Term of permit.

AlaskaStatutes

Ask Donna

How this section applies to your facts.

AK Code › Title 27 › Chapter 27.21 › Section 27.21.070

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

(a) Permits will be issued for a term of five years. However, the commissioner may grant a permit for a longer term if the application is complete for that longer term and the applicant demonstrates that the longer term is necessary to allow the applicant to obtain financing for equipment or for the opening of the operation.

(b) A permit terminates if a permittee does not begin surface coal mining operations under the permit within three years after the permit is issued. The commissioner may grant reasonable extensions of time if the permittee shows that the extensions are necessary (1) because of litigation that precludes the commencement of the operation or threatens substantial economic loss to the permittee; or (2) for reasons beyond the control and without the fault or negligence of the permittee. With respect to coal to be mined for use in a synthetic fuel facility or specific major electric generating facility, the permittee is considered to have begun surface mining operations at the time that the construction of the synthetic fuel or generating facility is begun.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.