Applications for Authorization To Construct, Operate, or Modify Facilities Used for the Export or Import of Natural Gas

FederalRegulations

Ask Donna

How this section applies to your facts.

Federal Register › Vol. 62 › 62 FR 5940

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 153

[Docket No. RM97-1-000]

Applications for Authorization To Construct, Operate, or Modify

Facilities Used for the Export or Import of Natural Gas

February 3, 1997.

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission is issuing a Notice

of Proposed Rulemaking (NOPR) to amend the regulations codifying the

Commission's responsibilities under the Natural Gas Act and Executive

Order 10485, as amended. The Commission proposes to update its

regulations governing the filing of applications for the siting,

construction, and operation of facilities for the import or export of

natural gas under section 3 of the Natural Gas Act and the issuance and

modification of Presidential Permits for the construction and operation

of border facilities. The proposal is necessary to conform the

Commission's regulations to the Commission's current responsibilities,

as delegated by the Secretary of Energy.

DATES: Comments are due no later than April 11, 1997.

ADDRESSES: An original and 14 copies of written comments must be filed.

All filings must refer to Docket No. RM97-1-000 and be addressed to the

Office of the Secretary, Federal Energy Regulatory Commission, 888

First Street, NE, Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:

Albert J. Francese, Office of the General Counsel, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426,

(202) 208-0736.

Richard W. Foley, Office of Pipeline Regulation, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426,

ederal Energy Regulatory Commission, 888

First Street, NE, Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:

Albert J. Francese, Office of the General Counsel, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426,

(202) 208-0736.

Richard W. Foley, Office of Pipeline Regulation, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426,

(202) 208-2245.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of

this document in the Federal Register, the Commission also provides all

interested persons an opportunity to inspect or copy the contents of

this document during normal business hours in the Public Reference

Room, Room 2A, 888 First Street, NE, Washington, DC 20426.

The Commission Issuance Posting System (CIPS), an electronic

bulletin board service, also provides access to the texts of formal

documents issued by the Commission. CIPS is available at no charge to

the user and may be accessed using a personal computer with a modem by

dialing 202-208-1397 if dialing locally or 1-800-856-3920 if dialing

long distance. To access CIPS, set your communications software to

19200, 14400, 12000, 9600, 7200, 4800, 2400, or 1200 bps, full duplex,

no parity, 8 data bits, and 1 stop bit. The full text of this document

will be available on CIPS in ASCII and Word Perfect 5.1 format. CIPS

user assistance is available at 202-208-2474.

CIPS also is available on the Internet through the Fed World

system. Telnet software is required. To access CIPS via the Internet,

point your browser to the URL address: http://www.fedworld.gov and

select the ``Go to the FedWorld Telnet Site'' button. When your Telnet

software connects you, log-on to the FedWorld system, scroll down and

select FedWorld by typing: 1 and at the command line type:/go FERC.

FedWorld also may be accessed by Telnet at the address fedworld.gov

tware is required. To access CIPS via the Internet,

point your browser to the URL address: http://www.fedworld.gov and

select the ``Go to the FedWorld Telnet Site'' button. When your Telnet

software connects you, log-on to the FedWorld system, scroll down and

select FedWorld by typing: 1 and at the command line type:/go FERC.

FedWorld also may be accessed by Telnet at the address fedworld.gov.

Finally, the complete text on diskette in Word Perfect format may

be purchased from the Commission's copy contractor, La Dorn Systems

Corporation. La Dorn Systems Corporation is also located in the Public

Reference Room at 888 First Street, NE, Washington, DC, 20426.

I. Introduction

The Federal Energy Regulatory Commission (Commission) proposes to

amend part 153 of its regulations governing the siting, construction,

and operation of facilities for the import and export of natural gas

between the United States and a foreign country. Part 153 has not been

significantly revised since the Commission's predecessor, the Federal

Power Commission (FPC), recodified its regulations in 1947.1

---------------------------------------------------------------------------

\1\ Order No. 141, 12 FR 8596 (December 19, 1947). The part 153

regulations originally became effective on July 11, 1938, in FPC

Order Nos. 52 (section 3 authorizations) and 66 (Presidential

Permits).

---------------------------------------------------------------------------

The Commission intends to conform its filing requirements in part

153 to the Commission's current responsibilities as changed by

intervening legislation and Department of Energy (DOE) delegation

orders. The DOE delegation orders divide jurisdiction and authority

over natural gas import and export issues between the Commission and

DOE. Thus, the proposed revisions to part 153 implement the

Commission's currently delegated responsibilities under section

part

153 to the Commission's current responsibilities as changed by

intervening legislation and Department of Energy (DOE) delegation

orders. The DOE delegation orders divide jurisdiction and authority

over natural gas import and export issues between the Commission and

DOE. Thus, the proposed revisions to part 153 implement the

Commission's currently delegated responsibilities under section

3 of the Natural Gas Act (NGA) 2 and Executive Order 10485, as

amended, regarding the construction and operation of facilities for the

import and export of natural gas.3

---------------------------------------------------------------------------

\2\ 15 U.S.C. 717b.

\3\ Executive Order 10485, 3 CFR, 1949-1953 Comp., p. 970, as

amended by Executive Order 12038, 3 CFR 1978 Comp., p. 136.

---------------------------------------------------------------------------

The proposed regulatory revisions generally make the part 153

regulations current and more readable. To that end, the proposed rule

redefines and clarifies the Commission's role with respect to granting

the authorizations necessary to construct and operate facilities for

the import and export of natural gas between a foreign country and the

United States. The proposed regulations codify existing practice which

requires the applicant proposing to construct LNG facilities to file

exhibits concerning the environmental and safety features of those

facilities. The proposed regulations also delete references to the

Commission's previous authority to approve the import and export of

natural gas.

The changes to the Commission's regulations are proposed to be

effective 60 days after publication of the final rule in the Federal

Register.

II. Information Collection Statement

exhibits concerning the environmental and safety features of those

facilities. The proposed regulations also delete references to the

Commission's previous authority to approve the import and export of

natural gas.

The changes to the Commission's regulations are proposed to be

effective 60 days after publication of the final rule in the Federal

Register.

II. Information Collection Statement

The following collection of information contained in this proposed

rule is being submitted to the Office of Management and Budget (OMB)

for review under Section 3507(d) of the Paperwork Reduction Act of

1995.4 FERC identifies the information provided under part 153 as

FERC-539.

___________

4 44 U.S.C. 3507(d).

Comments are solicited on the Commission's need for this

information, whether the information will have practical utility, the

accuracy of the provided burden estimates, ways to enhance the quality,

utility, and clarity of the information to be collected, and any

suggested methods for minimizing respondents' burden, including the use

of automated information techniques. The burden estimates for complying

with this proposed rule are as follows:

Public Reporting Burden: Estimated Annual Burden:

----------------------------------------------------------------------------------------------------------------

Number of Number of Hours per Total annual

Data collection respondents responses response hours

----------------------------------------------------------------------------------------------------------------

FERC-539................................................ 12 12 200 2,400

----------------------------------------------------------------------------------------------------------------

-

Number of Number of Hours per Total annual

Data collection respondents responses response hours

----------------------------------------------------------------------------------------------------------------

FERC-539................................................ 12 12 200 2,400

----------------------------------------------------------------------------------------------------------------

Total Annual Hours for Collection (Reporting + Recordkeeping, (if

appropriate)) = 2,400.

Based on the Commission's experience with processing applications

for siting and facilities' construction over the last three fiscal

years (FY94-FY96), it is estimated that about 12 filings per year will

be made over the next three years at a burden of 200 hours per filing,

for a total annual burden of 2,400 hours under the proposed

regulations.5 The current annual reporting burden for FERC-539

under the current regulations is 38,400 hours. The simplified filing

requirements under the proposed regulations and a projected reduced

number of filings per year would result in a reduction of 36,000 hours

per year from the current OMB burden inventory for FERC-539 data

collection.

___________

5 The 200 hour burden applies to an application by a pipeline

to construct non-LNG facilities. The 200 hour burden does not

include the environmental burden on non-pipeline applicants

proposing to construct LNG facilities. These applicants would

prepare proposed environmental exhibits E, E-1, and F, which the

Commission identifies as under reporting requirement FERC-577.

ection.

___________

5 The 200 hour burden applies to an application by a pipeline

to construct non-LNG facilities. The 200 hour burden does not

include the environmental burden on non-pipeline applicants

proposing to construct LNG facilities. These applicants would

prepare proposed environmental exhibits E, E-1, and F, which the

Commission identifies as under reporting requirement FERC-577.

Applications for import/export facilities vary in size and

regulatory complexity depending on the project proposed. Accessibility

of documents through commonly available electronic search services,

government bulletin boards, and the public record greatly affects

research time needed to understand the import/export regulatory

structure and application filing requirements. The total burden for a

typical new pipeline application under NGA section 3 is estimated at a

maximum of 200 hours based on an applicant with general knowledge of

the Federal regulatory scheme for natural gas projects. Applications to

amend existing authorizations and Presidential Permits would have a

significantly lesser burden since less background work would be needed.

Information Collection Costs: The Commission seeks comments on the

costs to comply with these requirements. It has projected the average

annualized cost for all respondents to be:

Annualized Capital/Startup Costs--0

Annualized Costs (Operations & Maintenance)--$120,000 ($50 per hour)

Total Annualized Costs--$120,000

The OMB regulations require OMB to approve certain information

collection requirements imposed by agency rule.6 Accordingly,

pursuant to OMB regulations, the Commission is providing notice of its

proposed information collection to OMB.7

---------------------------------------------------------------------------

perations & Maintenance)--$120,000 ($50 per hour)

Total Annualized Costs--$120,000

The OMB regulations require OMB to approve certain information

collection requirements imposed by agency rule.6 Accordingly,

pursuant to OMB regulations, the Commission is providing notice of its

proposed information collection to OMB.7

---------------------------------------------------------------------------

\6\ 5 CFR 1320.11.

\7\ On December 29, 1996, OMB approved a 90-day extension of

current FERC-539 data collection (from May 31, 1997 until August 31,

1997) to allow the Commission to obtain public comment on its

proposed rule to modify the current reporting requirements.

---------------------------------------------------------------------------

Title: FERC-539, Gas Pipeline Certificate: Import/Export.

Action: Proposed Data Collection.

OMB Control No.: 1902-0062. The applicant shall not be penalized

for failure to respond to this collection of information unless the

collection of information displays a valid OMB control number.

Respondents: Business or other for-profit, including small

businesses.

Frequency of Responses: On occasion.

Necessity of the Information: The proposed rule revises the

requirements contained in 18 CFR part 153. Because the Commission no

longer grants authorizations for the import or export of natural gas,

the major filing requirements imposed by FERC-539 are no longer

applicable and revisions of the regulations are needed to reflect these

changes. The implementation of these data requirements will help the

Commission carry out its responsibilities under the Natural Gas Act and

Executive Order 10485, as amended, and coincide with the current

competitive regulatory environment which the Commission fostered under

Order No. 636.

Internal Review: The Commission has assured itself, by means of its

internal review, that there is specific, objective support for the

burden estimates associated with the information requirements

ion of information(s)

and the associated burden estimate(s), please send your comments to the

contact listed above and to the Office of Management and Budget, Office

of Information and Regulatory Affairs, Washington, DC 20503.

[Attention: Desk Officer for the Federal Energy Regulatory Commission,

phone: (202)395-3087, fax: (202)395-7285]

III. Discussion

A. Background and Statutory Authority

Section 3 of the NGA requires prior authorization before exporting

or importing natural gas from or to the United States. Agency

implementation of section 3 has evolved in three stages. Initially, the

FPC was vested with exclusive jurisdiction under section 3 to decide

all natural gas import and export issues, including the authorization

to import and export natural gas and to construct and operate necessary

facilities.8 The FPC also had the authority, pursuant to Executive

Order 10485, as amended, to issue or modify a Presidential Permit for

the construction and operation of border facilities at the

international boundary between the United States and Canada or Mexico.

---------------------------------------------------------------------------

\8\ See Distrigas Corporation v. FPC, 495 F.2d 1057 (D.C. Cir.

1974).

---------------------------------------------------------------------------

The Department of Energy Organization Act (DOE Act), enacted in

1977, transferred all the FPC's authority over natural gas imports and

exports to the Secretary of Energy ``unless the Secretary assigns such

a function to the [Federal Energy Regulatory] Commission.'' 9

Between October 1, 1977 and February, 1984, DOE and the Commission

shared responsibility over natural gas import and export issues

pursuant to DOE delegation orders (which have since been rescinded)

ransferred all the FPC's authority over natural gas imports and

exports to the Secretary of Energy ``unless the Secretary assigns such

a function to the [Federal Energy Regulatory] Commission.'' 9

Between October 1, 1977 and February, 1984, DOE and the Commission

shared responsibility over natural gas import and export issues

pursuant to DOE delegation orders (which have since been rescinded).

The Secretary of Energy administered his authority over natural gas

import and export issues pursuant to FPC rules in place on September

30, 1977, until DOE issued its own final regulations.10 During

this transition period, however, ``the lines of jurisdiction and

authority between the two agencies [were] not entirely clear.'' 11

---------------------------------------------------------------------------

\9\ See sections 301(b), 402(a) and 402(f) of the Department of

Energy Organization Act, 42 U.S.C. 7151(b), 7172(a) and 7172(f).

\10\ DOE's final rules establishing procedures for processing

applications for the import and export of natural gas and revised ex

parte rules became effective on September 6, 1984. 49 FR 35302

(September 6, 1984).

\11\ DOE, New Policy Guidelines and Delegation Orders on the

Regulation of Imported Natural Gas, at 23, 49 FR 6684 (February 22,

1984).

---------------------------------------------------------------------------

The Secretary issued new delegation orders 0204-111 and 0204-112,

discussed below, in February 1984, to minimize problems of coordination

on certain import/export issues.12 These delegation orders

allocated regulatory functions concerning the import and export of

natural gas to the Commission and DOE/Economic Regulatory

Administration (ERA).13 DOE and the Commission continue to share

responsibility for determining natural gas import/export issues under

these currently applicable delegation orders.

---------------------------------------------------------------------------

gation orders

allocated regulatory functions concerning the import and export of

natural gas to the Commission and DOE/Economic Regulatory

Administration (ERA).13 DOE and the Commission continue to share

responsibility for determining natural gas import/export issues under

these currently applicable delegation orders.

---------------------------------------------------------------------------

\12\ Both delegation orders were published at 49 FR 6684

(February 22, 1984).

\13\ Effective on February 7, 1989, the Assistant Secretary for

Fossil Energy (DOE/FE) assumed the delegated responsibilities of the

Administrator of ERA. See DOE Delegation Order No. 0204-127. 54 FR

11436 (March 20, 1989).

---------------------------------------------------------------------------

Under DOE Delegation Order 0204-111, effective February 22, 1984,

the Secretary of Energy delegated to the Administrator of ERA authority

under section 3 of the NGA to regulate the import (including the place

of entry) and the export (including the place of exit) of natural

gas.14 On the same date, the Secretary of Energy issued Delegation

Order 0204-112 which delegated to the Commission exclusive authority

over specific import/export matters.

---------------------------------------------------------------------------

\14\ The Energy Policy Act of 1992, which added paragraphs (b)

and (c) to section 3 of the NGA, requires the DOE to grant

applications for the import or export of natural gas ``without

modification or delay'' if the United States has a free trade

agreement in effect with the foreign country into which the imported

or exported natural gas flows.

---------------------------------------------------------------------------

of 1992, which added paragraphs (b)

and (c) to section 3 of the NGA, requires the DOE to grant

applications for the import or export of natural gas ``without

modification or delay'' if the United States has a free trade

agreement in effect with the foreign country into which the imported

or exported natural gas flows.

---------------------------------------------------------------------------

The responsibilities delegated to the Commission include the

authority to approve or disapprove proposals for the construction,

operation, and siting of facilities, and when the construction of new

domestic facilities is involved, the place of entry for imports or

place of exit for exports. The Commission's delegated authority is

subject to DOE's right of disapproval if the Administrator finds

disapproval to be appropriate ``in the circumstances of a particular

case.'' Thus, under the most recent and presently applicable delegation

orders, the facility and siting aspects of natural gas import and

export are delegated and assigned to the Commission for determination

of the public interest.

Section 3 of the NGA provides that the Commission ``shall issue an

order upon application, unless * * * it finds that the proposed

exportation or importation will not be consistent with the public

interest.'' The Commission determines the public interest in particular

proceedings upon consideration of all relevant factors

d assigned to the Commission for determination

of the public interest.

Section 3 of the NGA provides that the Commission ``shall issue an

order upon application, unless * * * it finds that the proposed

exportation or importation will not be consistent with the public

interest.'' The Commission determines the public interest in particular

proceedings upon consideration of all relevant factors. For example,

the Commission will authorize the construction and operation of import/

export facilities under NGA section 3 upon its conclusion that the

proposal is necessary to access new foreign gas supplies and to deliver

imported gas to an industrial user.15 The Commission will also

grant authorization under NGA section 3 if the Commission concludes

that the new construction will enhance system reliability, flexibility,

the dependability of international energy trade, and will not adversely

affect the service or rates of existing customers.16

---------------------------------------------------------------------------

\15\ See National Steel Corporation, 45 FERC para. 61,100

(1988).

\16\ Great Lakes Transmission Limited Partnership, 76 FERC para.

61,148 (1996).

---------------------------------------------------------------------------

A person applying to the Commission for authority under section 3

must also apply to the Commission, pursuant to DOE Delegation Order No.

0204-112, for the issuance of a Presidential Permit or an amendment to

an existing Presidential Permit if the proposed facilities are to be

located at the borders of the United States and Canada or Mexico. A

Presidential Permit authorizes the applicant to construct, operate,

maintain, or connect natural gas pipeline facilities at the

international borders

pursuant to DOE Delegation Order No.

0204-112, for the issuance of a Presidential Permit or an amendment to

an existing Presidential Permit if the proposed facilities are to be

located at the borders of the United States and Canada or Mexico. A

Presidential Permit authorizes the applicant to construct, operate,

maintain, or connect natural gas pipeline facilities at the

international borders.

The Commission has the jurisdiction, pursuant to Executive Order

10485, as amended, to condition a Presidential Permit ``as the public

interest may in its judgment require.'' 17 In addition, Executive

Order 10485, as amended, requires the Commission to obtain the

concurrence of the Secretary of State and the Secretary of Defense who

will consider foreign policy and national security aspects of the

application.

---------------------------------------------------------------------------

\17\ These conditions are stated as ``articles'' in the body of

a Presidential Permit. The articles describe the facilities, design

capacity, nature of the service and include various uniform

provisions concerning transferability of the Presidential Permit or

facilities, inspection and access to the facilities, liability for

damages, filing of information, removal of facilities, possession by

the United States, and control by a foreign government.

---------------------------------------------------------------------------

An applicant proposing to alter a term of an existing Presidential

Permit that does not also necessitate new construction, e.g., a

revision to the authorized operating or design capacity of an existing

import/export facility,

removal of facilities, possession by

the United States, and control by a foreign government.

---------------------------------------------------------------------------

An applicant proposing to alter a term of an existing Presidential

Permit that does not also necessitate new construction, e.g., a

revision to the authorized operating or design capacity of an existing

import/export facility,

must file to amend its Presidential Permit.18 That applicant,

however, does not also require section 3 authorization. On the other

hand, the applicant granted authorization under NGA section 3 does not

require a Presidential Permit for the construction of natural gas

import/export facilities located at tidewater or on the border of the

United States and international waters.19

---------------------------------------------------------------------------

\18\ See Panhandle Eastern Pipe Line Company, 62 FERC para.

61,190 (1993).

\19\ See EcoElectrica, L.P., 75 FERC para. 61,157 (1996), Yukon

Pacific Corporation 39 FERC para.61,216 (1987), and Phillips

Petroleum Company, 37 FPC 777 (1967).

---------------------------------------------------------------------------

B. Objectives of the Proposed Rule.

Part 153 currently imposes specific filing requirements on

applicants for authorization under section 3 and Executive Order 10485,

as amended, to site, construct, and operate facilities for the import

or export of natural gas.20 The proposed part 153 incorporates

basic housekeeping changes to eliminate obsolete and redundant language

and sections. The proposed part 153 also makes conforming changes to

regulations to reflect the Commission's diminished responsibilities in

the regulation of natural gas imports and exports under DOE's currently

effective delegation orders.

---------------------------------------------------------------------------

orates

basic housekeeping changes to eliminate obsolete and redundant language

and sections. The proposed part 153 also makes conforming changes to

regulations to reflect the Commission's diminished responsibilities in

the regulation of natural gas imports and exports under DOE's currently

effective delegation orders.

---------------------------------------------------------------------------

\20\ Thus, the part 153 regulations and this NOPR do not address

filing requirements applicable to the construction of any connecting

facilities transporting natural gas in interstate commerce. Such

facilities would be within the scope of section 7 and the

Commission's part 157 regulations.

---------------------------------------------------------------------------

The proposed rule also updates the type of information and exhibits

that an applicant must include in its application. The Commission

proposes to revise its filing requirements to match its current

responsibilities and does not propose to change its substantive

policies.

Other proposed changes to part 153 reflect the separate but related

nature of the Commission's and DOE's responsibilities concerning

natural gas import and export issues. The Commission's proposed

revisions will make clear that the part 153 regulations apply only to

the siting, construction, operation, or modification of facilities for

the import or export of natural gas. On the other hand, DOE's

responsibility is the authorization of requests to import/export

natural gas.21

---------------------------------------------------------------------------

\21\ Under DOE regulations, applications must be filed at least

60 days prior to the proposed import or export, unless a later date

is permitted for good cause shown. See 10 CFR 590.202. DOE processes

applications for import/export authority on an expedited basis.

---------------------------------------------------------------------------

------------------------------------------------------

\21\ Under DOE regulations, applications must be filed at least

60 days prior to the proposed import or export, unless a later date

is permitted for good cause shown. See 10 CFR 590.202. DOE processes

applications for import/export authority on an expedited basis.

---------------------------------------------------------------------------

Proposed Sec. 153.6, codifying current Commission practice,

requires that an application to the Commission under section 3 be filed

simultaneously with or after the filing of the related application with

DOE for authority to import or export natural gas.22 The

information an applicant must file with FERC to support its requested

authorization is different from that required to be filed to support an

application to import/export natural gas.23

---------------------------------------------------------------------------

\22\ The person filing with DOE for import or export

authorization may be a shipper of the FERC applicant and need not be

the FERC applicant.

\23\ DOE's regulations permit an applicant to submit copies of

relevant documents filed or intended to be filed with FERC to

satisfy the requirements of DOE's regulations. See 10 CFR 590.202.

These regulations would permit a DOE applicant to submit its

application before FERC to satisfy DOE's requirement that the

applicant provide a description of the facilities to be used or

constructed for the proposed import/export. The information that a

DOE applicant files with DOE concerning imports/exports would not,

however, generally satisfy the informational requirements of part

153.

---------------------------------------------------------------------------

C. Electronic Filing

y DOE's requirement that the

applicant provide a description of the facilities to be used or

constructed for the proposed import/export. The information that a

DOE applicant files with DOE concerning imports/exports would not,

however, generally satisfy the informational requirements of part

153.

---------------------------------------------------------------------------

C. Electronic Filing

The Commission is not proposing to modify part 153 at this time to

require an applicant to file its applications on electronic media. The

Commission will review in a future proceeding the electronic filing

requirements for the entire certificate application process, including

existing electronic filing requirements for part 157 applications and

appropriate electronic filing procedures to adopt for part 153

applications. The Commission will determine where changes are necessary

to reflect current policies and modify existing electronic filing

requirements as necessary to streamline and update the filing process.

As was done in NOPRs in Docket Nos. RM95-3-000 24 and RM95-4-

000,25 the Commission will solicit participation of the industry

and other users of filed information in formulating final electronic

filing instructions.

---------------------------------------------------------------------------

\24\ Filing and Reporting Requirements for Interstate Natural

Gas Company Rate Schedules and Tariffs, 60 FR 3111 (January 13,

1995).

\25\ Revisions to Uniform System of Accounts, Forms, Statements,

and Reporting Requirements for Natural Gas Companies, 60 FR 3141

(January 13, 1995).

---------------------------------------------------------------------------

D. The Revised Regulations

------

\24\ Filing and Reporting Requirements for Interstate Natural

Gas Company Rate Schedules and Tariffs, 60 FR 3111 (January 13,

1995).

\25\ Revisions to Uniform System of Accounts, Forms, Statements,

and Reporting Requirements for Natural Gas Companies, 60 FR 3141

(January 13, 1995).

---------------------------------------------------------------------------

D. The Revised Regulations

The proposed part 153 is arranged by subparts. General provisions,

including the regulatory purpose and definitions, are set out in

subpart A. Applications under NGA section 3 and applications for a

Presidential Permit are addressed in subparts B and C, respectively,

with revised section designations. The requirements for paper filing

and certain procedural matters are set forth in subpart D.

Since the amendments to part 153 are extensive (with some

regulatory text retained and other text deleted), it is appropriate to

republish the entire regulatory text of part 153 instead of identifying

many fragmentary amendments to the current text. The proposed

regulations are discussed below.

1. Part 153--Applications for Authorization To Construct, Operate or

Modify Facilities Used for the Export or Import of Natural Gas

The Commission proposes the new heading for part 153 to replace the

current heading (application for authorization to export or import

natural gas).

2. Authority Citation

The Commission is proposing to revise the authority citation for

part 153 to reflect current legal authority--DOE Delegation Order No.

0204-112 and Executive Order 10485, as amended by Executive Order

12038.

3. Subpart A--General Provisions

a. Section 153.1 Purpose. Proposed Sec. 153.1 states that the

purpose of part 153 is to implement the Commission's authorities

delegated under section 3 of the Natural Gas Act and Executive Order

10485, as amended. Part 153 establishes revised procedures for applying

for authorization under section 3 and for a Presidential Permit.

b. Section 153.2 Definitions

3. Subpart A--General Provisions

a. Section 153.1 Purpose. Proposed Sec. 153.1 states that the

purpose of part 153 is to implement the Commission's authorities

delegated under section 3 of the Natural Gas Act and Executive Order

10485, as amended. Part 153 establishes revised procedures for applying

for authorization under section 3 and for a Presidential Permit.

b. Section 153.2 Definitions. The Commission is proposing to

define the terms ``DOE/FE'' (Department of Energy/Office of Fossil

Energy), ``NBSIR'' (National Bureau of Standards Information Report),

and ``person'' for purposes of part 153.

The Commission proposes in Sec. 153.2 to cross-reference DOE's

definition of ``person'' stated at 10 CFR 590.102(m), which DOE uses

for purposes of considering applications for import/export

authorization.26 A ``person'' is defined by DOE as ``any

individual, firm, estate, trust, partnership, association, company,

joint-venture, corporation, United States local, state and federal

governmental unit or instrumentality thereof, charitable, educational

or other institution, and others including any officer, director,

owner, employee, or duly authorized representative of the foregoing.''

The Commission's proposed definition replaces the undefined use of

``person'' in current Sec. 153.1(a) with a comprehensive listing of

potential applicants.

---------------------------------------------------------------------------

\26\ 10 CFR 590.102(m).

---------------------------------------------------------------------------

The proposed new definition would by its own terms automatically

incorporate any future changes by DOE

in its definition of ``person.'' The proposed definition would not

change current Commission practice in processing applications under

section 3 or Executive Order 10485, as amended. The Commission would

administer the proposed definition of ``person'' consistent with its

statutory authority.27

---------------------------------------------------------------------------

y future changes by DOE

in its definition of ``person.'' The proposed definition would not

change current Commission practice in processing applications under

section 3 or Executive Order 10485, as amended. The Commission would

administer the proposed definition of ``person'' consistent with its

statutory authority.27

---------------------------------------------------------------------------

\27\ The Commission has plenary and elastic authority under NGA

section 3 to prevent gaps in regulation between Federal and local

jurisdiction as applied to import and export facilities. See

Distrigas Corporation v. FPC, 495 F.2d 1057 at 1064 (D.C. Cir.

1974).

---------------------------------------------------------------------------

4. Subpart B--Application under Section 3

a. Section 153.5 Who Shall Apply. Proposed Sec. 153.5(a) retains

the requirement that a person file an application to seek authorization

under section 3 and adds a new provision, codifying current practice,

requiring the filing of an application in order to amend an existing

authorization. References to the necessity of filing an application for

import/export authority are deleted.

Current Sec. 153.1(b) is rewritten as proposed Sec. 153.5(b) to

revise and restate the current cross-reference to Presidential Permits

as a requirement that an applicant must also simultaneously apply under

subpart C for a Presidential Permit for the construction of border

facilities at the international boundary between the United States and

Canada or Mexico.

b. Section 153.6 Time of Filing. Current filing requirements as to

the form and number of paper copies of applications are deleted from

current Sec. 153.2 and are included in new subpart D to avoid

duplication of regulatory text.

The portion of the third sentence of current Sec. 153.2 stating the

time of making applications for the import and export of natural gas is

deleted. In its place, proposed Sec

153.6 Time of Filing. Current filing requirements as to

the form and number of paper copies of applications are deleted from

current Sec. 153.2 and are included in new subpart D to avoid

duplication of regulatory text.

The portion of the third sentence of current Sec. 153.2 stating the

time of making applications for the import and export of natural gas is

deleted. In its place, proposed Sec. 153.6 codifies current practice to

require the simultaneous or prior filing of an application with DOE for

authority to import or export natural gas. Proposed Sec. 153.6

recognizes the related nature of applications before the Commission and

DOE. The current section heading is revised.

c. Section 153.7 Contents of Application. Proposed Sec. 153.7

eliminates obsolete references in the text and heading of current

Sec. 153.3 to information concerning import or export applications and

to filing fees.28 Informational requirements in current

Secs. 153.3(a) through 153.3(c) identify the applicant. These

informational requirements are revised and retained in proposed

Sec. 153.7(a)(1) through (a)(3) with a paragraph heading added. The

informational requirements in current Secs. 153.3(d) through 153.3(f)

are deleted because they are associated with the import and export of

natural gas.

---------------------------------------------------------------------------

\28\ The informational filing requirements in proposed

Secs. 153.7 and 153.8 are proposed to apply to applications under

subpart C for Presidential Permits for the construction of import/

export facilities at the border as well.

---------------------------------------------------------------------------

f

natural gas.

---------------------------------------------------------------------------

\28\ The informational filing requirements in proposed

Secs. 153.7 and 153.8 are proposed to apply to applications under

subpart C for Presidential Permits for the construction of import/

export facilities at the border as well.

---------------------------------------------------------------------------

The requirement in current paragraph 153.3(g) to describe proposed

facilities is retained, expanded, and redesignated as proposed

Sec. 153.7(b) with a separate paragraph heading added. The information

required by Sec. 153.7(b) should provide the Commission with sufficient

details of the applicant's proposal to permit the Commission to process

applications under subparts B and C, as applicable.

Proposed Sec. 153.7(b) requires the applicant to include a summary

of its proposal. In addition, proposed Sec. 153.7(b) requires the

applicant to file a description of the proposed facilities and a

description of state, foreign, or other Federal licenses or permits for

the construction or operation of facilities (revising a similar

requirement in current Sec. 153.11(d) applicable to Presidential

Permits). The reference in current Sec. 153.11(d) to permits in

connection with the import/export of natural gas is deleted. Proposed

Sec. 153.7(b) includes a new requirement that the applicant must also

state the status of any non-FERC regulatory proceedings (United States

or foreign) related to the proposal.

Proposed Sec. 153.7(c) requires the applicant to file two

statements with its application. One statement reflects a revision of

the requirement in current Sec. 153.3(h)(1) that an applicant

demonstrate that its proposal will not be inconsistent with the public

interest and the other statement requires, for the first time, a

description of the nature of the transportation service offered. A

separate heading is added. Proposed Sec

plicant to file two

statements with its application. One statement reflects a revision of

the requirement in current Sec. 153.3(h)(1) that an applicant

demonstrate that its proposal will not be inconsistent with the public

interest and the other statement requires, for the first time, a

description of the nature of the transportation service offered. A

separate heading is added. Proposed Sec. 153.7(c)(1) identifies

illustrative elements of the public interest (without restriction on

the Commission's ability to request other information as necessary in

proposed Sec. 153.21(b) to cure deficiencies in an application.

The first illustrative element of the public interest is reflected

in Commission precedent under NGA section 3 (and section 7) and is not

part of the current part 153 regulations.

Proposed Sec. 153.7(c)(1)(i) requires the applicant to file a

statement demonstrating that the proposal will access new foreign

supplies of natural gas and new markets, enhance system reliability and

flexibility and not impair service to existing customers. For example,

a freeze-up of Gulf coast production platforms may require increased

reliance on Canadian or Mexican-source natural gas, which could

necessitate the construction of additional border-crossing facilities.

Also, the possibility of a break-down in service over critical energy

corridors at the borders or the existence of transportation bottlenecks

could warrant the construction of looping transportation facilities.

Proposed Sec. 153.7(c)(1)(ii) deletes the reference to bundled

sales service in current paragraph (h)(2) and substitutes

``transportation service'' in the provision requiring the applicant to

show that the proposal will not impair service to United States

customers.

Proposed Sec. 153.7(c)(iii) revises the requirement to file a

statement describing certain contracts in current Sec. 153.11(c)

applicable to Presidential Permits. Proposed Sec

ce to bundled

sales service in current paragraph (h)(2) and substitutes

``transportation service'' in the provision requiring the applicant to

show that the proposal will not impair service to United States

customers.

Proposed Sec. 153.7(c)(iii) revises the requirement to file a

statement describing certain contracts in current Sec. 153.11(c)

applicable to Presidential Permits. Proposed Sec. 153.7(c)(iii)

requires the applicant for section 3 authorization to file a statement

describing any existing contracts involving the control of operations

at import/export facilities or transportation rates that could prevent

competing United States companies from extending their activities in

the same general area. Such agreements could interfere with free trade

in natural gas between the United States and Canada or Mexico. They may

also be inconsistent with proposed Sec. 153.10 which provides that

section 3 authorizations are not exclusive to the holder.

Proposed Sec. 153.7(c)(2) establishes a new requirement that the

applicant include a statement that the proposed import/export

facilities will be used: (1) To render transportation services under

Part 284, (2) to provide private transportation, or (3) to provide

service that is exempt from the provisions of the NGA pursuant to

sections 1(b) or 1(c) thereof.29 This requirement will enable the

Commission to determine whether the applicant's operations are

consistent with the Commission's open access transportation policies.

Current Sec. 153.5 (other information) is redesignated as proposed

Sec. 153.21(b)(rejection of applications), and Sec. 153.5 is deleted.

---------------------------------------------------------------------------

r 1(c) thereof.29 This requirement will enable the

Commission to determine whether the applicant's operations are

consistent with the Commission's open access transportation policies.

Current Sec. 153.5 (other information) is redesignated as proposed

Sec. 153.21(b)(rejection of applications), and Sec. 153.5 is deleted.

---------------------------------------------------------------------------

\29\ Section 1(b) states that the provisions of the NGA apply,

inter alia, to the transportation of natural gas in interstate

commerce but not to ``any other transportation,'' the local

distribution of natural gas, or the production or gathering of

natural gas. Section 1(c) exempts a Hinshaw pipeline from the

provisions of the NGA. The Commission, however, regulates the

activities of these exempt entities in foreign commerce under

section 3. See, e.g., Vermont Gas System, Inc., 24 FERC para. 61,366

(1983) (LDC); Interenergy Sheffield Processing, 78 FERC para. 61,085

(1997) (gathering); and Havre Pipeline Company, et al., 71 FERC

para. 61,292) (1995) (intrastate pipeline/gatherer engaging in

foreign commerce).

---------------------------------------------------------------------------

d. Section 153.8 Required Exhibits. The Commission proposes to

redesignate current Sec. 153.4 as proposed Sec. 153.8, which retains

the requirement to file current Exhibits A through C in new paragraphs

(a)(1), (a)(2), and (a)(3), respectively, with editorial revisions.

Current Exhibit A is revised to incorporate the requirement of current

Sec. 153.11(a)(3) that an applicant for a Presidential Permit describe

the amount and classes of capital stock issued by a corporate applicant

and the nationality of officers, directors, and stockholders, and the

amount and class of stock held by each. The Commission proposes to

eliminate obsolete exhibits D and E (contracts for the export or import

of natural gas).

Proposed Sec

of current

Sec. 153.11(a)(3) that an applicant for a Presidential Permit describe

the amount and classes of capital stock issued by a corporate applicant

and the nationality of officers, directors, and stockholders, and the

amount and class of stock held by each. The Commission proposes to

eliminate obsolete exhibits D and E (contracts for the export or import

of natural gas).

Proposed Sec. 153.8(a) requires an applicant to file new exhibits D

(copy of any construction and operation agreements), E (LNG-related

engineering data), E-1 (LNG-related seismic information for certain

facilities), and F (an environmental report required by part 380 for

LNG and non-LNG related facilities). Applicants may refer to the

``Guidance Manual for Environmental Report Preparation'' to assist in

the preparation of these exhibits.

New exhibit D codifies current practice in processing applications

under section 3 for pipeline facilities, which do not involve the

import/export of LNG. Exhibit D requires the applicant to verify the

business feasibility of the import/export project by filing copies of

construction and operation agreements. These contracts will show how

the applicant and its Canadian or Mexican counterpart intend to jointly

construct and operate the border-crossing facilities.

New exhibits E, E-1, and F codify existing practice which requires

an applicant for the construction of LNG facilities to provide

sufficient information that will enable the Commission to determine

whether the new facilities will be constructed and operated safely and

with minimal adverse environmental impact. These exhibits are justified

by the significant safety and environmental implications of LNG

terminal facilities. The proposed rule revises the existing map exhibit

as proposed Exhibit G to eliminate the current reference to a scale not

greater than 20 miles to the inch and, in its place, to require a map

of suitable scale.

e. Section 153.9 Transferability. The Commission proposes to

redesignate current Sec

e justified

by the significant safety and environmental implications of LNG

terminal facilities. The proposed rule revises the existing map exhibit

as proposed Exhibit G to eliminate the current reference to a scale not

greater than 20 miles to the inch and, in its place, to require a map

of suitable scale.

e. Section 153.9 Transferability. The Commission proposes to

redesignate current Sec. 153.6 as Sec. 153.9, revise current paragraph

(a) to delete references to authorizations for the import/export of

natural gas, and substitute references to authorizations under section

3. Proposed Sec. 153.9 adds headings to current paragraphs (a) and (b)

to clarify that authorizations under subpart B are not transferable or

assignable.

f. Section 153.10 Authorization Not Exclusive. The Commission

proposes to redesignate current Sec. 153.7 as Sec. 153.10 and to revise

the current regulation to eliminate references to authorizations for

the import/export of natural gas, replacing them with references to

authorizations for construction and operation under section 3 of the

NGA. Under proposed Sec. 153.10, which codifies current Commission

practice, if the Commission authorizes the construction of facilities

pursuant to section 3, the Commission is not prevented from granting

authorization to another applicant under section 3 at the same general

location.30 Current Sec. 153.8 (filing of import/export contracts,

rate schedules, etc.) is proposed to be deleted as obsolete.

---------------------------------------------------------------------------

\30\ See, e.g., Tenneco Baja California Corporation, 75 FERC

para. 61,192 (1996) and Pacific Interstate Offshore Company, 74 FERC

para. 61,350 (1996).

---------------------------------------------------------------------------

ing of import/export contracts,

rate schedules, etc.) is proposed to be deleted as obsolete.

---------------------------------------------------------------------------

\30\ See, e.g., Tenneco Baja California Corporation, 75 FERC

para. 61,192 (1996) and Pacific Interstate Offshore Company, 74 FERC

para. 61,350 (1996).

---------------------------------------------------------------------------

5. Subpart C--Application for a Presidential Permit

a. Section 153.15 Who Shall Apply. The existing heading prefacing

current Secs. 153.10 through 153.12 is deleted and replaced with a more

concise heading (Application for a Presidential Permit) substituted

under a new subpart C of part 153. The Commission is proposing to

redesignate current Sec. 153.10 as Sec. 153.15 and to divide proposed

Sec. 153.15 into paragraphs (a) and (b) with individual headings.

The Commission is proposing to use the same definition of person in

paragraph (a) as is used in subpart B and is deleting the reference in

current Sec. 153.10 to any ``person, firm or corporation.'' It is

appropriate to use the same definition because the same entity that

applies under subpart C to construct and operate border facilities

would need to apply for authorization under subpart B. Proposed

paragraph (b) cross-references the requirement to file simultaneously

an application under subpart B for the siting or construction of

facilities, deleting the current cross-reference to applications for

authorization to import or export natural gas.

b. Section 153.16 Contents of Application. The Commission is

proposing to redesignate current Sec. 153.11 as Sec. 153.16, with a

revised heading. Filing requirements for Presidential Permit

applications stated in the first sentence of current Sec. 153.11 are

deleted and relocated to new subpart D of part 153. Obsolete references

to the payment of filing fees are deleted

r export natural gas.

b. Section 153.16 Contents of Application. The Commission is

proposing to redesignate current Sec. 153.11 as Sec. 153.16, with a

revised heading. Filing requirements for Presidential Permit

applications stated in the first sentence of current Sec. 153.11 are

deleted and relocated to new subpart D of part 153. Obsolete references

to the payment of filing fees are deleted.

Current informational requirements for filing an application for a

Presidential Permit for the construction or modification of border

facilities are virtually identical to the current informational

requirements for applications under NGA section 3. Thus, to avoid

duplication of regulatory text, filing requirements for applications

for Presidential Permits are the same as those stated in subpart B for

section 3 authorization. Proposed Sec. 153.16(a) states that an

applicant for a Presidential Permit for the construction and operation

of border facilities that complies with the informational filing

requirements under subpart B is not required to satisfy separate filing

requirements under subpart C.

Accordingly, current Secs. 153.11(a)(1) and (a) (2) and the first

part of paragraph (a)(3) are deleted as they duplicate the same

provisions in proposed Sec. 153.7(a). The remainder of current

Sec. 153.11(a)(3) is redesignated in proposed Sec. 153.8 (Exhibit A).

Current Sec. 153.11(a)(4) is revised to update references to applicants

``subventioned'' (subsidized) by a foreign government and is relocated

to proposed Sec. 153.7(a)(3). Current Sec. 153.11(b), requiring an

applicant to file a map, is deleted because it duplicates the same

requirement in current Sec. 153.4 and proposed Sec. 153.8(a)(8)

(Exhibit G).

Current Sec. 153.11(c), concerning anti-competitive agreements, and

Sec. 153.11(d), concerning permits granted by a foreign government, are

revised to eliminate out-dated references to bundled gas service,

``landing licenses,'' and import/export permits

licant to file a map, is deleted because it duplicates the same

requirement in current Sec. 153.4 and proposed Sec. 153.8(a)(8)

(Exhibit G).

Current Sec. 153.11(c), concerning anti-competitive agreements, and

Sec. 153.11(d), concerning permits granted by a foreign government, are

revised to eliminate out-dated references to bundled gas service,

``landing licenses,'' and import/export permits. These sections are

redesignated as proposed Secs. 153.7(c)(1)(iii) and 153.7(b),

respectively.

Certain amendments to an existing Presidential Permit do not

involve related section 3 applications because these amendments do not

propose the construction or modification of import/export facilities.

For example, an applicant may propose to revise articles of an existing

Presidential Permit that deal with non-facilities issues, e.g.,

authorized design capacity, name of the Permittee, or whether the

facility may be used both to import and export natural gas. Proposed

Sec. 153.16(b) requires that applicant to provide information

identifying itself pursuant to proposed Sec. 153.7(a) and to fully

explain and justify its proposed amendment. This applicant would not be

required to provide the remainder of information required by proposed

Secs. 153.7 and 153.8, applicable to the construction of facilities.

Current Sec. 153.12, authorizing the Commission to request such

other

information in connection with an application as it may deem pertinent,

is deleted. In its place, proposed Sec. 153.21(b) authorizes the

Commission to direct the applicant to file such information as may be

necessary to cure a deficient application.

c. Section 153.17 Effectiveness of Presidential Permit. Proposed

Sec. 153.17 codifies the Commission's existing practice of requiring a

Permittee to accept an issued Presidential Permit by executing, with

proof of proper authorization, the Testimony of Acceptance of the

Presidential Permit

n to direct the applicant to file such information as may be

necessary to cure a deficient application.

c. Section 153.17 Effectiveness of Presidential Permit. Proposed

Sec. 153.17 codifies the Commission's existing practice of requiring a

Permittee to accept an issued Presidential Permit by executing, with

proof of proper authorization, the Testimony of Acceptance of the

Presidential Permit. The Permittee would be required to file a copy of

the executed Testimony of Acceptance with the Secretary prior to the

start of construction.31

---------------------------------------------------------------------------

\31\ See MidCon Texas Pipeline Corporation, 77 FERC para. 61,205

(1996).

---------------------------------------------------------------------------

6. Subpart D--Paper Media and Other Requirements

a. Section 153.20 General Rule. The Commission proposes to

relocate its current filing requirements for paper media in subpart D.

b. Section 153.21 Conformity with Requirements. Proposed

Sec. 153.21 states the requirement that an application must conform to

the requirements of part 153.

c. Section 153.22 Amendments and Withdrawals. Proposed Sec. 153.22

applies the Commission's Rules of Practice and Procedure applicable to

amending or withdrawing pleadings to amending or withdrawing an

application under subpart B or subpart C of part 153.

d. Section 153.23 Reporting Requirement. The NOPR would delete as

obsolete the only post-authorization reporting requirement in current

part 153.32 Interstate pipelines are currently required to file

operational information about facilities authorized under section 3 in

their FERC Form No. 2 (annual report), FERC Format No. 567 (annual

system flow diagram), and annual report of estimated peak capacity

pursuant to 18 CFR 284.12.

---------------------------------------------------------------------------

requirement in current

part 153.32 Interstate pipelines are currently required to file

operational information about facilities authorized under section 3 in

their FERC Form No. 2 (annual report), FERC Format No. 567 (annual

system flow diagram), and annual report of estimated peak capacity

pursuant to 18 CFR 284.12.

---------------------------------------------------------------------------

\32\ Current Sec. 153.8 (filing of import/export contracts and

rate schedules pursuant to part 154 of the Commission's

regulations).

---------------------------------------------------------------------------

Commission regulations, however, do not require applicants which

are not natural gas companies to file operational information with the

Commission concerning facilities authorized under section 3.33

Accordingly, the Commission proposes in Sec. 153.23 to require

applicants which are not otherwise required to file operating

information concerning facilities authorized under section 3 with the

Commission to report the completion of construction or modification,

the date service commenced, and annually the continued operation of the

import/export facilities.34

---------------------------------------------------------------------------

\33\ The Commission has imposed such reporting as a condition in

individual section 3 proceedings. See, e.g., Yukon Pacific Company,

L.P., 71 FERC para. 61,197 (1995) and EcoElectrica, L.P., 75 FERC

para. 61,157 (1996).

\34\ Effective November 13, 1995, the Commission eliminated its

annual report of import/export volumes in FPC Form 14. See Final

rule, Revisions to Uniform System of Accounts, Forms, Statements and

Reporting Requirements for Natural Gas Companies, 60 FR 53019

(October 11, 1995). The Commission eliminated FPC Form 14 because

importers/exporters currently file quarterly reports with DOE/FE

including the same volume and price information.

---------------------------------------------------------------------------

ee Final

rule, Revisions to Uniform System of Accounts, Forms, Statements and

Reporting Requirements for Natural Gas Companies, 60 FR 53019

(October 11, 1995). The Commission eliminated FPC Form 14 because

importers/exporters currently file quarterly reports with DOE/FE

including the same volume and price information.

---------------------------------------------------------------------------

IV. Regulatory Flexibility Act Certification

The Regulatory Flexibility Act (RFA) requires agencies to prepare

certain statements, descriptions, and analyses of proposed rules that

will have a significant economic impact on a substantial number of

small entities.35 The Commission is not required to make such

analyses if a rule would not have such an effect.

---------------------------------------------------------------------------

\35\ 5 U.S.C. 601-612.

---------------------------------------------------------------------------

The Commission does not believe that this rule would have such an

impact on small entities. Most filing companies regulated by the

Commission do not fall within the RFA's definition of small

entity.36 Further, the filing requirements of small entities are

reduced by the rule. Therefore, the Commission certifies that this rule

will not have a significant economic impact on a substantial number of

small entities.

---------------------------------------------------------------------------

\36\ 5 U.S.C. 601(3), citing to section 3 of the Small Business

Act, 15 U.S.C. 632. Section 3 of the Small Business Act defines a

``small-business concern'' as a business which is independently

owned and operated and which is not dominant in its field of

operation.

---------------------------------------------------------------------------

V. Environmental Statement

------------------------

\36\ 5 U.S.C. 601(3), citing to section 3 of the Small Business

Act, 15 U.S.C. 632. Section 3 of the Small Business Act defines a

``small-business concern'' as a business which is independently

owned and operated and which is not dominant in its field of

operation.

---------------------------------------------------------------------------

V. Environmental Statement

The Commission excludes certain actions not having a significant

effect on the human environment from the requirement to prepare an

environmental assessment or an environmental impact statement.37

No environmental consideration is raised by the promulgation of a rule

that is procedural or that does not substantially change the effect of

legislation or regulations being amended.38 The instant rule

updates the part 153 regulations and does not substantially change the

effect of the underlying legislation or the regulations being revised

or eliminated. Accordingly, no environmental consideration is

necessary.

---------------------------------------------------------------------------

\37\ 18 CFR 380.4.

\38\ 18 CFR 380.4(a)(2)(ii).

---------------------------------------------------------------------------

VI. Public Comment Procedures

The Commission invites all interested persons to submit written

comments on this NOPR.

An original and 14 copies must be filed with the Commission no

later than April 11, 1997. Comments must refer to Docket No. RM97-1-000

and be submitted to the Office of the Secretary, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426.

Additionally, comments should be submitted on computer diskette in

WordPerfect 5.1/5.2 format (Dos or Windows version) or in ASCII format,

with the name of the filer, Docket No. RM97-1-000, and the format used

(WP or ASCII) on the outside of the diskette

97-1-000

and be submitted to the Office of the Secretary, Federal Energy

Regulatory Commission, 888 First Street, NE, Washington, DC 20426.

Additionally, comments should be submitted on computer diskette in

WordPerfect 5.1/5.2 format (Dos or Windows version) or in ASCII format,

with the name of the filer, Docket No. RM97-1-000, and the format used

(WP or ASCII) on the outside of the diskette.

All written submissions will be placed in the Commission's public

file and will be available for public inspection, during regular

business hours, at the Commission's Public Reference Room at 888 First

Street, NE, Washington, DC 20426.

List of Subjects in 18 CFR Part 153

Exports, Imports, Natural gas, Reporting and recordkeeping

requirements.

By direction of the Commission.

Lois D. Cashell,

Secretary.

For the reasons set out in the preamble, the Commission proposes to

revise 18 CFR part 153 to read as follows.

PART 153--APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE, OR

MODIFY FACILITIES USED FOR THE EXPORT OR IMPORT OF NATURAL GAS

Subpart A--General Provisions

Sec.

153.1 Purpose and scope.

153.2 Definitions.

Subpart B--Application Under Section 3

153.5 Who shall apply.

153.6 Time of filing.

153.7 Contents of application.

153.8 Required exhibits.

153.9 Transferability.

153.10 Authorization not exclusive.

Subpart C--Application for a Presidential Permit

153.15 Who shall apply.

153.16 Contents of application.

153.17 Effectiveness of Presidential Permit.

Subpart D--Paper Media and Other Requirements

153.20 General rule.

153.21 Conformity with requirements.

153.22 Amendments and withdrawals.

153.23 Reporting Requirements.

Authority: 15 U.S.C. 717b, 717o; E.O. 10485, 3 CFR, 1949-1953

Comp., p. 970, as

amended by E.O. 12038, 3 CFR, 1978 Comp., p. 136, DOE Delegation

Order No. 0204-112, 49 FR 6684 (February 22, 1984).

Subpart A--General Provisions

Sec. 153.1 Purpose and scope.

equirements

153.20 General rule.

153.21 Conformity with requirements.

153.22 Amendments and withdrawals.

153.23 Reporting Requirements.

Authority: 15 U.S.C. 717b, 717o; E.O. 10485, 3 CFR, 1949-1953

Comp., p. 970, as

amended by E.O. 12038, 3 CFR, 1978 Comp., p. 136, DOE Delegation

Order No. 0204-112, 49 FR 6684 (February 22, 1984).

Subpart A--General Provisions

Sec. 153.1 Purpose and scope.

The purpose of this part is to implement the Commission's delegated

authorities under section 3 of the Natural Gas Act and Executive Order

10485, as amended by Executive Order 12038. Subpart B of this part

establishes filing requirements an applicant must follow to obtain

authorization under section 3 of the NGA for the siting, construction,

operation, place of entry for imports or place of exit for exports.

Subpart C of this part establishes filing requirements an applicant

must follow to apply for a Presidential Permit, or an amendment to an

existing Presidential Permit, for border facilities at the

international boundary between the United States and Canada or Mexico.

Sec. 153.2 Definitions.

(a) DOE/FE means the Department of Energy/Office of Fossil Energy

or its successor office.

(b) NBSIR means the National Bureau of Standards Information

Report.

(c) Person means an individual or entity as defined in 10 CFR

590.102(m).

Subpart B--Application Under Section 3

Sec. 153.5 Who shall apply.

(a) Applicant. Any person proposing to site, construct, operate, or

modify facilities which are to be used for the export of natural gas

from the United States to a foreign country or for the import of

natural gas from a foreign country or to amend an existing

authorization shall file with the Commission an application for

authorization therefor under subpart B of this part and section 3 of

the Natural Gas Act.

erson proposing to site, construct, operate, or

modify facilities which are to be used for the export of natural gas

from the United States to a foreign country or for the import of

natural gas from a foreign country or to amend an existing

authorization shall file with the Commission an application for

authorization therefor under subpart B of this part and section 3 of

the Natural Gas Act.

(b) Cross-reference. Any person applying under paragraph (a) of

this section to construct facilities at the borders of the United

States and Canada or Mexico must also simultaneously apply for a

Presidential Permit under subpart C of this part.

Sec. 153.6 Time of filing.

An application filed pursuant to Sec. 153.5(a) shall be made

simultaneous with or after the filing of any related applications with

DOE/FE for exporting or importing natural gas, except where otherwise

ordered by the Commission for good cause shown.

Sec. 153.7 Contents of application.

Every application under subpart B of this part shall include, in

the order indicated, the following:

(a) Information regarding applicant. (1) The exact legal name of

applicant;

(2) The name, title, and post office address, telephone and

facsimile numbers of the person to whom correspondence in regard to the

application shall be addressed;

(3) If a corporation, the state or territory under the laws of

which the applicant was organized, and the town or city where

applicant's principal office is located. If applicant is incorporated

under the laws of, or authorized to operate in, more than one state,

all pertinent facts should be stated. If applicant company is owned

wholly or in part by any government entity, or directly or indirectly

subsidized by any government entity; or, if applicant company has any

agreement for such ownership or subsidization from any government,

provide full details of ownership and/or subsidies.

under the laws of, or authorized to operate in, more than one state,

all pertinent facts should be stated. If applicant company is owned

wholly or in part by any government entity, or directly or indirectly

subsidized by any government entity; or, if applicant company has any

agreement for such ownership or subsidization from any government,

provide full details of ownership and/or subsidies.

(b) Summary. A detailed summary of the proposal, including

descriptions of the facilities utilized in the proposed export or

import of natural gas; state, foreign, or other Federal governmental

licenses or permits for the construction, operation, or modification of

facilities in the United States, Canada, or Mexico; and the status of

any state, foreign, or other Federal regulatory proceedings which are

related to the proposal.

(c) Statements. (1) A statement demonstrating that the proposal or

proposed construction is not inconsistent with the public interest,

including, where applicable, a demonstration that the proposal:

(i) Will access new foreign supplies of natural gas and serve new

market demand, enhance the reliability and flexibility of the

applicant's pipeline system, the dependability of international energy

trade, and will not impair transportation service to existing

customers;

(ii) Will not impair the ability of the applicant to render

transportation service at reasonable rates to customers in the United

States; and,

(iii) will not involve any existing contract(s) between the

applicant and a foreign government or person concerning the control of

operations or rates for the delivery or receipt of natural gas which

may restrict or prevent other United States companies from extending

their activities in the same general area, with copies of such

contracts.

able rates to customers in the United

States; and,

(iii) will not involve any existing contract(s) between the

applicant and a foreign government or person concerning the control of

operations or rates for the delivery or receipt of natural gas which

may restrict or prevent other United States companies from extending

their activities in the same general area, with copies of such

contracts.

(2) A representation that the proposal will be used to render

transportation services under part 284 of this chapter, private

transportation, or service that is exempt from the provisions of the

Natural Gas Act pursuant to sections 1(b) or 1(c) thereof.

Sec. 153.8 Required exhibits.

(a) An application must include the following exhibits:

(1) Exh. A. A certified copy of articles of incorporation,

partnership or joint venture agreements, and by-laws of applicant; the

amount and classes of capital stock; nationality of officers,

directors, and stockholders, and the amount and class of stock held by

each;

(2) Exh. B. A detailed statement of the financial and corporate

relationship existing between applicant and any other person or

corporation;

(3) Exh. C. A statement, including signed opinion of counsel,

showing that the construction, operation, or modification of facilities

for the export or the import of natural gas is within the authorized

powers of applicant, that applicant has complied with laws and

regulations of the state or states in which applicant operates;

(4) Exh. D. If the proposal is for a pipeline interconnection to

import or export natural gas, a copy of any construction and operation

agreement between the applicant and the operator(s) of border

facilities in the United States and Canada or Mexico;

the authorized

powers of applicant, that applicant has complied with laws and

regulations of the state or states in which applicant operates;

(4) Exh. D. If the proposal is for a pipeline interconnection to

import or export natural gas, a copy of any construction and operation

agreement between the applicant and the operator(s) of border

facilities in the United States and Canada or Mexico;

(5) Exh. E. If the proposal is to import or export LNG, evidence

that an appropriate and qualified concern will properly and safely

receive or deliver such LNG, including a report containing detailed

engineering and design information. The Commission staff's ``Guidance

Manual for Environmental Report Preparation'' may be obtained from the

Commission's Office of Pipeline Regulation, 888 First Street, NE,

Washington, DC 20426;

(6) Exh. E-1. If the LNG import/export facility is to be located at

a site in zones 2, 3, or 4 of the Uniform Building Code's Seismic Risk

Map of the United States, or where there is a risk of surface faulting

or ground liquefaction, a report on earthquake hazards and engineering.

Guidelines are contained in ``Data Requirements for the Seismic Review

of LNG Facilities,'' NBSIR 84-2833. This document may be obtained from

the National Technical Information Service or the Commission's Office

of Pipeline Regulation, 888 First Street, NE, Washington, DC 20426;

(7) Exh. F. An environmental report as specified in Sec. 380.3 of

this chapter. Refer to Commission staff's ``Guidance Manual for

Environmental Report Preparation;'' and

(8) Exh. G. A geographical map of a suitable scale and detail

showing the physical location of the facilities to be utilized for the

applicant's proposed export or import operations The map should

indicate with particularity the ownership of such facilities at or on

each side of the border between the United States and Canada or Mexico,

if applicable.

Environmental Report Preparation;'' and

(8) Exh. G. A geographical map of a suitable scale and detail

showing the physical location of the facilities to be utilized for the

applicant's proposed export or import operations The map should

indicate with particularity the ownership of such facilities at or on

each side of the border between the United States and Canada or Mexico,

if applicable.

(b) The applicant may incorporate by reference any exhibit required

by paragraph (a) of this section already on file with the Commission.

Sec. 153.9 Transferability.

(a) Non-transferable. Authorizations under subpart B of this part

and section 3 of the Natural Gas Act shall not be transferable or

assignable. A Commission order granting such authorization shall

continue in effect temporarily for a reasonable time in the event of

the involuntary transfer of facilities used thereunder by operation of

law (including such transfers to receivers, trustees, or purchasers

under foreclosure or judicial sale) pending the making of an

application for permanent authorization and decision thereon, provided

notice is promptly given in writing to the Commission accompanied by a

statement that the physical facts relating to operations of the

facilities remains substantially the same as before the transfer and as

stated in the initial application for such authorization.

(b) Supplemental orders. The Commission also may make, at any time

subsequent to the original order of authorization, after opportunity

for hearing, such supplemental orders concerning the operation of the

facilities as it may find necessary or appropriate.

Sec. 153.10 Authorization not exclusive.

No authorization granted pursuant to subpart B of this part and

section 3 of the Natural Gas Act shall be deemed to prevent the

Commission from granting authorization under subpart B to any other

person at the same general location, or to prevent any other person

from making application for such authorization.

as it may find necessary or appropriate.

Sec. 153.10 Authorization not exclusive.

No authorization granted pursuant to subpart B of this part and

section 3 of the Natural Gas Act shall be deemed to prevent the

Commission from granting authorization under subpart B to any other

person at the same general location, or to prevent any other person

from making application for such authorization.

Subpart C--Application for a Presidential Permit.

Sec. 153.15 Who shall apply.

(a) Applicant. Any person proposing to construct, operate,

maintain, or connect facilities or to change the operation or

maintenance of facilities at the borders of the United States and

Canada or Mexico, for the export or import of natural gas to or from

those countries, or to amend an existing Presidential Permit, shall

file with the Commission an application for a Presidential Permit under

subpart C of this part and Executive Order 10485, as amended by

Executive Order 12038.

(b) Cross-reference. Any person applying under paragraph (a) of

this section for a Presidential Permit for the construction and

operation of border facilities must also simultaneously apply for

authorization under subpart B of this part.

Sec. 153.16 Contents of application.

(a) Cross-reference. The submission of information under

Secs. 153.7 and 153.8 of subpart B of this part shall be deemed

sufficient for purposes of applying for a Presidential Permit or an

amendment to an existing Presidential Permit under subpart C of this

part for the construction and operation of border facilities.

zation under subpart B of this part.

Sec. 153.16 Contents of application.

(a) Cross-reference. The submission of information under

Secs. 153.7 and 153.8 of subpart B of this part shall be deemed

sufficient for purposes of applying for a Presidential Permit or an

amendment to an existing Presidential Permit under subpart C of this

part for the construction and operation of border facilities.

(b) Amendment Not Proposing Construction. An applicant proposing to

amend the article(s) of an existing Presidential Permit (other than

facilities aspects) must file information pursuant to Sec. 153.7(a) and

a summary and justification of its proposal.

Sec. 153.17 Effectiveness of Presidential Permit.

A Presidential Permit, once issued by the Commission, shall not be

effective until it has been accepted by the highest authority of the

Permittee, as indicated by Permittee's execution of a Testimony of

Acceptance, and a certified copy of the accepted Presidential Permit

and the executed Testimony of Acceptance has been filed with the

Commission.

Subpart D--Paper Media and Other Requirements

Sec. 153.20 General rule.

(a) Number of Copies. Applications under subpart B of this part

must be submitted to the Commission in an original and 7 conformed

paper copies. Applications under subpart C of this part must be

submitted to the Commission in an original and 9 conformed paper

copies.

(b) Certification. All applications must be signed in compliance

with Sec. 385.2005 of this chapter.

(1) The signature on an application constitutes a certification

that: the signer has read the filing signed and knows the contents of

the paper copies; and, the signer possesses the full power and

authority to sign the filing.

(2) An application must be signed by one of the following:

opies.

(b) Certification. All applications must be signed in compliance

with Sec. 385.2005 of this chapter.

(1) The signature on an application constitutes a certification

that: the signer has read the filing signed and knows the contents of

the paper copies; and, the signer possesses the full power and

authority to sign the filing.

(2) An application must be signed by one of the following:

(i) The person on behalf of whom the application is made;

(ii) An officer, agent, or employee of the governmental authority,

agency, or instrumentality on behalf of which the filing is made; or,

(iii) A representative qualified to practice before the Commission

under Sec. 385.2101 of this chapter who possesses authority to sign.

(c) Where to file. The paper copies and an accompanying transmittal

letter must be submitted in one package to: Office of the Secretary,

Federal Energy Regulatory Commission, Washington, DC 20426.

Sec. 153.21 Conformity with requirements.

(a) General rule. Applications under subparts B and C must conform

with the requirements of this part.

(b) Rejection of applications. If an application does not conform

to the requirements of this part, the Director of the Office of

Pipeline Regulation will notify the applicant of all deficiencies.

Deficient applications not amended within 20 days of the notice of

deficiency, or such longer period as may be specified in the notice of

deficiency, will be rejected by the Director of the Office of Pipeline

Regulation as provided by Sec. 385.2001(b) of this chapter. Copies of a

rejected application will be returned. An application which relates to

an operation, service, or construction concerning which a prior

application has been filed and rejected, shall be docketed as a new

application. Such new application shall state the docket number of the

prior rejected application.

Sec. 153.22 Amendments and withdrawals.

Amendments to or withdrawals of applications must conform to the

requirements of Secs. 385.215 and 385.216 of this chapter.

n operation, service, or construction concerning which a prior

application has been filed and rejected, shall be docketed as a new

application. Such new application shall state the docket number of the

prior rejected application.

Sec. 153.22 Amendments and withdrawals.

Amendments to or withdrawals of applications must conform to the

requirements of Secs. 385.215 and 385.216 of this chapter.

Sec. 153.23 Reporting requirements.

Each person authorized under part 153 that is not otherwise

required to file information concerning the start of construction or

modification of import/export facilities, the completion of

construction or modification, and the commencement of service must file

such information with the Commission within 10 days after such event.

Each such person must also report by March 1 of each year the estimated

peak day capacity and actual peak day usage of its import/export

facilities.

[FR Doc. 97-3199 Filed 2-7-97; 8:45 am]

BILLING CODE 6717-01-P