water quality parameters under Section
611.357(b), evaluate compliance
flexibility
options
under subsections (a)(1) through (a)(4), and recommend a compliance flexibility
option to the Agency within six months of the end of the tap sampling period in
which the exceedance occurred.
When recommending to
the Agency, the supplier must comply with Section 611.382(a)(1).
T
he Agency must either approve
the supplier’s recommended compliance flexibility option or designate an
alternative under subsections (a)(1) through (a)(4)
within six months after the
supplier recommends an
option. If
the
supplier subsequently exceeds the
lead action level, the supplier must implement the
Agency-approved
compliance flexibility option
under subsection (b)
.
A supplier must
select one from among specific
compliance flexibility options
:
1)
Replacing Lead Service Lines
. A
supplier must implement
a
program for full lead service line replacement
on
an
Agency-approved schedule not exceeding 15 years
. The supplier must
begin replacing lead service lines
within one year
after the Agency approves or designates this compliance
flexibility option
.
A)
T
he supplier must
replace lead service lines
complying with Section
611.354(e) and (g)(4), (g)(8), and (g)(9)
. A
supplier must implement
a
program for full lead service line replacement
on
an
Agency-approved schedule not exceeding 15 years
. The supplier must
begin replacing lead service lines
within one year
after the Agency approves or designates this compliance
flexibility option
.
A)
T
he supplier must
replace lead service lines
complying with Section
611.354(e) and (g)(4), (g)(8), and (g)(9)
.
B) The
supplier must
continue replacing
lead service lines even if
the
supplier’s 90th percentile lead concentration
is at or below the lead
action level in future tap monitoring cycles.
C) The
supplier must have no
lead, galvanized requiring
replacement, or lead status unknown service lines
in its inventory before
ending
its lead service line replacement program
.
2)
Corrosion Control Treatment
. A supplier must
install and maintain OCCT
under Sections 611.351 and
611.352
, even if its
90th
percentile
concentration is at or below the lead action level in future tap
monitoring cycles. A
supplier having installed
corrosion control treatment
must re-optimize its corrosion control
treatment
under Section 611.351(d)
.
A
supplier the Agency requires
to optimize
or re-optimize corrosion control treatment must follow
the appropriate schedule in Section 611.351(d) or (e)
,
beginning with Step 3 in Section 611.351(d)(3) or
(e)(3)
, unless the Agency specifies OCCT
under the
applicable of Section 611.351(d)(2)(B) or (e)(2)
.
3)
Point-of-Use Devices
. A supplier
must continue installing, maintaining, and monitoring POU
devices
in each household or building it serves even if its
90th percentile
lead
concentration is at or below the action level in future tap monitoring cycles.
A)
Schedule
for Installing POU
Devices
i) A
CWS supplier must install a minimum of one POU device (at one tap) in every
household and at every
tap persons use for cooking or
drinking
in
every
non-residential building
the supplier serves on
a
schedule not exceeding one year the Agency specifies in a SEP
concentration is at or below the action level in future tap monitoring cycles.
A)
Schedule
for Installing POU
Devices
i) A
CWS supplier must install a minimum of one POU device (at one tap) in every
household and at every
tap persons use for cooking or
drinking
in
every
non-residential building
the supplier serves on
a
schedule not exceeding one year the Agency specifies in a SEP
.
ii) An
NTNCWS supplier must provide a POU device to every tap persons use for cooking
or drinking on a schedule not exceeding
three months
the Agency specifies in a SEP.
B) A
third party must independently certify the POU device to meet the American National
Standards Institute standard
applying to the specific
type
of POU unit
for reducing lead
in drinking
water.
C) T
he supplier must maintain each POU device
according to
its manufacturer’s recommendations to
ensure the POU device continues effectively filt
ering,
including
changing filter cartridges and resolving
any operational issues. The POU devices
must have mechanical warnings ensuring automatic noti
ce
to customers of operational problems. T
he supplier
must certify to the Agency
under Section 611.360(j)(1)
that it maintains the POU devices,
unless the Agency
issues a SEP waiving this requirement
.
D) The
supplier
must monitor one-third of the POU devices each
year and all POU devices within a three-year cycle
.
The
supplier must collect first draw tap samples under this Section
after water
passes through the POU device to assess its performance. Samples must be
one-liter in volume and have had a minimum six-hour stagnation time.
R
esults from all samples must not
exceed
the lead trigger level. T
he supplier
must report
its tap sampling results
no later than
10 days after the end of the tap monitoring cycle
under
Section 611.360(j)(1)
. The supplier must document the problem and take
corrective action at
any
site
exceeding the lead trigger level
e
one-liter in volume and have had a minimum six-hour stagnation time.
R
esults from all samples must not
exceed
the lead trigger level. T
he supplier
must report
its tap sampling results
no later than
10 days after the end of the tap monitoring cycle
under
Section 611.360(j)(1)
. The supplier must document the problem and take
corrective action at
any
site
exceeding the lead trigger level. I
f a site
exceeds the lead trigger level
, the supplier must reach out to
the homeowner or building
manage
r or, if applicable, both no later than 24 hours after receiving the
tap sample results. T
he supplier must complete the
corrective action
within 30 days. I
f the supplier does not complete
the corrective action
within 30 days, the supplier must
document to the
Agency
within 30 days explaining
why the supplier was unable
to correct the issue.
E) The
supplier must provide public education to consumers
under
Section 611.355(j)
informing them how to properly
use POU devices
to
maximize
their effectiveness in reducing lead concentrations
.
F) The
supplier must operate and maintain the POU devices
until
the Agency approves another compliance flexibility option, and supplier
implements it
.
4)
Replacing Lead-Bearing Plumbing
. A supplier
controlling all plumbing in
buildings
the supplier serves
and having no lead
status unknown, galvanized requiring replacement, or lead service lines
must replace
all plumbing that is not
lead free as Section 611.126(c) defines the term
when
the supplier replaces it.
R
eplacing
all lead-bearing plumbing
must occur on
a schedule
not exceeding one year as established by the Agency in a SEP
.
T
he supplier must certify to
the Agency
that it has replaced all lead-bearing
material
under Section 611.360(j)(2)
replacement, or lead service lines
must replace
all plumbing that is not
lead free as Section 611.126(c) defines the term
when
the supplier replaces it.
R
eplacing
all lead-bearing plumbing
must occur on
a schedule
not exceeding one year as established by the Agency in a SEP
.
T
he supplier must certify to
the Agency
that it has replaced all lead-bearing
material
under Section 611.360(j)(2)
.
b)
Implementing
a Compliance Option after Exceeding an Action Level
1) A
supplier
exceeding the
lead action level after exceeding the lead trigger level
but
not exceeding the copper action level
must implement the compliance
option the Agency approved
under subsection (a).
2) A
supplier exceeding the lead action level but not the
copper action level and not previously exceeding the lead trigger level
must
comply with subsection
(a) and implement
the compliance option the Agency approved under
subsection (a).
3) A
supplier exceeding
the lead trigger level
after implementing a
compliance option
the Agency approved under subsection (a) must complete
the steps in subsection (a). I
f the supplier later
exceeds
the lead action level, the supplier must implement the compliance
option the Agency approved under subsection (a).