a) Supplement To Engineer's Report
1) The engineer's report shall contain pertinent information on
location, geology, soil conditions, area for expansion, and any other factors
that will affect the feasibility and acceptability of the proposed treatment.
2) Supplementary Field Survey Data
The following information must be submitted in addition to
that required in Section 370.111:
A) The location and direction of all residences, commercial
development, and water supplies within ½ mile of the proposed pond.
B) Soil borings to determine surface and subsurface soil
characteristics of the immediate area and their effect on the construction and
operation of a pond located on the site.
C) Data demonstrating anticipated percolation rates at the
elevation of the proposed pond bottom.
D) A description, including maps showing elevations and contours
of the site and adjacent area suitable for expansion.
E) Sulfate content of the water supply.
F) Identification of the location, depth and discharge point of
any field tile in the immediate area of the proposed site.
b) Location
1) Distance From Habitation
A pond site should be as far as practicable from habitation
or any area which may be built up within a reasonable future period.
2) Prevailing Winds
If practicable, ponds should be located so that local
prevailing winds will be in the direction of uninhabited areas. Preference
should be given sites which will permit an unobstructed wind sweep across the
ponds, especially in the direction of the local prevailing winds.
3) Surface Runoff
Adequate provisions shall be made to divert storm water
around the ponds and otherwise protect pond embankments.
4) Ground Water Contamination
The requirements of the Illinois Groundwater Protection Act
[415 ILCS 55] shall be taken into account in the siting of ponds
tructed wind sweep across the
ponds, especially in the direction of the local prevailing winds.
3) Surface Runoff
Adequate provisions shall be made to divert storm water
around the ponds and otherwise protect pond embankments.
4) Ground Water Contamination
The requirements of the Illinois Groundwater Protection Act
[415 ILCS 55] shall be taken into account in the siting of ponds. Ponds should
not be located proximate to water supplies and other facilities subject to
contamination or located in areas of porous soils and fissured rock
formations. If conditions dictate using such a site, then the potential for
and the means necessary to combat groundwater contamination shall be critically
evaluated in the engineer's report. In such locations, the Agency will require
groundwater monitoring wells.
5) Geology
Ponds shall not be located in areas subject to sink holes and
mine subsidence. Soil borings and tests to determine the characteristics of
surface soil and subsoil shall be made a part of preliminary pond site
selection surveys. Gravel and limestone areas should be avoided; however,
where conditions dictate locating ponds in such areas and the minimum
separation between the pond bottom and gravel or limestone will be less than 10
feet, the Agency shall be contacted about the necessary precautions.
c) Basis Of Design
1) Organic Loading
A) Waste Stabilization Ponds
The organic loading on each cell shall not exceed the
loadings listed below. If more accurate design information for the particular
type waste is not submitted and supported by the engineer, subsequent cells
shall be sized for an organic loading of 25% of each preceding cell.
i) North of Illinois Highway 116 (Pontiac) 22 lbs. BOD per acre
per day.
ii) Between Illinois Highway 116 and U.S. Highway 50, 26 lbs. BOD
per acre per day.
iii) South of U.S. Highway 50 (Salem-Carlyle) 30 lbs. BOD per acre
per day
waste is not submitted and supported by the engineer, subsequent cells
shall be sized for an organic loading of 25% of each preceding cell.
i) North of Illinois Highway 116 (Pontiac) 22 lbs. BOD per acre
per day.
ii) Between Illinois Highway 116 and U.S. Highway 50, 26 lbs. BOD
per acre per day.
iii) South of U.S. Highway 50 (Salem-Carlyle) 30 lbs. BOD per acre
per day.
B) Aerated Lagoons
The organic loading for aerated lagoons shall not exceed 0.5
lb. BOD[5] day per 1,000 cu. ft. first cell nor 0.3 lb. BOD[5] day per 1,000
cu. ft. on any subsequent cells. If more accurate design information for the
particular type waste is not submitted and supported by the engineer, the
second and third cells shall be sized for an organic loading of 25% of each
preceding cell.
2) Depth
A) Waste Stabilization Ponds
The minimum operating liquid depth for waste stabilization
ponds should be 2 feet. The maximum operating liquid depth shall be based on
design storage requirements and shall not be less than 5 feet.
B) Aerated Lagoons
The design water depth for aerated lagoons should be 10 to 15
feet. This depth limitation may be altered depending on the aeration equipment,
waste strength, climatic and geological conditions.
3) Aeration Requirements For Aerated Lagoons
A) Aeration systems shall be designed to provide, with the largest
unit out of service, a minimum of 1,500 cu. ft. of air/lb. of BOD
5
in the raw waste (1.5 lbs. of oxygen/lb. of BOD
5
plus oxygen
required to oxidize the ammonia present in the raw waste). The aeration
equipment shall be located to ensure proper mixing and distribution of oxygen
in proportion to oxygen demand in multiple cells. Splash type aerators with
motors above the water surface may not be used.
B) Where hose type diffusers are used, the holes shall be of
sufficient size to prevent plugging by dissolved solids incrustation
dize the ammonia present in the raw waste). The aeration
equipment shall be located to ensure proper mixing and distribution of oxygen
in proportion to oxygen demand in multiple cells. Splash type aerators with
motors above the water surface may not be used.
B) Where hose type diffusers are used, the holes shall be of
sufficient size to prevent plugging by dissolved solids incrustation.
4) Multiple Cells
A minimum of two cells to be operated in series or parallel
should be provided for all waste stabilization ponds when they are utilized as
a part of the primary and secondary treatment process. The number of cells
required for aerated lagoons are dependent upon the degree of treatment
required. Refer to subsection (c)(6).
5) Pond Shape
The shape of all primary cells should be such that there are
no narrow or elongated portions. Round, square, or rectangular ponds with a
length not exceeding 3 times the width are considered most desirable. No
islands, peninsulas, or coves should be permitted. Dikes should be rounded at
corners to minimize accumulations of floating materials.
6) Solids Removal
All lagoon systems shall include effective solids removal
facilities. Design criteria for acceptable solids removal facilities are
contained in Subpart K. Other solids removal facilities may be approved in
accordance with Section 370.520(b).
d) Construction Details
1) Embankments and Dikes
A) Material
Embankments and dikes shall be constructed of relatively
impervious materials and compacted to at least 90% Standard Proctor density to
form a stable structure. Vegetation and other unsuitable material shall be
removed from the area upon which the embankment is to be placed.
B) Top Width
The minimum embankment top width should be 8 feet to permit
access of maintenance vehicles. Lesser top widths will be considered for very
small installations.
C) Maximum Embankment Slopes
i) Inner
Slopes:
3 horizontal to 1 vertical
structure. Vegetation and other unsuitable material shall be
removed from the area upon which the embankment is to be placed.
B) Top Width
The minimum embankment top width should be 8 feet to permit
access of maintenance vehicles. Lesser top widths will be considered for very
small installations.
C) Maximum Embankment Slopes
i) Inner
Slopes:
3 horizontal to 1 vertical.
ii) Outer
Slopes:
3 horizontal to 1 vertical.
D) Minimum Embankment Slopes
i) Inner
Slopes:
4 horizontal
to 1 vertical. Flatter slopes are sometimes specified for larger installations
because of wave action but have the disadvantage of added shallow areas
conducive to emergent vegetation.
ii) Outer
Slopes:
Outer slopes
shall be sufficient to prevent surface runoff from entering the ponds.
E) Freeboard
Minimum freeboard shall be 3 feet except for very small
installations 2 feet may be acceptable.
F) Erosion Control Requirements
For effective erosion control on the lagoon embankments, both
seeding and riprap (or acceptable alternate) are required.
i) Seeding
Embankments
shall be seeded from the outside toe to 1 foot above the high water line on the
dikes, measured on the slope. Perennial type, low growing, spreading grasses
that withstand erosion and can be kept mowed are most satisfactory for seeding
of embankments. In general, alfalfa and other long rooted crops should not be
used in seeding, since the roots of this type plant are apt to impair the water
holding efficiency of the dikes. The County Agricultural Extension Agent can
usually advise as to hardy, locally suited permanent grasses which would be
satisfactory for embankment seeding.
ii) Riprap
Riprap (or
acceptable alternate) shall be placed on the inner slope of the embankments
from 1 foot above the high water mark to 1 foot below the low water level
apt to impair the water
holding efficiency of the dikes. The County Agricultural Extension Agent can
usually advise as to hardy, locally suited permanent grasses which would be
satisfactory for embankment seeding.
ii) Riprap
Riprap (or
acceptable alternate) shall be placed on the inner slope of the embankments
from 1 foot above the high water mark to 1 foot below the low water level.
Riprap shall be comprised of a two-layer system consisting of a minimum 4-inch
layer of coarse aggregate that meets the Illinois Department of Transportation
(IDOT) Standard Specification for Road and Bridge Construction adopted January
1, 1997 for the gradations in the range of CA-6 through CA-10 and a minimum
12-inch layer of stone. The rock layer shall consist of evenly graded material
with a maximum weight of 150 pounds per piece and shall meet the IDOT
gradations for rock of either Grade No. 3 or 4.
2) Pond Bottom
A) Uniformity
Finished elevations shall not be more than 3 inches from the
average elevation of the bottom. Shallow or feathering fringe areas usually
result in locally unsatisfactory conditions.
B) Vegetation
The bottom shall be cleared of vegetation and debris. Organic
material thus removed shall not be used in the dike core construction.
However, suitable topsoil relatively free of debris may be used as cover
material on the outer slopes of the embankment.
C) Soil
Soil used in constructing the pond bottom (not including the
seal) shall be relatively incompressible and tight. Porous topsoil shall be
removed. Porous areas, such as gravel or sandy pockets, shall be removed and
replaced with well compacted clay. The entire bottom shall be compacted at or
up to 4% above the optimum water content to at least 90% Standard Proctor
density.
D) Seal
The pond bottom and embankments shall be sealed such that
seepage loss through the seal is as low as possible
ight. Porous topsoil shall be
removed. Porous areas, such as gravel or sandy pockets, shall be removed and
replaced with well compacted clay. The entire bottom shall be compacted at or
up to 4% above the optimum water content to at least 90% Standard Proctor
density.
D) Seal
The pond bottom and embankments shall be sealed such that
seepage loss through the seal is as low as possible. Seals consisting of
soils, bentonite or synthetic liners may be used, provided that the
permeability, durability and integrity of the proposed material is demonstrated
for anticipated conditions. The results of a testing program that
substantiates the adequacy of the proposed seal shall be incorporated into or
accompany the engineering report. Standard ASTM procedures or similar accepted
testing methods shall be used for all tests.
i) A seal consisting of soil materials shall have a thickness of
at least 24 inches and a permeability of less than 1x10
-7
cm per
second. Provision shall be made in the specifications for demonstrating the
permeability of the seal after completion of construction and prior to filling
the pond.
ii) For a seal that consists of a synthetic liner, seepage loss
through the liner shall not exceed a quantity equivalent to seepage loss through
a soil seal as described above.
E) Prefilling
Prefilling the pond after completion of testing is
recommended in order to protect the seal from weed growth, to prevent drying
and cracking and to reduce odor during initial operation. The pond dikes must
be completely prepared as described in subsection (d)(1)(F). Synthetic liners
shall be protected from damage during installation and filling.
3) Influent Lines
A) Material
Any generally accepted material for underground sewer
construction will be given consideration for the influent line to the pond.
The material selected should be adapted to local conditions
e pond dikes must
be completely prepared as described in subsection (d)(1)(F). Synthetic liners
shall be protected from damage during installation and filling.
3) Influent Lines
A) Material
Any generally accepted material for underground sewer
construction will be given consideration for the influent line to the pond.
The material selected should be adapted to local conditions. Special
consideration must be given to the character of the wastes, possibility of
septicity, exceptionally heavy external loadings, abrasion, the necessity of
reducing the number of joints, soft foundations, and similar problems.
B) Manholes
A readily accessible manhole shall be installed at the
terminus of the trunk sewer or the force main, unless the force main discharges
directly to the lagoon as described in subsection (d)(3)(H). The manhole shall
be located as close to the dike as topography permits and its invert should be
at least 6 inches above the maximum operating level of the pond to provide
sufficient hydraulic head without surcharging the manhole. Surcharging of the
sewer upstream from the inlet manhole is not permitted.
C) Grade
i) Influent line can be placed at zero grade and should be
located along the bottom of the pond so that the top of the pipe is just below
the average elevation of the pond bottom. The pipe shall have adequate seal
below it.
ii) The laying of the influent pipe on the surface of the pond
bottom is prohibited.
D) Point of Discharge
Influent lines to the primary cell should terminate at
approximately the third point farthest from the outlet structure. For
interconnecting piping to secondary cells refer to subsection (d)(4)(B).
E) Flow Distribution
Flow distribution structures shall be designed to effectively
split hydraulic and organic loads proportionally to primary cells. Refer to
Section 370.520(f)
f Discharge
Influent lines to the primary cell should terminate at
approximately the third point farthest from the outlet structure. For
interconnecting piping to secondary cells refer to subsection (d)(4)(B).
E) Flow Distribution
Flow distribution structures shall be designed to effectively
split hydraulic and organic loads proportionally to primary cells. Refer to
Section 370.520(f).
F) Submerged Inlets
Submerged inlet lines shall discharge horizontally into a
shallow, saucer-shaped depression which should extend below the pond bottom not
more than the diameter of the influent pipe plus 1 foot.
G) Discharge Apron
The end of the discharge line should rest on a suitable
concrete apron with a minimum size of 2 feet square.
H) Force Mains
Force mains discharging directly to lagoons are permitted if
the force main has a freefall discharge into the lagoon and is not turned
upward at the point of discharge. The point of discharge shall be at
approximately the third point farthest from the outlet structure and the pipe
shall be sloped for drainage into the lagoon to avoid freezing.
I) Anti-Seep Collars
Anti-seep collars shall be used on all piping passing through
or under the lagoon embankments.
4) Outlet Structures and Interconnecting Piping
A) Outlet Structure
i) Outlet structures shall be designed to allow the operating
level of the pond to be adjusted to permit operation at depths of 2 feet to the
maximum depth. The design shall also allow effluent to be drawn from various
depths below all operating levels. All structures and devices such as weirs,
gates and valves shall be watertight and capable of being easily adjusted by
the operator without the need of additional mechanical equipment. Wooden
stop-planks are not acceptable for level control.
ii) Drawoff lines should not be located any lower than 12 inches
off the bottom to control eroding velocities and avoid pickup of bottom
deposits
All structures and devices such as weirs,
gates and valves shall be watertight and capable of being easily adjusted by
the operator without the need of additional mechanical equipment. Wooden
stop-planks are not acceptable for level control.
ii) Drawoff lines should not be located any lower than 12 inches
off the bottom to control eroding velocities and avoid pickup of bottom
deposits.
iii) A locking device should be provided to prevent unauthorized
access to the level control facilities.
iv) When possible, the outlet structure should be located on the
windward side to prevent short circuiting. The outlet structure shall be
properly baffled to prevent the discharge of floating material.
v) Consideration must be given in the design of all structures to
protect against freezing or ice damage under winter conditions.
B) Interconnecting Piping and Unit Bypass
i) Interconnecting piping and overflows should be constructed of
materials that will withstand damage during construction and operation, giving
special consideration to damage that may occur during compaction of embankments
and damage to shallow piping. Piping shall be sized to allow transfer of
maximum flows without raising the lagoon water level by more than 6 inches in
the upstream cell. In no case shall interconnecting pipe be less than 8 inches
in diameter. Interconnecting piping between cells should be valved or provided
with other arrangements to regulate flow between structures and permit flexible
depth control.
ii) The interconnecting pipe to the secondary cell should
discharge horizontally near the lagoon bottom to minimize need for erosion
control measures and should be located as near the dividing dike as
construction permits.
iii) Piping and valves shall be provided so that each cell can be
operated independently of any other cell. Provision shall be made for
independent cell dewatering
The interconnecting pipe to the secondary cell should
discharge horizontally near the lagoon bottom to minimize need for erosion
control measures and should be located as near the dividing dike as
construction permits.
iii) Piping and valves shall be provided so that each cell can be
operated independently of any other cell. Provision shall be made for
independent cell dewatering.
C) Anti-Seep Collars
Anti-seep collars shall be used on all interconnecting and outlet
piping passing through or under the lagoon embankments.
5) Miscellaneous
A) Fencing
The pond area shall be enclosed with a suitable fence to
preclude livestock and discourage trespassing. A vehicle access gate of
sufficient width to accommodate mowing equipment shall be provided. All access
gates shall be provided with locks.
B) Warning Signs
Appropriate signs should be provided along the fence around
the pond to designate the nature of the facility and advise against
trespassing.
C) Flow Measurement, Sampling and Level Gauge
Provisions for flow measurement and sampling shall be
provided on the inlet and outlet. Pond level gauges shall be provided. The
NPDES permit monitoring requirements for the facility shall be taken into
account. Elapsed time meters on pumps or calibrated weirs may be used as flow
measurement devices for lagoons.
D) Sludge Removal
When an existing lagoon is to be
upgraded, the project design shall provide for removal of any sludge
accumulation in the existing lagoon. The sludge removed shall be disposed of
in accordance with IPCB regulations.