RULES REGULATING ELECTRIC UTILITIES

ColoradoRegulations

Ask Donna

How this section applies to your facts.

Code of Colorado Regulations › 700 Department of Regulatory Agencies › 723 Public Utilities Commission › 4 CCR 723-3

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

1

Department of Regulatory Agencies

Public Utilities Commission

RULES REGULATING ELECTRIC UTILITIES

4 CCR 723-3

[Editor’s Notes follow the text of the rules at the end of this CCR Document.]

BASIS, PURPOSE, AND STATUTORY AUTHORITY.

The basis and purpose of these rules is to describe the electric service to be provided

by jurisdictional utilities and master meter operators to their customers; to designate the

manner of regulation over such utilities and master meter operators; and to describe the

services these utilities and master meter operators shall provide. In addition, these rules

identify the specific provisions applicable to public utilities or other persons over which

the Commission has limited jurisdiction. These rules address a wide variety of subject

areas including, but not limited to, service interruption, meter testing and accuracy,

safety, customer information, customer deposits, rate schedules and tariffs,

discontinuance of service, master meter operations, flexible regulation, procedures for

administering the Low-Income Energy Assistance Act, electric service low-income

program, cost allocation between regulated and unregulated operations, recovery of

costs, the acquisition of renewable energy, small power producers and cogeneration

facilities, and appeals regarding local government land use decisions. The statutory

authority for these rules can be found at §§ 29-20-108, 40-1-103.5, 40-2-108, 40-2-

124(2), 40-2-202, 40-2-203, 40-3-102, 40-3-102.5, 40-3-103, 40-3-104.3, 40-3-106, 40-

3-111, 40-3-114, 40-4-101, 40-4-106, 40-4-108, 40-4-109, 40-5-103, 40-7-113.5, 40-7-

116.5, 40 8.7 105(5), and 40-9.5-107(5), C.R.S.

GENERAL PROVISIONS

3000. Scope and Applicability.

al government land use decisions. The statutory

authority for these rules can be found at §§ 29-20-108, 40-1-103.5, 40-2-108, 40-2-

124(2), 40-2-202, 40-2-203, 40-3-102, 40-3-102.5, 40-3-103, 40-3-104.3, 40-3-106, 40-

3-111, 40-3-114, 40-4-101, 40-4-106, 40-4-108, 40-4-109, 40-5-103, 40-7-113.5, 40-7-

116.5, 40 8.7 105(5), and 40-9.5-107(5), C.R.S.

GENERAL PROVISIONS

3000. Scope and Applicability.

(a)

Absent a specific statute, rule, or Commission Order which provides otherwise,

all rules in this Part 3 (the 3000 series) shall apply to all jurisdictional electric

utilities and electric master meter operators and to Commission proceedings

concerning electric utilities or electric master meter operators providing electric

service.

(b)

The following rules in this Part 3 shall apply to cooperative electric associations

which have elected to exempt themselves from the Public Utilities Law pursuant

to § 40-9.5-103, C.R.S.

(I)

Paragraphs 3002 (a)(I), (a)(II), (a)(IV), (a)(V), (a)(XVI), (b), and (c)

concerning the filing of applications for certificate of public convenience

Code of Colorado Regulations

Secretary of State

State of Colorado

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

2

and necessity for franchise or service territory, for certificate amendments,

to merge or transfer, or for appeals of local government actions.

(II)

Paragraphs 3005 (a)(III), (IV), (d), (e), (g), and (h) concerning records

under RUS accounting system and preservation of records.

(III)

Paragraphs 3006 (a), (b), (c), (d), and (e) concerning the filing of annual

reports, designation for service of process, and election of applicability of

Title 40, Article 8.5.

(IV)

Paragraphs 3008 (b) and (d) concerning incorporation by reference.

(V)

Rules 3100 and 3103 concerning application for and amendment of a

certificate of public convenience and necessity relating to a franchise

ds.

(III)

Paragraphs 3006 (a), (b), (c), (d), and (e) concerning the filing of annual

reports, designation for service of process, and election of applicability of

Title 40, Article 8.5.

(IV)

Paragraphs 3008 (b) and (d) concerning incorporation by reference.

(V)

Rules 3100 and 3103 concerning application for and amendment of a

certificate of public convenience and necessity relating to a franchise.

(VI)

Rules 3101 and 3103 concerning application for and amendment of a

certificate of public convenience and necessity relating to service territory.

(VII)

Rule 3104 concerning application to transfer assets, to obtain a controlling

interest, or to merge with another entity.

(VIII) Rule 3204 concerning incidents occurring in connection with the operation

of facilities.

(IX)

Paragraphs 3207 (a) and (b) concerning construction and expansion of

distribution facilities.

(X)

Rules 3250 through 3253 concerning major event reporting.

(XI)

Rule 3411 concerning the Low-Income Energy Assistance Act unless the

cooperative electric association has exempted themselves pursuant to

paragraph 3411(a).

(XII)

Rules 3650(b), 3651, 3652, 3654(b), (d) through (i), and (l); 3655(h)-(m);

3659(a)(I) through (a)(V), (b) and (d) through (i), 3660(l), 3661(b), (c), (g),

and (i), 3662(a)(I), (a)(II), (a)(IV) through (a)(X), (a)(XIII), (a)(XV), (b), (d)

and (e), and 3667.

(XIII) Rules 3700 through 3707 concerning appeals of local governmental land

use decisions actions.

selves pursuant to

paragraph 3411(a).

(XII)

Rules 3650(b), 3651, 3652, 3654(b), (d) through (i), and (l); 3655(h)-(m);

3659(a)(I) through (a)(V), (b) and (d) through (i), 3660(l), 3661(b), (c), (g),

and (i), 3662(a)(I), (a)(II), (a)(IV) through (a)(X), (a)(XIII), (a)(XV), (b), (d)

and (e), and 3667.

(XIII) Rules 3700 through 3707 concerning appeals of local governmental land

use decisions actions.

(c)

The following rules in this Part 3 shall apply to cooperative electric generation

and transmission associations.

(I)

Paragraphs 3002 (a)(III), (a)(XVI), (b), and (c) concerning the filing of

applications for certificates of public convenience and necessity for

facilities or for appeals of local government actions.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

3

(II)

Paragraph 3006(j) concerning the filing of electric resource planning

reports.

(III)

Rule 3102 concerning applications for certificates of public convenience

and necessity for facilities.

(IV)

Rule 3103 concerning amendments to certificates of public convenience

and necessity for facilities.

(V)

Rule 3104 concerning application to transfer, to obtain a controlling

interest, or to merger with another entity.

(VI)

Rule 3200 concerning construction, installation, maintenance, and

operation of facilities.

(VII)

Rule 3204 concerning incidents occurring in connection with the operation

of facilities.

(VIII) Rule 3205 concerning construction or expansion of generating capacity.

(IX)

Rule 3206 concerning construction or extension of transmission facilities.

(X)

Paragraph 3253(a) concerning major event reporting.

(XI)

Rules 3602, 3605, and 3618(a) concerning electric resource planning.

(XII)

Rules 3650(e), 3651, 3652, 3662(f), and 3668(d) concerning the RES.

(XIII) Rules 3700 through 3707 concerning appeals of local government actions.

(XIV) Rules 3750 through 3757 concerning regional electricity market

participation.

nsion of transmission facilities.

(X)

Paragraph 3253(a) concerning major event reporting.

(XI)

Rules 3602, 3605, and 3618(a) concerning electric resource planning.

(XII)

Rules 3650(e), 3651, 3652, 3662(f), and 3668(d) concerning the RES.

(XIII) Rules 3700 through 3707 concerning appeals of local government actions.

(XIV) Rules 3750 through 3757 concerning regional electricity market

participation.

(d)

The following rules in this Part 3 shall apply to municipally owned utilities, which

are qualifying retail utilities:

(I)

Rules 3650(c), 3651, 3652, 3653, 3654(b), (c), (d) through (i) and (l);

3659(a)(I) through (a)(V), (b), (d) through (i), 3666, and 3668(d).

(e)

The following rules in this Part 3 shall apply to municipally owned utilities which

are not qualifying retail utilities.

(I)

Paragraph 3650(d).

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

4

3001. Definitions.

The following definitions apply throughout this Part 3, except where a specific rule or

statute provides otherwise. In addition to the definitions here, the definitions found in the

Public Utilities Law and Part 1 apply to these rules. In the event of a conflict between

these definitions and a statutory definition, the statutory definition shall apply. In the

event of a conflict between these definitions and a definition in Part 1, these definitions

shall apply.

(a)

“Advanced metering infrastructure” means an integrated system of smart electric

utility meters and communication networks that enables two-way communication

between an electric utility's data systems and the meter's internet protocol

address and allows the electric utility to measure electricity usage and/or connect

or disconnect service remotely.

tion in Part 1, these definitions

shall apply.

(a)

“Advanced metering infrastructure” means an integrated system of smart electric

utility meters and communication networks that enables two-way communication

between an electric utility's data systems and the meter's internet protocol

address and allows the electric utility to measure electricity usage and/or connect

or disconnect service remotely.

(b)

“Affiliate” of a utility means a subsidiary of a utility, a parent corporation of a

public utility, a joint venture organized as a separate corporation or partnership to

the extent of the individual utility’s involvement with the joint venture, a subsidiary

of a parent corporation of a utility or where the utility or the parent corporation

has a controlling interest over an entity.

(c)

“Aggregated data” means customer data, alone or in combination with non-

customer data, resulting from processing (e.g., average of a group of customers)

and/or the compilation of customer data of one or more customers from which all

unique identifiers and personal information has been removed.

(d)

“Applicant for service” means a person who applies for utility service and who

either has taken no previous utility service from that utility or has not taken utility

service from that utility within the most recent 30 days.

(e)

"Base rate" means charges used to recover costs of utility infrastructure and

operations, including a return on capital investment, not otherwise recovered

through a utility rate adjustment mechanism.

(f)

"Basis point" means one-hundredth of a percentage point (100 basis points = one

percent).

(g)

"Benefit of service" means the use of utility service by each person of legal age

who resides at a premises to which service is delivered and who is not registered

with the utility as the customer of record.

(h)

"Commission" means the Colorado Public Utilities Commission.

ty rate adjustment mechanism.

(f)

"Basis point" means one-hundredth of a percentage point (100 basis points = one

percent).

(g)

"Benefit of service" means the use of utility service by each person of legal age

who resides at a premises to which service is delivered and who is not registered

with the utility as the customer of record.

(h)

"Commission" means the Colorado Public Utilities Commission.

(i)

"Contracted agent" means any person that has contracted with a utility in

compliance with rule 3030 to assist in the provision of regulated utility services

(e.g., an affiliate or vendor).

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

5

(j)

“Craft labor certification” means all documentation and certification of payroll

required for an energy sector public works project.

(k)

"Customer" means any person who is currently receiving utility service. Any

person who moves within a utility’s service territory and obtains utility service at a

new location within 30 days shall be considered a "customer." Unless stated in a

particular rule, "customer" applies to any class of customer as defined by the

Commission or by utility tariff.

(l)

"Customer data" means customer-specific data or information, excluding

personal information as defined in paragraph 1004(x), that is:

(I)

collected from the electric meter by the utility and stored in its data

systems (e.g., kWh, kW, voltage, VARs and power factor);

(II)

combined with customer-specific energy usage information on bills issued

to the customer for regulated utility service when not publicly or lawfully

available to the general public; or

(III)

about the customer’s participation in regulated utility programs, such as

renewable energy, demand-side management, load management, or

energy efficiency programs.

Wh, kW, voltage, VARs and power factor);

(II)

combined with customer-specific energy usage information on bills issued

to the customer for regulated utility service when not publicly or lawfully

available to the general public; or

(III)

about the customer’s participation in regulated utility programs, such as

renewable energy, demand-side management, load management, or

energy efficiency programs.

(m)

"Distribution facilities" are those lines designed to operate at the utility's

distribution voltages in the area as defined in the utility’s tariffs including

substation transformers that transform electricity to a distribution voltage and also

includes other equipment within a transforming substation which is not integral to

the circuitry of the utility’s transmission system.

(n)

"Emergency or safety event or circumstance" means a manmade or natural

emergency event or safety circumstance:

(I)

that prevents utility staff from being able to safely travel to or work at a

customer's residence or place of business for purposes of reconnecting or

making necessary repairs prior to reconnecting utility service; or

(II)

for which a utility has dispatched utility staff members to help respond to

the emergency or safety event or circumstance and, due to the timing or

number of utility staff dispatched, the utility lacks sufficient trained staff to

reconnect or make necessary repairs prior to reconnecting utility service at

a customer's residence or place of business; and

(III)

includes a severe weather event that one or more reputable weather

forecasting sources forecasts to occur in the following twenty-four hours

and that is more likely than not to result in dangerous travel or on-site

outdoor or indoor work conditions for individuals in the path of the weather

event.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

6

(o)

"Energy assistance organization" means the nonprofit corporation established for

low-income energy assistance pursuant to § 40-8.5-104, C.R.S.

owing twenty-four hours

and that is more likely than not to result in dangerous travel or on-site

outdoor or indoor work conditions for individuals in the path of the weather

event.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

6

(o)

"Energy assistance organization" means the nonprofit corporation established for

low-income energy assistance pursuant to § 40-8.5-104, C.R.S.

(p)

“Energy Sector Public Works (ESPW) project” is a project pursuant to § 24-92-

301, C.R.S., et seq., that for purposes of these rules:

(I)

for an investor-owned utility:

(A)

has the purpose of generating, transmitting, or distributing

electricity to provide energy to Colorado individual consumers and

businesses;

(B)

is built by or for a utility, including any project for which energy is

purchased through a power purchase or similar agreement;

(C)

has a total project cost of $1,000,000 or greater, of which the utility

will request Commission approval for ratepayers to pay at least

$500,000;

(D)

is included for approval through any proceeding conducted by the

Commission as part of an electric resource acquisition pursuant to

rule 3600 et seq., or a request for a certificate of public

convenience and necessity pursuant to § 40-5-101, C.R.S., et seq.;

and

(E)

consists of either:

(i)

electric power generation with a nameplate generation

capacity of one megawatt or higher, or an energy storage

system as defined by § 40-2-202, C.R.S., with an energy

rating of one megawatt of power capacity or four megawatt

hours of usable energy capacity or higher; or

st for a certificate of public

convenience and necessity pursuant to § 40-5-101, C.R.S., et seq.;

and

(E)

consists of either:

(i)

electric power generation with a nameplate generation

capacity of one megawatt or higher, or an energy storage

system as defined by § 40-2-202, C.R.S., with an energy

rating of one megawatt of power capacity or four megawatt

hours of usable energy capacity or higher; or

(ii)

pollution controls, electric transmission, electric vehicle

charging infrastructure, or carbon capture and storage; and

(II)

for a cooperative electric generation and transmission association, any

project in Colorado that:

(A)

has the purpose of generating or distributing electricity for the

purposes of providing energy to Colorado individual consumers and

businesses from utility customer funding of $500,000 or more as

approved by a cooperative electric association that is built by or for

a utility;

(B)

has a total project cost of $1,000,000 or greater; and

(C)

consists of either:

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

7

(i)

electric power generation with a nameplate generation

capacity of one megawatt or higher, or an energy storage

system as defined by § 40-2-202, C.R.S., with an energy

rating of one megawatt of power capacity or four megawatt

hours of usable energy capacity or higher; or

(ii)

pollution controls, electric transmission, electric vehicle

charging infrastructure, or carbon capture and storage.

(q)

"Energy storage system" means a commercially available technology that is

capable of retaining energy, storing the energy for a period of time, and

delivering the energy as electricity after storage by chemical, thermal,

mechanical, or other means.

(r)

"Financial security" includes any stock, bond, note, or other evidence of

indebtedness.

charging infrastructure, or carbon capture and storage.

(q)

"Energy storage system" means a commercially available technology that is

capable of retaining energy, storing the energy for a period of time, and

delivering the energy as electricity after storage by chemical, thermal,

mechanical, or other means.

(r)

"Financial security" includes any stock, bond, note, or other evidence of

indebtedness.

(s)

"Generation facility" means a power plant that converts a primary energy

resource into electricity. Primary energy resources include, but are not limited to:

nuclear resources, coal, natural gas, hydro, wind, solar, biomass, and

geothermal.

(t)

"Heavy load" means not less than 60 percent, but not more than 100 percent, of

the nameplate-rated capacity of a meter.

(u)

"Income qualified utility customer” or “low income customer” is a customer

meeting the requirements of § 40-3-106(1)(d)(II), C.R.S.

(v)

"Informal complaint" means an informal complaint as defined and discussed in

the Commission’s Rules Regulating Practice and Procedure.

(w)

"Light load" means approximately five to ten percent of the nameplate-rated

capacity of a meter.

(x)

"Load" means the power consumed by an electric utility customer over time

(measured in terms of either demand or energy or both).

(y)

"Local government" means any Colorado county, municipality, city and county,

home rule city or town, home rule city and county, or city or town operating under

a territorial charter.

s approximately five to ten percent of the nameplate-rated

capacity of a meter.

(x)

"Load" means the power consumed by an electric utility customer over time

(measured in terms of either demand or energy or both).

(y)

"Local government" means any Colorado county, municipality, city and county,

home rule city or town, home rule city and county, or city or town operating under

a territorial charter.

(z)

"Local office" means any Colorado office operated by a utility at which persons

may make requests to establish or to discontinue utility service. If the utility does

not operate an office in Colorado, "local office" means any office operated by a

utility at which persons may make requests to establish or to discontinue utility

service in Colorado.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

8

(aa)

"Main service terminal" means the point at which the utility’s metering

connections terminate.

(bb)

"Major event" means an event as defined in and consistent with IEEE Standard

Number 1366-2003, Guide for Electric Power Distribution Reliability Indices.

(cc)

"MVA" means mega-volt amperes and is the vector sum of the real power and

the reactive power.

(dd)

"Non-standard customer data" means all customer data that are not standard

customer data.

(ee)

"Output" means the energy and power produced by a generation system.

(ff)

"Past due" means the point at which a utility can affect a customer’s account for

regulated service due to non-payment of charges for regulated service.

(gg)

"Powerline trail" means a multimodal trail that is: eight feet in width or wider;

made of hard surface such as concrete or compacted gravel; used for

recreational purposes or commuting in a manner that does not involve a motor

vehicle; and located in an existing transmission or future transmission corridor

er’s account for

regulated service due to non-payment of charges for regulated service.

(gg)

"Powerline trail" means a multimodal trail that is: eight feet in width or wider;

made of hard surface such as concrete or compacted gravel; used for

recreational purposes or commuting in a manner that does not involve a motor

vehicle; and located in an existing transmission or future transmission corridor.

(hh)

“Project labor agreement,” pursuant to § 24-92-303(9), C.R.S., means a pre-hire

collective bargaining agreement between a lead contractor and construction

labor organization(s) covering the affected trades necessary to perform work on

a project that establishes the terms and conditions of employment of the

construction workforce and includes provisions that:

(I)

set forth effective, immediate, and mutually binding procedures for

resolving jurisdictional labor disputes and grievances arising before the

completion of work;

(II)

contain guarantees against strikes, lockouts, or similar actions;

(III)

ensure a reliable source of trained, skilled, and experienced construction

craft labor;

(IV)

further public policy objectives regarding improved employment

opportunities for minorities, women, or other economically disadvantaged

populations in the construction industry, including persons from

disproportionately impacted communities, to the extent permitted by state

and federal law;

(V)

permit the selection of the lowest qualified responsible bidder or lowest

qualified responsible offeror without regard to union or non-union status at

other construction sites; and

(VI)

include other terms as the parties deem appropriate.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

9

oportionately impacted communities, to the extent permitted by state

and federal law;

(V)

permit the selection of the lowest qualified responsible bidder or lowest

qualified responsible offeror without regard to union or non-union status at

other construction sites; and

(VI)

include other terms as the parties deem appropriate.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

9

(ii)

"Principal place of business" means the place, in or out of the State of Colorado,

where the executive or managing principals who directly oversee the utility's

operations in Colorado are located.

(jj)

"Property owner" means the legal owner of government record for a parcel of real

property within the service territory of a utility. A utility may rely upon the records

of a county clerk for the county within which a parcel of property is located to

determine ownership of government record.

(kk)

"Qualifying communication" means one of the following methods of

communicating with a utility customer about a possible upcoming disconnection

of service:

(I)

a physical visit to the customer's premises during which a utility

representative speaks with the customer and provides the customer utility

assistance information or, if the customer is not available to speak, leaves

notice of proposed disconnection and utility assistance information for the

customer's review; or

(II)

a telephone call, text, or e-mail to the customer’s last-known telephone

number or email address in which:

(A)

the utility representative provides the customer with notice of

proposed disconnection and utility assistance information; and

(B)

the utility representative either speaks directly with the customer

over the telephone or the customer receives the utility

representative’s text or email.

(ll)

"Rate adjustment mechanism" or "rate rider" means a charge added to a utility

bill to recover a specific cost that is not part of the base rate

the customer with notice of

proposed disconnection and utility assistance information; and

(B)

the utility representative either speaks directly with the customer

over the telephone or the customer receives the utility

representative’s text or email.

(ll)

"Rate adjustment mechanism" or "rate rider" means a charge added to a utility

bill to recover a specific cost that is not part of the base rate.

(mm) "Reference standard" means suitable indicating electrical equipment permanently

mounted in a utility's laboratory and used for no purpose other than testing

rotating standards.

(nn)

"Regulated charges" means charges billed by a utility to a customer if such

charges are approved by the Commission or contained in a tariff of the utility.

(oo)

"RFP" means request for proposals.

(pp)

"Rotating standard" means a portable meter used for testing service meters.

(qq)

"RUS" means the Rural Utilities Service of the United States Department of

Agriculture, or its successor agencies.

(rr)

"Service connection" is the location on the customer’s premises/facilities at which

a point of delivery of power between the utility and the customer is established.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

10

For example, in the case of a typical residential customer served from overhead

secondary supply, this is the location at which the utility’s electric service drop

conductors are physically connected to the customer’s electric service entrance

conductors.

(ss)

"Standard customer data" means customer data maintained by a utility in its

systems in the ordinary course of business.

(tt)

"Test year" means a twelve-month period that is examined to determine a utility's

costs of service in a rate case.

(uu)

"Third-party" means a person who is not the customer, an agent of the customer

who has been designated by the customer with the utility and is acting of the

customer’s behalf, a regulated utility serving the customer, or a contracted agent,

of the utility.

ourse of business.

(tt)

"Test year" means a twelve-month period that is examined to determine a utility's

costs of service in a rate case.

(uu)

"Third-party" means a person who is not the customer, an agent of the customer

who has been designated by the customer with the utility and is acting of the

customer’s behalf, a regulated utility serving the customer, or a contracted agent,

of the utility.

(vv)

"Transmission corridor" means a tract of land owned, occupied, or leased by a

transmission provider as defined in § 33-45-102(11), C.R.S., or covered by an

easement or right-of-way held by a transmission provider, where an electric

transmission line is constructed, operated, or maintained at a voltage of 69

kilovolts or above.

(ww) "Transmission facilities" are those lines and related substations designed and

operating at voltage levels above the utility's voltages for distribution facilities,

including but not limited to related substation facilities such as transformers,

capacitor banks, or breakers that are integral to the circuitry of the utility’s

transmission system.

(xx)

"Unique identifier" means a customer’s name, mailing address, telephone

number, or email address that is displayed on a bill.

(yy)

"Unregulated charges" means charges that are billed by a utility to a customer

and that are not regulated or approved by the Commission, are not contained in

a tariff filed with the Commission, and are for service or merchandise not

required as a condition of receiving regulated utility service.

(zz)

"Utility assistance information" means information that a utility representative

provides a customer informing the customer that the customer may contact 1-

866-HEAT-HELP (1-866-432-8435) to determine if the customer qualifies for

utility bill payment assistance.

(aaa) "Utility" means any public utility as defined in § 40-1-103, C.R.S., providing

electric, steam, or associated services in the state of Colorado

stance information" means information that a utility representative

provides a customer informing the customer that the customer may contact 1-

866-HEAT-HELP (1-866-432-8435) to determine if the customer qualifies for

utility bill payment assistance.

(aaa) "Utility" means any public utility as defined in § 40-1-103, C.R.S., providing

electric, steam, or associated services in the state of Colorado.

(bbb) "Utility service" or "service" means a service offering of a utility, which service

offering is regulated by the Commission.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

11

(ccc) "Whole building data" means the sum of the monthly electric use for either all

meters at a building on a parcel or real property or all buildings on a parcel of real

property.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

12

3002. Applications.

(a)

Any person may seek Commission action regarding any of the following matters

through the filing of an appropriate application to request a(n):

(I)

issuance or extension of a certificate of public convenience and necessity

for a franchise, as provided in rule 3100;

(II)

issuance or extension of a certificate of public convenience and necessity

for service territory, as provided in rule 3101;

(III)

issuance of a certificate of public convenience and necessity for

construction of facilities, as provided in rule 3102;

(IV)

amendment of a certificate of public convenience and necessity in order to

change, extend, curtail, abandon, or discontinue any service or facility, as

provided in rule 3103;

(V)

transfer of a certificate of public convenience and necessity, to obtain a

controlling interest in any utility, to transfer assets within the jurisdiction of

the Commission or stock, or to merge a utility with another entity, as

provided in rule 3104;

(VI)

issuance, or assumption of any financial security or to create a lien

pursuant to § 40-1-104, as provided in rule 3105;

(VII)

flexible regulatory treatment to provide service without reference to tariff

ty, to obtain a

controlling interest in any utility, to transfer assets within the jurisdiction of

the Commission or stock, or to merge a utility with another entity, as

provided in rule 3104;

(VI)

issuance, or assumption of any financial security or to create a lien

pursuant to § 40-1-104, as provided in rule 3105;

(VII)

flexible regulatory treatment to provide service without reference to tariffs,

as provided in rule 3106;

(VIII) approval of an air quality improvement program, as provided for in rule

3107;

(IX)

approval of a new tariff or an amendment of a tariff for a rate adjustment

mechanism on less than statutory notice, as provided in rule 3109;

(X)

variance of voltage standards, as provided in rule 3202;

(XI)

approval of meter and equipment testing practices, as provided in rule

3303;

(XII)

approval of a meter sampling program, as provided in rule 3304;

(XIII) approval of a refund plan, as provided in rule 3410;

(XIV) approval of a Low-Income Energy Assistance Plan, as provided in rule

3411;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

13

(XV) approval of a cost assignment and allocation manual, as provided in rule

3503;

(XVI) approval of or for amendment to a least-cost resource plan, as provided in

rules 3603, 3618, and 3619;

(XVII) approval of a compliance plan, as provided in rule 3657;

(XVIII) appeal of local government land use decision, as provided in rule 3703; or

(XIX) matter not specifically described in this rule, unless such matter is required

to be submitted as a petition under rule 1304, as a motion, or as some

other specific type of submittal.

-cost resource plan, as provided in

rules 3603, 3618, and 3619;

(XVII) approval of a compliance plan, as provided in rule 3657;

(XVIII) appeal of local government land use decision, as provided in rule 3703; or

(XIX) matter not specifically described in this rule, unless such matter is required

to be submitted as a petition under rule 1304, as a motion, or as some

other specific type of submittal.

(b)

In addition to the requirements of specific rules, all applications shall include, in

the following order and specifically identified, the following information, either in

the application or in appropriately identified attachments:

(I)

the name and address of the applying utility;

(II)

the name(s) under which the applying utility is, or will be, providing service

in Colorado;

(III)

the name, address, telephone number, and e-mail address of the applying

utility's representative to whom all inquiries concerning the application

should be made;

(IV)

a statement that the applying utility agrees to answer all questions

propounded by the Commission staff concerning the application;

(V)

a statement that the applying utility shall permit the Commission or

Commission staff to inspect the applying utility's books and records as part

of the investigation into the application;

(VI)

a statement that the applying utility understands that, if any portion of the

application is found to be false or to contain material misrepresentations,

any authorities granted pursuant to the application may be revoked upon

Commission order;

(VII)

in lieu of the separate statements required by subparagraphs (b)(IV)

through (VI) of this rule, a utility may include a statement that it has read,

and agrees to abide by, the provisions of subparagraphs (b)(IV) through

(VI) of this rule;

(VIII) a statement describing the applying utility’s existing operations and

general service area in Colorado;

cation may be revoked upon

Commission order;

(VII)

in lieu of the separate statements required by subparagraphs (b)(IV)

through (VI) of this rule, a utility may include a statement that it has read,

and agrees to abide by, the provisions of subparagraphs (b)(IV) through

(VI) of this rule;

(VIII) a statement describing the applying utility’s existing operations and

general service area in Colorado;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

14

(IX)

for applications listed in subparagraphs (a)(I), (II), (III), (V), and (VI) of this

rule, a copy of the applying utility's or parent company’s and consolidated

subsidiaries’ most recent audited balance sheet, income statement,

statement of retained earnings, and statement of cash flows so long as

they provide Colorado specific financial information;

(X)

a statement indicating the town or city, and any alternative town or city, in

which the applying utility prefers any hearings be held; and

(XI)

acknowledgment that, by signing the application, the applying utility

understands that:

(A)

the filing of the application does not by itself constitute approval of

the application;

(B)

if the application is granted, the applying utility shall not commence

the requested action until the applying utility complies with

applicable Commission rules and any conditions established by

Commission order granting the application;

(C)

if a hearing is held, the applying utility must present evidence at the

hearing to establish its qualifications to undertake, and its right to

undertake, the requested action; and

(D)

in lieu of the statements contained in subparagraphs (b)(XI)(A)

through (C) of this rule, an applying utility may include a statement

that it has read, and agrees to abide by, the provisions of

subparagraphs (b)(XI)(A) through (C) of this rule

pplying utility must present evidence at the

hearing to establish its qualifications to undertake, and its right to

undertake, the requested action; and

(D)

in lieu of the statements contained in subparagraphs (b)(XI)(A)

through (C) of this rule, an applying utility may include a statement

that it has read, and agrees to abide by, the provisions of

subparagraphs (b)(XI)(A) through (C) of this rule.

(XII)

An attestation which is made under penalty of perjury; which is signed by

an officer, a partner, an owner, an employee of, an agent for, or an

attorney for the applying utility, as appropriate, who is authorized to act on

behalf of the applying utility; and which states that the contents of the

application are true, accurate, and correct. The application shall contain

the title and the complete address of the affiant.

(c)

In addition to the requirements of specific rules, all applications shall include the

information listed in subparagraphs (a)(I) through (V) of rule 1310. Applying

utilities may either include the information in the application itself, or incorporate

the information by reference to the miscellaneous proceeding created under rule

1310.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

15

(d)

Customer notice. Except as required or permitted by § 40-3-104, C.R.S., if the

applicant is required by statute, Commission rule, or order to provide notice to its

customers of the application, the applicant shall, within seven days after filing an

application with the Commission, cause to have published notice of the filing of

the application in each newspaper of general circulation in the municipalities

impacted by the application. The applicant shall provide proof of such customer

notice within 14 days of the publication in the newspaper. Failure to provide such

notice or failure to provide the Commission with proof of notice may cause the

Commission to deem the application incomplete

published notice of the filing of

the application in each newspaper of general circulation in the municipalities

impacted by the application. The applicant shall provide proof of such customer

notice within 14 days of the publication in the newspaper. Failure to provide such

notice or failure to provide the Commission with proof of notice may cause the

Commission to deem the application incomplete. The applicant may also be

required by statute, Commission rule, or order to provide additional notice to its

customers of the application by first-class mailing or by hand-delivery. Both the

newspaper notice and any additional customer notice(s) shall include the

following.

(I)

The title “Notice of Application by [Name of the Utility] to [Purpose of

Application]”.

(II)

State that [Name of Utility] has applied to the Colorado Public Utilities

Commission for approval to [Purpose of Application]. If the utility

commonly uses another name when conducting business with its

customers, the “also known as” name should also be identified in the

notice to customers.

(III)

Provide a brief description of the proposal and the scope of the proposal,

including an explanation of the possible impact upon persons receiving the

notice.

(IV)

Identify which customer class(es) will be affected and the monthly

customer rate impact by customer class, if customers’ rates are affected

by the application.

(V)

Identify the proposed effective date of the application.

(VI)

Identify that the application was filed on less than statutory notice or if the

applicant requests an expedited Commission decision, as applicable.

(VII)

State that the filing is available for inspection in each local office of the

applicant and at the Colorado Public Utilities Commission.

(VIII) Identify the proceeding number, if known at the time the customer notice is

provided.

pplication.

(VI)

Identify that the application was filed on less than statutory notice or if the

applicant requests an expedited Commission decision, as applicable.

(VII)

State that the filing is available for inspection in each local office of the

applicant and at the Colorado Public Utilities Commission.

(VIII) Identify the proceeding number, if known at the time the customer notice is

provided.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

16

(IX)

State that any person may file written comment(s) or objection(s)

concerning the application with the Commission. As part of this statement,

the notice shall identify both the address and e-mail address of the

Commission and shall state that the Commission will consider all written

comments and objections submitted prior to the evidentiary hearing on the

application.

(X)

State that if a person desires to participate as a party in any proceeding

before the Commission regarding the filing, such person shall file an

intervention in accordance with the rule 1401 of the Commission’s Rules

of Practice and Procedure or any applicable Commission order.

(XI)

State that the Commission may hold a public hearing in addition to an

evidentiary hearing on the application and that if such a hearing is held

members of the public may attend and make statements even if they did

not file comments, objections or an intervention. State that if the

application is uncontested or unopposed, the Commission may determine

the matter without a hearing and without further notice.

(XII)

State that any person desiring information regarding if and when hearings

may be held shall submit a written request to the Commission or,

alternatively, shall contact the External Affairs section of the Commission

at its local or toll-free phone number. Such statement shall also identify

both the local and toll-free phone numbers of the Commission’s External

Affairs section.

3003. [Reserved].

3004. Disputes and Informal Complaints.

mation regarding if and when hearings

may be held shall submit a written request to the Commission or,

alternatively, shall contact the External Affairs section of the Commission

at its local or toll-free phone number. Such statement shall also identify

both the local and toll-free phone numbers of the Commission’s External

Affairs section.

3003. [Reserved].

3004. Disputes and Informal Complaints.

(a)

For purposes of this rule, “dispute” means a concern, difficulty, or problem which

needs resolution and which a customer or a person applying for service brings

directly to the attention of the utility without the involvement of Commission staff

or the Commission.

(b)

A dispute may be initiated orally or in writing. Using the procedures found in rule

1301, a utility shall conduct a full and prompt investigation of all disputes

concerning utility service.

(c)

In accordance with the procedures in rule 1301, each utility shall conduct a full

and prompt investigation of all informal complaints concerning utility service.

(d)

A utility shall comply with all rules regarding the timelines for responding to

informal complaints.

(e)

If a current customer, or an applicant for service that is not a current customer, is

dissatisfied with the utility's proposed adjustment or disposition of a dispute, the

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

17

utility shall inform the person, customer or applicant for service of the right to

make an informal complaint to the External Affairs section of the Commission

and shall provide to the person, customer or applicant for service the address

and toll free number of the Commission’s External Affairs section.

ion of a dispute, the

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

17

utility shall inform the person, customer or applicant for service of the right to

make an informal complaint to the External Affairs section of the Commission

and shall provide to the person, customer or applicant for service the address

and toll free number of the Commission’s External Affairs section.

(f)

Each utility shall keep a record of each informal complaint and of each dispute.

The record shall show the name and address of the initiating customer or person

applying for service, the date and character of the issue, and the adjustment or

disposition made. This record shall be open at all times to inspection by the

person who initiated the informal complaint or dispute, by the Commission, and

by Commission staff.

3005. Records.

(a)

Except as a specific rule may require, every utility shall maintain, for a period of

not less than three years, and shall make available for inspection at its principal

place of business during regular business hours, the following:

(I)

records concerning disputes and informal complaints, which records are

created pursuant to rule 3004;

(II)

records of daily load and monthly plant output, which records are created

pursuant to rule 3201;

(III)

records of service voltage measurements, which records are created

pursuant to paragraph 3202(a);

(IV)

records concerning interruptions of service, which records are created

pursuant to rule 3203;

(V)

records concerning certification and calibration of meter testing

equipment, which records are created pursuant to rule 3303;

(VI)

records concerning meter testing upon customer request, which records

are created pursuant to rule 3305;

(VII)

records concerning meters and their associated testing, which records are

created pursuant to rule 3306;

(VIII) customer billing records, which records are created pursuant to paragraph

3401(a);

(IX)

customer deposit records, which records are created pursuant to rule

3403;

(X)

records and supporting documentatio

testing upon customer request, which records

are created pursuant to rule 3305;

(VII)

records concerning meters and their associated testing, which records are

created pursuant to rule 3306;

(VIII) customer billing records, which records are created pursuant to paragraph

3401(a);

(IX)

customer deposit records, which records are created pursuant to rule

3403;

(X)

records and supporting documentation concerning its cost assignment and

allocation manual and fully-distributed cost study pursuant to paragraphs

3503(g) and 3504(e), for so long as the manual and study are in effect or

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

18

are the subject of a complaint or a proceeding before the Commission;

and

(XI)

records concerning the utility’s inspection of Qualifying Facilities, which

records are created pursuant to paragraphs 3927(c) and (e).

(b)

A utility shall maintain at each of its local offices and at its principal place of

business all tariffs filed with the Commission and applying to Colorado rate

areas. If the utility maintains a website, it shall also maintain its current and

complete tariffs on its website.

(c)

Each utility shall maintain its books of account and records in accordance with

the provisions of 18 C.F.R. Part 101, the Uniform System of Accounts, amended

as of April 1, 2014. A utility shall maintain its books of accounts and records

separately from those of its affiliates.

(d)

Each cooperative electric association which is a RUS borrower shall maintain its

books of account and records in accordance with the provisions of 7 C.F.R. Part

1767, effective as of May 27, 2008.

(e)

Each non-RUS borrower cooperative electric association shall maintain its books

of account and records either consistent with the provisions of 18 C.F.R. Part

125, effective as of April 1, 2004, or consistent with the provisions of 7 C.F.R.

Part 1767, effective as of May 27, 2008.

ooks of account and records in accordance with the provisions of 7 C.F.R. Part

1767, effective as of May 27, 2008.

(e)

Each non-RUS borrower cooperative electric association shall maintain its books

of account and records either consistent with the provisions of 18 C.F.R. Part

125, effective as of April 1, 2004, or consistent with the provisions of 7 C.F.R.

Part 1767, effective as of May 27, 2008.

(f)

Each utility shall preserve its records in accordance with the provisions of 18

C.F.R. Part 125, the Preservation of Records of Public Utilities and Licensees,

amended as of August 7, 2000.

(g)

Each cooperative electric association that is a RUS borrower shall preserve its

records in accordance with the provisions of Rural Utilities Service Bulletin 180-2,

effective June 26, 2003.

(h)

Each non-RUS borrower cooperative electric association shall preserve records

consistent with the provisions of 18 C.F.R. Part 101, effective as of April 1, 2014.

3006. Annual Reports and Cooperative Electric Association Reports.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

19

(a)

On or before April 30th of each year, each utility shall file with the Commission an

annual report for the preceding calendar year. The utility shall submit the annual

report on forms prescribed by the Commission; shall properly complete the

forms; and shall ensure the forms are verified and signed by a person authorized

to act on behalf of the utility; and shall file the forms in accordance with

subparagraph 1204(a)(III) of the Commission’s Rules of Practice and Procedure.

If the Commission grants the utility an extension of time to file the annual report,

the utility nevertheless shall file with the Commission, on or before April 30, the

utility's total gross operating revenue from intrastate utility business transacted in

Colorado for the preceding calendar year.

orms in accordance with

subparagraph 1204(a)(III) of the Commission’s Rules of Practice and Procedure.

If the Commission grants the utility an extension of time to file the annual report,

the utility nevertheless shall file with the Commission, on or before April 30, the

utility's total gross operating revenue from intrastate utility business transacted in

Colorado for the preceding calendar year.

(b)

If a certified public accountant prepares an annual report for a utility, the utility

either shall file two copies of the report with the Commission or shall file it

through the Commission’s E-Filings System within 30 days after publication.

(c)

A cooperative electric association shall file with the Commission a report listing

its designation of service of process.

(d)

A cooperative electric association shall file with the Commission a report of

election to be governed by § 40-8.5-102, C.R.S., pertaining to unclaimed monies.

This report shall be filed within 60 days of the election.

3007. [Reserved].

3008. Incorporation by Reference.

(a)

The Commission incorporates by reference 18 C.F.R. Part 101 (as published on

April 1, 2014) regarding the Uniform System of Accounts Prescribed for Public

Utilities and Licensees Subject to the Provisions of the Federal Power Act. No

later amendments to or editions of 18 C.F.R. Part 101 are incorporated into these

rules.

(b)

The Commission incorporates by reference 7 C.F.R. Part 1767 (as published on

May 27, 2008) regarding the Uniform System of Accounts Prescribed for RUS

Electric Borrowers. No later amendments to or editions of 7 C.F.R. Part 1767 are

incorporated into these rules.

(c)

The Commission incorporates by reference 18 C.F.R. Part 125 (as published on

August 7, 2000) regarding the Preservation of Records of Public Utilities and

Licensees. No later amendments to or editions of 18 C.F.R. Part 125 are

incorporated into these rules.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

20

editions of 7 C.F.R. Part 1767 are

incorporated into these rules.

(c)

The Commission incorporates by reference 18 C.F.R. Part 125 (as published on

August 7, 2000) regarding the Preservation of Records of Public Utilities and

Licensees. No later amendments to or editions of 18 C.F.R. Part 125 are

incorporated into these rules.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

20

(d)

The Commission incorporates by reference RUS Bulletin 180-2 (as published on

June 26, 2003) regarding Record Retention Recommendations for RUS Electric

Borrowers. No later amendments to or editions of RUS Bulletin 180-2 are

incorporated into these rules.

(e)

The Commission incorporates by reference the National Electrical Safety Code,

2012 edition, published by the Institute of Electrical and Electronics Engineers

and endorsed by the American National Standards Institute. No later

amendments to or editions of the National Electrical Safety Code are

incorporated into these rules.

(f)

The Commission incorporates by reference 18 C.F.R., Subchapter K, Part 292,

Subparts A, B and C (as published on February 21, 2012) regarding §§ 201 and

210 of the Public Utility Regulatory Policies Act of 1978. No later amendments to

or editions of 18 C.F.R., Subchapter K, Part 292, Subparts A, B and C are

incorporated into these rules.

(g)

Any material incorporated by reference in this Part 3 may be examined at the

offices of the Commission, 1560 Broadway, Suite 250, Denver, Colorado 80202,

during normal business hours, Monday through Friday, except when such days

are state holidays. . Incorporated standards shall be available electronically and

provided in certified copies, at cost, upon request. Restrictions on the provision of

physical copies due to copyright protections may apply

3 may be examined at the

offices of the Commission, 1560 Broadway, Suite 250, Denver, Colorado 80202,

during normal business hours, Monday through Friday, except when such days

are state holidays. . Incorporated standards shall be available electronically and

provided in certified copies, at cost, upon request. Restrictions on the provision of

physical copies due to copyright protections may apply. The Director or the

Director’s designee will provide information regarding how the incorporated

standards may be examined at any state public depository library The standards

and regulations are also available from the agency, organization or association

originally issuing the code, standard, guideline or rule as follows: Code of Federal

Regulations: www.govinfo.gov/help/cfr; United States Department of Agriculture

Rural Development: www.rd.usda.gov/publications/regulations-

guidelines/bulletins/electric; and National Electrical Safety Code:

www.standards.ieee.org.

CIVIL PENALTIES

3009. Definitions.

The following definitions apply to rules 3009, 3010, and 3976, unless a specific statute

or rule provides otherwise. In the event of a conflict between these definitions and a

statutory definition, the statutory definition shall apply.

(a)

“Civil penalty” means any monetary penalty levied against a public utility because

of intentional violations of statutes in Articles 1 to 7 and 15 of Title 40, C.R.S.,

Commission rules, or Commission orders.

(b)

“Civil penalty assessment” means the act by the Commission of imposing a civil

penalty against a public utility after the public utility has admitted liability or has

been adjudicated by the Commission to be liable for intentional violations of

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

21

statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission rules, or

Commission orders.

y assessment” means the act by the Commission of imposing a civil

penalty against a public utility after the public utility has admitted liability or has

been adjudicated by the Commission to be liable for intentional violations of

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

21

statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission rules, or

Commission orders.

(c)

“Civil penalty assessment notice” means the written document by which a public

utility is given notice of an alleged intentional violation of statutes in Articles 1 to 7

and 15 of Title 40, C.R.S., Commission rules, or Commission orders and of a

proposed civil penalty.

(d)

“Intentional violation.” A person acts “intentionally” or “with intent” when his

conscious objective is to cause the specific result proscribed by the statute, rule,

or order defining the violation.

3010. Regulated Electric Utility Violations, Civil Enforcement, and Enhancement

of Civil Penalties.

(a)

The Commission may impose a civil penalty in accordance with the requirements

and procedures contained in § 40-7-113.5, C.R.S., § 40-7-116.5, C.R.S., and

paragraph 1302(b), 4 Code of Colorado Regulations 723-1, for intentional

violations of statutes in Articles 1 to 7 and 15 of Title 40, C.R.S., Commission

rules, or Commission orders as specified in §§ 40-7-113.5 and 40-7-116.5,

C.R.S., and in these rules.

(b)

The Director of the Commission or his or her designee shall have the authority to

issue civil penalty assessments for the violations enumerated in § 40-7-113.5,

C.R.S., subject to hearing before the Commission. When a public utility is cited

for an alleged intentional violation, the public utility shall be given notice of the

alleged violation in the form of a civil penalty assessment notice.

(b)

The Director of the Commission or his or her designee shall have the authority to

issue civil penalty assessments for the violations enumerated in § 40-7-113.5,

C.R.S., subject to hearing before the Commission. When a public utility is cited

for an alleged intentional violation, the public utility shall be given notice of the

alleged violation in the form of a civil penalty assessment notice.

(c)

The public utility cited for an alleged intentional violation may either admit liability

for the violation pursuant to § 40-7-116.5(1)(c) or the public utility may contest

the alleged violation pursuant to § 40-7-116.5(1)(d), C.R.S. At any hearing

contesting an alleged violation, trial staff shall have the burden of demonstrating

a violation by a preponderance of the evidence.

(d)

In any written decision entered by the Commission pursuant to § 40-6-109,

C.R.S., adjudicating a public utility liable for an intentional violation of a statute in

Articles 1 to 7 and 15 of Title 40, C.R.S., a Commission rule, or a Commission

order, the Commission may impose a civil penalty of not more than two thousand

dollars, pursuant to § 40-7-113.5(1), C.R.S. In imposing any civil penalty

pursuant to § 40-7-113.5(1), C.R.S., the Commission shall consider the factors

set forth in paragraph 1302(b).

(e)

The Commission may assess doubled or tripled civil penalties against any public

utility, as provided by § 40-7-113.5(3), C.R.S., § 40-7-113.5(4), C.R.S., and this

rule.

vil penalty of not more than two thousand

dollars, pursuant to § 40-7-113.5(1), C.R.S. In imposing any civil penalty

pursuant to § 40-7-113.5(1), C.R.S., the Commission shall consider the factors

set forth in paragraph 1302(b).

(e)

The Commission may assess doubled or tripled civil penalties against any public

utility, as provided by § 40-7-113.5(3), C.R.S., § 40-7-113.5(4), C.R.S., and this

rule.

(f)

The Commission may assess any public utility a civil penalty containing doubled

penalties only if:

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

22

(I)

the public utility has admitted liability by paying the civil penalty

assessment for, or has been adjudicated by the Commission in an

administratively final written decision to be liable for, engaging in prior

conduct that constituted an intentional violation of a statute in Articles 1 to

7 and 15 of Title 40, C.R.S., a Commission rule, or a Commission order;

(II)

the conduct for which doubled civil penalties are sought violates the same

statute, rule, or order as conduct for which the public utility has admitted

liability by paying the civil penalty assessment, or conduct for which the

public utility has been adjudicated by the Commission in an

administratively final written decision to be liable; and

(III)

the conduct for which doubled civil penalties are sought occurred within

one year after conduct for which the public utility has admitted liability by

paying the civil penalty assessment, or conduct for which the public utility

has been adjudicated by the Commission in an administratively final

written decision to be liable.

ion in an

administratively final written decision to be liable; and

(III)

the conduct for which doubled civil penalties are sought occurred within

one year after conduct for which the public utility has admitted liability by

paying the civil penalty assessment, or conduct for which the public utility

has been adjudicated by the Commission in an administratively final

written decision to be liable.

(g)

The Commission may assess any public utility a civil penalty containing tripled

penalties only if:

(I)

the public utility has admitted liability by paying the civil penalty

assessment for, or has been adjudicated by the Commission in an

administratively final written decision to be liable for, engaging in prior

conduct that constituted two or more prior intentional violations of a statute

in Articles 1 to 7 and 15 of Title 40, C.R.S., a Commission rule, or a

Commission order;

(II)

the conduct for which tripled civil penalties are sought violates the same

statute, rule, or order as conduct for which the public utility has either

admitted liability by paying the civil penalty assessment or been

adjudicated by the Commission in an administratively final written decision

to be liable, in at least two prior instances; and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

23

(III)

the conduct for which tripled civil penalties are sought occurred within one

year after the two most recent prior instances of conduct for which the

public utility has either admitted liability by paying the civil penalty

assessment, or been adjudicated by the Commission in an

administratively final written decision to be liable.

(h)

When more than two instances of prior conduct exist, the Commission shall only

consider those instances occurring within one year prior to the date of such

alleged conduct for which tripled civil penalties are sought.

(i)

Nothing in this rule shall preclude the assessment of tripled penalties when

doubled and tripled penalties are sought in the same civil penalty assessment

notice.

be liable.

(h)

When more than two instances of prior conduct exist, the Commission shall only

consider those instances occurring within one year prior to the date of such

alleged conduct for which tripled civil penalties are sought.

(i)

Nothing in this rule shall preclude the assessment of tripled penalties when

doubled and tripled penalties are sought in the same civil penalty assessment

notice.

(j)

The Commission shall not issue a decision on doubled or tripled penalties until

after the effective date of the administratively final Commission decision upon

which the single civil penalty was based.

(k)

The civil penalty assessment notice shall contain the maximum penalty amount

provided by rule for each individual violation noted, with a separate provision for

a reduced penalty of 50 percent of the penalty amount sought if paid within ten

days of the public utility’s receipt of the civil penalty assessment notice.

(l)

The civil penalty assessment notice shall contain the maximum amount of the

penalty surcharge pursuant to § 24-34-108(2), C.R.S., if any.

(m)

A penalty surcharge referred to in paragraph (l) of this rule shall be equal to the

percentage set by the Department of Regulatory Agencies on an annual basis.

The surcharge shall not be included in the calculation of the statutory limits set in

§ 40-7-113.5(5), C.R.S.

(n)

Nothing in these rules shall affect the Commission’s ability to pursue other

remedies in lieu of issuing civil penalties.

3011. – 3024.

[Reserved].

CUSTOMER DATA ACCESS AND PRIVACY

3025. Scope and Applicability.

The basis and purpose of these rules is to describe the protection of and limited access

to customer data for electric utilities over which the Commission has jurisdiction. These

rules are applicable to all utilities except for certain provisions as defined in the rule

dies in lieu of issuing civil penalties.

3011. – 3024.

[Reserved].

CUSTOMER DATA ACCESS AND PRIVACY

3025. Scope and Applicability.

The basis and purpose of these rules is to describe the protection of and limited access

to customer data for electric utilities over which the Commission has jurisdiction. These

rules are applicable to all utilities except for certain provisions as defined in the rule. For

the purpose of the Customer Data Access and Privacy Rules, electric utilities are

classed into two tiers: a Tier I electric utility serves more than 150,000 electric

customers; a Tier II electric utility serves 150,000 or fewer electric customers.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

24

3026. Customer Data.

A utility shall maintain standard customer data sufficient to allow a customer to

understand his or her energy usage at a level of detail commensurate with the meter or

network technology used to serve the customer.

3027. Privacy, Access, and Disclosure.

(a)

A utility shall protect customer data in the utility’s possession or control to

maintain the privacy of customers, while providing reasonable access to that

data. A utility is only authorized to use customer data to provide regulated utility

service in the ordinary course of business.

(b)

A utility shall not disclose customer data unless such disclosure conforms to

these rules, except as required by law or to comply with Commission rule.

Illustratively, this includes responses to requests of the Commission, warrants,

subpoenas, court orders, or as authorized by § 16-15.5-102, C.R.S.

ed to use customer data to provide regulated utility

service in the ordinary course of business.

(b)

A utility shall not disclose customer data unless such disclosure conforms to

these rules, except as required by law or to comply with Commission rule.

Illustratively, this includes responses to requests of the Commission, warrants,

subpoenas, court orders, or as authorized by § 16-15.5-102, C.R.S.

(c)

A utility shall include in its tariffs a description of customer data that the utility is

able to provide to the customer or to any third party recipient to whom the

customer has authorized disclosure of the customer’s data within the utility’s

technological and data capabilities. At a minimum, the utility’s tariff must provide

the following:

(I)

a description of standard customer data and non-standard customer data

and the frequency of customer data updates that will be available (annual,

monthly, daily, etc.);

(II)

the method and frequency of customer data transmittal and access

available (electronic, paper, etc.) as well as the security protections or

requirements for such transmittal;

(III)

a timeframe for processing requests;

(IV)

any rate associated with processing a request for non-standard customer

data; and

(V)

any charges associated with obtaining non-standard customer data.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

25

(d)

As part of basic utility service, a utility shall provide access to the customer’s

standard customer data in electronic machine-readable form, without additional

charge, to the customer or to any third party recipient to whom the customer has

authorized disclosure of the customer’s customer data. Such access shall

conform to nationally recognized open standards and best practices. The utility

shall provide access in a manner that ensures adequate protections for the

utility’s system security and the continued privacy of the customer data during

transmission.

arge, to the customer or to any third party recipient to whom the customer has

authorized disclosure of the customer’s customer data. Such access shall

conform to nationally recognized open standards and best practices. The utility

shall provide access in a manner that ensures adequate protections for the

utility’s system security and the continued privacy of the customer data during

transmission.

(e)

Nothing in these rules shall limit a customer’s right to provide his or her customer

data to anyone.

(f)

A utility and each of its directors, officers and employees that discloses customer

data pursuant to a customer’s authorization in accordance with these data

privacy rules shall not be liable or responsible for any claims for loss or damages

resulting from the utility’s disclosure of customer data.

3028. Customer Notice.

(a)

A utility shall provide each year to its customers a written notice complying with

this rule. The utility shall conspicuously post on its website notice of its privacy

and security policies governing access to and disclosure of customer data and

aggregated data to third parties. This notice shall:

(I)

explain what is available to customers, as standard and/or non-standard

customer data (e.g., 15 minute versus hourly data);

(II)

describe the frequency that the utility can provide customer data based on

a request for standard data (e.g., on a weekly or monthly basis);

(III)

advise customers that their customer data may provide insight into their

activities within the premises receiving service;

(IV)

inform customers that the privacy and security of their customer data will

be protected by the utility while in its possession;

(V)

explain that customers can access their standard customer data, as

identified by the utility’s tariff, without additional charge;

(VI)

advise customers that their customer data will not be disclosed to third

parties, except:

(A)

as necessary to provide regulated utility services to the customers;

(B)

as otherwise permitted or required by law or Commission rule; or

lity while in its possession;

(V)

explain that customers can access their standard customer data, as

identified by the utility’s tariff, without additional charge;

(VI)

advise customers that their customer data will not be disclosed to third

parties, except:

(A)

as necessary to provide regulated utility services to the customers;

(B)

as otherwise permitted or required by law or Commission rule; or

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

26

(C)

pursuant to the authorization given by the customer in accordance

with these rules.

(VII)

describe the utility’s policies regarding how a customer can authorize

access and disclosure of his or her customer data to third parties. With

regard to such third party data disclosure, the notice shall:

(A)

inform customers that declining a request for disclosure of

customer data to a third party will not affect the provision of utility

service that the customer receives from the utility; and

(B)

explain that any customer consent for access to, disclosure of, or

use of a customer’s customer data by a third party may be

terminated or limited by the customer of record at any time and

inform the customers of the process for doing so.

(VIII) explain that aggregated data does not contain customer identifying

information and inform customers that customer data may be used to

create aggregated data that will not contain customer identifying

information;

(IX)

explain that the utility may provide aggregated data to third parties, subject

to its obligation under paragraph 3033(a);

(X)

be viewable on-line and printed in ten point or larger font;

(XI)

be sent either separately or included as an insert in a regular monthly bill,

or, for those customers who have consented to receive e-bills, such notice

may be sent electronically separately from an e-bill, conspicuously marked

and stating clearly that important information on the utility’s privacy

practices is contained therein;

(XII)

be available in English and Spanish

point or larger font;

(XI)

be sent either separately or included as an insert in a regular monthly bill,

or, for those customers who have consented to receive e-bills, such notice

may be sent electronically separately from an e-bill, conspicuously marked

and stating clearly that important information on the utility’s privacy

practices is contained therein;

(XII)

be available in English and Spanish. The customer notice may also be

translated to a language other than English or Spanish by a third party or

the utility. Forms translated to other languages in accordance with this rule

must be accepted by utilities, and may be relied upon, after the English

version of the form, the translated version of the form, and an affidavit

attesting to the accurate and complete translation from the English version

of the form, have been provided to the Commission and the utility

possessing the data. Such affidavit must be executed by an interpreter on

the active roster of interpreters maintained by the Office of Language

Access of the Colorado Judicial Branch. If the utility incurs a cost for

translation made at the request of a third party, it may charge the

requestor for such cost and may include a reasonable administrative fee in

addition to the translation cost; and

(XIII) provide a customer service phone number and web address where

customers can direct additional questions or obtain additional information

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

27

regarding their customer data, the disclosure of customer data or

aggregated data, or the utility’s privacy policies and procedures with

respect to customer data or aggregated data.

3029. Customer Consent Form for the Disclosure of their Customer Data to Third

Party Recipients by a Utility.

ns or obtain additional information

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

27

regarding their customer data, the disclosure of customer data or

aggregated data, or the utility’s privacy policies and procedures with

respect to customer data or aggregated data.

3029. Customer Consent Form for the Disclosure of their Customer Data to Third

Party Recipients by a Utility.

(a)

A utility shall make available to any third party a consent form for the disclosure

of customer data that is maintained by the Commission and available from the

Commission’s website. The form shall be available electronically from the utility.

The consent form shall be provided in a non-electronic format by a utility upon

request from a customer or third party.

(b)

In addition to the Commission supplied form, a utility may create and make

available a consent form that:

(I)

includes the same information contained in the annual notice provided

pursuant to subparagraphs 3028(a)(V), (VI), (VII), and (XIII);

(II)

provides spaces for the following required information regarding the third

party recipient of the customer data:

(A)

the name, including trade name if applicable, physical address,

mailing address, e-mail address, and telephone number;

(B)

the uses of the data for which the customer is allowing disclosure;

(C)

the time period (e.g., months, years) for which data are being

requested;

(D)

the description of the data that are being requested;

(III)

states that the consent is valid until terminated;

(IV)

states that the customer must notify the utility service provider in writing

(electronically or non-electronically) to terminate the consent including

appropriate utility contact information;

(V)

states any additional terms except an inducement for the customer’s

disclosure;

(VI)

be viewable on-line and printed in ten point or larger font; and

(VII)

provides notice to the customer that the utility shall not be responsible for

monitoring or taking any steps to ensure that the third party to whom the

data is disclosed

rminate the consent including

appropriate utility contact information;

(V)

states any additional terms except an inducement for the customer’s

disclosure;

(VI)

be viewable on-line and printed in ten point or larger font; and

(VII)

provides notice to the customer that the utility shall not be responsible for

monitoring or taking any steps to ensure that the third party to whom the

data is disclosed is maintaining the confidentiality of the data or using the

data as intended by the customer.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

28

(c)

A utility may make available an electronic customer consent process for

disclosure of customer data to a third party (e.g., a utility controlled web portal)

that authenticates the customer identity. The contents of the electronic consent

process must generally follow the format of the model consent to disclose

customer data form, be clear, and include the elements to be provided pursuant

to paragraph (a) of this rule. No utility is required to provide an electronic consent

process in a language other than English.

(d)

A utility may make available an in-person consent process for disclosure of

customer data.

(e)

A consent form may be submitted to the utility through electronic or non-

electronic methods.

(f)

The scope of consent given shall be defined by the terms of the consent form,

except that changes of contact names for an organization, trade name, or utility

over time do not invalidate consent as to the respective organization, trade

name, or utility. Because the contact named for an organization, trade name, or

utility is a representative of the respective organization, trade name, or utility,

consent terminates as to such contact when the relationship with the

organization, trade name, or utility terminates. Modifications to the consent form

over time do not invalidate previous consent. Consent need not be provided on

new forms so long as the data provided remains within the scope of consent.

e name, or

utility is a representative of the respective organization, trade name, or utility,

consent terminates as to such contact when the relationship with the

organization, trade name, or utility terminates. Modifications to the consent form

over time do not invalidate previous consent. Consent need not be provided on

new forms so long as the data provided remains within the scope of consent.

(g)

Customer consent forms shall be available in English and Spanish. Customer

consent forms may be translated into languages other than English or Spanish

by a third party or the utility. Forms translated to other languages in accordance

with this rule must be accepted by utilities, and may be relied upon, after the

English version of the form, the translated version of the form, and an affidavit

attesting to the accurate and complete translation from the English version of the

form, have been provided to the Commission and the utility possessing the data.

Such affidavit must be signed by an interpreter on the active roster of interpreters

maintained by the Office of Language Access of the Colorado Judicial Branch. If

a utility incurs a cost for a translation at the request of a third party, it may charge

the requestor for such cost and may include a reasonable administrative fee in

addition to the translation cost.

(h)

Any customer consent forms made available from the Commission’s website

shall be presumed to comply with these rules.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

29

3030. Access to Customer Data for the Provision of Regulated Utility Service.

it may charge

the requestor for such cost and may include a reasonable administrative fee in

addition to the translation cost.

(h)

Any customer consent forms made available from the Commission’s website

shall be presumed to comply with these rules.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

29

3030. Access to Customer Data for the Provision of Regulated Utility Service.

(a)

A utility may disclose customer data to a contracted agent, provided that the

contract requires the agent to:

(I)

implement and maintain data security procedures and practices to protect

the customer data from unauthorized access, destruction, use,

modification, or disclosure that are equal to or greater than the data

privacy and security policies and procedures used by the utility internally

to protect customer data;

(II)

use customer data solely for the purpose of the contract and prohibit the

use of customer data for a secondary commercial purpose not related to

the purpose of the contract without first obtaining the customer’s consent

as provided for in these rules;

(III)

return to the utility or destroy any customer data that is no longer

necessary for the purpose for which it was transferred; and

(IV)

execute a non-disclosure agreement with the utility.

(b)

The utility shall maintain records of the disclosure of customer data to contracted

agents for a minimum of three years. Such records shall include all contracts with

the contracted agent and executed non-disclosure agreements.

3031. Local Government Access to Customer Data from a Utility for Audit.

ose for which it was transferred; and

(IV)

execute a non-disclosure agreement with the utility.

(b)

The utility shall maintain records of the disclosure of customer data to contracted

agents for a minimum of three years. Such records shall include all contracts with

the contracted agent and executed non-disclosure agreements.

3031. Local Government Access to Customer Data from a Utility for Audit.

(a)

A utility may disclose customer data to a local government either with an audit

required to be provided pursuant to a final Commission decision (e.g., a decision

approving a franchise agreement) or as reasonably necessary for an audit

conducted by a governmental entity of franchise fees paid to them by the utility,

provided that:

(I)

disclosure is not otherwise prohibited by a final Commission decision (e.g.,

Commission-approved franchise between the utility and the local

government);

(II)

disclosure is made to a designated auditor or auditor’s office, who is either

an employee or agent of the local government;

(III)

the auditor collects and uses the customer data solely for the purpose of

reviewing or conducting the audit and is prohibited from disclosing or

using the customer data for a purpose not related to the audit;

(IV)

the local government implements and maintains data security procedures

and practices to protect the customer data from unauthorized access,

destruction, use, or modification;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

30

(V)

the local government destroys or returns to the utility any customer data

no longer necessary for the purpose for which it was transferred unless

state law or the municipality’s state-mandated retention schedule requires

otherwise;

(VI)

the local government agrees not to permit access to the data by anyone

that has not agreed to abide by the terms pursuant to which the data was

provided by the utility

local government destroys or returns to the utility any customer data

no longer necessary for the purpose for which it was transferred unless

state law or the municipality’s state-mandated retention schedule requires

otherwise;

(VI)

the local government agrees not to permit access to the data by anyone

that has not agreed to abide by the terms pursuant to which the data was

provided by the utility. This includes, but is not limited to, all interns,

subcontractors, staff, other workforce members, and consultants;

(VII)

the local government agrees that any recipient of the data pursuant to this

rule does not obtain any right, title or interest in any of the data provided

by the utility;

(VIII) governing law or a non-disclosure agreement executed with the utility

requires that the local government, at a minimum, comply with the

requirements of this rule; and

(IX)

the data requested is for utility customers served in the boundaries of the

local government.

(b)

The utility shall maintain records of all disclosures of customer data to local

government requestors for a minimum of three years.

(c)

Availability of customer data pursuant to this rule does not preclude a local

government from requesting other data reports.

3032. Third Party Access to Customer Data from a Utility.

(a)

Except as provided in this rule, paragraph 3027(b), rule 3030, and rule 3031, a

utility shall not disclose customer data to any third party unless the customer or a

third party acting on behalf of a customer submits a paper or electronic signed

consent to disclose customer data form that has been executed by the customer

of record.

(b)

Incomplete or non-compliant consent to disclose customer data forms are not

valid and shall be rejected by the utility.

3030, and rule 3031, a

utility shall not disclose customer data to any third party unless the customer or a

third party acting on behalf of a customer submits a paper or electronic signed

consent to disclose customer data form that has been executed by the customer

of record.

(b)

Incomplete or non-compliant consent to disclose customer data forms are not

valid and shall be rejected by the utility.

(c)

The utility shall maintain records of all of the disclosures of customer data to third

party requestors. Such records shall include a copy of the customer’s signed

consent to disclose customer data form all identifying documentation produced

by the third party requestor, the customer's agreed upon terms of use, the date(s)

and frequency of disclosure, and a description of the customer data disclosed.

(d)

The utility shall maintain records of customer data disclosures for a minimum of

three years and shall make the records of the disclosure of a customer’s

customer data available for review by the customer within five business days of

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

31

receiving a paper or electronic request from the customer, or at such greater time

as is mutually agreed between the utility and the customer.

3033. Requests for Aggregated Data Reports from a Utility.

(a)

A utility shall not disclose aggregated data unless the recipient is authorized to

receive all customer data within the aggregated data, that the disclosure

otherwise conforms to this rule and rules 3031, 3034, and 3035. In aggregating

customer data to create an aggregated data report, a utility must ensure the data

does not include any personal information or a unique identifier.

m a Utility.

(a)

A utility shall not disclose aggregated data unless the recipient is authorized to

receive all customer data within the aggregated data, that the disclosure

otherwise conforms to this rule and rules 3031, 3034, and 3035. In aggregating

customer data to create an aggregated data report, a utility must ensure the data

does not include any personal information or a unique identifier.

(b)

At a minimum, a particular aggregation must contain at least fifteen customers;

and, within any customer class no single customer’s customer data or premise

associated with a single customer’s customer data may comprise 15 percent or

more of the total customer data aggregated per customer class to generate the

aggregated data report (the “15/15 Rule”).

(c)

If an aggregated data report cannot be generated in compliance with paragraph

3033(b), the utility shall notify the requestor that the aggregated data, as

requested, cannot be disclosed and identify the reason(s) the request was

denied. The requestor shall be given an opportunity to revise its aggregated data

request in order to address the identified reason(s). An aggregated data request

may be revised by expanding the number of customers or premise accounts in

the request, expanding the geographic area included in the request, combining

different customer classes or rate categories, or other applicable means of

aggregating.

(d)

A utility shall include in its tariffs a description of standard and non-standard

aggregated data reports available from the utility to any requestor

uest

may be revised by expanding the number of customers or premise accounts in

the request, expanding the geographic area included in the request, combining

different customer classes or rate categories, or other applicable means of

aggregating.

(d)

A utility shall include in its tariffs a description of standard and non-standard

aggregated data reports available from the utility to any requestor. At a minimum,

the utility’s tariff shall provide the following:

(I)

a description of standard and non-standard aggregated data reports

available from the utility including all available selection parameters

(customer data or other data);

(II)

the frequency of data collection (annual, monthly, daily, etc.);

(III)

the method of transmittal available (electronic, paper, etc.) and the

security protections or requirements for such transmittal;

(IV)

the charge for providing a standard aggregated data report or the hourly

charge for compiling a non-standard aggregated data report;

(V)

the timeframe for processing requests; and

(VI)

a request form for submitting a data request for aggregated data reports to

the utility identifying any information necessary from the requestor in order

for the utility to process the request.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

32

(e)

If a utility is unable to fulfill a non-standard aggregated data report request

because it does not have and/or does not elect to or cannot obtain all of the data

the requestor wishes to include in the aggregated data report, then the utility may

contract with a contracted agent to include the additional data and process it

along with the customer data in the utility’s possession, to generate a non-

standard aggregated data report.

(f)

A utility and each of its directors, officers and employees that discloses

aggregated data as provided in these data privacy rules shall not be liable or

responsible for any claims for loss or damages resulting from the utility’s

disclosure of aggregated data.

ional data and process it

along with the customer data in the utility’s possession, to generate a non-

standard aggregated data report.

(f)

A utility and each of its directors, officers and employees that discloses

aggregated data as provided in these data privacy rules shall not be liable or

responsible for any claims for loss or damages resulting from the utility’s

disclosure of aggregated data.

(g)

A utility shall not provide aggregated customer data in response to multiple

overlapping requests from or on behalf of the same requestor that have the

potential to identify customer data.

3034. Property Owner Request for Whole Building Energy Use Data from a Utility.

(a)

If requested by a property owner or its authorized agent, a Tier I utility shall

provide whole building energy use data to the property owner or its authorized

agent so long as:

(I)

the whole building energy use data contains at least four customers or

tenants, which may include the property owner’s own account; and no

single customer’s customer data, unless it is the property owner’s,

comprises more than 50 percent of the whole building energy use data

used to generate the whole building energy use data report;

(II)

the property owner agrees to not disclose the whole building energy use

data except for the purposes of building benchmarking, identifying energy

efficiency projects, and energy management; and

(III)

the property owner signs a non-disclosure agreement with the utility

requiring the property owner, at a minimum to:

(A)

take appropriate administrative, technical, and physical safeguards

to protect the whole building data from any unauthorized use or

disclosure to protect the data from unauthorized access,

destruction, use, modification, or disclosure;

(B)

only use the whole building energy use data for the purposes of

building benchmarking, identifying energy efficiency projects,

energy management, and complying with laws or ordinances;

(C)

agree to not attempt to determine an individual utility customer’s

energy use from the whole build

e or

disclosure to protect the data from unauthorized access,

destruction, use, modification, or disclosure;

(B)

only use the whole building energy use data for the purposes of

building benchmarking, identifying energy efficiency projects,

energy management, and complying with laws or ordinances;

(C)

agree to not attempt to determine an individual utility customer’s

energy use from the whole building energy use data and not to use

the information to contact the subject of the information;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

33

(D)

agree to not use the whole building energy use data for a

secondary commercial purpose not related to the authorized

purpose without first obtaining the customer’s consent as provided

for in these rules;

(E)

destroy any whole building energy use data that is no longer

necessary for the purpose for which it was transferred;

(F)

agree not to permit access to the whole building data by anyone

that has not agreed to abide by the terms pursuant to which the

data was provided by the utility. This includes, but is not limited to,

all interns, subcontractors, staff, other workforce members, and

consultants; and

(G)

agree that any recipient of the whole building data pursuant to this

rule does not obtain any right, title or interest in any of the data

provided by the utility.

(b)

Upon request by a property owner or its authorized agent, a Tier II utility shall

provide whole building energy use data upon the same conditions to the extent

of, and based upon, information available in the ordinary course of business.

(c)

A utility shall provide a requested whole building energy use data report in

electronic, machine readable format that conforms to nationally recognized open

standards and best practices.

wner or its authorized agent, a Tier II utility shall

provide whole building energy use data upon the same conditions to the extent

of, and based upon, information available in the ordinary course of business.

(c)

A utility shall provide a requested whole building energy use data report in

electronic, machine readable format that conforms to nationally recognized open

standards and best practices.

(d)

A utility may charge a property owner or its authorized agent for the development

of a whole building energy use data report. Such rate shall be determined in a

utility tariff as a non-standard aggregated data report. Alternatively, the utility

need not charge the customer if the cost to charge a property owner or its

authorized agent is greater than the cost to develop a whole building energy use

data report.

(e)

Availability of whole building energy use data pursuant to this rule does not

preclude a property owner from requesting other data reports.

3035. Community Energy Reports

(a)

A Tier I utility shall generate a community energy report for each local

government, other than a Colorado county, included in its service territory with

50,000 or more residents. A Tier I utility shall generate a community energy

report for each Colorado county included in its service territory with 100,000 or

more residents. Any local government with fewer than 50,000 residents and

Colorado county with fewer than 100,000 residents or a minority of whom are

served by a Tier I utility shall be treated as if it had 50,000 or more residents

served by the Tier I upon request from the local government or county. Such

requests shall be made by January 31 of the calendar year following the

reporting year and shall continue in effect until such time as the request is

00 residents and

Colorado county with fewer than 100,000 residents or a minority of whom are

served by a Tier I utility shall be treated as if it had 50,000 or more residents

served by the Tier I upon request from the local government or county. Such

requests shall be made by January 31 of the calendar year following the

reporting year and shall continue in effect until such time as the request is

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

34

withdrawn or cancelled by the local government. All population thresholds shall

be based on the most recent population estimate from the Colorado State

Demography Office and where the utility serves the majority of the population.

(b)

On or before June 1 of every year, a Tier I utility shall make publicly available for

download all community energy reports generated for the prior year. Reports

shall be available in an electronic machine-readable form that conforms to

nationally recognized open standards and best practices.

(c)

The community energy report shall include the following information or

aggregated data for the utility and its customers and specific to the local

government for the prior calendar year:

(I)

the annual kilowatt hours consumed by customers, provided by

residential, commercial, and industrial classes, and street lighting;

(II)

the average number of customers in the residential, commercial, industrial

class, and street lighting;

(III)

the utility’s emissions factor;

(IV)

the utility’s electric generation resource mix;

(V)

the total capacity of retail renewable distributed generation (as defined at

paragraph 3652(ff)) installed in the local government’s jurisdiction and the

total annual kilowatt hours produced from that generation; and

(VI)

the total annual energy saved (in kilowatt hours) from energy efficiency

measures installed.

(d)

A local government may submit, or have another local government submit on its

behalf, GIS data to define its jurisdictional boundaries prior to the issuance of the

community energy report.

in the local government’s jurisdiction and the

total annual kilowatt hours produced from that generation; and

(VI)

the total annual energy saved (in kilowatt hours) from energy efficiency

measures installed.

(d)

A local government may submit, or have another local government submit on its

behalf, GIS data to define its jurisdictional boundaries prior to the issuance of the

community energy report.

(e)

Upon request by a local government, a Tier II utility shall generate a community

energy report, in accordance with this rule, consistent with the utility’s meter,

network, or data capabilities. Such requests shall be made by January 31 of the

calendar year following the reporting year and shall continue in effect until such

time as the request is withdrawn or cancelled by the local government. On or

before June 1 of every year, the utility shall make publicly available for download

all community energy reports generated for the prior year. Reports shall be

available in an electronic machine-readable form that conforms to nationally

recognized open standards and best practices.

(f)

Availability of the community energy report pursuant to this rule does not

preclude a local government from requesting other data reports.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

35

3036. – 3099.

[Reserved].

OPERATING AUTHORITY

3100. Certificate of Public Convenience and Necessity for a Franchise.

(a)

A utility seeking authority to provide service pursuant to a franchise shall file an

application pursuant to this rule. When a utility enters into a franchise agreement

with a municipality for the first time, it shall obtain authority from the Commission

pursuant to § 40-5-102, C.R.S. prior to providing service under that initial

franchise agreement. A utility maintains the right and obligation to serve a

municipality within its service territory after the expiration of any franchise

agreement.

rsuant to this rule. When a utility enters into a franchise agreement

with a municipality for the first time, it shall obtain authority from the Commission

pursuant to § 40-5-102, C.R.S. prior to providing service under that initial

franchise agreement. A utility maintains the right and obligation to serve a

municipality within its service territory after the expiration of any franchise

agreement.

(b)

An application for certificate of public convenience and necessity to exercise

franchise rights shall include, in the following order and specifically identified, the

following information, either in the application or in appropriately identified

attachments:

(I)

the information required in paragraphs 3002(b) and 3002(c);

(II)

a statement of the facts (not conclusory statements) relied upon by the

applying utility to show that the public convenience and necessity require

the granting of the application;

(III)

a statement describing the franchise rights proposed to be exercised. The

statement shall include a description of the type of utility service to be

rendered and a description of the city or town sought to be served;

(IV)

a certified copy of the franchise ordinance; proof of publication, adoption,

and acceptance by the applying utility; a statement as to the number of

customers served or to be served and the population of the city or town;

and any other pertinent information;

(V)

a statement describing in detail the extent to which the applying utility is

an affiliate of any other utility which holds authority duplicating in any

respect the authority sought;

(VI)

a copy of a feasibility study for areas previously not served by the applying

utility, which study shall at least include estimated investment, income,

and expense

or town;

and any other pertinent information;

(V)

a statement describing in detail the extent to which the applying utility is

an affiliate of any other utility which holds authority duplicating in any

respect the authority sought;

(VI)

a copy of a feasibility study for areas previously not served by the applying

utility, which study shall at least include estimated investment, income,

and expense. An applying utility may request that its most recent audited

balance sheet, income statement, statement of retained earnings, and

statement of cash flows be submitted in lieu of a feasibility study; and

(VII)

a statement of the names of public utilities and other entities of like

character providing similar service in or near the area sought to be served.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

36

3101. Certificate of Public Convenience and Necessity for Service Territory.

(a)

A utility seeking authority to provide service in a new service territory shall file an

application pursuant to this rule. A utility cannot provide service to a new

geographic area without authority from the Commission, unless the utility extends

its facilities and service:

(I)

within a city and county or city or town within which the utility has lawfully

commenced operations;

(II)

into territory contiguous to the utility’s facility, line, plant, or system that is

not served by a public utility providing the same commodity or service; or

(III)

within or to territory already served by the utility and the extension is

necessary in the ordinary course of business.

vice:

(I)

within a city and county or city or town within which the utility has lawfully

commenced operations;

(II)

into territory contiguous to the utility’s facility, line, plant, or system that is

not served by a public utility providing the same commodity or service; or

(III)

within or to territory already served by the utility and the extension is

necessary in the ordinary course of business.

(b)

An application for certificate of public convenience and necessity to provide

service in a new territory shall include, in the following order and specifically

identified, the following information, either in the application or in appropriately

identified attachments:

(I)

the information required in paragraphs 3002(b) and 3002(c);

(II)

a statement of the facts (not conclusory statements) relied upon by the

applying utility to show that the public convenience and necessity require

the granting of the application;

(III)

a description of the type of utility service to be rendered and a description

of the area sought to be served;

(IV)

a map showing the specific geographic area that the applying utility

proposes to serve. If the applying utility intends to phase in service in the

territory over time, specific areas and proposed in-service dates shall be

included. The map shall describe the geographic areas in section,

township, and range convention;

(V)

a statement describing in detail the extent to which the applying utility is

an affiliate of any other utility which holds authority duplicating in any

respect the territory sought;

(VI)

a statement of the names of public utilities and other entities of like

character providing similar service in or near the area involved in the

application; and

reas in section,

township, and range convention;

(V)

a statement describing in detail the extent to which the applying utility is

an affiliate of any other utility which holds authority duplicating in any

respect the territory sought;

(VI)

a statement of the names of public utilities and other entities of like

character providing similar service in or near the area involved in the

application; and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

37

(VII)

a copy of a feasibility study for the proposed area to be served, which

shall at least include estimated investment, income, and expense. An

applying utility may request that its most recent audited balance sheet,

income statement, statement of retained earnings, and statement of cash

flows be submitted in lieu of a feasibility study.

3102. Certificate of Public Convenience and Necessity for Facilities.

(a)

A utility seeking authority to construct and to operate a facility or an extension of

a facility pursuant to § 40-5-101, C.R.S., shall file an application pursuant to this

rule. The utility need not apply to the Commission for approval of construction

and operation of a facility or an extension of a facility which is in the ordinary

course of business. The utility shall apply to the Commission for approval of

construction and operation of a facility or an extension of a facility which is not in

the ordinary course of business.

(b)

An application for certificate of public convenience and necessity to construct and

to operate facilities or an extension of a facility pursuant to § 40-5-101, C.R.S.,

shall include, in the following order and specifically identified, the following

information, either in the application or in appropriately identified attached

exhibits:

(I)

The information required in rules 3002(b) and 3002(c)

(b)

An application for certificate of public convenience and necessity to construct and

to operate facilities or an extension of a facility pursuant to § 40-5-101, C.R.S.,

shall include, in the following order and specifically identified, the following

information, either in the application or in appropriately identified attached

exhibits:

(I)

The information required in rules 3002(b) and 3002(c).

(II)

A statement of the facts (not conclusory statements) relied upon by the

applying utility to show that the public convenience and necessity require

the granting of the application or citation to any Commission decision that

is relevant to the proposed facilities.

(III)

A description of the proposed facilities to be constructed.

(IV)

Estimated cost of the proposed facilities to be constructed. If the facility is

a transmission facility, the estimated costs shall be itemized as land costs,

substation costs, and transmission line costs.

(V)

Anticipated construction start date, construction period, and in-service

date.

(VI)

A map showing the general area or actual locations where facilities will be

constructed, population centers, major highways, and county and state

boundaries.

(VII)

As applicable, electric one-line diagrams.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

38

(VIII) For requests for construction or expansion of generating facilities,

including pollution control, fuel conversion upgrades, and conversion of

coal-fired plants to natural gas plants, the application shall include

information about Best Value Employment metrics consistent with

paragraph 3211(a) or, in the alternative, information to demonstrate that

the project qualifies for an exemption under paragraph 3211(e)

for construction or expansion of generating facilities,

including pollution control, fuel conversion upgrades, and conversion of

coal-fired plants to natural gas plants, the application shall include

information about Best Value Employment metrics consistent with

paragraph 3211(a) or, in the alternative, information to demonstrate that

the project qualifies for an exemption under paragraph 3211(e). If the

information required in paragraph 3211(a) is not available at the time an

application is filed because relevant contracts have not yet been entered

into, the applicant shall file a status report in the proceeding within 45 days

after the last contract has been entered into that identifies how selected

contractor(s) meet Best Value Employment metrics.

(IX)

The application shall address whether it includes one or more projects that

are also ESPW projects, and if so, the applicant shall further attest that

material contract terms that comply with paragraph 3211(b) have been or

will be included in any relevant contracts and that such terms will be

required to be included in any relevant subcontracts.

(X)

As applicable, information on alternatives studied, costs for those

alternatives, and criteria used to rank or eliminate alternatives, including,

to the extent feasible, information on Best Value Employment metrics

pursuant to paragraph 3211(a).

(XI)

As applicable, a report of prudent avoidance measures considered and

justification for the measures selected to be implemented.

(XII)

For transmission construction or extension, the utility shall also comply

with rule 3206.

atives, and criteria used to rank or eliminate alternatives, including,

to the extent feasible, information on Best Value Employment metrics

pursuant to paragraph 3211(a).

(XI)

As applicable, a report of prudent avoidance measures considered and

justification for the measures selected to be implemented.

(XII)

For transmission construction or extension, the utility shall also comply

with rule 3206.

(c)

For an application for a certificate of public convenience and necessity for

construction or extension of transmission facilities, the applying utility shall

describe its actions and techniques relating to cost-effective noise mitigation with

respect to the planning, siting, construction, and operation of the proposed

transmission construction or extension. The applying utility shall provide

computer studies which show the potential noise levels expressed in db(A) and

measured at the edge of the transmission line right-of-way. These computer

studies shall be the output of utility standard programs, such as EPRI’s EMF

Workstation 2.51 ENVIRO Program -- Bonneville Power Administration model.

The steps and techniques may include, without limitation, the following:

(I)

Bundled conductors.

(II)

Larger conductors.

(III)

Design alternatives considering the spatial arrangement of phasing of

conductors.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

39

(IV)

Corona-free attachment hardware.

(V)

Conductor quality.

(VI)

Handling and packaging of conductor.

(VII)

Construction techniques.

(VIII) Line tension.

, without limitation, the following:

(I)

Bundled conductors.

(II)

Larger conductors.

(III)

Design alternatives considering the spatial arrangement of phasing of

conductors.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

39

(IV)

Corona-free attachment hardware.

(V)

Conductor quality.

(VI)

Handling and packaging of conductor.

(VII)

Construction techniques.

(VIII) Line tension.

(d)

For an application for a certificate of public convenience and necessity for

construction or extension of transmission facilities, the applying utility shall

describe its actions and techniques relating to prudent avoidance with respect to

planning, siting, construction, and operation of the proposed construction or

extension. As used in this paragraph, “prudent avoidance” means the striking of a

reasonable balance between the potential health effects of exposure to magnetic

fields and the cost and impacts of mitigation of such exposure, by taking steps to

reduce the exposure at reasonable or modest cost. The steps and techniques

may include, without limitation, the following:

(I)

Design alternatives considering the spatial arrangement of phasing of

conductors.

(II)

Routing lines to limit exposures to areas of concentrated population and

group facilities such as schools and hospitals.

(III)

Installing higher structures.

(IV)

Widening right of way corridors.

(V)

Burying lines.

(e)

Within 30 days of final Commission approval of an application pursuant to this

rule, or after the last contract has been entered into, that includes one or more

ESPW projects, the applicant or its contractor(s) shall notify the Division of Labor

Standards and Statistics within the Colorado Department of Labor and

Employment (CDLE) about the project to facilitate the collection of craft labor

certification(s).

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

40

3103. Certificate Amendments for Changes in Service, in Service Territory, or in

Facilities.

e applicant or its contractor(s) shall notify the Division of Labor

Standards and Statistics within the Colorado Department of Labor and

Employment (CDLE) about the project to facilitate the collection of craft labor

certification(s).

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

40

3103. Certificate Amendments for Changes in Service, in Service Territory, or in

Facilities.

(a)

A utility seeking authority to do the following shall file an application pursuant to

this rule: amend a certificate of public convenience and necessity in order to

extend, to restrict, to curtail, or to abandon or to discontinue without equivalent

replacement any service, service area, or facility. A utility shall not extend,

restrict, curtail, or abandon or discontinue without equivalent replacement, any

service, service area, or facility not in the ordinary course of business without

authority from the Commission.

(b)

An application to amend a certificate of public convenience and necessity in

order to change, to extend, to restrict, to curtail, to abandon, or to discontinue

any service, service area, or facility without equivalent replacement shall include,

in the following order and specifically identified, the following information, either

in the application or in appropriately identified attachments:

(I)

all information required in paragraphs 3002(b) and 3002(c);

(II)

if the application for amendment pertains to a certificate of public

convenience and necessity for facilities, all of the information required in

rule 3102;

(III)

if the application for amendment pertains to a certificate of public

convenience and necessity for franchise rights, all of the information

required in rule 3100;

(IV)

if the application for amendment pertains to a certificate of public

convenience and necessity for service territory, all of the information

required in rule 3101;

(V)

if the application for amendment pertains to a service, the application shall

include:

(A)

the requested effective date for the extension, restriction,

cu

sity for franchise rights, all of the information

required in rule 3100;

(IV)

if the application for amendment pertains to a certificate of public

convenience and necessity for service territory, all of the information

required in rule 3101;

(V)

if the application for amendment pertains to a service, the application shall

include:

(A)

the requested effective date for the extension, restriction,

curtailment, or abandonment or discontinuance without equivalent

replacement of the service; and

(B)

a description of the extension, restriction, curtailment, or

abandonment or discontinuance without equivalent replacement

sought. This shall include maps, as applicable. This shall also

include a description of the applying utility's existing operations and

general service area.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

41

(c)

Customer notice of application. In addition to complying with the notice

requirements of the Commission’s Rules Regulating Practice and Procedure, a

utility applying to curtail, restrict, abandon or discontinue service without

equivalent replacement shall prepare a written notice as provided in

subparagraphs 3002(d)(I) - (XII) and shall mail or deliver the notice at least 30

days before the application's requested effective date to each of the applying

utility's affected customers. The customer notice shall include a statement

detailing the requested restriction, curtailment, or abandonment or

discontinuance without equivalent replacement.

(d)

If no customers will be affected by the grant of the application, the notice must

meet the requirements of subparagraphs 3002(d)(I) – (XII) and shall be mailed to

the Board of County Commissioners of each affected county, and to the mayor of

each affected city, town, or municipality.

3104. Transfers, Controlling Interest, and Mergers.

andonment or

discontinuance without equivalent replacement.

(d)

If no customers will be affected by the grant of the application, the notice must

meet the requirements of subparagraphs 3002(d)(I) – (XII) and shall be mailed to

the Board of County Commissioners of each affected county, and to the mayor of

each affected city, town, or municipality.

3104. Transfers, Controlling Interest, and Mergers.

(a)

A utility seeking authority to do any of the following shall file an application

pursuant to this rule: transfer a certificate of public convenience and necessity;

transfer or obtain a controlling interest in a utility, whether the transfer of control

is effected by the transfer of assets, by the transfer of stock, by merger or by

other form of business combination; or transfer assets subject to the jurisdiction

of the Commission outside the normal course of business. A utility cannot

transfer a certificate of public convenience and necessity; transfer or obtain a

controlling interest in any utility; or transfer assets outside the normal course of

business without authority from the Commission.

(b)

An application to transfer a certificate of public convenience and necessity, to

transfer or obtain a controlling interest in a utility, or to transfer assets subject to

the jurisdiction of the Commission shall include, in the following order and

specifically identified, the following information, either in the application or in

appropriately identified attachments:

(I)

the information required in paragraphs 3002(b) and 3002(c), as pertinent

to each party to the transaction;

(II)

a statement showing accounting entries, under the Uniform System of

Accounts, including any plant acquisition adjustment, gain, or loss

proposed on the books by each party before and after the transaction

which is the subject of the application;

(III)

any agreement for merger, sales agreement, or contract of sale pertinent

to the transaction which is the subject of the application;

(IV)

facts showing that the transaction which is the subject of t

Uniform System of

Accounts, including any plant acquisition adjustment, gain, or loss

proposed on the books by each party before and after the transaction

which is the subject of the application;

(III)

any agreement for merger, sales agreement, or contract of sale pertinent

to the transaction which is the subject of the application;

(IV)

facts showing that the transaction which is the subject of the application is

not contrary to the public interest;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

42

(V)

an evaluation of the benefits and detriments to the customers of each

party and to all other persons who will be affected by the transaction which

is the subject of the application; and

(VI)

a comparison of the kinds and costs of service rendered before and after

the transaction which is the subject of the application.

(c)

An application to transfer a certificate of public convenience and necessity, an

application to transfer assets subject to the jurisdiction of the Commission, or an

application to transfer or obtain control of the utility may be made by joint or

separate application of the transferor and the transferee.

(d)

When control of a utility is transferred to another entity, or the utility’s name is

changed, the utility which will afterwards operate under the certificate of public

convenience and necessity shall file with the Commission a tariff adoption notice,

shall post the tariff adoption notice in a prominent public place in each local office

and principal place of business of the utility, and shall have the tariff adoption

notice available for public inspection at each local office and principal place of

business. Adoption notice forms are available from the Commission

onvenience and necessity shall file with the Commission a tariff adoption notice,

shall post the tariff adoption notice in a prominent public place in each local office

and principal place of business of the utility, and shall have the tariff adoption

notice available for public inspection at each local office and principal place of

business. Adoption notice forms are available from the Commission. The tariff

adoption notice shall contain all of the following information:

(I)

the name, phone number and complete address of the adopting utility;

(II)

the name of the previous utility;

(III)

the number of the tariff adopted and the description or title of the tariff

adopted;

(IV)

the number of the tariff after adoption and the description or title of the

tariff after adoption; and

(V)

unless otherwise requested by the applying utility in its application, a

statement that the adopting utility is adopting as its own all rates, rules,

terms, conditions, agreements, concurrences, instruments, and all other

provisions that have been filed or adopted by the previous utility.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

43

3105. Securities and Liens.

(a)

Subject to the exception contained in paragraph (h) of this rule, a utility which

either derives more than five percent of its consolidated gross revenues in

Colorado as a public utility or derives a lesser percentage if its revenues are

earned by supplying an amount of energy which equals five percent or more of

Colorado's consumption shall file an application for Commission approval of any

proposal to issue or to assume any financial security or to create a lien.

tility which

either derives more than five percent of its consolidated gross revenues in

Colorado as a public utility or derives a lesser percentage if its revenues are

earned by supplying an amount of energy which equals five percent or more of

Colorado's consumption shall file an application for Commission approval of any

proposal to issue or to assume any financial security or to create a lien.

(b)

An application for the issuance or assumption of securities with a maturity of 12

months or more or to create a lien shall include, in the following order and

specifically identified, the following information, either in the application or in

appropriately identified attachments:

(I)

all information required in paragraphs 3002(b) and 3002(c);

(II)

the resolution of the applying utility’s board of directors approving the

issuance, renewal, extension, or assumption of the securities or to create

a lien, together with, as applicable and available, the proposed indenture

requirements, the mortgage note, the amendment to the loan contract,

and the contract for sale of securities or creation of a lien;

(III)

a statement describing all short-term and long-term indebtedness

outstanding on the date of the most recent balance sheet;

(IV)

a statement describing the classes and amounts of capital stock

authorized by the articles of incorporation and the amount by each class of

capital stock outstanding on the date of the most recent balance sheet;

(V)

a statement of capital structure showing common equity, long-term debt,

preferred stock, if any, and pro forma capital structure on the date of the

most recent balance sheet giving effect to the issuance of the proposed

securities

of capital stock

authorized by the articles of incorporation and the amount by each class of

capital stock outstanding on the date of the most recent balance sheet;

(V)

a statement of capital structure showing common equity, long-term debt,

preferred stock, if any, and pro forma capital structure on the date of the

most recent balance sheet giving effect to the issuance of the proposed

securities. Debt and equity percentages to total capitalization, actual and

pro forma, shall be shown;

(VI)

a statement of the amount and rate of dividends declared and paid, or the

amount and year of capital credits assigned and capital credits refunded,

during the previous four calendar years including the present year to the

date of the most recent balance sheet;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

44

(VII)

a statement describing the type and amount of securities to be issued; the

anticipated interest rate or dividend rate; the redemption or sinking fund

provisions, if any; and, within ten days of their filing with the Securities and

Exchange Commission, the registration statement, related forms, and

preliminary prospectus filed with the Securities and Exchange

Commission relating to the proposed issuance;

(VIII) a statement of proposed uses, including construction, to which the funds

will be or have been applied and a concise statement of the need for the

funds; and

(IX)

a statement of the estimated cost of financing.

ies and

Exchange Commission, the registration statement, related forms, and

preliminary prospectus filed with the Securities and Exchange

Commission relating to the proposed issuance;

(VIII) a statement of proposed uses, including construction, to which the funds

will be or have been applied and a concise statement of the need for the

funds; and

(IX)

a statement of the estimated cost of financing.

(c)

For applications for the creation of a lien on the applying utility's property situated

within the State of Colorado where the creation of the lien is not related to the

issuance or assumption of a financial security, the application shall also include,

in the following order and specifically identified, the following information, either

in the application or in appropriately identified attachments:

(I)

a description of the property which will be subject to the lien;

(II)

the amount of the lien;

(III)

the proposed use of the funds to be received from the lien;

(IV)

the estimated cost for the creation of the lien;

(V)

the anticipated duration of the lien;

(VI)

the anticipated release date of the lien;

(VIII) the retirement payment plan to release the lien;

(IX)

a description of how the applying utility will ensure that neither the creation

of the lien nor the use of the proceeds will violate § 40-3-114, C.R.S.;

(X)

a statement that, for the duration of the lien, the applying utility will advise

the Commission within ten days of any bankruptcy, foreclosure, or

liquidation proceeding; and

(XI)

a statement that the applying utility will advise the Commission within ten

days of any deviation from its lien retirement payment plan.

(d)

The Commission shall give notice of the application, which shall set a ten-day

intervention period and a hearing date.

(e)

Customer notice. In addition to the requirements of subparagraphs 3002(d)(I) –

(XII), the notice shall include the address of the applicant.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

45

ays of any deviation from its lien retirement payment plan.

(d)

The Commission shall give notice of the application, which shall set a ten-day

intervention period and a hearing date.

(e)

Customer notice. In addition to the requirements of subparagraphs 3002(d)(I) –

(XII), the notice shall include the address of the applicant.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

45

(f)

The applying utility shall file with the Commission the published notice and an

affidavit of publication as soon as possible after the filing of the application. The

Commission shall not grant the application without a filed notice and the affidavit

of publication.

(g)

The Commission shall give priority to an application made pursuant to this rule

and shall grant or deny the application within 30 days after filing, unless the

Commission, for good cause shown, enters an order granting an extension and

stating fully the facts necessitating the extension. The Commission shall approve

or disapprove an application made pursuant to this rule by written order.

(h)

Pursuant to § 40-1-104, C.R.S., a utility may issue, renew, extend or assume

liability on securities, other than stocks, with a maturity date of not more than 12

months after the date of issuance, whether secured or unsecured, without

application to or order of the Commission provided that no such securities so

issued shall be refunded, in whole or in part, by any issue of securities having a

maturity of more than 12 months except on application to and approval of the

Commission.

(i)

Any financial security requiring Commission approval, but issued or assumed

without such approval, shall be void.

3106. Flexible Regulation to Provide Jurisdictional Service Without Reference to

Tariffs.

(a)

A utility seeking authority to provide a jurisdictional service without reference to a

tariff shall file an application pursuant to this rule. A utility cannot provide a

jurisdictional service without reference to a tariff without authority from the

Commission.

ssumed

without such approval, shall be void.

3106. Flexible Regulation to Provide Jurisdictional Service Without Reference to

Tariffs.

(a)

A utility seeking authority to provide a jurisdictional service without reference to a

tariff shall file an application pursuant to this rule. A utility cannot provide a

jurisdictional service without reference to a tariff without authority from the

Commission.

(b)

An application for flexible regulation to provide jurisdictional service without

reference to tariffs shall include, in the following order and specifically identified,

the following information, either in the application or in appropriately identified

attachments:

(I)

all information required in paragraphs 3002(b) and 3002(c);

(II)

the name of the customer or potential customer;

(III)

a description of the jurisdictional service or services which the applying

utility seeks to provide to a customer or a potential customer;

(IV)

a description of the manner in which the applying utility will provide the

jurisdictional service or services if it contracts with a customer or potential

customer;

(V)

the facts (not conclusory statements) which the applying utility believes

satisfy the requirements of § 40-3-104.3(1)(a), C.R.S.; and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

46

(VI)

a statement that the applying utility has provided, or will provide when

available, the application and contract as required by paragraph (c) of this

rule.

tomer or potential

customer;

(V)

the facts (not conclusory statements) which the applying utility believes

satisfy the requirements of § 40-3-104.3(1)(a), C.R.S.; and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

46

(VI)

a statement that the applying utility has provided, or will provide when

available, the application and contract as required by paragraph (c) of this

rule.

(c)

The contract which is the subject of the application shall be filed when available

with the Commission under seal pursuant to rules 1100 – 1102 and § 40-3-

104.3(1)(b), C.R.S. The applying utility shall furnish the application and, when it

is available, of the contract, under seal, to the OCC. Unless the applying utility

requests other treatment, the Commission and the OCC shall treat the contract

as confidential. If the Commission grants a protective order preserving the

confidentiality of the contents of an application, then the applying utility shall also

furnish a non-confidential version of the application without the contract to any

utility then providing service to the customer or potential customer.

(d)

The direct testimony and attachments to be offered at hearing shall accompany

the application unless the applying utility believes that the application will be

uncontested and unopposed. If an attachment is large or cumbersome, the

applying utility shall file the attachment with the Commission; shall provide, for

the benefit of the intervenors, the title of the attachment and a summary of the

information contained in the attachment; and shall state the location (other than

the Commission) at which parties may inspect the attachment.

e application will be

uncontested and unopposed. If an attachment is large or cumbersome, the

applying utility shall file the attachment with the Commission; shall provide, for

the benefit of the intervenors, the title of the attachment and a summary of the

information contained in the attachment; and shall state the location (other than

the Commission) at which parties may inspect the attachment.

(e)

Prefiled testimony shall not be modified once filed unless the modification is to

correct typographical errors or misstatements of fact or unless all parties to the

proceeding agree to the modification. In the event a substantive modification is

made without the agreement of all parties, the Commission may consider the

effect of the substantive modification as a basis for a motion to continue in order

to allow the Commission staff or any other party a reasonable opportunity to

investigate and, if necessary, to address the modification.

(f)

The Commission shall give notice of the application. Any person desiring to

intervene in a proceeding initiated pursuant to § 40-3-104.3, C.R.S., and this rule

shall move to do so within five days of the date the Commission provides notice.

(g)

Within five days of receiving written notice of an intervention in a proceeding

initiated pursuant to § 40-3-104.3, C.R.S., and this rule, the applying utility shall

hand-deliver or otherwise provide to the intervenor a non-confidential version of

the application and the applying utility’s prefiled testimony.

(h)

Unless the Commission orders otherwise, the applying utility shall publish notice

of the application in a newspaper of general circulation within three days of the

filing of the application.

0-3-104.3, C.R.S., and this rule, the applying utility shall

hand-deliver or otherwise provide to the intervenor a non-confidential version of

the application and the applying utility’s prefiled testimony.

(h)

Unless the Commission orders otherwise, the applying utility shall publish notice

of the application in a newspaper of general circulation within three days of the

filing of the application.

(i)

The notice provided by the applying utility shall include the following information,

in addition to the information required by subparagraphs 3002(d)(I) – (XII):

(I)

the address of the applying utility;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

47

(II)

the name of the customer(s) or potential customer(s) involved;

(III)

a statement that the identified customer(s) or potential customer(s) may

have the ability to provide its/their own service or may have competitive

alternatives available to it/them;

(IV)

a general description of the jurisdictional services to be provided;

(V)

a statement of where affected customers may call to obtain information

concerning the application; and

(VI)

a statement that anyone desiring to participate as a party must file a

petition to intervene within five days from the date of Commission notice of

the application and that the intervention must comport with the

Commission's Rules Regulating Practice and Procedure.

(j)

Within three days of providing notice, the applying utility shall file with the

Commission an affidavit showing proof of publication of notice.

(k)

On a case-by-case basis, the Commission may require the applying utility to

provide additional information.

f Commission notice of

the application and that the intervention must comport with the

Commission's Rules Regulating Practice and Procedure.

(j)

Within three days of providing notice, the applying utility shall file with the

Commission an affidavit showing proof of publication of notice.

(k)

On a case-by-case basis, the Commission may require the applying utility to

provide additional information.

(l)

Should an application be filed which the Commission determines is not complete,

the Commission or Commission staff shall notify the applying utility within seven

days from the date the application is filed of the need for additional information.

The applying utility may then supplement the application so that it is complete.

Once the application is complete, the Commission will process the application,

with all applicable timelines running from the date the application is completed.

(m)

The Commission shall issue an order approving or disapproving the application

within the time permitted under § 40-3-104.3(1)(b), C.R.S.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

48

(n)

At the time of any proceeding in which a utility’s overall rate levels are

determined, the Commission shall require the utility to file a fully distributed cost

method which segregates investments, revenues, and expenses associated with

jurisdictional utility service provided pursuant to contract from other regulated

utility operations in order to ensure that jurisdictional utility service provided

pursuant to contract is not subsidized by revenues from other regulated utility

operations. If revenues from a service provided by a utility pursuant to contract

are less than the cost of service for that service, the rates for other regulated

utility operations shall not be increased to recover the difference.

ated

utility operations in order to ensure that jurisdictional utility service provided

pursuant to contract is not subsidized by revenues from other regulated utility

operations. If revenues from a service provided by a utility pursuant to contract

are less than the cost of service for that service, the rates for other regulated

utility operations shall not be increased to recover the difference.

(o)

The applying utility shall provide final contract or other description of the price

and terms of service as specified in § 40-3-104.3(1)(e), C.R.S.

3107. Voluntary Air Quality Improvement Programs pursuant to § 40-3.2-102,

C.R.S.

(a)

A utility seeking authority for cost recovery of a voluntary air quality improvement

program shall file an application pursuant to this rule. The utility cannot recover

the cost of a voluntary air quality improvement program without authority from the

Commission.

(b)

An application for cost recovery of a voluntary air quality improvement program

shall include, in the following order and specifically identified, the following

information, either in the application or in appropriately identified attachments:

(I)

all information required in paragraphs 3002(b) and 3002(c);

(II)

the voluntary agreement entered into pursuant § 40-3.2-102(1), C.R.S.;

(III)

an analysis demonstrating that the proposed cost recovery mechanism

complies with, and does not exceed, the rate impact cap, the total cost

cap, and the recovery period limit established in § 40-3.2-102(3), C.R.S.;

(IV)

a written acknowledgment that any revenues the applying utility receives

from transferring, selling, banking, or otherwise using allowances under

title IV of the federal Clean Air Act shall be credited to the applying utility’s

customers to offset air quality improvement costs if such revenues are a

result of a voluntary agreement entered into under part 12 of article 7 of

title 25 C.R.S., as required by § 40-3.2-102(4), C.R.S.;

(V)

a statement as to whether the applying utility’s generating capacity will

increase under the v

lowances under

title IV of the federal Clean Air Act shall be credited to the applying utility’s

customers to offset air quality improvement costs if such revenues are a

result of a voluntary agreement entered into under part 12 of article 7 of

title 25 C.R.S., as required by § 40-3.2-102(4), C.R.S.;

(V)

a statement as to whether the applying utility’s generating capacity will

increase under the voluntary agreement for air quality improvement; and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

49

(VI)

a statement as to whether, pursuant to § 40-3.2-102(7), C.R.S., the

applying utility intends to seek recovery of a portion of the air quality

improvement costs from its wholesale customers and, if it does so intend,

whether the applying utility intends to credit its retail customers for air

quality improvement costs recovered from wholesale customers.

3108. Tariffs.

(a)

A utility shall keep on file with the Commission the following documents

pertaining to retail electric service: its current Colorado tariffs, forms of contracts

and electric service agreements. These documents, unless filed under seal shall

be available for public inspection at the Commission and at the principal place of

business of the utility.

(b)

All tariffs shall comply with rule 1210 of the Commission's Rules of Practice and

Procedure.

(c)

Filing and contents of tariff.

(I)

In addition to the requirements and contents in rule 1210, the following

shall be included in a utility's tariff, as applicable:

(A)

information regarding the utility’s voltages, pursuant to rule 3202;

(B)

information regarding the utility’s meter testing equipment and

facilities, scheduled meter testing, meter testing records, fees for

meter testing upon request, and meter reading, pursuant to rules

3303, 3304, 3305, 3306, and 3309;

(C)

information regarding the utility’s benefit of service transfer policies,

pursuant to paragraph 3401(c);

(D)

information regarding the utility’s installment payment plans and

other plans, pursuant to rule 3404;

(E)

inf

pment and

facilities, scheduled meter testing, meter testing records, fees for

meter testing upon request, and meter reading, pursuant to rules

3303, 3304, 3305, 3306, and 3309;

(C)

information regarding the utility’s benefit of service transfer policies,

pursuant to paragraph 3401(c);

(D)

information regarding the utility’s installment payment plans and

other plans, pursuant to rule 3404;

(E)

information regarding the utility’s collection fees or miscellaneous

service charges, pursuant to subparagraphs 3404(c)(VI) and (VIII);

(F)

information regarding the utility’s after-hour restoration fees,

pursuant to paragraph 3409(b);

(G)

information regarding the utility’s renewable energy program

pursuant to subparagraphs 3657(a)(III), (V), (VI) and (VII);

(H)

information regarding the utility’s avoided costs, pursuant to

paragraph 3902(b); and

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

50

(I)

rules, regulations, and policies covering the relations between the

customer and the utility.

3109. New or Changed Tariffs.

(a)

A utility shall file with the Commission any new or changed tariffs. No new or

changed tariff shall be effective unless it is filed with the Commission and either

is allowed to go into effect by operation of law or is approved by the Commission.

(b)

A utility may use one of the following filing processes to add a new tariff or to

change an existing tariff.

(I)

The utility may file the proposed tariff, including the proposed effective

date, accompanied by an advice letter pursuant to rule 1210. The utility

shall provide notice in accordance with rule 1207. If the Commission does

not suspend the proposed tariff in accordance with rule 1305 prior to the

tariff’s proposed effective date, the proposed tariff shall take effect on the

proposed effective date.

(II)

The utility may file an application to implement a proposed tariff on less

than 30-days’ notice, accompanied by the proposed tariff, including the

proposed effective date

ordance with rule 1207. If the Commission does

not suspend the proposed tariff in accordance with rule 1305 prior to the

tariff’s proposed effective date, the proposed tariff shall take effect on the

proposed effective date.

(II)

The utility may file an application to implement a proposed tariff on less

than 30-days’ notice, accompanied by the proposed tariff, including the

proposed effective date. The application shall include the information

required in paragraphs 3002(b) and 3002(c); shall explain the details of

the proposed tariff, including financial data if applicable; shall state the

facts which are the basis for the request that the proposed tariff become

effective on less than 30 days’ notice; and shall note any prior

Commission action, in any proceeding, pertaining to the present or

proposed tariff. If the application is approved by the Commission, the utility

shall file a compliance advice letter and tariff which tariff shall be the same

in substance as was approved by decision. The advice letter and tariff

shall be filed in a new proceeding with the prescribed notice period either

in the decision or pursuant to paragraph 1207(g).

(c)

A utility tariff filing, either by an advice letter or an application, that introduces or

increases any rate, charge, fee, fare, toll, rental, or classification shall include a

rate trend report. The rate trend report shall include:

(I)

the amount of increase and percentage change in the rate, charge, fee,

fare, toll, rental, or classification relative to the amount in effect on the date

of the utility’s filing;

(II)

the amount of increase and percentage change in annual revenues

collected by the utility as a result of the utility’s filing;

(III)

a chart, graph, or other visualization demonstrating each of the utility’s

rates, charges, fees, fares, tolls, rentals, or classifications, including base

rates and rate adjustment mechanisms, for the ten years prior to the date

of the utility filing;

y’s filing;

(II)

the amount of increase and percentage change in annual revenues

collected by the utility as a result of the utility’s filing;

(III)

a chart, graph, or other visualization demonstrating each of the utility’s

rates, charges, fees, fares, tolls, rentals, or classifications, including base

rates and rate adjustment mechanisms, for the ten years prior to the date

of the utility filing;

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

51

(IV)

a chart, graph, or other visualization demonstrating all of the utility bill line

items, including subtotal summary lines, for the ten years prior to the date

of the utility filing for each of the utility’s customer classes;

(V)

a representation in the chart, graph, or other visualization required by

subparagraphs 3109(c)(III) and (IV) of the total of the rates, charges, fees,

fares, tolls, rentals, or classifications in effect ten years prior to the date of

the utility filing, escalated over the ten years using the United States

Bureau of Labor Statistics Consumer Price Index –Denver-Aurora-

Lakewood; and

(VI)

for the same rate, charge, fee, fare, toll, rental, or classification as the

utility’s filing over the ten years prior to the date of the utility’s filing:

(A)

the dates when a previous increase or decrease went into effect;

(B)

the amount of the rate, charge, fee, fare, toll, rental, or classification

before a previous increase or decrease went into effect;

(C)

the amount of increase or decrease relative to the amount before

the previous increase or decrease went into effect;

(D)

the change in annual revenues collected by the utility as a result of

the utility’s filing; and

(E)

the proceeding number for the tariff filing where the rate, charge,

fee, fare, toll, rental, or classification either was allowed to go into

effect by operation of law or was approved by the Commission and,

in the event a compliance filing resulted in the tariff going into effect

by operation of law, the proceeding number of the original

proceeding where the rat

lt of

the utility’s filing; and

(E)

the proceeding number for the tariff filing where the rate, charge,

fee, fare, toll, rental, or classification either was allowed to go into

effect by operation of law or was approved by the Commission and,

in the event a compliance filing resulted in the tariff going into effect

by operation of law, the proceeding number of the original

proceeding where the rate, charge, fee, fare, toll, rental, or

classification was introduced or where an increase in the existing

rate, charge, fee, fare, toll, rental, or classification was proposed.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

52

(d)

If the utility files an application to add a new base rate tariff or to change an

existing base rate tariff, the Commission shall deem the application complete

pursuant to rule 1303 upon certifying by written decision that the filing includes

sufficient information, including a comprehensive cost and revenue requirement

analysis based on actual, auditable, historical data, which analysis must be

accompanied by appropriate workpapers and other supporting materials, to

compare test years and to satisfy other purposes as determined by the

Commission.

3110. Advice Letters.

(a)

All advice letter filings shall comply with rule 1210 of the Commission's Rules of

Practice and Procedure.

(b)

In addition to the requirements and contents in rule 1210, the advice letter shall

include the estimated amounts, if any, by which the utility’s revenues will be

affected, calculated on an annual basis.

(c)

Customer notice of advice letter. If the utility is required by statute, Commission

rule, or order to provide notice to its customers of the advice letter, such notice

shall include the requirements of subparagraph 3002(d)(I) – (XII).

3111. – 3199.

[Reserved].

FACILITIES

3200. Construction, Installation, Maintenance, and Operation.

ty’s revenues will be

affected, calculated on an annual basis.

(c)

Customer notice of advice letter. If the utility is required by statute, Commission

rule, or order to provide notice to its customers of the advice letter, such notice

shall include the requirements of subparagraph 3002(d)(I) – (XII).

3111. – 3199.

[Reserved].

FACILITIES

3200. Construction, Installation, Maintenance, and Operation.

(a)

The plant, equipment, and facilities of a utility shall be constructed, installed,

inspected, maintained, and operated in accordance with accepted engineering

practice in the electric industry to assure continuity of service, uniformity in the

quality of service, and the safety of persons and property.

(b)

For all electric plant construction or installation, the minimum standard of

accepted engineering practice is the edition of the National Electrical Safety

Code in effect at the time of commencing construction or installation of the

electric plant.

(c)

Any utility plant that was constructed or installed, and that is maintained and

operated, in accordance with the National Electrical Safety Code in effect at the

time of its construction or installation shall be presumed to be in compliance with

accepted engineering practice in the electric industry and with the provisions of

this rule.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

53

3201. Production Plant Instruments.

Each electric utility shall install such indicating watt meters, watt-hour meters, or other

instruments as may be necessary to obtain a daily record of the load and a monthly

record of the output of its production plants. Each utility purchasing electrical energy

shall install such instruments or meters as may be necessary to furnish full information

as to the monthly purchases.

3202. Standard Voltage and Frequency; Applications for Variance.

(a)

A utility must make every reasonable effort consistent with good engineering

practices to maintain a constant frequency and constant voltage on its facilities at

all times.

ach utility purchasing electrical energy

shall install such instruments or meters as may be necessary to furnish full information

as to the monthly purchases.

3202. Standard Voltage and Frequency; Applications for Variance.

(a)

A utility must make every reasonable effort consistent with good engineering

practices to maintain a constant frequency and constant voltage on its facilities at

all times.

(b)

A utility shall periodically measure and record service voltages maintained at the

utility's main service terminals as installed for individual customers or groups of

customers. Those service voltages shall be practically constant as follows.

(I)

For service rendered under a lighting contract or primarily for lighting

purposes, the voltage shall be maintained within five percent above or

below the standard stated in the utility’s tariff.

(II)

For service rendered under a power contract or primarily for power

purposes, the voltage shall be maintained within ten percent above or

below the standard stated in the utility’s tariff.

(c)

The following shall not be considered a violation of paragraph (b) of this rule.

(I)

A temporary variation in voltage in excess of those specified if caused by

the operation of power apparatus on a customer's premises which

necessarily require large starting currents, provided that only the

customer’s premises are affected. If other customers are affected, the

utility shall work with the customer causing the variation to resolve the

voltage fluctuation/violation problem or problems.

(II)

A temporary variation in voltage in excess of those specified if caused by

the action of the elements.

(III)

A temporary variation in voltage in excess of those specified if caused by

infrequent, unavoidable, and short-duration fluctuations due to necessary

station or line operations.

ork with the customer causing the variation to resolve the

voltage fluctuation/violation problem or problems.

(II)

A temporary variation in voltage in excess of those specified if caused by

the action of the elements.

(III)

A temporary variation in voltage in excess of those specified if caused by

infrequent, unavoidable, and short-duration fluctuations due to necessary

station or line operations.

(d)

If a utility seeks to operate at a greater variation in voltages than permitted by

paragraph (b) of this rule, the utility shall file an application for a variance. An

application for variance shall include:

(I)

all information required in paragraphs 3002(b) and 3002(c);

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

54

(II)

delineation of the geographic boundaries of the service territory for which

the variance is sought;

(III)

a statement of the facts (not conclusory statements) which supports the

need for the requested variance; and

(IV)

a demonstration that the applying utility proposes to provide the best

voltage regulation practicable under the circumstances.

(e)

The Commission may allow a greater variation of voltage when:

(I)

service is furnished directly from a transmission line; or

(II)

service is furnished in a limited or extended area where customers are

widely scattered and the business done within that area does not justify

close voltage regulation (such as individual customers or small groups of

customers whose service from a transmission line is incidental).

(f)

Each utility’s tariff shall include a description of test methods, equipment, and

frequency of testing used to determine the voltage of electric service furnished.

(g)

Each utility’s tariff shall include a description of standard average voltage, or

voltages, and frequency, or frequencies, as may be required by:

(I)

the utility’s distribution system;

(II)

the utility’s entire system; or

(III)

each of the several districts into which the utility’s system may be divided.

3203. Interruptions of Service.

ed to determine the voltage of electric service furnished.

(g)

Each utility’s tariff shall include a description of standard average voltage, or

voltages, and frequency, or frequencies, as may be required by:

(I)

the utility’s distribution system;

(II)

the utility’s entire system; or

(III)

each of the several districts into which the utility’s system may be divided.

3203. Interruptions of Service.

(a)

Each utility shall keep a record of every service interruption (including, without

limitation, forced outages caused by events outside of the utility’s control,

scheduled outages, or sustained outages) which occurs on its entire system or

on a major division of its system. The record shall include at least a statement of

the time, the duration, and the cause of any service interruption.

(b)

The records of service interruptions and a statement of the utility’s operating

schedules shall be open at all times to the inspection of the duly authorized

representatives of the Commission. The utility shall retain these records for five

years.

(c)

As used in this rule, “service interruption” means a loss of service consistent with

IEEE Standard Number 1366, Guide for Electric Power Distribution Reliability

Indices.

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

55

3204. Incidents Resulting in Death, Serious Injury or Significant Property

Damage.

(a)

Each utility shall inform the Commission of all incidents which occur in

connection with the operation of its property, facilities, or service and which result

in death, serious injury, or significant property damage within two hours (120

minutes) of learning of the incident.

(b)

Within 30 calendar days of the incident, the utility shall submit a written report to

the Director of the Commission. The report shall contain at least the following

information:

(I)

date, time, place, and location of the incident;

(II)

type of incident;

(III)

names of all persons involved; and

(IV)

nature and extent of injury and damage.

in two hours (120

minutes) of learning of the incident.

(b)

Within 30 calendar days of the incident, the utility shall submit a written report to

the Director of the Commission. The report shall contain at least the following

information:

(I)

date, time, place, and location of the incident;

(II)

type of incident;

(III)

names of all persons involved; and

(IV)

nature and extent of injury and damage.

(c)

If the utility conducts an internal investigation of an incident referred to in

paragraph (a) above, the utility shall make its report available to the Commission

upon request by the Commission. The utility may provide paragraphs (b)(III) and

(b)(IV) of this report on a confidential basis under seal.

3205. Construction or Expansion of Generating Capacity.

(a)

No utility may commence new construction or an expansion of generation

facilities or projects until either the Commission notifies the utility that such

facilities or projects do not require a certificate of public convenience and

necessity or the Commission issues a certificate of public convenience and

necessity for the facility or project. Rural electric cooperatives do not need a

certificate of public convenience and necessity for new construction or an

expansion of generation facilities provided that such construction or expansion is

contained entirely within the cooperative’s certificated area. The certificate of

public convenience and necessity requirement under subparagraph (b)(II) of this

rule applies only to jurisdictional electric utilities subject to resource regulation

under Rule 3603 and rate regulation under either Rule 3108 or Rule 3109.

ansion of generation facilities provided that such construction or expansion is

contained entirely within the cooperative’s certificated area. The certificate of

public convenience and necessity requirement under subparagraph (b)(II) of this

rule applies only to jurisdictional electric utilities subject to resource regulation

under Rule 3603 and rate regulation under either Rule 3108 or Rule 3109.

(b)

The following shall be deemed to occur in the ordinary course of business and

shall not require a certificate of public convenience and necessity:

(I)

New construction or expansion of existing generation, which will result in

an increase in generating capacity of less than ten megawatts.

(II)

A generating plant remodel, or installation of any equipment or building

space, required for pollution control systems where the estimated total

cost in nominal dollars including, but not limited to, engineering,

Code of Colorado Regulations

4 CCR 723-3

Public Utilities Commission

56

procurement, construction, and interrelated work for such project is

reasonably expected

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.