DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Chapter II [Docket Number: COE-2020-0002] RIN 0710-AA84 Reissuance and Modification of Nationwide Permits AGENCY:
Army Corps of Engineers, DoD.
ACTION:
Final rule.
SUMMARY:
Nationwide Permits (NWPs) authorize certain activities under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. The NWPs help protect the aquatic environment and the public interest by providing incentives to reduce impacts on jurisdictional waters and wetlands while effectively authorizing activities that have no more than minimal individual and cumulative adverse environmental effects. In this final rule, the Corps is reissuing and modifying 12 existing NWPs and issuing four new NWPs. For these 16 NWPs, the Corps is also reissuing and modifying the NWP general conditions and definitions. The Corps is not reissuing or modifying the remaining 40 existing NWPs or finalizing proposed new NWP E at this time. Those 40 remaining NWPs continue to be in effect under the January 6, 2017, final rule and the existing general conditions and definitions in the 2017 final rule continue to apply to those permits.
DATES:
These 16 NWPs, the 32 general conditions, and the associated definitions will go into effect on March 15, 2021.
ADDRESSES:
U.S. Army Corps of Engineers, Attn: CECW-CO-R, 441 G Street NW, Washington, DC 20314-1000.
FOR FURTHER INFORMATION CONTACT:
Mr. David Olson at 202-761-4922 or access the U.S. Army Corps of Engineers Regulatory Home Page at https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Background A. General B. Overview of Proposed Rule C. Overview of This Final Rule D. Status of Existing Permits E. Nationwide Permit Verifications F. Executive Order 13783, Promoting Energy Independence and Economic Growth G. Executive Order 13777, Enforcing the Regulatory Reform Agenda H. Executive Order 13921, Promoting American Seafood Competitiveness and Economic Growth I. 2018 Legislative Outline for Rebuilding Infrastructure in America II. Discussion of Public Comments A. Overview B. Responses to General Comments C. Comments on Proposed Actions Under Executive Order 13921, Promoting American Seafood Competitiveness and Economic Growth D. Comments on the 2018 Legislative Outline for Rebuilding Infrastructure in America E. Comments on Regional Conditioning of Nationwide Permits F. Comments on Proposed Removal of the 300 Linear Foot Limit for Losses of Stream Bed G. Response to Comments on Specific Nationwide Permits H. Responses to Comments on the Nationwide Permit General Conditions I. Discussion of Proposed Modifications to Section D, District Engineer's Decision J. Discussion of Proposed Modifications to Section F, Definitions III. Compliance With Relevant Statutes A. National Environmental Policy Act Compliance B. Compliance With Section 404(e) of the Clean Water Act C. 2020 Revisions to the Definition of “Waters of the United States” ( i.e., the Navigable Waters Protection Rule) D. Compliance With the Endangered Species Act E. Compliance With the Essential Fish Habitat Provisions of the Magnuson-Stevens Fishery Conservation and Management Act F. Compliance With Section 106 of the National Historic Preservation Act G. Section 401 of the Clean Water Act H. Section 307 of the Coastal Zone Management Act (CZMA) IV. Economic Impact V. Administrative Requirements VI. References Authority Nationwide Permits, Conditions, Further Information, and Definitions List of Acronyms
BMP Best Management Practice CEQ Council on Environmental Quality CWA Clean Water Act DA Department of the Army EFH Essential Fish Habitat ESA Endangered Species Act FWS U.S. Fish and Wildlife Service GC General Condition NEPA National Environmental Policy Act NHPA National Historic Preservation Act NMFS National Marine Fisheries Service NPDES National Pollutant Discharge Elimination System NWP Nationwide Permit PCN Pre-construction Notification List of Nationwide Permits Included in This Rule and General Conditions Nationwide Permits (NWPs)
12. Oil or Natural Gas Pipeline Activities 21. Surface Coal Mining Activities 29. Residential Developments 39. Commercial and Institutional Developments 40. Agricultural Activities 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 48. Commercial Shellfish Mariculture Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects 55. Seaweed Mariculture Activities 56. Finfish Mariculture Activities 57. Electric Utility Line and Telecommunications Activities 58. Utility Line Activities for Water and Other Substances Nationwide Permit General Conditions
1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Birds and Bald and Golden Eagles 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification I. Background
A. General
The U.S. Army Corps of Engineers (Corps) issues nationwide permits (NWPs) to authorize activities under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899, where those activities will result in no more than minimal individual and cumulative adverse
Section 404(e) of the Clean Water Act provides the statutory authority for the Secretary of the Army, after notice and opportunity for public hearing, to issue general permits on a nationwide basis for any category of activities involving discharges of dredged or fill material into waters of the United States for a period of no more than five years after the date of issuance (33 U.S.C. 1344(e)). The Secretary's authority to issue permits has been delegated to the Chief of Engineers and his or her designated representatives. Nationwide permits are a type of general permit issued by the Chief of Engineers and are designed to regulate with little, if any, delay or paperwork certain activities in federally jurisdictional waters and wetlands, where those activities would have no more than minimal adverse environmental impacts (see 33 CFR 330.1(b)). The categories of activities authorized by NWPs must be similar in nature, cause only minimal adverse environmental effects when performed separately, and have only minimal cumulative adverse effect on the environment (see 33 U.S.C. 1344(e)(1)). NWPs can be issued for a period of no more than 5 years (33 U.S.C. 1344(e)(2)), and the Corps has the authority to modify or revoke the NWPs before they expire. Nationwide permits can also be issued to authorize activities pursuant to Section 10 of the Rivers and Harbors Act of 1899 (see 33 CFR 322.2(f)). The NWP program is designed to provide timely authorizations for the regulated public while protecting the Nation's aquatic resources.
The phrase “minimal adverse environmental effects when performed separately” refers to the direct and indirect adverse environmental effects caused by a specific activity authorized by an NWP. The phrase “minimal cumulative adverse effect on the environment” refers to the collective direct and indirect adverse environmental effects caused by all the activities authorized by a particular NWP during the time period when the NWP is in effect (a period of no more than 5 years) in a specific geographic region. These concepts are defined in paragraph 2 of section D, “District Engineer's Decision.” The appropriate geographic area for assessing cumulative effects is determined by the decision-making authority for the general permit (generally, the district engineer).
Some NWPs include pre-construction notification (PCN) requirements. PCNs give the Corps the opportunity to evaluate certain proposed NWP activities on a case-by-case basis to ensure that they will cause no more than minimal adverse environmental effects, individually and cumulatively. Except for activities conducted by non-Federal permittees that require PCNs under paragraph (c) of the “Endangered Species” and “Historic Properties” general conditions (general conditions 18 and 20, respectively), if the Corps district does not respond to the PCN within 45 days of a receipt of a complete PCN, the activity is deemed authorized by the NWP (see 33 CFR 330.1(e)(1)).
In fiscal year 2018, the average processing time for an NWP PCN was 45 days and the average processing time for a standard individual permit was 264 days. This difference in burden can incentivize project proponents to reduce the adverse effects of their planned activities that would otherwise require an individual permit under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899, in order to qualify for NWP authorization. This reduction in adverse effects can therefore reduce a project's impact on the Nation's aquatic resources.
There are 38 Corps district offices and 8 Corps division offices. The district offices administer the NWP program on a day-to-day basis by reviewing PCNs for proposed NWP activities. The division offices oversee district offices and are managed by division engineers. Division engineers have the authority, after public notice and comment, to modify, suspend, or revoke NWP authorizations on a regional basis to take into account regional differences among aquatic resources and to ensure that the NWPs authorize only those activities that result in no more than minimal individual and cumulative adverse environmental effects in a region (see 33 CFR 330.5(c)). When a Corps district receives a PCN, the district engineer reviews the PCN and determines whether the proposed activity will result in no more than minimal individual and cumulative adverse environmental effects, consistent with the criteria in paragraph 2 of section D, “District Engineer's Decision.” At this point, the district engineer may add conditions to the NWP authorization to ensure that the verified NWP activity results in no more than minimal individual and cumulative adverse environmental effects, consistent with processes and requirements set out in 33 CFR 330.5(d). See Section II.G for more information on regional conditions for the NWPs.
For some NWPs, when submitting a PCN, an applicant may request a waiver for a particular limit specified in the NWP's terms and conditions. If the applicant requests a waiver of an NWP limit and the district engineer determines, after coordinating with the resource agencies under paragraph (d) of NWP general condition 32, that the proposed NWP activity will result in no more than minimal adverse environmental effects, the district engineer may grant such a waiver. Following the conclusion of the district engineer's review of a PCN, he/she prepares an official, publicly-available decision document. This document discusses the district engineer's findings as to whether a proposed NWP activity qualifies for NWP authorization, including compliance with all applicable terms and conditions, and the rationale for any waivers granted, and activity-specific conditions needed to ensure that the activity being authorized by the NWP will have no more than minimal individual and cumulative adverse environmental effects and will not be contrary to the public interest (see § 330.6(a)(3)(i)).
The case-by-case review of PCNs often results in district engineers adding activity-specific conditions to NWP authorizations to ensure that the adverse environmental effects are no more than minimal. These can include permit conditions such as time-of-year restrictions and/or use of best management practices and/or compensatory mitigation requirements to offset authorized losses of jurisdictional waters and wetlands so that the net adverse environmental effects caused by the authorized activity are no more than minimal. Any compensatory mitigation required for NWP activities must comply with the Corps' compensatory mitigation regulations at 33 CFR part 332. Review of a PCN may also result in the district engineer asserting discretionary authority to require an individual permit from the Corps for the proposed activity, if he or she determines, based on the information provided in the PCN and other available information, that the adverse environmental effects will be more than minimal, or otherwise determines that “sufficient concerns for the environment or any other factor of
During the review of PCNs, district engineers assess cumulative adverse environmental effects at an appropriate regional scale. Cumulative effects are the result of the accumulation of direct and indirect effects caused by multiple activities that persist over time in a particular geographic area (MacDonald 2000), such as a watershed or ecoregion (Gosselink and Lee 1989). Therefore, the geographic and temporal scales for cumulative effects analysis are larger than the analysis of the direct and indirect adverse environmental effects caused by specific activities. For purposes of the NWP program, cumulative effects are the result of the combined effects of activities authorized by NWPs during the period the NWPs are in effect. The cumulative effects are assessed against the current environmental setting to determine whether the cumulative adverse environmental effects are more than minimal. The district engineer uses his or her discretion to determine the appropriate regional scale for evaluating cumulative effects.
For the NWPs, the appropriate regional scale for evaluating cumulative effects may be a waterbody, watershed, county, state, or a Corps district, as appropriate. The appropriate regional scale is dependent, in part, on where the NWP activities are occurring. For example, for NWPs that authorizes structures and/or work in navigable waters of the United States under Section 10 of the Rivers and Harbors Act of 1899, the appropriate geographic region for assessing cumulative effects may be a specific navigable waterbody. For NWPs that authorize discharges of dredged or fill material into non-tidal jurisdictional wetlands and streams, the appropriate geographic region for assessing cumulative effects may be a watershed, county, state, or Corps district. The direct individual adverse environmental effects caused by activities authorized by NWPs are evaluated within the project footprint, and the indirect individual adverse environmental effects caused by activities authorized by NWPs are evaluated within the geographic area to which those indirect effects extend.
When the district engineer reviews a PCN and determines that the proposed activity qualifies for NWP authorization, he or she will issue a written NWP verification to the permittee (see 33 CFR 330.6(a)(3)). If an NWP verification includes multiple authorizations using a single NWP ( e.g., linear projects with crossings of separate and distant waters of the United States authorized by NWPs 12 or 14) or non-linear projects authorized with two or more different NWPs ( e.g., an NWP 28 for reconfiguring an existing marina plus an NWP 19 for minor dredging within that marina), the district engineer will evaluate the cumulative effects of the applicable NWP authorizations within the geographic area that she or he determines is appropriate for assessing cumulative effects caused by activities authorized by that NWP. As discussed above, the geographic area may be a waterbody, watershed, county, state, Corps district, or other geographic area.
Further, the Corps' public interest review regulations at 33 CFR 320.4(a)(1) require consideration of cumulative impacts for the issuance of DA permits. Since the required public interest review and 404(b)(1) Guidelines cumulative effects analyses are conducted by Corps Headquarters in its decision documents for the issuance of the NWPs, district engineers do not need to do comprehensive cumulative effects analyses for NWP verifications. For an NWP verification, the district engineer needs only to include a statement in the administrative record stating whether the proposed activity to be authorized by an NWP, plus any required mitigation, will result in no more than minimal individual and cumulative adverse environmental effects. If the district engineer determines, after considering mitigation, that a proposed NWP activity will result in more than minimal cumulative adverse environmental effects, she or he will exercise discretionary authority and require an application for an individual permit.
There may be activities authorized by NWPs that cross more than one Corps district or more than a single state. On May 15, 2018, the Director of Civil Works at Corps Headquarters issued a Director's Policy Memorandum titled: “Designation of a Lead USACE District for Permitting of Non-USACE Projects Crossing Multiple Districts or States.” 1 This Director's Policy Memorandum identified lead districts for states that have more than one Corps district and established a policy for designating a lead district for activities that require Department of the Army permits that cross district or state boundaries. Under this policy, when the Corps receives an NWP PCN or individual permit application for such activities, a lead Corps district will be designated by the applicable Corps division office(s) using the criteria in the 2018 Director's Policy Memorandum, and that district will be responsible for serving as a single point of contact for each permit applicant, forming a Project Delivery Team comprising representatives of each of the affected districts, ensuring consistent reviews by the affected districts, and taking responsibility for identifying and resolving inconsistencies that may arise during the review. The list of lead districts for states is also used during the regional conditioning process for the NWPs. For that process the lead district is responsible for coordinating the development of the regional conditions and preparing the supplemental documents required by 33 CFR 330.5(c)(1)(iii). The Corps requests comments on whether there are efficiencies that can be adopted to improve the coordination and regional conditioning processes.
1 This document is available at: https://usace.contentdm.oclc.org/digital/collection/p16021coll11/id/2757/ (accessed 3/12/2020).
B. Overview of Proposed Rule
On September 15, 2020, the Corps published in the Federal Register (85 FR 57298) a proposed regulation to reissue with modification the existing NWPs and associated general conditions and definitions and to create five new NWPs (2020 Proposal). The Corps provided a 60-day public comment period which closed on November 16, 2020. Among other things, the Corps proposed the following: (1) To create two new NWPs to authorize certain categories of mariculture activities ( i.e., seaweed and finfish mariculture) that are not currently authorized by NWP 48; (2) to divide the NWP that authorizes utility line activities (NWP 12) into three separate NWPs that address the differences in how different utility line projects are constructed, the substances they convey, and the different standards and best management practices that help ensure those NWPs authorize only those activities that have no more than minimal adverse environmental effects; (3) a new NWP which would authorize discharges of dredged or fill material into jurisdictional waters for the construction, expansion, and maintenance of water reuse and reclamation facilities; and (4) to remove the 300 linear foot limit for losses of stream bed from 10 NWPs (NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52). The Corps requested comment on these and all other aspects of the proposal.
C. Overview of This Final Rule
This final rule replaces 12 of the existing NWPs that were published in the January 6, 2017, final rule (82 FR 1860), specifically: NWP 12 (oil or natural gas pipeline activities; NWP 21 (surface coal mining activities); NWP 29
For the 16 NWPs included in this final rule, the Corps is also reissuing the general conditions and definitions, with some changes. The Corps is not reissuing or modifying the remaining 40 NWPs included in the 2020 Proposal or taking any action on the proposed new NWP E at this time. The general conditions and definitions published in the January 6, 2017, final rule (82 FR 1860) continue to apply to the 40 existing 2017 NWPs that continue to remain in effect after the final rule for the 16 reissued and new NWPs goes into effect on March 15, 2021.
The 16 permits being finalized in this rule include permits proposed partly in response to E.O. 13783, Promoting Energy Independence and Economic Growth, and E.O. 13921, Promoting American Seafood Competitiveness and Economic Growth. The Corps is also reissuing NWPs 12 and 48 partly to address issues raised in two federal district court decisions: United States District Court for the District of Montana Great Falls Division's decision in Northern Plains Resource Council, et al., v. U.S. Army Corps of Engineers, et al., (Case No. CV 19-44-GF-BMM) and the United States District Court, Western District of Washington at Seattle's decision in the Coalition to Protect Puget Sound Habitat v. U.S. Army Corps of Engineers et al. (Case No. C16-0950RSL) and Center for Food Safety v. U.S. Army Corps of Engineers et al. (Case No. C17-1209RSL).
D. Status of Existing Permits
When the Corps modifies existing NWPs, the modified NWPs replace the prior versions of those NWPs so that there are not two sets of NWPs in effect at the same time. Having two sets of NWPs in effect at the same time creates regulatory uncertainty if each set of those NWPs has different limits, requirements, and conditions because permittees may be unclear as to which limits, requirements, and conditions apply to their authorized activities. In addition, differences in NWP limits, requirements, and conditions between two sets of NWPs can create challenges for district engineers in terms of enforcement and compliance efforts.
The Corps is modifying the expiration date for the 12 existing NWPs ( i.e., NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, 52) that are issued in this final rule to March 15, 2021. The expiration date for the 12 existing NWPs and the 4 new NWPs issued in this final rule is five years after the date those NWPs go into effect. Activities authorized by the 2017 NWPs currently remain authorized by those NWPs until March 18, 2022. Under 33 CFR 330.6(a)(3)(ii), if the NWP is reissued without modification or the activity complies with any subsequent modification of the NWP authorization, the NWP verification letter ( i.e., the written confirmation from the district engineer that the proposed activity is authorized by an NWP) should include a statement that the verification will remain valid for a period of time specified in the verification letter. The specified period of time is usually the expiration date of the NWP. In other words, for the 2017 NWPs, if the previously verified activity continues to qualify for NWP authorization under any of the 12 NWPs issued in this final rule, that verification letter continues to be in effect until March 18, 2022, unless the district engineer specified a different expiration date in the NWP verification letter. For most activities authorized by the 2017 NWPs, where the district engineer issued an NWP verification letter, the verification letter identified March 18, 2022, as the expiration date. As long as the verified NWP activities continue to comply with the terms and conditions of the 12 existing NWPs issued in this final rule, those activities continue to be authorized by the applicable NWP(s) until March 18, 2022, unless a district engineer modifies, suspends, or revokes a specific NWP authorization.
Under 33 CFR 330.6(b), Corps Headquarters may modify, reissue, or revoke the NWPs at any time. Activities that were authorized by the 2017 NWPs, but no longer qualify for authorization under any of the 12 existing NWPs that are reissued in this final rule, continue to be authorized by the 2017 NWP(s) for 12 months as long as those activities have commenced ( i.e., are under construction) or are under contract to commence in reliance upon an NWP prior to the date on which the NWP expires. That authorization is contingent on the activity being completed within twelve months of the date of an NWP's expiration, modification, or revocation, unless discretionary authority has been exercised by a division or district engineer on a case-by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5(c) or (d). This provision applies to activities that were previously verified by the district engineer as qualifying for NWP authorization, but no longer qualify for NWP authorization under the modified or reissued NWP.
The 16 NWPs issued in this final rule go into effect on March 15, 2021. The 2017 versions of the 12 NWPs reissued in this final rule expire on March 15, 2021. The 12 existing NWPs and 4 new NWPs issued in this final rule expire five years after March 15, 2021.
E. Nationwide Permit Verifications
Certain NWPs require the permittee to submit a PCN, and thus request confirmation from the district engineer prior to commencing the proposed NWP activity, to ensure that the NWP activity complies with the terms and conditions of the NWP. The requirement to submit a PCN is identified in the NWP text, as well as certain general conditions. General condition 18 requires non-federal permittees to submit PCNs for any proposed activity that might affect ESA-listed species or designated critical habitat, if listed species or designated critical habitat are in the vicinity of the proposed activity, or if the proposed activity is located in critical habitat. General condition 20 requires non-federal permittees to submit PCNs for any proposed activity that may have the potential to cause effects to any historic properties listed in, determined to be eligible for listing in, or potentially eligible for listing in, the National Register of Historic Places.
In the PCN, the project proponent must specify which NWP or NWPs he or she wants to use to provide the required Department of Army (DA) authorization under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. For voluntary NWP verification requests (where a PCN is not required), the request should also identify the NWP(s) the project proponent wants to use. The district engineer should verify the activity under the NWP(s) requested by the project proponent, as long as the proposed activity complies with all applicable terms and conditions, including any applicable regional conditions imposed by the division engineer. All NWPs have the same general requirements: That the authorized activities may only cause no
Pre-construction notification requirements may be added to NWPs by division engineers through regional conditions to require PCNs for additional activities. For an activity where a PCN is not required, a project proponent may submit a PCN voluntarily, if he or she wants written confirmation that the activity is authorized by an NWP. Some project proponents submit permit applications without specifying the type of authorization they are seeking. In such cases, the district engineer will review those applications and determine if the proposed activity qualifies for NWP authorization or another form of DA authorization, such as a regional general permit (see 33 CFR 330.1(f)).
In response to a PCN or a voluntary NWP verification request, the district engineer reviews the information submitted by the prospective permittee. If the district engineer determines that the activity complies with the terms and conditions of the NWP, he or she will notify the permittee. Activity-specific conditions, such as compensatory mitigation requirements, may be added to an NWP authorization to ensure that the activity to be authorized under the NWP will result in no more than minimal individual and cumulative adverse environmental effects. The activity-specific conditions are incorporated into the NWP verification, along with the NWP text and the NWP general conditions. In general, NWP verification letters will expire on the date the NWP expires (see 33 CFR 330.6(a)(3)(ii)), although district engineers have the authority to issue NWP verification letters that will expire before the NWP expires, if it is in the public interest to do so.
If the district engineer reviews the PCN or voluntary NWP verification request and determines that the proposed activity does not comply with the terms and conditions of an NWP, he or she will notify the project proponent and provide instructions for applying for authorization under a regional general permit or an individual permit. District engineers will respond to NWP verification requests, submitted voluntarily or as required through PCNs, within 45 days of receiving a complete PCN. Except for NWP 49, and for proposed NWP activities that require Endangered Species Act section 7 consultation and/or National Historic Preservation Act section 106 consultation, if the project proponent has not received a reply from the Corps within 45 days, he or she may assume that the project is authorized, consistent with the information provided in the PCN. For NWP 49, and for proposed NWP activities that require ESA Section 7 consultation and/or NHPA Section 106 consultation, the project proponent may not begin work before receiving a written NWP verification. If the project proponent requested a waiver of a limit in an NWP, the waiver is not granted unless the district engineer makes a written determination that the proposed activity will result in no more than minimal individual and cumulative adverse environmental effects, and issues an NWP verification.
F. Executive Order 13783, Promoting Energy Independence and Economic Growth
Section 2(a) of E.O. 13783 requires federal agencies to review their existing regulations that potentially burden the development or use of domestically produced energy resources, with particular attention to oil, natural gas, coal, and nuclear resources. For the Corps, the NWPs authorize activities associated with the development or use of domestically produced energy resources. In response to E.O. 13783, Office of the Assistant Secretary of the Army (Civil Works) issued a report that reviewed 12 NWPs that authorize activities associated with the development or use of domestically produced energy resources. That report included recommendations for changes that could be made to nine NWPs to support the objectives of E.O. 13783.
The Office of the Assistant Secretary of the Army (Civil Works) issued its report on October 25, 2017, and the November 28, 2017, issue of the Federal Register (82 FR 56192) published a notice of availability for that report. Section 2(g) of E.O. 13783 states that agencies should, as soon as practicable and as appropriate and consistent with law, publish for notice and comment proposed rules that would implement the recommendations in their reports. Section 2(g) further states that agencies shall endeavor to coordinate the regulatory reforms identified in their reports with their activities undertaken in compliance with E.O. 13771, “Reducing Regulation and Controlling Regulatory Costs.”
G. Executive Order 13777, Enforcing the Regulatory Reform Agenda
On February 24, 2017, the President signed E.O. 13777, “Enforcing the Regulatory Reform Agenda,” which required agencies to evaluate existing regulations and make recommendations to the agency head regarding their repeal, replacement, or modification, consistent with applicable law. The E.O. specified that agencies must attempt to identify regulations that eliminate jobs or inhibit job creation; are outdated, unnecessary, or ineffective; impose costs that exceed benefits; create a serious inconsistency or otherwise interfere with regulatory reform initiatives and policies; or meet other criteria identified in that Executive Order. Pursuant to this E.O., in the July 20, 2017, issue of the Federal Register (82 FR 33470) the Corps published a notice seeking public input from state, local, and tribal governments, small businesses, consumers, non-governmental organizations, and trade associations on its existing regulations that may be appropriate for repeal, replacement, or modification. Some of the changes to the NWPs in this proposal are intended to address some of the comments received in response to the July 20, 2017, Federal Register notice. Comments received in response to the July 20, 2017, Federal Register notice can be viewed at www.regulations.gov in docket number COE-2017-0004.
H. Executive Order 13921, Promoting American Seafood Competitiveness and Economic Growth
On May 7, 2020, the President signed Executive Order 13921 on Promoting American Seafood Competitiveness and Economic Growth. Section 6(b) of the E.O., “Removing Barriers to Aquaculture Permitting,” requires the Secretary of the Army, acting through the Assistant Secretary of the Army for Civil Works, to “develop and propose for public comment, as appropriate and consistent with applicable law,” NWPs authorizing finfish aquaculture activities and seaweed aquaculture activities in marine and coastal waters, including ocean waters beyond the territorial sea within the exclusive economic zone of the United States.
Instead of proposing a new, separate NWP for authorizing structures in coastal waters and federal waters on the outer continental shelf for multi-species aquaculture activities, the Corps proposed to include provisions allowing additional species to be cultivated with seaweed mariculture activities authorized under proposed new NWP A and finfish mariculture activities authorized under proposed new NWP B. In addition, the Corps invited public comment on whether a separate NWP should be issued to authorize structures or work regulated by the Corps for multi-species mariculture activities.
As required by the Executive Order, the Corps proposed to issue two new NWPs: NWP A to authorize seaweed mariculture activities in navigable waters of the United States, including federal waters on the outer continental shelf, and NWP B to authorize finfish mariculture activities in these waters. Based on the reasons set out in the final rule, the Corps has decided to issue these two permits. These new NWPs authorize structures and work in navigable waters of the United States under Section 10 of the Rivers and Harbors Act of 1899. These new NWPs also authorize seaweed and finfish mariculture structures attached to the seabed on the outer continental shelf. Section 4(f) of the Outer Continental Shelf Lands Act of 1953 as amended (43 U.S.C. 1333(e)), extended the Corps' Rivers and Harbors Act of 1899 section 10 permitting authority to artificial islands, installations, and other devices located on the seabed, to the seaward limit of the outer continental shelf (see 33 CFR 320.2(b)). On the outer continental shelf, the seaweed and finfish mariculture structures may be anchored to the seabed, and thus require section 10 authorization as devices located on the seabed. Each of these NWPs includes a provision on multi-trophic species mariculture activities in marine and coastal waters, including federal waters on the outer continental shelf. This provision for multi-trophic species mariculture gives flexibility to these NWPs to allow mariculture operators to propagate additional species, such as mussels, on their seaweed or finfish mariculture structures. Including this provision was an alternative to developing a separate NWP for multi-trophic species mariculture activities, and provides NWP authorization that is responsive to the E.O. The Corps recognizes that some mariculture operators may choose to produce seaweeds or finfish exclusively. As discussed in this final rule, the Corps issued proposed new NWP A as NWP 55 and issued proposed new NWP B as NWP 56.
I. 2018 Legislative Outline for Rebuilding Infrastructure in America
On February 12, 2018, the Administration issued its “Legislative Outline for Rebuilding Infrastructure in America.” In Part 3 (Infrastructure Permitting Improvement), Principle I.C.1 recommends reforms for eliminating redundancy, duplication, and inconsistency in the application of clean water provisions. One of the recommended reforms was to make statutory changes to authorize Federal agencies to select and use NWPs without additional review by the Corps. Principle I.C.1 recommends allowing Federal agencies to move forward on NWP projects without submitting PCNs to the Corps. That principle also states that removing PCN requirements for Federal agencies would allow the Corps to focus on projects that do not qualify for NWPs, such as activities that require individual permits that have greater environmental impacts.
Consistent with the recommendation included in the Legislative Outline, in the 2020 Proposal the Corps invited comment on whether it can use its existing authority to create specific procedures or conditions by which Federal agencies that want to use NWPs for regulated activities would not need to submit PCNs, consistent with applicable law. The Corps specified that, under such a mechanism, the Corps would retain under its authority for district engineers to modify, suspend, or revoke NWP authorizations (see 33 CFR 330.5(d)), and the right to take action to address situations where the Federal agency incorrectly determined that the NWP terms and conditions were met.
The Corps sought public comment on whether to exempt federal agencies from PCN requirements under the theory that federal agencies may employ staff who are environmental experts and who already review these projects before submitting PCNs to the Corps to determine whether they meet the criteria for the applicable NWP. These environmental staff are responsible for ensuring that the agencies' proposed activities comply with applicable federal laws, regulations, and policies, as well as relevant Executive Orders. In the proposed rule the Corps stated that it understands that non-federal permittees that want to use the NWPs often hire consultants to help them secure NWP authorization in compliance with applicable federal laws, regulations, and policies and that these consultants may have similar expertise to staff at federal agencies. These consultants may provide general services to assist in securing NWP authorizations on behalf of their clients, or they may specialize in complying with specific laws and regulations, such as Section 7 of the Endangered Species Act, Section 106 of the National Historic Preservation Act, and the Essential Fish Habitat provisions of the Magnuson-Stevens Act. Non-federal permittees are not bound to comply with Executive Orders.
Consistent with this legislative principle, the Corps requested comment on whether to modify the NWPs that require PCNs to limit the PCN requirement to non-federal permittees. The Corps requested that commenters provide their views on whether they support or oppose having different PCN requirements for Federal and non-Federal permittees, with supporting information to explain their views. After reviewing and considering public comments on this proposal, the Corps has determined not to finalize any change to PCN requirements for federal permittees.
II. Discussion of Public Comments
A. Overview
In response to the 2020 Proposal, the Corps received more than 22,700 comment letters, of which approximately 22,330 were form letters pertaining to the proposed removal of the 300 linear foot limit for losses of stream bed, the proposed changes to NWPs 21, 49, and 50, or the proposed reissuance of NWP 12. In addition to the various form letters, the Corps received www.regulations.gov docket (COE-2020-0002) for this rulemaking action. The Corps reviewed and fully considered all comments received in response to the 2020 Proposal.
B. Responses to General Comments
Many commenters expressed general support for the proposed rule, as well as the NWP program as a whole, and many commenters stated opposition to the proposed changes to the NWPs or the use of NWPs to authorize certain activities. Many commenters said that the NWP program should be discontinued. Many commenters objected to reissuing the NWPs ahead of schedule, stating that early reissuance of the NWPs presents an unnecessary burden and cost to the agency and the public. Many commenters stated that the proposed NWPs do not comply with the Clean Water Act, the National Environmental Policy Act, the Endangered Species Act, the National Historic Preservation Act, the Magnuson Stevens Act, and other federal laws. Many commenters said that the NWP program is pushing species closer to extinction.
The NWP program is an important component of the Corps Regulatory Program because it provides an efficient means of authorizing activities that result in no more than minimal individual and cumulative adverse environmental effects so that the Corps can devote more of its resources for evaluating proposed activities that require Department of the Army (DA) authorization that have the potential to cause more substantial adverse environmental effects. The grandfathering provisions in the Corps' NWP regulations at 33 CFR 330.6(a)(3)(ii) and 330.6(b) and as described in Section I.D, Status of Existing Permits, provide mechanisms to reduce regulatory burdens when the Corps modifies or reissues the NWPs to replace existing NWPs. The NWPs are issued in compliance with the Clean Water Act, the National Environmental Policy Act, the Endangered Species Act, the National Historic Preservation Act, the Magnuson Stevens Act, and other applicable federal laws.
Several commenters said that the proposal is not compliant with the regulations that govern NWPs. Several commenters stated that every NWP authorization should be announced through a public notice. Several commenters said that the Corps does not have the authority to enforce state conditions. One commenter stated that each NWP should include a state-level review prior to verification. One commenter asserted that the proposal violates the authority of individual states to resolve noncompliance with water quality standard permits. One commenter stated that the Corps should ensure compliance with Safe Water Drinking Act when verifying NWP eligibility. One commenter said that the proposed rule conflicts with efforts to update state general permits.
The 16 NWPs issued in this final rule comply with the Corps' NWP regulations at 33 CFR part 330. The NWPs authorize only those activities that have no more than minimal individual and cumulative adverse environmental effects, so it is not necessary to issue public notices to announce the tens of thousands of NWP verification letters Corps districts issue each year. The Corps acknowledges that it does not have the authority to enforce conditions provided by states, except for those conditions added to the NWPs by water quality certifications by certifying authorities and Coastal Zone Management Act consistency concurrences issued by states, that are within the Corps' legal authority to enforce. States can take actions to enforce their own water quality requirements, including permits issued under Section 402 of the Clean Water Act. The Corps does not have the legal authority to enforce the Safe Water Drinking Act. The issuance or reissuance of the NWPs is independent of the issuance of general permits by states, or the issuance of state programmatic general permits by Corps districts.
Several commenters said that the proposed rule did not allow sufficient time for adequate review by states and tribes. Several commenters requested additional time to review the proposed NWPs. One commenter said that the comment period should be extended by 180 days. One commenter stated that Corps divisions and districts should not solicit comments on proposed regional conditions concurrently with the public comment period of the NWP reissuance. Many commenters said that the Corps should have a lead district for every state.
For the 2020 Proposal, the Corps provided a 60-day comment period, which is same duration the Corps has used for past rulemaking actions involving the issuance, reissuance, and/or modification of the NWPs. The Corps sent response letters to entities that made timely requests for extensions of the comment period for the 2020 Proposal. In the 2020 Proposal, the Corps did not propose a large number or substantial changes to the NWPs. Soliciting public comment on proposed regional conditions concurrently with the proposed issuance or reissuance of the NWPs is consistent with the Corps' NWP regulations at 33 CFR 330.5(b)(2)(ii). The Corps has a designated a lead district for each state; these districts have been identified since 2004. As discussed in Section I.A., the Corps issued a Director's Policy Memorandum on May 15, 2018, that further clarified its policy for designating a lead district for activities that require Department of the Army permits that cross district or state boundaries.
One commenter stated that the Corps is required under Section 404(e) of the Clean Water Act to hold a public hearing, which it cannot meaningfully accomplish given the pandemic. One commenter said the NWPs should not allow losses of up to 1/2 -acre of waters of the United States in areas that have already been heavily impacted and should not be used in areas where critical and essential habitat exists for species that are federally threatened or endangered species.
The Corps declined to hold a public hearing on the proposed NWPs because it determined that a public hearing was unlikely to provide additional information that would inform the Corps' decision on whether to issue these NWPs. Under the Corps' regulations at 33 CFR 327.4(b), requests for public hearing under this paragraph shall be granted, unless the Corps determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by holding a public hearing. The Corps received approximately 22,700 comments on the proposed rule, and it is unlikely that any statements provided during a public hearing would raise issues that are different that the issues or concerns discussed in the written comments received in response to the 2020 Proposal.
The NWPs can be used in any area of the United States, except where the NWPs have been revoked by division engineers on a regional basis ( e.g., to use a programmatic general permit instead of the NWPs) or suspended or revoked by district engineers on a case-by-case basis. The NWPs can be used in a variety of areas ranging from environmental settings that have been heavily impacted by human activities to environmental settings that have been shaped by fewer or less severe impacts caused by human activities. For those NWPs with a 1/2 -acre limit for losses of waters of the United States ( e.g., NWPs 1/10 -acre of waters of the United States for NWP 51), which gives district engineers the opportunity to review proposed activities in their current environmental setting and determine whether those activities will result in no more than minimal individual and cumulative adverse environmental effects.
The ability for division and district engineers to modify, suspend, or revoke NWPs on a regional or case-by-case basis is a key tool for ensuring that the NWPs only authorize activities that cause no more than minimal individual and cumulative adverse environmental effects. There is substantial variation in aquatic resource types across the country, as well as a large amount of variability among geographic regions in the quantity of those resources. Those regional differences require division and district engineers to have the authority to tailor the NWPs to address regional and site-specific concerns. The NWPs can only be issued for a period of 5 years because of the statutory language in section 404(e) of the Clean Water Act, as well as the Corps' regulations at 33 CFR 330.6(b). Section 330.6(b) states that if “an NWP is not modified or reissued within five years of its effective date it automatically expires and becomes null and void.” The 5-year cycle for reissuing the NWPs provides sufficient time to make necessary changes to the NWPs to ensure that the NWPs only authorize those activities that result in no more than minimal individual and cumulative adverse environmental effects.
Many commenters objected to the proposed NWPs, stating that they authorize activities that result in more than minimal individual and cumulative adverse environmental effects and that they do not authorize categories of activities that are similar in nature. Many commenters said that the Corps has not done any meaningful analysis of the cumulative effects from NWPs. A few commenters said that since the Corps does not require pre-construction notifications (PCNs) for all NWP activities, it could not ensure that NWP activities result in no more than minimal individual and cumulative adverse environmental effects. One commenter said that Corps districts should improve their tracking of cumulative impacts. A number of commenters opposed the NWPs, stating that they authorize activities associated with larger projects that have substantial environmental impacts. Several commenters said that the NWPs should either not authorize activities that impact streams and rivers occupied by anadromous salmon, or compensatory mitigation should always be required for those activities. One commenter stated that the NWPs should not be used in areas with substantial cumulative impacts, such as essential fish habitat and areas inhabited by ESA-listed species. Many commenters said that Corps should fund an independent evaluation of its methodology for assessing cumulative impacts. One commenter said that the proposal should be based on peer-reviewed scientific analysis. One commenter stated that the proposal should include a scientific support document. One commenter said that NWPs should only authorize activities with predictable environmental effects and outcomes.
The NWP activities that do not require PCNs are those activities that have characteristics that do not result in more than minimal adverse environmental effects, such as small structures in navigable waters subject to section 10 of the Rivers and Harbors Act of 1899 or minor fills in waters of the United States associated with maintenance activities or temporary impacts.
For the issuance or reissuance of these NWPs, the Corps has conducted the required cumulative effects analyses. In the national decision document for each NWP issued or reissued in this final rule, the Corps evaluated the cumulative impacts that are anticipated to occur during the 5-year period the NWPs are expected to be in effect. The cumulative impacts are evaluated against the current environmental setting or baseline, in accordance with typical practices for conducting environmental impact analyses. The Corps' public interest review regulations at 33 CFR 320.4(a)(1) and the Corps' general permit regulations at 33 CFR 322.2(f) and 323.2(h) require consideration of cumulative effects for the issuance of permits.
For those NWPs that authorize discharges of dredged or fill material into waters of the United States, the Corps complies with the U.S. EPA's regulations at 40 CFR 230.7(b)(3) for assessing cumulative impacts for the issuance of general permits. Section 230.7(b)(3) requires the permitting authority ( e.g., the Corps) to predict cumulative effects by evaluating the number of individual discharge activities likely to be regulated under a general permit until its expiration, including repetitions of individual discharge activities at a single location. In its cumulative effects analyses for the issuance or reissuance of an NWP, the Corps goes further than estimating the number of times an NWP may be used to authorize activities during the 5-year period it is expected to be in effect by estimating the acreage of impacts and the acreage of compensatory mitigation required by district engineers during that 5-year period. In its analysis of the effects or impacts of the proposed issuance or reissuance of the NWPs under the Council of Environmental Quality's current NEPA regulations at 40 CFR 1508.1(g), the Corps also estimates the impacts that are reasonably foreseeable and have a reasonably close causal relationship to the proposed action during the 5-year period the NWP is expected to be in effect.
These analyses of effects and their associated estimates of authorized activities, authorized impacts to jurisdictional waters and wetlands, and compensatory mitigation required by district engineers, include NWP activities that require PCNs and NWP activities that do not require PCNs. The Corps disagrees that an independent evaluation of these approaches to cumulative effects is necessary, or that a peer-reviewed scientific analysis or a scientific support document should be prepared. The Corps follows existing federal regulations for assessing cumulative effects. In its evaluations of individual and cumulative adverse environmental effects of activities authorized by NWPs, the Corps considers reasonably foreseeable effects or impacts, especially those effects or impacts that are directly or indirectly caused by the activity authorized under the Corps' permitting authorities under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act.
The NWP program provides a three-tiered approach to ensure compliance with Section 404(e) of the Clean Water Act. Those three tiers are: (1) the terms and conditions of the NWPs issued by Corps Headquarters; (2) the authority of division engineers to modify, suspend, or revoke NWPs on a regional basis; and (3) the authority of district engineers to modify, suspend, or revoke NWPs on a case-by-case basis. Section 404(e) of the Clean Water Act does not specify how broad or narrow a category of activity must be in order to be covered by a general permit. Therefore, that section of the Clean Water Act gives the Corps the discretion to identify categories of activities for the issuance of NWPs. The Corps interprets broadly the requirement for general permits to authorize categories of activities that are similar in nature, to provide program
While the Corps recognizes that many NWP activities may be components of larger overall projects, the Corps' authorities under the NWP program are limited to discharges of dredged or fill material into waters of the United States that are regulated under Section 404 of the Clean Water Act, and structures and work in navigable waters that are regulated under Section 10 of the Rivers and Harbors Act of 1899. The Corps does not regulate other components of those larger overall projects, such as activities that occur in upland areas. In many cases, the NWPs are authorizing minor features that may be part of those larger overall projects but that still does not bring those larger upland features into the Corps' jurisdiction.
Division engineers can impose regional conditions on the NWPs to protect rivers and streams inhabited by anadromous fish, including salmon. For those salmonids that are listed as endangered or threatened under the Endangered Species Act (ESA), general condition 18 requires PCNs for all NWP activities proposed to be undertaken by non-federal permittees that might affect those listed species or their designated critical habitat (or proposed species or proposed critical habitat), or that occur in their designated or proposed critical habitat. If a proposed NWP activity may adversely affect essential fish habitat, the district engineer will conduct essential fish habitat consultation with the NMFS. District engineers have the discretion to require compensatory mitigation to offset stream losses caused by NWP activities. After conducting ESA section 7 consultation or essential fish habitat consultation, the district engineer may determine that stream compensatory mitigation is necessary to ensure that the NWP activity results in no more than minimal individual and cumulative adverse environmental effects. A division engineer has the authority to modify, suspend, or revoke one or more NWPs in a geographic region if he or she determines that the use of that NWP or NWPs will result in more than minimal cumulative adverse environmental effects.
One commenter said the NWPs should not authorize activities that result in adverse environmental impacts. One commenter stated that the terms and conditions of the NWPs should not be changed to be less protective of the environment. Several commenters said that public notices should be issued for NWP PCNs to disclose proposed NWP activities and increase public participation. A number of commenters suggested that NWPs should require no net loss of aquatic resources. A number of commenters asked why the proposed NWPs use the term “no more than minimal adverse environmental effects” instead of “no more than minimal adverse effects on the aquatic environment.”
Section 404(e) of the Clean Water Act recognizes that activities authorized by general permits, including NWPs, will result in adverse environmental impacts, but limits those adverse impacts so that they can only be no more than minimal. The Corps has adopted terms and conditions for the NWPs to be sufficiently protective of the aquatic environment while allowing activities that result in no more than minimal adverse environmental effects to be conducted.
Requiring public notices for PCNs would be contrary to the purpose of the general permit program established through section 404(e) of the Clean Water Act, for a streamlined authorization process for activities that result in no more than minimal individual and cumulative adverse environmental effects. In addition, it is unlikely that there would be any meaningful public comment submitted to Corps districts in response to public notices for the minor activities authorized by these NWPs that would warrant the reduction in permitting efficiency providing such a comment period would cause. Compensatory mitigation can only be required by the district engineer after he or she reviews the PCN and determines that compensatory mitigation is necessary to comply with the “no more than minimal adverse environmental effects” requirement for NWPs (see 33 CFR 330.1(e)(3)). There is no federal statute or regulation that requires “no net loss” of aquatic resources. The “no overall net loss” goal for wetlands articulated in the 1990 U.S. EPA-Army Memorandum of Agreement for mitigation for Clean Water Act section 404 permits states that the section 404 permit program will contribute to that national goal. The 1990 Memorandum of Agreement only applies to standard individual permits, not to general permits.
The NWP program provides valuable protection to the Nation's aquatic resources by establishing incentives to avoid and minimize losses of jurisdictional waters and wetlands in order to qualify for the streamlined NWP authorizations. A large majority of fills in jurisdictional waters and wetlands authorized by general permits and individual permits are less than 1/10 -acre (see Figure 5.1 in the Regulatory Impact Analysis for this final rule, which is available in the www.regulations.gov docket (COE-2020-0002)). The 16 NWPs use the term “no more than minimal adverse environmental effects” to be consistent with the text of Section 404(e) of the Clean Water Act and 33 CFR 322.2(f)(1) for Section 10 of the Rivers and Harbors Act of 1899. When making no more than minimal adverse environmental effects determinations for proposed NWP activities, the district engineer considers the adverse effects to the aquatic environment and any other factor of the public interest ( e.g., 33 CFR 330.1(d)). The district engineer also applies the 10 criteria listed in paragraph 2 of Section D, District Engineer's Decision. The use of the term “no more than minimal adverse environmental effects” does not expand the Corps' scope of analysis. The Corps' control and responsibility remains limited to the activities it has the authority to regulate, and the effects to the environment caused by those activities.
Several commenters said that the proposed NWPs are not sufficiently protective of freshwater mussels. One commenter stated that the NWPs should be modified to provide additional protections to wilderness areas. Several commenters identified specific areas of the country where they were concerned that the use of the NWPs would authorize activities with adverse environmental impacts. Many commenters said that the NWPs have increased coastal communities' vulnerability to future flood events by accelerating wetland alteration following hurricanes. One commenter stated that the NWPs should be revoked in areas included under the Safe Drinking Water Act, such as public water systems source water areas. One commenter said that all NWPs should be subject to an acreage limit of 1/10 -acre.
Impacts to freshwater mussels that are listed as endangered or threatened under the ESA are addressed through general condition 18 and the subsequent ESA section 7 consultations that occur when district engineers review PCNs and determine that a proposed NWP activity may affect listed mussels. Where there are concerns about the use of NWPs in wilderness areas and other specific waterbodies or geographic areas of the United States, division engineers can add regional conditions to the NWPs to restrict or prohibit their use in those areas. The Corps does not have the legal authority to address the i.e., water supply and conservation at 33 CFR 320.4(m)) that can be a basis for exercising discretionary authority. The Corps believes that the 1/2 -acre limit for the NWPs, the PCN review process, and the ability of division engineers to modify, suspend, or revoke the NWPs on a regional or case-specific basis is sufficient for ensuring that the NWPs that have the 1/2 -acre limit authorize only those activities that result in no more than minimal individual and cumulative adverse environmental effects.
One commenter stated that implementing NWPs under the Navigable Waters Protection Rule (NWPR) will result in more than minimal impacts and not account for areas that were jurisdictional but are not under current rule. Many commenters said that the NWPs should include language clarifying that not all ditches constructed in adjacent wetlands are jurisdictional. Many commenters stated that the discussion of wetland jurisdiction in the NWPs should mirror that in the NWPR. Many commenters asserted that there are inconsistencies between the proposed NWPs and the NWPR. Several commenters said that the terminology in the NWPs should be consistent with the NWPR, especially the terms “stream,” “tributary,” and “ephemeral.”
The NWPs are used to authorize activities in waters and wetlands that are jurisdictional under the Corps' permitting authorities: Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899. If a project proponent wants to discharge dredged or fill material into a waterbody that is not subject to Clean Water Act jurisdiction under the NWPR, then DA authorization under an NWP or any other type of Corps permit is not required for that proposed discharge. The Corps declines to add language to this final rule regarding the jurisdictional status of ditches under the Clean Water Act because that jurisdictional status is more appropriately addressed through application of the provisions of the NWPR at 33 CFR part 328. Many of the NWPs can be used to authorize discharges of dredged or fill material into numerous wetland types that are subject to Clean Water Act jurisdiction under the NWPR. There are no inconsistencies between the proposed NWPs and the NWPR. The NWPs can be used to authorize specific activities in waters and wetlands that are subject to Clean Water Act jurisdiction under the NWPR. Some of the NWPs specifically authorize discharges of dredged or fill material into streams, so the Corps declines to replace the term “stream” with “tributary.” Under the NWPR, ephemeral features, including ephemeral streams are excluded from Clean Water Act jurisdiction.
One commenter requested that the Corps issue a new NWP with no PCN requirements that authorizes emergency projects such as repair of significant leaks from canals, tunnels, and other features, culvert repair and replacement, critical pump plant repairs, and small scale urgent natural disaster mitigation projects. One commenter suggested that the Corps issue a new NWP to authorize natural disaster mitigation projects ( e.g., fire or flood repairs or mitigation projects) with an acreage limit of 1/10 -acre. One commenter stated that the Corps should issue a new NWP to authorize aggregate mining activities, instead of NWP 44. One commenter said that the Corps should prioritize NWP verifications for time-sensitive maintenance and emergency work. One commenter stated that the proposal should include a list of typically exempted activities, such as ditch maintenance. One commenter said that that the NWPs should include a general condition to limit the spread of invasive/noxious species.
The Corps declines to issue a new NWP to authorize the repair of leaks from canals, tunnels, and other features because NWP 3 can be used to authorize discharges of dredged or fill material into waters of the United States or structures or work in navigable waters of the United States to repair leaking structures or fills. The Corps also declines to issue a new NWP to authorize natural disaster mitigation projects. Some of these activities are already authorized by NWP 37, emergency watershed protection and rehabilitation activities. Some of these activities can also be authorized through the Corps' emergency permitting procedures at 33 CFR 325.2(e)(4). Nationwide permit 44 authorizes aggregate mining activities, so it is not necessary to issue another NWP to authorize those activities. District engineers currently have the authority to prioritize authorization of time-sensitive maintenance and emergency work, including the use of the emergency permitting procedures at 33 CFR 325.2(e)(4). Certain NWPs include notes that point to exemptions that may be related to authorized activities. The Corps declines to add a general condition to the NWPs to require permittees to take actions to limit the spread of invasive or noxious species because such a condition would not be reasonably enforceable and invasive or noxious species can spread through natural mechanisms outside the control of permittees. The Corps' regulations at 33 CFR 325.4(a) requires permit conditions to be directly related to the impacts of the proposal, appropriate to the scope and degree of those impacts, and reasonably enforceable.
(1) Status of Existing Permits
In response to the 2020 Proposal, the Corps received comments concerning the status of existing NWP authorizations and how the issuance of the final rule may affect those existing authorizations. The Corps also invited public comment on changing the expiration date for the 2017 NWPs to avoid having two sets of NWPs in effect at the same time.
Many commenters stated that current NWPs should expire on their original expiration date ( i.e., March 18, 2022). Several commenters expressed support for the 2017 NWPs expiring the day before the new NWPs become effective in order to provide certainty and continuity without imposing burdens on permittees, provided that all activities authorized by the 2017 NWPs remain approved regardless of whether those activities meet the requirements of the new NWPs. These commenters also wanted to avoid having differing sets of NWPs in effect at the same time.
Many commenters stated that the Corps proposed grandfathering procedure would cause uncertainty and disruption to those who are relying on the expiration date of the 2017 NWPs and the 12-month grandfathering period. A few commenters said that the grandfathering process and applicability was unclear. One commenter stated that previously verified activities should be allowed to continue under the 2017 NWPs unless the new NWPs are more restrictive. One commenter stated that if the NWPs issued in the final rule replaces the 2017 NWPs and the NWPs issued in the final rule go into effect before the 2017 NWPs were originally scheduled to expire on March 18, 2022, the Corps should notify all permittees who submitted PCNs or received NWP
The Corps acknowledges that that these changes to the NWPs may cause uncertainty and disruption for some project proponents who have received NWP verifications from the Corps. However, the Corps believes this disruption will be limited because the activities affected by the changes to the 12 existing NWPs are likely to continue to qualify for NWP authorization. Further, project proponents can work with Corps districts to efficiently obtain NWP verifications under the reissued NWPs. The information previously submitted to Corps districts via PCNs can be used to provide NWP verifications for many of the activities that will be authorized by the new NWPs for different types of utility line activities that were previously authorized by NWP 12. It is impractical to require the Corps districts to reach out to all permittees who received NWP verifications under the 2017 NWPs that are reissued in this final rule because of the number of verified activities. Once an NWP verification has been provided there is no obligation for a permittee to undertake the work that has been permitted; therefore, there it is impractical for the Corps to follow-up on every verification to ascertain if the work has been completed and/or whether the project proponent still intends to proceed with the activity authorized under the NWP.
One commenter asked what would happen to activities approved under the 2017 NWPs that would start construction prior to March 18, 2022, but after the implementation dated of the new NWPs. One commenter stated that activities that no longer qualify under the new NWPs but were verified under the 2017 NWPs should have 18 months to complete the authorized activity. One commenter questioned whether projects verified under the 2017 NWPs would still be valid as verified or would they be in non-compliance and require re-authorization either by NWP or by individual permit.
If a project proponent received an NWP verification under one of the 2017 NWPs, and the activity continues to be authorized by one of the existing NWPs that was reissued, that activity continues to be authorized by the 2017 NWP until it expires on March 18, 2022, unless the district engineer specified a different expiration date in the NWP verification letter (see 33 CFR 330.6(a)(3)(ii)). In contrast to the grandfathering provision at 33 CFR 330.6(b), the grandfathering provided by section 330.6(a)(3)(ii) is not dependent on when the project proponent commences construction. If the activity is not authorized by the reissued NWP, then the project proponent has 12 months to complete the authorized activity after the 16 final NWPs go into effect as long as the project proponent has commenced construction or is under contract to commence construction before the new expiration date for the twelve 2017 NWPs that are reissued in this final rule (see 33 CFR 330.6(b)). The Corps' regulations at 33 CFR 330.6(b) specify a 12-month grandfathering period for activities that no longer qualify for authorization under the reissued NWP if the activity has commenced or is under contract to commence prior to the expiration of the NWP. To change that 12-month period to 18 months would require rulemaking to amend the regulation. The validity of the prior NWP authorization would depend on whether the activity continues to be authorized by any of the 16 NWPs issued in this final rule, and whether any of the grandfathering provisions in 33 CFR 330.6 apply.
One commenter said that based on section 330.6(b) permittees should have until March 18, 2023 to complete projects authorized under the 2017 NWPs as long as they are under construction or contract to commence construction. One commenter stated that special emphasis should be placed on NWP 12 if it is split into three NWPs, to ensure that activities previously authorized under the 2017 NWP 12 continue to be permitted through the date specified in the verification letter. One commenter stated that the Corps should allow for a reasonable transition between existing activities authorized by an NWP and the new NWPs, for up to one year.
As discussed above, electric utility line and telecommunications activities and utility line activities for water and other substances continue to be authorized by the 2017 NWP 12 for up to 12 months as long as the project proponent has commenced construction or is under contract to commence construction before NWPs 57 and 58 go into effect. Given the anticipated effective date of this final rule, the 12-month grandfathering provision is likely to end close to March 18, 2022. The Corps believes that the current regulations provide a reasonable transition from the 2017 NWPs to the 16 NWPs issued in this final rule.
(2) Pre-Construction Notification Requirements
A few commenters stated they are supportive of the reduction of the number of PCN thresholds under various NWPs. A few commenters said they are supportive of the removal of the 300 linear foot PCN threshold. Many commenters stated that they are opposed to reducing the number of PCN thresholds for the NWPs because they believe these PCN thresholds are necessary to ensure that the activities authorized by these NWPs have no more than minimal adverse environmental effects. A few commenters said that the lack of PCNs does not meet the national no-net-loss of aquatic resources goal because these losses are not being mitigated. A few commenters stated their opposition to the removal of the 300 linear foot PCN thresholds. Several commenters said that they are opposed to federal agencies not having to submit PCNs because it is contrary to the Clean Water Act.
The changes to the PCN thresholds for the NWPs are discussed in the sections of the final rule that apply to each NWP. With the removal of the 300 linear foot limit for losses of stream bed, the Corps has also removed the ability of district engineers to waive that 300 linear foot limit on a case-by-case basis after reviewing PCNs. Activities can be authorized by NWPs with no compensatory mitigation requirements as long as those activities result in no more than minimal individual and cumulative adverse environmental effects. In FY 2018, approximately 11 percent of activities verified by district engineers as qualifying for NWP authorization required compensatory mitigation. There is no requirement in law or regulation for no net loss of aquatic resources. The requirement for what can be authorized by an NWP is that established by Section 404(e) of the Clean Water Act requiring activities authorized by NWPs to cause only minimal individual and cumulative adverse environmental effects. As discussed in Section II.D, the Corps is retaining PCN requirements for federal agencies that use the NWPs to authorize their activities.
A few commenters said that PCNs should be required for all NWP activities to ensure the authorized activities are not affecting the environment adversely and to ensure the permittee is avoiding and minimizing impacts to the maximum extent practicable. One commenter stated that a PCN should be required to ensure compliance with Section 106 of the National Historic Preservation Act. One commenter said that the timing of the review process for a PCN is not identified in the proposed rule for any of the NWPs.
The Corps establishes PCN thresholds for those NWP activities that have the potential to cause more than minimal
One commenter stated that the Corps undertakes many actions under its permitting authorities for which the tribes and villages are not notified. One commenter asked how the Corps ensures no more than minimal adverse environmental effects if a default NWP authorization occurs after 45 days has passed after the district engineer receives a PCN. One commenter asked for clarification as to how the Corps ensures compliance for activities that do not require PCNs. One commenter requested that Corps Headquarters clarify to each of the Corps districts that it is up to the permittee to determine whether a PCN is required or not.
In conjunction with the rulemaking process for the issuance of these NWPs, Corps districts have been conducting consultation and coordination with tribes to identify regional conditions and coordination procedures to ensure compliance with general condition 17, concerning tribal rights. Activities that qualify for the default authorization that occurs 45-days after the district engineer receives a complete PCN must comply with all conditions of the NWP, including the general conditions and any applicable regional conditions imposed by the division engineer. The permittee is responsible for reading the NWPs and all of their conditions to determine whether he or she is required to submit a PCN before proceeding with an authorized activity.
One commenter said that for linear projects that are considered “single and complete,” where some crossings do not require PCNs, the permittee should not have to divulge the non-PCN crossing information to the Corps because the permittee is not required to provide the same level of documentation for non-PCN crossings, and the project proponent should be free to move forward with the non-PCN crossings. One commenter encouraged the Corps to implement a nationwide tracking and monitoring system for NWPs with PCN requirements to share information with cooperating resource agencies so that informed decisions can be made regarding changes to the NWP program.
The information on the non-PCN crossings associated with a linear project is necessary so that the district engineer can consider all crossings of waters of the United States that require DA authorization when making his or her determination that the proposed NWP activities will result in no more than minimal cumulative adverse environmental effects. The information required by paragraphs (b)(4)(i) and (ii) of general condition 32 does not change these non-PCN crossings into those requiring PCNs. The Corps tracks all NWP verifications issued for activities that require PCNs and for activities reported to Corps districts through voluntary PCNs where the permittee seeks written verification even though he or she is not required to do so.
(3) Climate Change
Many commenters said that the Corps should consider climate change during the reissuance of these NWPs. One commenter stated that the Corps failed to analyze climate change, the risk of which will be exacerbated by the issuance of the NWPs. Some of these commenters stated that the Corps should consider increased energy consumption as a foreseeable indirect effect of the Corps' decisions for these NWPs. Several commenters asserted that the proposed changes to the NWPs will have significant impacts on the environment, including climate change. One commenter said that the cumulative impacts of stream and wetland losses from NWP activities must be considered in the context of the changing climate. Several commenters stated that the proposed NWPs help support the nation's investment of its infrastructure, including changes to infrastructure to address global climate change.
The Corps has considered climate change during the reissuance of the NWPs, and each of the national decision documents includes a discussion of climate change. Although some activities authorized by various NWPs may be associated with energy production, distribution, and use, the Corps does not have the authority to regulate or control the production, distribution, or combustion of hydrocarbons and other materials are sources of carbon dioxide and other greenhouse gases that contribute to global climate change. Permittees may use equipment during the construction of the NWP activity that emits carbon dioxide and other greenhouse gases, but those emissions occur during the construction period for the authorized activity and have an insignificant contribution to cumulative greenhouse gas emissions in the region. The activities authorized by NWPs may result in permanent or temporary impacts to wetlands and streams, and the discharges of dredged or fill material into waters of the United States and structures and work in navigable waters of the United States are only a subset of the variety of human activities that change the quantity and quality of wetlands, streams, and other aquatic resources. Those other human activities are discussed in section 4.0 of the national decision documents for these NWPs. Some activities authorized by the NWPs, such as utility line activities, bank stabilization activities, living shorelines, and aquatic resource restoration activities contribute to adaptation to climate change.
C. Comments on Proposed Actions Under Executive Order 13921, Promoting American Seafood Competitiveness and Economic Growth
In response to the 2020 Proposal, the Corps received comments on its proposed actions under Executive Order 13921, Promoting American Seafood Competitiveness and Economic Growth. The comments on proposed NWPs A and B for seaweed mariculture activities and finfish mariculture activities, respectively, are discussed in Section II.G of this final rule. In response to the section of the 2020 Proposal on E.O. 13921, the Corps received a few comments on aquaculture in other waters of the United States, but those commenters seemed to think that the mariculture NWPs might also authorize aquaculture activities in those other waters ( e.g., freshwater lakes, ponds, and wetlands). The new NWPs 55 (seaweed mariculture activities) and 56 (finfish mariculture activities) limit those activities to estuarine and marine waters. These new NWPs also authorize multi-trophic mariculture activities.
D. Comments on the 2018 Legislative Outline for Rebuilding Infrastructure in America
In the 2020 Proposal, the Corps requested comment on whether to modify the NWPs that require PCNs to limit the PCN requirement to non-federal permittees. The Corps requested that commenters provide their views on whether they support or oppose having different PCN requirements for Federal and non-Federal permittees, with supporting information to explain their views.
After considering the comments received in response to the proposal based on the 2018 Legislative Outline
Many commenters opposed the proposal to remove PCN requirements for federal permittees that want to use the NWPs to authorize their activities, because it would apply different PCN requirements and standards to federal versus non-federal permittees. Some of these commenters said this change may result in inadvertent violations. Some of these commenters stated that applying different PCN requirements for federal and non-federal permittees has no rational basis, and PCN requirements should be based on the regulated activity, not who undertakes the regulated activity.
After reviewing the comments received in response to this aspect of the proposal, the Corps agrees that there is no substantive basis for establishing different PCN requirements for federal and non-federal permittees. The Corps is thus retaining the existing PCN requirements for federal permittees.
Many commenters questioned whether federal agencies employ environmental experts qualified to review the projects before submitting the PCNs to the Corps and ensure that those federal agencies comply with applicable laws, regulations, and policies. Some these commenters said that expertise is inconsistent in terms of presence and depth among different federal agencies. They stated that staff at Corps districts are the best equipped with the technical knowledge and familiarity to administer the program and provide compliance oversight.
The Corps agrees that knowledge regarding environmental laws and regulations, and experience in preparing environmental documentation to demonstrate compliance with environmental laws, varies among people as a whole, and is not dependent on whether they work for a federal government agency. As discussed in the 2020 Proposal, many non-federal permittees seek the assistance of environmental consultants to help them obtaining DA authorization through the NWP authorization process.
Many commenters pointed out that PCNs allow the NWP program to meet the goal of no more than minimal individual and cumulative adverse impacts to the environment. Many of them said that exempting activities undertaken by federal agencies would reduce the ability of the Corps to track the cumulative effects of the NWP program. Many commenters expressed concerns with the Corps not assessing compensatory mitigation for federal permittees. They said there would be no mechanism for oversight and assurance that mitigation is completed and legally binding. Some of these commenters stated that federal permittees would have no incentive to avoid and minimize impacts and it is a clear conflict of interest for federal agencies, as they are incentivized to ensure their projects are permitted with as little cost as possible.
The Corps is continuing to require PCNs from federal permittees, so there will be no change in the number of PCNs. District engineers will still review PCNs and require compensatory mitigation and other forms of mitigation when necessary to ensure that NWP activities result in no more than minimal individual and cumulative adverse environmental effects.
Regarding the proposed definition of non-federal permittee, several commenters asked about the circumstances under which a non-federal permittee would be considered a federal permittee, and whether federal funding or some other federal nexus involving a local partner would be a factor. Some commenters inquired whether a state or local agency who has been delegated NEPA authority be considered a non-federal permittee. Several commenters said that there would need to be a clearer definition to help identify federal permittees who would no longer have to submit PCNs for proposed NWP activities. Because the Corps is retaining PCN requirements for federal agencies, it declines to speculate on how it would have implemented the proposal.
Several commenters stated that delegation of the section 404 permitting program to another federal agency is not likely to be legally permissible and might expose the Corps to litigation. Some of these commenters said that case law suggests that such delegation of a federal agency's statutory authority is not allowed, especially in the absence of memorandum of agreement between agencies. Not requiring PCNs from federal permittees for NWP activities is not be a delegation of the section 404 permitting program. The Corps continues to implement the NWP program and take actions necessary ensure that NWP activities comply with the terms and conditions of those authorizations, including potential actions identified in its enforcement regulations at 33 part CFR 326.
Several commenters did not support the inclusion of state departments of transportation (DOTs) that have been assigned NEPA responsibilities in the category of federal permittees that would not have to submit PCNs for proposed NWP activities. Some of these commenters said that state DOTs may forgo internal mitigation programs if PCNs were no longer required and district engineers would not have the ability to impose mitigation requirements on NWP activities through conditions added to the NWP authorization. Some commenters said that long-term linear transportation projects are some of the biggest contributors of turbidity in the nation's waterbodies and can have permanent impacts to streams and wetlands. Some DOTs already have funding agreements with the Corps in most states to provide supplemental staff that are required to implement impartial decision-making and are overseen and reviewed by non-funded regulators to ensure transparency and fairness. A few commenters said that if these critical safeguards be removed, DOTs will not be impartial or unbiased, and could undermine the environmental protections provided by the PCN process. Since the Corps is not changing the PCN requirements for federal permittees, it declines to speculate on how it would have implemented the proposed definition of “non-federal permittee” and other aspects of the proposal.
A few commenters stated that removing PCN requirements for federal permittees could limit the ability of states to ensure that state water quality standards are being met under Section
The PCN requirements do not affect the requirements of Section 401 of the Clean Water Act. If a certifying agency does not issue water quality certification for the issuance of an NWP that does not require pre-construction notification, the project proponent is still required to obtain an activity-specific water quality certification or waiver for the proposed discharge.
A few commenters stated that the further an agency's focus is from natural resource management, the input from state fish and wildlife agencies is more critical. These commenters said that the participation of state natural resource agencies in the PCN review process helps ensure potential impacts to state trust resources are considered, and ensures public trust property is not taken without compensation. The Corps does not coordinate PCNs with state natural resource agencies, except for a few exceptions. Those exceptions are identified in paragraph (d) of general condition 32.
Several commenters pointed out that both federal and state projects are causes of some of the nation's largest wetland losses. These commenters said that if PCN requirements are removed, there will be no way to assess the impacts of these large-scale projects and it would result in huge aquatic resource losses. Several commenters stated that few federal agencies have the level of experience in working with and consulting tribes and said that PCNs should continue to be required in order to provide communication between the potentially impacted tribe, the Corps, and the federal agency regarding any potential impacts to tribal lands and resources. Since the Corps is retaining PCN requirements for federal permittees, these concerns have been addressed.
A commenter said that the preamble to the proposed rule explains that the PCN process also provides a database to inform renewal of NWPs. A couple of commenters stating that the Corps' assumption that non-federal entities, such as private entities, non-profits and even state governments do not possess the same or higher expertise than the federal government is arbitrary and unfair. One commenter stated that there has been an erosion of positions within agencies along with the required expertise for such environmental reviews. Since the Corps is retaining PCN requirements for federal permittees, there is no need to speculate on how it would have implemented the proposal.
A couple of commenters said that Section 313 of the Clean Water Act states in no uncertain terms that all federal agencies “shall be subject to, and comply with, all federal, state, interstate, and local requirements respecting the control and abatement of water pollution in the same manner, and to the same extent, as any nongovernmental entity.” A couple of commenters stated that removal of the PCN requirements for federal permittees would make it difficult for states to identify violations and impossible for the Corps to ensure that the conditions of the permits are being property implemented, especially since recent changes to the EPA's regulations for Clean Water Act Section 401 water quality certifications, which preclude certifying authorities from monitoring and enforcing conditions of permitted activities. Since the Corps is retaining PCN requirements for federal permittees, there is no need to respond to these comments.
One commenter requested clarification regarding use of the phrase “NEPA responsibility for all federal highway project in the state”, and asked whether the Corps intended to only provide federal permittee status to those NEPA assignment states who accept all federal highway projects in the state. One commenter stated that state transportation agencies would gain efficiency by elimination of PCNs for many small projects. A few commenters supported the proposal and believe it will streamline review and approval of permitting while allowing the Corps to focus on individual permitting needs. Several commenters supported the proposed definition of “non-federal permittee” including the inclusion of state DOTs. The Corps is not adopting the proposed definition of “non-federal permittee” so it is not necessary to address the comments on the proposed definition.
One commenter supports the PCN process and encourages the Corps to work with state agencies for additional options such as reducing comment periods to reduce overall time constraints associated with Corps permitting. Several commenters suggested that there should be a certification process through which individuals receive training by the Corps and demonstrate that they have sufficient knowledge to preserve the intent of the NWPs. They said the Corps should develop a set of criteria that each entity needs to meet to demonstrate proficiency to allow the entity to be exempt from submitting PCNs for proposed NWP activities.
The Corps does not solicit comments from state agencies on proposed NWP activities, except for certain NWP activities identified in paragraph (d) of general condition 32. The Corps does support the development of a certification process for potential users of the NWPs. Certain NWPs do not require the submission of PCNs but for those that do, district engineers will continue to review and render decisions on those actions.
One commenter suggested that the Corps exempt private companies that are undertaking projects in conjunction with, or in response to, federal projects. One commenter stated that the Corps should clarify whether states, or entities acting with or on behalf of states, would be exempt from the requirement to submit PCNs when operating under the Surface Transportation Block Grant Program, which allows states to implement road projects and other projects using federal money with some amount of regulatory oversight by the Federal Highways Administration. A couple commenters suggested that if the Corps does not require PCNs for activities undertaken federal permittees, the PCN requirements for all applicants could be included as regional conditions to the NWPs. The Corps is retaining the PCN requirements for federal permittees, therefore it declines to speculate on how it would have implemented the proposal.
One commenter suggested modifying the PCN exemption to only encompass federal, state, or local agencies that have established their credentials for application of the NWP program. One commenter suggested an exemption from PCN requirements for federal permittees when pre-construction notification is required solely as a result of federal consultation thresholds noted in the NWP general conditions. One commenter suggested there would be a benefit in including a statement clarifying that state transportation agencies with NEPA delegation are the federal leads in terms of ESA Section 7 and NHPA 106 compliance. One commenter stated that most DOTs strive for consistency and implement NEPA requirements on all projects, which ensures compliance with federal regulations and allows previously non-
One commenter stated that to the extent there is a perception of delay caused through federal administrative shortfalls and backlogs, a greater level of funding for Corps staff and offices would be a better investment in reducing perceived delays. This commenter said that exchanging one federal staff funding shortfall for another agency with less expertise would not produce a net gain in permitting efficiency while complying with the duty to authorize only those impacts that will have minimal adverse effects on the environment. One commenter suggested that the Corps evaluate whether a PCN requirement should be based on qualifications rather than the federal status of a permittee. This commenter said that an audit process could be implemented to verify past and continued quality of the applicant's work. One commenter suggested the Corps focus on how to improve staff training and the mechanics of the PCN process so that it is completed in a reliable, transparent, and effective manner within the designated time frames. The Corps is retaining the PCN requirements for federal permittees, so these concerns have been addressed.
E. Comments on Regional Conditioning of Nationwide Permits
Under Section 404(e) of the Clean Water Act, NWPs can only be issued for those activities that result in no more than minimal individual and cumulative adverse environmental effects. For activities that require authorization under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), the Corps' regulations at 33 CFR 322.2(f) have a similar requirement. Since it can be difficult for the Corps to draft national NWPs in such a way that they account for regional differences, an important mechanism for ensuring compliance with these requirements is regional conditions imposed by division engineers to address local environmental concerns. Effective regional conditions help protect local aquatic ecosystems and other resources and help ensure that the NWPs authorize only those activities that result in no more than minimal individual and cumulative adverse effects on the environment and are not contrary to the public interest.
Corps regional conditions are added to the NWPs by division engineers in accordance with the procedures at 33 CFR 330.5(c). Water quality certification (WQC) and Coastal Zone Management Act (CZMA) consistency concurrence regional conditions are also added to the NWPs if an appropriate certifying authority issues a water quality certification or CZMA consistency concurrence with special conditions prior to the finalization of the issued, reissued, or modified NWPs.
Corps regional conditions approved by division engineers cannot remove or reduce any of the terms and conditions of the NWPs, including general conditions. Corps regional conditions cannot lessen PCN requirements. In other words, Corps regional conditions can only be more restrictive than the NWP terms and conditions established by Corps Headquarters when it issues or reissues an NWP.
The Corps' regulations for establishing WQC regional conditions for the NWPs are located at 33 CFR 330.4(c)(2). If, prior to the issuance or reissuance of NWPs, a state, authorized tribe, or EPA issues a Clean Water Act section 401 water quality certification with conditions, the division engineer will make those water quality certification conditions regional conditions for the applicable NWPs, unless he or she determines that a specific condition in a water quality certification issued for the issuance of an NWP does not comply with 40 CFR 121.7(d)(2). If the district engineer makes such a determination, then he or she will consider that condition waived under 40 CFR 121.9(b) after written notice is provided to EPA and the certifying authority consistent with 40 CFR 121.9(c). For more information on compliance with Section 401 of the CWA, refer to Section III.G.
For CZMA consistency concurrences issued by a state for the issuance of an NWP, if the division engineer determines those CZMA concurrence conditions do not comply with 33 CFR 325.4, then the conditioned CZMA consistency certification will be considered an objection, and the project proponent will need to request an activity-specific CZMA consistency concurrence from the state (see 15 CFR 930.31(d)) under subpart D of 15 CFR part 930.
Corps regional conditions may be added to NWPs by division engineers after a public notice and comment process and coordination with appropriate federal, state, and local agencies, as well as tribes. After Corps Headquarters publishes in the Federal Register the proposal to issue, reissue, or modify NWPs, all district engineers issue local public notices to advertise the availability of the proposed rule in the Federal Register and to solicit public comment on proposed regional conditions and/or proposed revocations of NWP authorizations for specific geographic areas, classes of activities, or classes of waters (see 33 CFR 330.5(b)(1)(ii)).
As discussed above, regional conditions are an important tool for taking into account regional differences in aquatic resources and their local importance and for ensuring that the NWPs comply with the requirements of Section 404(e) of the Clean Water Act, especially the requirement that activities authorized by NWPs may only result in no more than minimal individual and cumulative adverse environmental effects. Regional conditions are modifications of the NWPs that are made by division engineers. Regional conditions can only further condition or restrict the applicability of an NWP (see 33 CFR 330.1(d)). Under 33 CFR 330.5(c)(1)(i), the first step of the Corps' regional conditioning is for district engineers to issue public notices announcing proposed regional conditions, and to solicit public comment on those proposed regional conditions, usually for a 45-day comment period. Those public notices also solicit suggestions from interested agencies and the public on additional regional conditions that they believe are necessary to ensure that the NWPs authorize only those activities that have no more than minimal adverse environmental effects. The district public notices are generally issued shortly after Corps Headquarters publishes the proposed NWPs in the Federal Register .
After the public comment period ends for the district public notices, the Corps district evaluates the comments and begins preparing the supplemental documents required by 33 CFR 330.5(c)(1)(iii) for each NWP. Each supplemental document will evaluate a specific NWP on a regional basis ( e.g., by Corps district geographic area of responsibility or by state) and discuss the need for regional conditions for that NWP. Each supplemental document will also include a statement by the division engineer that will certify that the NWP, with approved regional conditions, will authorize only those activities that will have no more than minimal individual and cumulative adverse environmental effects. The supplemental documents may cover a
After the division engineer approves the regional conditions and signs the supplemental documents, the district issues a public notice on its website announcing the final Corps regional conditions and when those regional conditions go into effect (see 33 CFR 330.5(c)(1)(v)). Copies of the district's public notice are also sent to interested parties that are on the district's public notice mailing list via email or the U.S. mail. The public notice will also describe, if appropriate, a grandfathering period as specified by 33 CFR 330.6(b) for those who have commenced work under the NWP or are under contract to commence work under the NWP (see 33 CFR 330.5(c)(1)(iv)). A copy of all Corps regional conditions approved by the division engineers for the NWPs are forwarded to Corps Headquarters (see 33 CFR 330.5(c)(3)).
Under the current regulations, Corps Headquarters does not have a formal role in the development and approval of Corps' regional conditions by division engineers. However, Corps Headquarters provides templates for the supplemental documents required by § 330.5(c)(1)(iii), to promote consistency in those supplemental documents. If requested by district and division offices, Corps Headquarters also provides advice on appropriate Corps regional conditions for the NWPs. The Corps is a highly decentralized organization, with most of the authority for administering the regulatory program delegated to the 38 district engineers and 8 division engineers (see 33 CFR 320.1(a)(2)). District engineers are responsible for the day-to-day implementation of the Corps Regulatory Program, including the evaluation of applications for individual permits, evaluating PCNs for proposed NWP activities, evaluating notifications for activities authorized by regional general permits, responding to requests for approved and preliminary jurisdictional determinations, conducting compliance and enforcement actions, and other tasks. Division engineers are responsible for overseeing implementation of the Regulatory Program by their districts, and making permit decisions referred to them by district engineers under the circumstances identified in 33 CFR 325.9(c). Under that section of the Corps' regulations, a division engineer can refer certain permit applications to the Chief of Engineers for a decision. Other than making permit decisions under the circumstances listed in § 325.9(c), Corps Headquarters is responsible for development of regulations, guidance, and policies.
When a state, authorized tribe, or EPA issues a WQC for the issuance of an NWP and that WQC includes conditions, those conditions become conditions of the NWP authorization, unless one or more conditions is waived because they do not meet the criteria at 40 CFR 121.7(d)(2). The processes for states, approved tribes, and EPA to issue WQCs for the issuance of the NWPs, are separate from the Corps' regional conditioning process under 33 CFR 330.5(c), and are governed by state, tribal, or EPA, regulations. The Corps' current regulations for water quality certification for the NWPs are found at 33 CFR 330.4(c), and those regulations provide a process for WQC conditions becoming conditions of the NWPs when WQCs are issued for the NWPs before the NWPs are issued by Corps Headquarters.
When a state issues a general CZMA consistency concurrence with conditions for an NWP, those conditions become CZMA regional conditions if, after recommendation by the district engineer, the division engineer determines those conditions are acceptable under 33 CFR 330.4(d)(2). The processes for states to issue general CZMA consistency concurrences for the NWPs, are separate from the Corps' regional conditioning process under 33 CFR 330.5(c), and are governed by Department of Commerce regulations.
When the final WQCs and CZMA consistency concurrences are issued, District and division engineers will review those WQCs and CZMA consistency concurrences and determine which conditions become conditions for the final NWPs. Division engineers will then finalize any Corps regional conditions. After division engineers finalize Corps regional conditions, Corps districts will issue public notices announcing the final regional conditions and the final WQCs and CZMA consistency concurrences for the issuance of the NWPs. The Corps will post copies of the district public notices announcing the final Corps regional conditions and final WQC/CZMA conditions in the regulations.gov docket (docket number COE-2020-0002), under “Supporting and Related Material.”
At present, districts manage their own processes for soliciting public comment on their regional conditions. In general, they make solicitations of public comment available on their own website and do not always make the comments they receive publicly available. To further improve the nationwide transparency of the regional conditioning process, the Corps is considering revising the regulations governing the regional conditioning process at 33 CFR 330.5(c). Specifically, the Corps is considering whether to require the districts to post and solicit public comment on notices proposing regional conditions in separate dockets at www.regulations.gov. Even though such changes were outside the scope of this action, the Corps solicited public comment on whether to implement this or a similar requirement relating to the regional conditioning process and any factors we should consider in a future rulemaking. While the comments relate to matters that were outside the scope of this action, the Corps appreciates the helpful suggestions it received from the public. The Corps will consider them as we continue to examine whether changes may be necessary to the regulations governing the regional conditioning process.
Several commenters said that regional conditions are excessive and/or unnecessary. Several commenters requested that Corps Headquarters review and concur with regional conditions before they are finalized. A few commenters said that regional conditions may be appropriate in some cases in specific areas of the country. A few commenters said that rationale and justification for regional conditions should be made available to the public. A few commenters recommended that Corps Headquarters provide detailed
The Corps believes that regional conditions are necessary to tailor the NWPs on a regional basis to ensure that the NWPs authorize only those activities that result in no more than minimal individual and cumulative adverse environmental effects. Under the Corps' current regulations at 33 CFR 330.5(c), division engineers have the authority to add regional conditions to the NWPs and Corps Headquarters has no role in that approval process. The supplemental documents division engineers prepare for adding regional conditions to the NWPs require consideration of the comments received on the district's public notices on the proposed regional conditions and a statement of findings showing how substantive comments were considered by the division engineer (see 33 CFR 330.5(c)(1)(iii)). Regional conditions do not need to be consistent across districts, among divisions, or nationally because they are intended to address specific regional issues or concerns for the aquatic environment or any of the Corps' public interest review factors. If regional conditions are specific to watersheds, differences in regional conditions among districts are inevitable because different watersheds are likely to have different resource concerns and different factors affecting what adverse environmental effects might be considered more than minimal.
One commenter stated that Corps districts should be able to develop and identify appropriate regional conditions. One commenter said that the proposed changes to regional conditions will remove coordination processes with state partners. One commenter remarked that the proposed changes will result in a disproportionate impact to floodplains and flood-prone areas. One commenter said that the regional conditions for NWPs 12, C, and D should be the same in each region. One commenter stated that there is inconsistency between whether or not Corps districts consider oil and gas natural pipelines as utility lines in regional conditions.
Corps districts identify regional conditions, and make recommendations to division engineers. The approval authority for regional conditions lies with the division engineer (see 33 CFR 330.5(c)). Regional conditions can provide for coordination with state partners, and that coordination may be removed as regional conditions are considered for a new set of NWPs. The Corps does not have the authority to regulate floodplains and flood-prone areas per se. The Corps has the authority to regulate discharges of dredged or fill material into waters of the United States, and those waters and proposed discharges may be located in floodplains or flood-prone areas. Having identical regional conditions for NWPs that authorize utility line activities would be contrary to the intent of regional conditions, which is to address regional differences in aquatic resources and ensure that the NWPs authorize only those activities that result in no more than minimal individual and cumulative adverse environmental effects. Oil and natural gas pipelines are a type of utility line and regional conditions are intended to address specific resource concerns.
One commenter said that regional conditions should include programmatic compliance with other federal laws. One commenter stated that regional conditions should be used to require in-kind mitigation and adopt impact and mitigation thresholds or associated methodologies. One commenter said that regional conditions should be developed to provide additional protection for species of concern and cultural/historical sites. One commenter asserted that regional conditions should be developed to require tribal consultation for every permit. One commenter said that regional conditions should prohibit work during spawning period for fish of cultural concern or which would jeopardize wild rice beds.
Regional conditions may be helpful in ensuing programmatic compliance with other federal laws. Regional conditions can also be used to specify mitigation requirements for the NWPs. Regional conditions can help provide protection for listed species, historic properties, and cultural resources, often by adding PCN requirements to help ensure that required consultations for those resources are undertaken. Decisions on whether and how to consult with tribes on proposed NWP activities are made on a case-by-case basis by district engineers. Regional conditions may add time-of-year restrictions on authorized activities to ensure that those activities have no more than minimal adverse effects on fish spawning or rice beds.
Several commenters requested greater transparency in the process of establishing regional conditions, saying that public notices, rationales for regional conditions, and comments received on proposed regional conditions should be available on separate dockets at www.regulations.gov. Several commenters requested revisions to governing regulations to require posting of any proposed additions of, changes to, or revocations of regional conditions in separate dockets on www.regulations.gov. Several commenters requested that the Corps create and maintain a single, national website where all proposed and final regional conditions can be viewed. The Corps will consider these comments when it prepares the next rulemaking for the issuance of NWPs.
A few commenters said that public notice processes for regional conditions should be consistent between districts. A few commenters stated that districts are inconsistent and limit comment by requiring subscriptions to respective mailing lists rather than publishing notices in the Federal Register or on www.regulations.gov. One commenter said that public notices for regional conditions should be published in the Federal Register . Two commenters asked for the same level of written justification for adoption of regional conditions that is required to reissue or modify the NWPs. One commenter said that publication of these documents on separate web pages or dockets is redundant and unnecessary. One commenter stated that that comments received on regional conditions should be posted to a web page. One commenter stated that the Corps analyses for regional conditions do not satisfy statutory requirements. Two commenters said that it is difficult to find public notices or regional conditions on district web pages.
The public notice process for regional conditions is consistent among all Corps districts, because the public notice process is described in the Corps' regulations at 33 CFR 330.5(c)(1). The current regulations governing the regional conditioning process relies on public notices, and does not include provisions requiring the publication of notices in the Federal Register . During the next rulemaking process for the NWPs, the Corps will decide whether to use www.regulations.gov for managing and posting public comments received on proposed regional conditions. Each Corps district is responsible for managing its own web pages, and regional conditions apply to a particular Corps district, so it is appropriate for Corps districts to post public notices for regional conditions proposed for their districts on their web pages.
F. Comments on Proposed Removal of the 300 Linear Foot Limit for Losses of Stream Bed
In the proposed rule, the Corps proposed to remove the 300 linear foot for losses of stream bed from NWPs 21 (Surface Coal Mining Activities), 29 (Residential Developments), 39 (Commercial and Institutional Developments), 40 (Agricultural Activities), 42 (Recreational Facilities), 43 (Stormwater Management Facilities), 44 (Mining Activities), 50 (Underground Coal Mining Activities), 51 (Land-Based Renewable Energy Generation Facilities), and 52 (Water-Based Renewable Energy Generation Pilot Projects). All of these NWPs have a 1/2 -acre limit for losses of non-tidal waters of the United States, including non-tidal wetlands and non-tidal streams. With the exception of NWPs 43 and 51, these NWPs require pre-construction notification for all activities. Nationwide permit 43 does not require PCNs for maintenance of existing stormwater management facilities, as long as those maintenance activities are limited to restoring the original design capacities of the stormwater management facility or pollutant reduction green infrastructure feature. Nationwide permit 51 does not require PCNs for activities that result in the loss of 1/10 -acre or less of waters of the United States. Therefore, district engineers will review all proposed activities for these on a case-by-case basis, except for the NWP 43 and 51 activities identified above. When reviewing these PCNs, district engineers apply the 10 criteria in paragraph 2 of Section D, District Engineer's Decision, to determine whether the proposed activities will result in no more than minimal individual and cumulative adverse environmental effects.
In the proposed rule, the Corps presented a number of reasons for these proposed changes to NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52. The Corps' rationale comprises four categories of considerations: (1) The Corps employs several tools in the NWP Program to ensure that NWP activities result only in no more than minimal individual and cumulative adverse environmental effects; (2) removing the 300 linear foot limit would provide consistency across the numeric limits used by the NWP Program for all categories of non-tidal waters of the United States ( i.e., jurisdictional wetlands, streams, ponds, and other non-tidal waters); (3) it would further the objective of the NWP Program stated in 33 CFR 330.1(b) ( i.e., to authorize with little, if any, delay or paperwork certain activities having minimal impacts), by providing equivalent quantitative limits for jurisdictional wetlands, streams, and other types of non-tidal jurisdictional waters, and NWP authorization for losses of jurisdictional stream bed that have no more than minimal individual and cumulative adverse environmental effects; and (4) using acres or square feet ( i.e., an area-based metric) instead of linear feet is a more accurate approach to quantifying losses of stream bed and also serves as a better surrogate for losses of stream functions when a functional assessment method is not available or practical to use.
After reviewing the comments received in response to the proposed rule, for the reasons discussed below the Corps has decided to remove the 300 linear foot limit for losses of stream bed from the 10 NWPs listed above. The comments received in response to the proposed rule are summarized below. The Corps' responses to those comments are also provided along with the comment summaries.
Retaining the 1/2 -acre limit for losses of non-tidal jurisdictional waters and wetlands in these 10 NWPs while removing the 300 linear foot limit for losses of stream bed will help further Congressional intent with respect to Section 404(e) of the Clean Water Act when that provision was enacted into law in 1977. Section 404(e) authorizes the Corps to issue, after notice and opportunity for public hearing, general permits on a state, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Corps determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Section 404(e) does not prescribe any particular approaches for ensuring that activities authorized by general permits result in no more than minimal individual and cumulative adverse environmental effects, thus the Corps developed the PCN process and provided division and district engineers with the authority to modify, suspend, or revoke NWP authorizations on a regional or activity-specific basis after the NWPs are issued by Corps Headquarters. General permits provide a process for authorizing, with minimal paperwork and delays, activities that have no more than minimal individual and cumulative adverse environmental effects. General permits are an important tool for the Corps managing its personnel and workload so that it can focus its efforts on evaluating permit applications for proposed activities that have the potential to cause more than minimal adverse environmental effects.
Removing the 300 linear foot limit for losses of stream bed under these 10 NWPs provides equivalent quantitative limits for all categories of non-tidal jurisdictional waters, including non-tidal “tributaries,” “lakes, ponds, and impoundments of jurisdictional waters,” and “adjacent wetlands” (see 33 CFR 328.3(a)). These non-tidal waters will continue to be subjected to the 1/2 -acre limit for losses of non-tidal waters. Except for NWPs 43 and 51, these NWPs require PCNs for all authorized activities, and district engineers will review these PCNs to determine which activities can be authorized by an NWP and which activities should require individual permits. When reviewing a PCN, the district engineer has the authority to exercise discretionary authority to modify, suspend, or revoke the NWP authorization (see 33 CFR 330.1(d)). When a district engineer reviews a PCN, and if she or he determines that the proposed activity would have more than minimal individual or cumulative net adverse effects on the environment or otherwise may be contrary to the public interest, he or she will either modify the NWP authorization to reduce or eliminate those adverse effects, or instruct the prospective permittee to apply for a regional general permit or an individual permit (§ 330.1(d)). To determine whether a proposed NWP activity will result in no more than minimal individual and cumulative adverse environmental effects, the district engineer will apply the 10 criteria in paragraph 2 of Section D, District Engineer's decision.
Those ten criteria for making minimal adverse environmental effects determinations are:
(1) The direct and indirect effects caused by the NWP activity;
(2) the cumulative adverse environmental effects caused by activities authorized by an NWP and whether those cumulative adverse environmental effects are no more than minimal;
(3) the environmental setting in the vicinity of the NWP activity;
(4) the type of resource that will be affected by the NWP activity;
(5) the functions provided by the aquatic resources that will be affected by the NWP activity;
(6) the degree or magnitude to which the aquatic resources perform those functions;
(7) the extent that aquatic resource functions will be lost as a result of the e.g., partial or complete loss);
(8) the duration of the adverse effects (temporary or permanent);
(9) the importance of the aquatic resource functions to the region ( e.g., watershed or ecoregion); and
(10) mitigation required by the district engineer.
If an appropriate functional assessment method is available and practicable to use, that assessment method may be used by the district engineer to help determine whether the proposed activity will result in no more than minimal adverse environmental effects. The removal of the 300 linear foot limit for losses of stream bed will help increase administrative efficiency by providing a mechanism to authorize, through the NWP Program activities that result in the loss of greater than 300 linear feet of jurisdictional stream bed, but less than 1/2 -acre of non-tidal jurisdictional waters. Under the 2017 NWPs, filling or excavating more than 300 linear feet of a perennial stream bed requires an individual permit even under circumstances where the loss of the stream bed would result in no more than minimal individual and cumulative adverse environmental effects. Under this final rule, district engineers would review PCNs for proposed losses of jurisdictional stream bed (plus any other losses of non-tidal waters of the United States) that are less than 1/2 -acre and determine whether those proposed activities can be authorized by one of these 10 NWPs. If, for a particular PCN, the district engineer determines that the individual and cumulative adverse environmental effects would be more than minimal, he or she will exercise discretionary authority and require an individual permit. This approach provides administrative efficiency by providing a mechanism for district engineers to distinguish which proposed activities should be authorized by an NWP versus which activities should require individual permits with a public notice and comment process and activity-specific evaluations under NEPA, the public interest review, and the Clean Water Act section 404(b)(1) Guidelines.
This approach also adds efficiency in terms of reducing processing times and paperwork for proposed activities that have no more than minimal adverse environmental effects and that are likely to generate few, if any, public or agency comments in response to a public notice for an individual permit application. When more activities that result in no more than minimal adverse environmental effects can be authorized by an NWP, there can be more staff and other resources for Corps districts to devote to undertaking other tasks, such as the review and approval of mitigation banks and in-lieu fee programs and overseeing their operation, conducting compliance actions to ensure that authorized activities are being conducted in accordance with the terms and conditions of their DA authorizations, and conducting approved and preliminary jurisdictional determinations that help project proponents plan and design their proposed projects to avoid and minimize impacts to jurisdictional waters and wetlands.
Another benefit of removing the 300 linear foot limit for losses of jurisdictional stream bed and shifting the quantification of losses of jurisdictional stream bed towards the 1/2 -acre limit for losses of non-tidal waters of the United States is more accurate accounting of the impacts of activities authorized by these 10 NWPs. The discharges of dredged or fill material authorized by these NWPs occur over an area of a river or stream bed and also may include impacts to other aquatic resources such as wetlands or open water areas ( e.g., lakes or ponds). The discharge to a river or stream has a length and a width, and the width can vary depending on the physical characteristics of the impact area, the type of activity being conducted ( e.g., bank stabilization, channel excavation, channel realignment), and other factors. To be regulated under Section 404 of the Clean Water Act, a discharge of dredged material involves any addition, including redeposit other than incidental fallback, of dredged material, including excavated material, into waters of the United States that is incidental to any activity, including mechanized land clearing, ditching, channelization, or other excavation (see 33 CFR 323.2(d)(1)(iii)). A regulated discharge of fill material involves the addition of fill material into waters of the United States that has the effect of either replacing any portion of a water of the United States with dry land or changing the bottom elevation of any portion of a water of the United States (see 33 CFR 323.3(e) and (f)). The direct impacts of these activities are most accurately quantified on an area basis, not a linear basis, to inform a district engineer's decision on whether a proposed activity should be or is authorized by an NWP and to track cumulative impacts.
Accurate quantification of stream bed losses authorized by an NWP is an important component of determining whether a proposed NWP activity will result in no more than minimal individual adverse environmental effects. (See item 1 above from paragraph 2 of Section D, District Engineer's Decision: Understanding “the direct and indirect effects caused by the NWP activity.”) Accurate quantification of stream bed losses is also important for tracking cumulative impacts of activities authorized by an NWP, both on a national and regional basis, and for determining whether a particular NWP activity will contribute to more than minimal cumulative adverse environmental effects. (See item 2 of paragraph 2 of the District Engineer's Decision: “The cumulative adverse environmental effects caused by activities authorized by an NWP and whether those cumulative adverse environmental effects are no more than minimal.”)
As discussed in the 2020 Proposal (85 FR 57316), discharges of dredged or fill material into jurisdictional streams can cause losses of stream bed along only a portion of the stream bed ( e.g., bank stabilization projects that involve discharging fill along the edge of the stream, with no fill in the rest of the stream bed) or across the entire stream bed ( e.g., excavating the stream bed to mine aggregates) along a stream reach. A wide variety of activities involving filling or excavating stream bed may be authorized by these NWPs, such as bank stabilization, channel realignment, culvert installation or replacement, stream channel restoration, the installation of grade control structures ( e.g., rock), fills for footings for bridges, livestock crossings, utility line crossings, and temporary fills for construction and access. Quantifying losses of stream bed in linear feet does not distinguish between filling or excavation activities that occur only in a portion of the stream bed along an ordinary high water mark versus filling or excavation activities that occur in the entire stream bed, from ordinary high water mark to ordinary high water mark.
Accurate quantification of losses of stream bed and losses of other types of jurisdictional waters and wetlands is also important for monitoring and evaluating the cumulative adverse environmental effects caused by NWP activities. In response to the 2020 Proposal, numerous commenters criticized the Corps' assessment of cumulative effects for the NWPs. An essential step in conducting a cumulative effects analysis for an NWP is estimating how many times that NWP may be used during the period the NWP is in effect, the quantity of jurisdictional waters and wetlands that may be lost or
Division engineers have discretionary authority to modify, suspend, or revoke NWP authorizations on a regional basis (33 CFR 330.5(c)) to help ensure that the NWPs are only used to authorize activities that have no more than minimal individual and cumulative adverse environmental effects. For example, if a Corps district determines, in a particular watershed, county, Corps district, or other geographic region, that cumulative losses of stream bed authorized by NWPs may be approaching a level that might exceed the “no more than minimal cumulative adverse environmental effects” threshold, the Corps district can request that the division engineer modify, suspend, or revoke the relevant NWP authorizations in that region. The division engineer can add regional conditions to the appropriate NWPs to restrict or prohibit their use in particular categories of waters, or suspend or revoke the NWP authorization so that those NWP(s) can no longer be used to authorize regulated activities in that geographic region. The division engineer's authority to modify, suspend, or revoke NWP authorizations on a regional basis can also be used to sort out which activities can be authorized by an NWP versus which activities should require individual permits.
District engineers have discretionary authority to modify, suspend, or revoke NWP authorizations on a case-specific basis (see 33 CFR 330.5(d)) to help ensure that NWPs are only used to authorize specific activities that have no more than minimal individual and cumulative adverse environmental effects. A district engineer can add conditions to an NWP authorization to reduce potential adverse environmental effects that might be caused by a proposed NWP activity, such as mitigation requirements to avoid or minimize direct and indirect effects caused by that activity. One example is a time of year restriction to prevent discharges of dredged or fill material from occurring during spawning seasons for fish or other aquatic organisms. Another example of a permit conditions to help reduce adverse environmental effects caused by an NWP activity might be to require the use of certain best management practices. A district engineer might also add permit conditions to the NWP authorization to require compensatory mitigation to offset losses of waters of the United States caused by the NWP activity.
As the Corps implements this final rule, it will continue to rely on these administrative tools that have long been used with these 10 NWPs to help ensure that authorized activities will result in no more than minimal individual and cumulative adverse environmental effects. Those tools are the 1/2 -acre limit for losses of non-tidal waters of the United States, the pre-construction notification requirements and associated activity-specific review by district engineers, the regional conditions that can be added by division engineers, and the activity-specific conditions that can be added by district engineers when reviewing individual PCNs.
The proposal was made in accordance with the recommendations in the report issued by the Office of the Assistant Secretary of the Army (Civil Works) in response to E.O. 13783 on ways to streamline the NWPs. In the proposed rule, the Corps invited public comment on the proposal to remove the 300 linear foot limit and to rely on the 1/2 -acre limit, the PCN process, the proposed modification of the “mitigation” general condition (general condition 23), and other tools to comply with the statutory and regulatory requirement that activities authorized by an NWP must result in no more than minimal individual and cumulative adverse environmental effects. The Corps also invited comment on whether there are situations where quantifying losses of stream bed in linear feet might more accurately represents the actual amount of stream bed filled or excavated as a result of an NWP activity and would result in more defensible determinations on whether a proposed NWP activity will result in no more than minimal individual and cumulative adverse environmental effects. In the proposed rule, the Corps asked commenters to provide information that would help illustrate or explain how and under what circumstance using a linear foot measure to quantify losses of stream bed would be more accurate than using square feet or acres to quantify the amount of authorized impacts.
The Corps also invited comment on the legal, regulatory, policy, or scientific bases for imposing different numeric limits on jurisdictional stream bed losses versus losses of non-tidal jurisdictional wetlands or other types of non-tidal jurisdictional waters. Commenters were encouraged to provide supporting information in the form of citations to laws, regulations, and policies, and the scientific literature, because substantive information would be valuable in assisting the Corps in preparing the final NWPs.
The Corps also requested comment on an alternative hybrid approach to establishing consistent quantitative limits for losses of stream bed authorized by NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52. Under the proposed hybrid approach, losses of stream bed would continue to be quantified in linear feet as long as the activities authorized by these NWPs would result only in the loss of stream bed. There would be linear foot limits for losses of stream bed by stream order identified using the Strahler (1957) method, and the mean stream widths identified by Downing et al. (2012). If a proposed NWP activity would result in the loss of jurisdictional stream bed plus other types of waters of the United States, such as non-tidal jurisdictional wetlands, the losses of waters of the United States would be quantified in acres and subjected to the 1/2 -acre limit. In the preamble to the proposed rule, the Corps provided a table for the hybrid approach (see 85 FR 57321). A critical component of effectively applying the hybrid approach is identifying the correct stream order for the stream segment that is proposed to be filled or excavated as a result of the proposed NWP activity. In this hybrid approach, the linear foot limits would only apply to losses of stream bed. If a proposed NWP activity would result in a combination of losses of jurisdictional stream bed and other types of waters of the United States, such as non-tidal jurisdictional wetlands, then the 1/2 -acre limit would apply to the combined losses of stream bed and non-tidal wetlands, to keep those losses below 1/2 -acre.
In conjunction with the proposal to remove the 300 linear foot limit for losses of stream bed, the Corps proposed to remove the provisions in these NWPs regarding the ability of district engineers to waive the 300 linear foot limit for losses of intermittent and ephemeral stream bed when the applicant submits a PCN and requests a waiver of that 300 linear foot limit. On April 21, 2020, EPA and the Department of the Army published a final rule to define “waters of the United States” entitled the Navigable Waters Protection Rule (85 FR 22250). On June 22, 2020, the Navigable Waters Protection Rule became effective in all states and jurisdictions except for the State of Colorado due to a federal
In addition, the Corps proposed to remove the agency coordination process for seeking input from federal and state agencies on whether the district engineer should grant the waiver of the 300 linear foot limit requested by an applicant for an NWP verification. Removing the waiver provision may reduce costs to permittees by reducing the amount of time the district engineer needs to make her or his decision. For example, the district engineer would not have to wait up to 25 days (see paragraph (d)(3) of the “pre-construction notification” general condition (GC 32) to make the decision on whether to issue the NWP verification. Removal of the agency coordination for these activities is also likely to reduce administrative costs to the Corps, by reducing the amount of staff time needed to send copies of PCNs to the agencies and summarizing and responding to agency comments. Removal of the waiver provision and associated agency coordination would also free up additional time for Corps staff to review other PCNs, other permit applications, and other regulatory actions such as jurisdictional determinations and compliance activities. As mentioned above, under the Navigable Waters Protection Rule, ephemeral streams are not “waters of the United States.” See 33 CFR 328.3(b)(3). Therefore, it should be noted that this would likely reduce the current number of waivers and required interagency coordination process from state and federal agencies, since the current waivers apply only to certain intermittent streams.
Many commenters opposed the removal of the 300 linear foot limit for losses of stream bed. Many commenters supported the proposed change, stating that calculating losses of stream bed in acres is a more accurate measure of those losses since acreage takes both the length and width of the stream channel into account when determining the amount of stream bed filled or excavated by an NWP activity. Several commenters in favor of the proposed change expressed concern with how this change would affect mitigation banks and credit calculations for future and past permits. Several commenters believed this change would continue to ensure that the activities authorized by these NWPs would result in no more than minimal impacts.
As discussed above, the Corps is removing the 300 linear foot limit for losses of stream bed from NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 for the reasons discussed in this final rule to increase the efficiency of the NWP program, utilize a metric that more accurately reflects the amount of impact, and to allow NWP authorization of losses of stream bed where district engineers determine that those losses would have no more than minimal adverse environmental effects after reviewing PCNs. Quantifying losses of stream bed in acres or square feet will be more accurate, provide a more substantial and defensible basis for decision-making by district engineers on PCNs for these activities, and provide more accurate data for the Corps to track cumulative impacts of the activities authorized by these NWPs. The removal of the 300 linear foot limit will not affect the ability of district engineers to require compensatory mitigation or other forms of mitigation for losses of stream bed. In addition, it should not have a substantial effect on mitigation banks that have already been approved and mitigation banks that may be approved in the future. Depending on how existing mitigation banks quantify the credits they produce, there may have to be some technical changes in how credit transactions occur between mitigation bank sponsors and permittees, to determine the appropriate number of stream credits that are needed to offset a permitted loss of stream bed.
A few commenters supported the removal of the 300 linear foot limit because the district engineer retains the ability to exercise discretionary authority to require individual permits if the adverse environmental effects caused by a proposed activity would be more than minimal. These commenters also said they support the removal of the 300 linear foot limit as long as Corps divisions and districts can continue to develop and use regional conditions in districts that have specific resource concerns.
The PCN process is an administrative tool that helps ensure that activities authorized by NWPs cause no more than minimal individual and cumulative adverse environmental effects, by providing activity-specific review of these activities by district engineers before they are authorized by an NWP. The 1/2 -acre limit is another tool that helps ensure that activities authorized by these NWPs have no more than minimal adverse environmental effects. In geographic areas where there are concerns about cumulative losses of headwater streams and the functions they provide, division engineers can add regional conditions to these NWPs to reduce the acreage limit from 1/2 -acre to a lower acreage limit, such as 1/4 -acre or 1/10 -acre. In addition, division engineers can add regional conditions to these NWPs to lower the threshold for requiring stream compensatory mitigation from 3/100 -acre to a different acreage threshold.
Many commenters expressed concerns with removing the 300-linear foot limit on loss of stream bed for these NWPs, stating that this change would allow much larger impacts to smaller stream channels since they typically have smaller widths and therefore a permittee could impact a much longer length of stream before reaching the 1/2 -acre limit. Many commenters said that a linear foot measurement was more appropriate for calculating stream impacts and losses than an acreage-based system because streams are fundamentally linear features in the landscape. Many commenters stated that the Corps has not provided any scientific rational or reasoning behind this change and even the scientific studies cited by the Corps were not interpreted appropriately.
As discussed above, the Corps will rely on other, existing protective mechanisms within the NWPs to ensure that the activities authorized by these NWPs will result in no more than minimal individual and cumulative adverse environmental effects. Those tools include the 1/2 -acre limit, the PCN requirements for these NWPs, and the ability of division and district engineers to further condition or restrict the applicability of an NWP in situations where they have concerns for the aquatic environment under the Clean Water Act section 404(b)(1) Guidelines or for any factor of the public interest (see 33 CFR 330.1(d)). While rivers and streams have a strong linear component, they also vary substantially in width. Discharges of dredged or fill material into waters of the United States that cause losses of waters of United States through the filling or excavation of stream beds occur over an area, and using acres or square feet to quantify losses of stream bed is more informative to determinations of minimal effects and
Another tool that the Corps added to this final rule to help ensure that the activities authorized by these NWPs will result in no more than minimal individual and cumulative adverse environmental effects is the addition of a 3/100 -acre threshold for stream compensatory mitigation in paragraph (d) of the mitigation general condition (general condition 23). The 1/10 -acre wetland mitigation threshold in general condition 23 has been effective in providing incentives for project proponents to reduce wetland losses well below the 1/2 -acre limit to avoid the costs of providing wetland compensatory mitigation. As shown in figure 5.1 of the Regulatory Impact Analysis for this final rule, more than 80 percent of losses of waters of the United States verified by district engineers in fiscal year 2018 as qualifying for NWP authorization were less than 1/10 -acre. The losses of waters of the United States in figure 5.1 include losses of stream bed, which were quantified in acres. The Corps anticipates that the 3/100 -acre stream compensatory mitigation threshold will also be an effective incentive to permittees to reduce losses of stream bed to avoid the costs of providing stream compensatory mitigation to offset losses of greater than 3/100 -acre of stream bed. For NWP activities that require PCNs, district engineers continue to have discretion to require stream compensatory mitigation for losses of stream bed above or below the 3/100 -acre threshold in paragraph (d) of general condition 23.
Several commenters also questioned the Corps' use of the study by Downing et al. (2012), which examined stream channels all over the world, stating that stream channels may be narrower in the United States (citing an average width in the United States of 2.6 feet). Several commenters stated support of a hybrid approach in lieu of an acreage calculation, but were concerned about the variability of stream order classifications and the availability of tools to Corps districts to implement that approach in an effective and defensible manner. One of these commenters noted that LiDAR is not available in all areas of the country. Many commenters opposed the proposed `hybrid approach' in the preamble in which stream impact limits would vary by stream order by applying a mean stream width. Some of these commenters asserted that a linear foot metric is still likely a more accurate and easier method since determining stream order is highly varied along with determining a stream width.
The Corps acknowledges that the study by Downing et al. (2012) does not fully represent the variability in stream dimensions. One of the purposes of using the information in that study was to demonstrate how a linear foot limit for losses of stream bed results in disparate differences in the amount of stream bed that can be filled or excavated under an NWP depending on where an affected stream reach is located in a tributary network ( i.e., a headwater stream versus a stream segment located further downstream in a watershed). In a study of headwater streams in North America and New Zealand, using field surveys of headwater streams instead of the published data and satellite imagery used by Downing et al. (2012), Allen et al. (2018) found a typical width of 1.05 feet for headwater streams. The Corps agrees that the hybrid approach proposed in the preamble to the 2020 Proposal would not be an efficient or effective approach to establishing quantitative limits for these 10 NWPs. There is not sufficiently accurate mapping of headwater streams in the United States to implement such a hybrid approach, and the hybrid approach would not take into account regional variability in stream geomorphology. The Corps does not agree that a linear foot metric is easier or more accurate than an acreage-based metric. The area of stream bed filled or excavated as a result of an NWP activity is already calculated by the Corps to record impacts to aquatic resources, and it represents the amount of stream bed lost as a result the discharges of dredged or fill material regulated under Section 404 of the Clean Water Act.
Many commenters also questioned how stream width was to be measured (ordinary high water mark to ordinary high water mark versus stream bed/bottom) which could also produce variability in how an acreage limit would be applied. Many commenters recognized that the measures for small and large streams should be different but until a more appropriate metric is developed, acreage should not be used in lieu of linear feet since it would be inappropriate to adopt a measure that better represents larger stream systems while the overwhelming majority of impacts occur to smaller streams and are therefore better represented for the time being by a linear foot measurement.
Stream width should be measured from ordinary high water mark to ordinary high water mark, perpendicular to the longitudinal direction of the stream channel. That is consistent with the definition of “stream bed” in Section F of the NWPs. Commenters did not suggest a more accurate method for quantifying impacts to small and large streams in their comments. Establishing different metrics for small versus large streams also presents challenges in terms of consistently determining what constitutes a small stream versus a large stream, which has the potential for being an arbitrary distinction and would add another layer of complexity to the NWP program.
Many commenters noted that smaller stream channels provide important ecological functions and values and they provided numerous references to scientific studies that document the importance of these stream channels as linear systems in the landscape. Some of these commenters said impacts to small stream channels were more severe and/or permanent ( e.g., complete losses by filling entire stream reaches) and noted that small streams are more susceptible to fragmentation impacts, are harder to restore/mitigate, and have compounding effects to downstream waters when impacts are cumulative and more than minimal. Many commenters noted that, in general, disproportionate impacts already occur to these smaller order stream channels because it is easier from an engineering standpoint and ultimately less costly to impact them versus larger order stream channels, and that removing the 300 linear foot limit would provide even less incentive to avoid and minimize impacts to these important resources.
The ecological functions of smaller stream channels are to be considered by district engineers when they review PCNs for proposed activities involving filling or excavating stream beds. When evaluating PCNs, district engineers consider the 10 criteria in paragraph 2 1/2 -acre limit and PCN review process to identify activities that require individual permits helps the Corps implement its permit program more effectively, to efficiently authorize activities with no more than minimal adverse environmental effects via NWP, and focusing more of its resources on evaluating individual permit applications for activities that are likely have more substantial environmental impacts.
Many commenters said that this change would allow more than minimal impacts because of the disproportionate length of impacts to headwater streams that would be allowed now under the NWP program, which is said to be counter to and inconsistent with the goal and purpose of the NWP program. Many commenters questioned how the Corps could reconcile and justify this change based on the long-standing history of the 300-linear foot limit for losses of stream bed in the NWP program. Many commenters stated that individual permits should be required for proposed impacts to more than 300 linear feet of stream bed, to allow for the public and federal, state, and local resource agencies to comment on proposals to fill or excavate several thousand feet of stream bed.
The Corps will be relying on other, existing protective mechanisms within the NWPs to ensure that these NWPs authorize only those activities that have no more than minimal adverse environmental effects. The NWP program has changed over time as new information is considered and alternative ways of implementing the program are identified to further the program's objective of regulating, “with little, if any, delay or paperwork certain activities having minimal impacts” (33 CFR 330.1(b)). The removal of the 300 linear foot limit, continued application of the 1/2 -acre limit, plus the ability of division and district engineers to exercise their discretionary authority to modify, suspend, or revoke NWP authorizations on a regional or case-by-case basis, respectively, will ensure that activities that would cause more than minimal adverse environmental effects will be evaluated through the individual permit process.
Many commenters expressed concern about other changes within this proposal, when combined with the removal of the 300 linear feet limit would eliminate agency coordination with federal and state resource agencies under paragraph (d) of general condition 32. One commenter said that when reviewing the number of individual permits issued versus activities authorized under NWPs that even with what the commenter considers the more stringent 300-linear foot limit in place there is no justifiable need for reducing regulatory burden since the number of individual permits is so small compared to NWP verifications and this change would likely not result in any significant decrease in number of individual permits or regulatory burden.
For the 10 NWPs that had the 300 linear foot limit for losses of stream bed, the agency coordination process in paragraph (d) of general condition 32 was limited to requests for waivers of the 300 linear foot limit for losses of intermittent and ephemeral stream bed. Ephemeral streams are not waters of the United States (see 33 CFR 328.3(b)(3)) and therefore not subject to jurisdiction under Section 404 of the Clean Water Act. In its Regulatory Impact Analyses for the proposed and final rules, the Corps acknowledges that the removal of the 300 linear foot limit is likely to result in a modest increase in NWP authorizations (174 per year), and a commensurate decrease in the number of activities that require individual permits. However, a modest reduction in the number of individual permits that must be processed each year can help improve administration of the Corps Regulatory Program and allow the Corps to devote more time and resources to working with project proponents to reduce the environmental impacts of activities that have the potential to result in more substantial impacts to jurisdictional wetlands and waters.
Many commenters said that the proposed 1/10 -acre mitigation threshold for losses of stream bed was not an adequate tool for ensuring no more than minimal adverse environmental effects based on the disproportionately large amount of impacts to smaller headwater streams that would need to occur before compensatory mitigation was required. Many commenters expressed concern about the potential for increased likelihood for out-of-kind mitigation being provided to offset headwater stream impacts if mitigation is based on an acreage or other area-based metric for losses of stream bed. These commenters said that out-of-kind mitigation would likely increase because it would be the only option available to permittees due to fewer stream credits being generated and available as mitigation bankers and other mitigation providers adapt to this change and the uncertainty in the market that this change might create.
The comments received on the proposed 1/10 -acre threshold for stream mitigation are discussed in the section of this preamble that discusses the comments received on general condition 23. In response to those comments, the Corps reduced the threshold for stream mitigation from 1/10 -acre to 3/100 -acre. As explained in the discussion of general condition 23 below, this change in the stream mitigation threshold aligns with current practice for stream mitigation requirements in the NWP program, and the recommendations for the stream mitigation threshold provided by commenters. The Corps uses a watershed approach for compensatory mitigation (see 33 CFR 332.3(c)). The goal of a watershed approach is to maintain and improve the quality and quantity of aquatic resources within watersheds through strategic selection of compensatory mitigation sites (see 33 CFR 332.3(c)(1)). A watershed approach considers how the types and locations of compensatory mitigation projects will provide the desired aquatic resource functions, and will continue to function over time in a changing landscape (33 CFR 332.3(c)(2)(i)), and may involve the use of out-of-kind mitigation.
Under a watershed approach, other approaches to stream restoration may be used to generate stream credits besides headwater stream channel reconfiguration projects. These other approaches may include process-based
The Corps received many comments and questions about how these changes would likely negatively affect long-standing stream mitigation accounting and the mitigation banking industry in general. These commenters said that a linear foot metric has always been us
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.