DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 284

[Docket Nos. RM96-14-000]

Secondary Market Transactions on Interstate Natural Gas Pipelines

July 31, 1996.

AGENCY: Federal Energy Regulatory Commission, Energy.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission is issuing a notice

of proposed rulemaking to revise section 284.243 of the Commission's

regulations to improve the efficiency of the Commission's capacity

release mechanism and encourage greater use of this mechanism. The

Commission is proposing to: make changes in its regulations and

policies to improve the operation of the capacity release mechanism;

eliminate the prior requirement for competitive bidding; and permit

shippers to release capacity, and pipelines to sell interruptible and

short-term firm service, at rates above the rate cap when the shipper

or pipeline has demonstrated that it does not exercise market power.

DATES: Comments on the proposed rule are due October 7, 1996. Comments

should be filed with the Office of the Secretary and should refer to

Docket No. RM96-14-000.

ADDRESSES: Federal Energy Regulatory Commission, 888 First Street, NE.,

Washington, DC, 20426.

FOR FURTHER INFORMATION CONTACT: Michael Goldenberg, Office of the

General Counsel, Federal Energy Regulatory Commission, 888 First

Street, NE., Washington, DC 20426; (202) 208-2294.

ober 7, 1996. Comments

should be filed with the Office of the Secretary and should refer to

Docket No. RM96-14-000.

ADDRESSES: Federal Energy Regulatory Commission, 888 First Street, NE.,

Washington, DC, 20426.

FOR FURTHER INFORMATION CONTACT: Michael Goldenberg, Office of the

General Counsel, Federal Energy Regulatory Commission, 888 First

Street, NE., Washington, DC 20426; (202) 208-2294.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of

this document in the Federal Register, the Commission provides all

interested persons an opportunity to inspect or copy the contents of

this document during normal business hours in Room 2A, 888 First

Street, N.E., Washington, D.C. 20426.

The Commission Issuance Posting System (CIPS), an electronic

bulletin board service, provides access to the texts of formal

documents issued by the Commission. CIPS is available at no charge to

the user and may be accessed using a personal computer with a modem by

dialing 202-208-1397 if dialing locally or 1-800-856-3920 if dialing

long distance. To access CIPS, set your communications software to

19200, 14400, 12000, 9600, 7200, 4800, 2400, 1200bps, full duplex, no

parity, 8 data bits, and 1 stop bit. The full text of this document

will be available on CIPS indefinitely in ASCII and WordPerfect 5.1

format for one year. The complete text on diskette in WordPerfect

format may also be purchased from the Commission's copy contractor, La

Dorn Systems Corporation, also located in Room 2A, 888 First Street,

N.E., Washington D.C. 20426.

The Commission's bulletin board system also can be accessed through

the FedWorld system directly by modem or through the Internet. To

access the FedWorld system by modem:

Dial (703) 321-3339 and logon to the FedWorld system.

After logging on, type: /go FERC

To access the FedWorld system, through the Internet:

Telnet to: fedworld.gov

Select the option: [1] FedWorld

Logon to the FedWorld system

Type: /go FERC

Or:

oard system also can be accessed through

the FedWorld system directly by modem or through the Internet. To

access the FedWorld system by modem:

Dial (703) 321-3339 and logon to the FedWorld system.

After logging on, type: /go FERC

To access the FedWorld system, through the Internet:

Telnet to: fedworld.gov

Select the option: [1] FedWorld

Logon to the FedWorld system

Type: /go FERC

Or:

Point your Web Browser to: http://www.fedworld.gov

Scroll down the page to select FedWorld Telnet Site

Select the option: [1] FedWorld

Logon to the FedWorld system

Type: /go FERC

The Federal Energy Regulatory Commission (Commission) requires

interstate natural gas pipelines to provide a mechanism that permits

firm shippers to release unneeded capacity to other shippers needing

that capacity. The Commission is proposing to revise its capacity

release regulations, Sec. 284.243, to improve the efficiency of the

program and encourage greater use of capacity release. The Commission

is proposing changes in three areas. First, the Commission is proposing

to require pipelines to improve their existing capacity release

procedures to make the system work more efficiently. Second, the

Commission is proposing to improve the speed and certainty of

transactions by removing the requirement for competitive bidding.

Third, the Commission proposes to permit releases of capacity and

pipeline sales of interruptible and short-term firm capacity at rates

above the pipeline's maximum rate upon a showing that the releasing

shipper or the pipeline cannot exercise market power.

I. Public Reporting Burden

osing to improve the speed and certainty of

transactions by removing the requirement for competitive bidding.

Third, the Commission proposes to permit releases of capacity and

pipeline sales of interruptible and short-term firm capacity at rates

above the pipeline's maximum rate upon a showing that the releasing

shipper or the pipeline cannot exercise market power.

I. Public Reporting Burden

The proposed rule would affect two existing Commission data

collections, FERC-545, Gas Pipeline Rates: Rate Change (Non-formal),

(OMB Control No. 1902-0154) (FERC-545), and FERC-549B, Gas Pipeline

Rates: Capacity Release Information (OMB Control No. 1902-0169)(FERC-

549B).

Under the existing data collection/requirements of FERC-545, there

would be a one-time estimated annual reporting burden of 4,125 hours

(55 hours per company) with the adoption of the revised regulations

proposed herein. A one-time tariff filing would adjust certain general

terms and condition language in pipeline tariffs to reflect the

implementation of the proposed changes in the Commission's capacity

release program. Tariff filings would be required of approximately 75

interstate natural gas pipelines. (See FERC-545 burden detail in

estimated burden table below.)

Under existing data collection FERC-549B there would be a reduction

in annual burden of an estimated 115,650 hours (1,542 hours per

company). The estimated burden reduction reflects the proposed

improvements to the way the capacity release program operates and the

elimination of competitive bidding requirements.

The revised regulations proposed in the subject NOPR are being

submitted to the Office of Management and Budget (OMB) for review under

section 3507(d) of the Paperwork Reduction Act of 1995, (44 U.S.C.

3507(d)). For copies of the OMB submission, contact Michael Miller at

ed

improvements to the way the capacity release program operates and the

elimination of competitive bidding requirements.

The revised regulations proposed in the subject NOPR are being

submitted to the Office of Management and Budget (OMB) for review under

section 3507(d) of the Paperwork Reduction Act of 1995, (44 U.S.C.

3507(d)). For copies of the OMB submission, contact Michael Miller at

(202)208-1415. Interested persons may send comments regarding these

burden estimates or any other aspect of these collections of

information, including suggestions for reductions of burden, to the

Desk Officer FERC, Office of Management and Budget, Room 3019 NEOB,

Washington, D.C. 20503, phone 202-395-3087 or via the Internet at

[email protected].

Comments should be filed with the Office of Management and Budget. A

copy of any comments filed with the Office of Management and Budget

also should be sent to the following address at the Commission: Federal

Energy Regulatory Commission, Information Services Division, Room 41-

17, Washington, DC 20426, Attention: Michael Miller.

Estimated Annual Burden Associated With the Subject NOPR

----------------------------------------------------------------------------------------------------------------

Total No. Total

Affected data collection/requirement No. of of Hours per annual

respondents responses response hours

----------------------------------------------------------------------------------------------------------------

FERC-549B (1902-0169):

Reporting/Data Requirement Burden.......................... 75 75 -1,542 -115,650

FERC-545 (1902-0154):

Reporting/Data Requirement Burden.......................... 75 75 55 4,125

Total Annual Hours Net Increase or (Decrease) in Burden.... 75 75 -1,487 -111,525

----------------------------------------------------------------------------------------------------------------

ERC-549B (1902-0169):

Reporting/Data Requirement Burden.......................... 75 75 -1,542 -115,650

FERC-545 (1902-0154):

Reporting/Data Requirement Burden.......................... 75 75 55 4,125

Total Annual Hours Net Increase or (Decrease) in Burden.... 75 75 -1,487 -111,525

----------------------------------------------------------------------------------------------------------------

The above estimates include time for reviewing the requirements of

the Commission's proposed regulations, searching existing data sources,

gathering and maintaining the necessary data, and reviewing and

completing the collection of information.

Data Collection/Requirement Costs

The Commission expects that the proposed changes in its regulations

would result in a net reduction in day-to-day operating costs. The one-

time tariff filing burden/cost under FERC-545 would be more than offset

by the expected burden/cost reduction and efficiencies created under

FERC-549B. The Commission estimates that the changes in reporting

requirements proposed herein would result in an overall net reduction

in the average annualized cost per respondent for the first year.

Following the first year, a permanent annual reduction in burden/cost

would occur under the FERC-549B data collection as indicated below.

------------------------------------------------------------------------

Estimated annualized costs (per respondent)

------------------------------------------------------------------------

FERC-549B (Annual Reduction)............................... -$75,378

FERC-545 (One-time Initial Cost/First Year)................ 2,652

------------

Net Total Cost (Net Reduction)......................... -$73,726

------------------------------------------------------------------------

Internal Review:

sts (per respondent)

------------------------------------------------------------------------

FERC-549B (Annual Reduction)............................... -$75,378

FERC-545 (One-time Initial Cost/First Year)................ 2,652

------------

Net Total Cost (Net Reduction)......................... -$73,726

------------------------------------------------------------------------

Internal Review:

The Commission has reviewed the proposed revisions to its

regulations and determined that the changes are necessary to establish

more efficient pipeline operations. The proposed rule would encourage

buyers to use the capacity release system more often and make it more

competitive with other means of acquiring capacity.

The proposed revisions are consistent with the Commission's plan

for efficient information collection, communication, and management

within the natural gas industry. The Commission has assured itself, by

means of its internal review, that there is reasonable and objective

support for the burden estimates associated with the proposed changes

in information requirements.

The Commission emphasizes that the increased cost under FERC-545

would be a one-time cost that pipelines would not incur on an ongoing

year-to-year basis. The estimated cost reflects the one-time tariff

filings to incorporate the revised regulations proposed herein. These

revisions appear necessary to improve the efficiency of the capacity

release program between shippers and pipelines, efficiency which, in

the long run, should reduce the costs of all participants in the

market.

II. Current Capacity Release Rules

n ongoing

year-to-year basis. The estimated cost reflects the one-time tariff

filings to incorporate the revised regulations proposed herein. These

revisions appear necessary to improve the efficiency of the capacity

release program between shippers and pipelines, efficiency which, in

the long run, should reduce the costs of all participants in the

market.

II. Current Capacity Release Rules

The Commission instituted the capacity release mechanism to create

a uniform, national program for the reallocation of interstate pipeline

capacity to complement the unbundled, open access environment created

by Order No. 636. 1 The capacity release mechanism enables firm

shippers to make the most efficient and economical use of the capacity

for which they pay as well as providing shippers that previously had

been unable to acquire firm pipeline capacity (i.e., non-local

distribution company shippers) with access to firm capacity. By

permitting market forces to reallocate capacity to those who place a

higher value on the capacity than the original holder, the capacity

release mechanism increases economic efficiency as well as promoting

the most efficient use of the natural gas transportation network.2

---------------------------------------------------------------------------

\1\ Pipeline Service Obligations and Revisions to Regulations

Governing Self-Implementing Transportation; and Regulation of

Natural Gas Pipelines After Partial Wellhead Decontrol, Order No.

636, 57 FR 13267 (Apr. 16, 1992), FERC Stats. & Regs. Preambles

[January 1991-June 1996] para. 30,939 (Apr. 8, 1992), order on

reh'g, Order No. 636-A, 57 FR 36128 (Aug. 12, 1992), FERC Stats. &

Regs. Preambles [January 1991-June 1996] para. 30,950 (Aug. 3,

1992), order on reh'g, Order No. 636-B, 57 FR 57911 (Dec. 8, 1992),

61 FERC para. 61,272 (1992), aff'd in part and remanded in part,

United Distribution Co. v. FERC, No. 92-1485 (D.C. Cir. July 16,

1996)

anuary 1991-June 1996] para. 30,939 (Apr. 8, 1992), order on

reh'g, Order No. 636-A, 57 FR 36128 (Aug. 12, 1992), FERC Stats. &

Regs. Preambles [January 1991-June 1996] para. 30,950 (Aug. 3,

1992), order on reh'g, Order No. 636-B, 57 FR 57911 (Dec. 8, 1992),

61 FERC para. 61,272 (1992), aff'd in part and remanded in part,

United Distribution Co. v. FERC, No. 92-1485 (D.C. Cir. July 16,

1996).

\2\ As part of its restructuring of the electric industry, the

Commission has also provided for transmission capacity reassignment

for electric utilities. See Promoting Wholesale Competition Through

Open Access Non-discriminatory Transmission Services by Public

Utilities, Order No. 888, 61 FR 21540 (May 10, 1996), FERC Stats. &

Regs. Preambles [January 1991-June 1996], para. 31,036, at 31,694

(Apr. 24, 1996).

---------------------------------------------------------------------------

The Commission's authority to establish a uniform, national program

governing the reallocation of interstate capacity has just been

affirmed by the United States Court of Appeals for the District of

Columbia in United Distribution Co. v. FERC (UDC).3 The Court also

affirmed the Commission's jurisdiction over, and authority to prevent,

other capacity reallocations that may interfere with the establishment

of the uniform federal program, such as buy-sell transactions in which

an LDC uses its interstate capacity to transport gas on behalf of a

purchaser. The Court found that the Commission's jurisdiction over a

buy-sell derives from the transportation component of the transaction;

the reallocation of interstate pipeline capacity to the purchaser is a

``central element'' of such transactions.4

---------------------------------------------------------------------------

n LDC uses its interstate capacity to transport gas on behalf of a

purchaser. The Court found that the Commission's jurisdiction over a

buy-sell derives from the transportation component of the transaction;

the reallocation of interstate pipeline capacity to the purchaser is a

``central element'' of such transactions.4

---------------------------------------------------------------------------

\3\ No. 92-1485, 1996 U.S. App. Lexis 17436, slip op. at 63-81

(D.C. Cir. July 16, 1996).

\4\ Id., at 80. The Commission also has Natural Gas Act

jurisdiction over buy-sells and other transactions to the extent

they constitute the sale of natural gas for resale. See id., at 68.

---------------------------------------------------------------------------

Under the Commission's capacity release program, a firm shipper

(releasing shipper) sells its capacity by returning its capacity to the

pipeline for reassignment to the buyer (replacement shipper). The

pipeline contracts with, and receives payment from, the replacement

shipper and then issues a credit to the releasing shipper. The

replacement shipper may pay less than the pipeline's maximum tariff

rate, but

not more. The results of all releases are posted by the pipeline on its

Electronic Bulletin Board (EBB) and made available through

standardized, downloadable files.

The releasing shipper can locate a replacement shipper in two ways.

The releasing shipper can choose to have the pipeline post the notice

of release so other shippers can submit bids for that capacity, with

the capacity awarded to the highest bidder. Or, the releasing shipper

can enter into a pre-arranged transaction with a replacement shipper

for the release of capacity.

The regulations establish a number of requirements for pre-arranged

releases. For pre-arranged releases at less than the maximum rate, the

regulations generally require that the pipeline post the release and

permit other shippers to bid for that capacity

highest bidder. Or, the releasing shipper

can enter into a pre-arranged transaction with a replacement shipper

for the release of capacity.

The regulations establish a number of requirements for pre-arranged

releases. For pre-arranged releases at less than the maximum rate, the

regulations generally require that the pipeline post the release and

permit other shippers to bid for that capacity. If a competitive bid

exceeds the pre-arranged release rate, the designated replacement

shipper is given the opportunity to match that bid and thus retain the

capacity.

The Commission, however, has recognized that, for short-term

transactions, shippers need the ability to reallocate capacity quickly

and efficiently. The original regulations, therefore, provided an

exemption from the competitive bidding requirements for transactions of

less than one calendar month. This exception has been extended to

transactions of 31 days or less. To ensure that parties cannot use the

exception to avoid bidding for longer-term transactions, the

regulations prohibit parties from rolling-over or granting extensions

to 31-day-or-less transactions unless they comply with the requirements

for prior notice and bidding.

Since Order No. 636, the Commission, on several occasions, has fine

tuned the mechanics of the capacity release procedure. In February

1993, the Commission convened a technical conference to examine methods

of creating standardized downloadable files for capacity information,

so that shippers and third-party service providers could obtain

capacity information without having to deal with the eccentricities of

the individual pipeline EBBs. The industry formed Working Groups to

devise the necessary standards, and, in Order No. 563, the Commission

adopted into its regulations the standards recommended by a consensus

of the industry.5

---------------------------------------------------------------------------

providers could obtain

capacity information without having to deal with the eccentricities of

the individual pipeline EBBs. The industry formed Working Groups to

devise the necessary standards, and, in Order No. 563, the Commission

adopted into its regulations the standards recommended by a consensus

of the industry.5

---------------------------------------------------------------------------

\5\ Standards For Electronic Bulletin Boards Required Under Part

284 of the Commission's Regulations, Order No. 563, 59 FR 516 (Jan.

5, 1994), FERC Stats. & Regs. Preambles [January 1991-June 1996]

para. 30,988 (Dec. 23, 1993), order on reh'g, Order No. 563-A, 59 FR

23624 (May 6, 1994), FERC Stats. & Regs. Preambles [January 1991-

June 1996] para. 30,994 (May 2, 1994), reh'g denied, Order No. 563-

B, 68 FERC para. 61,002 (1994).

---------------------------------------------------------------------------

The Commission also began receiving requests from local

distribution companies (LDCs) to revise the capacity release

regulations by removing the requirements for competitive bidding and

the cap on the rate releasing shippers could receive for

capacity.6 After the capacity release program had been in effect

for a year, the Commission began a review of the program which involved

informal meetings between staff and representatives from all segments

of the industry.

---------------------------------------------------------------------------

\6\ See Petition Of United Distribution Companies and Associated

Gas Distributors For A Rulemaking To Promote Growth And Development

Of The Secondary Market, Docket No. RM94-10-000, filed December 9,

1993.

---------------------------------------------------------------------------

s from all segments

of the industry.

---------------------------------------------------------------------------

\6\ See Petition Of United Distribution Companies and Associated

Gas Distributors For A Rulemaking To Promote Growth And Development

Of The Secondary Market, Docket No. RM94-10-000, filed December 9,

1993.

---------------------------------------------------------------------------

During these meetings, all industry segments recommended that the

less-than-one calendar month exception from the bidding requirements be

extended to a full month to conform the bidding exception to the

industry's monthly purchasing schedule. The Commission adopted the

industry's recommendation in Order No. 577 and extended the bidding

exception to 31 days.7 The extension of the bidding exception

ensures that releasing and replacement shippers can consummate monthly

transactions quickly and provides replacement shippers with the needed

assurance that they will obtain the contracted-for capacity at the

negotiated price.

---------------------------------------------------------------------------

\7\ Release of Firm Capacity on Interstate Natural Gas

Pipelines, Order No. 577, 60 FR 16979 (Apr. 4, 1995), FERC Stats. &

Regs. Preambles [January 1991-June 1996] para. 31,017 (Mar. 29,

1993), reh'g granted, Order No. 577-A, 60 FR 27882 (June 8, 1995),

FERC Stats. & Regs. Preambles [January 1991-June 1996] para. 31,021

(May 31, 1995).

---------------------------------------------------------------------------

The Commission also improved the capacity release system as part of

its recent standardization of pipeline business and communication

practices. On July 17, 1996, the Commission issued a final rule

incorporating by reference business practice and communication

standards proposed by the Gas Industry Standards Board (GISB).8

These standards will be implemented by pipelines in the spring of 1997.

---------------------------------------------------------------------------

nt standardization of pipeline business and communication

practices. On July 17, 1996, the Commission issued a final rule

incorporating by reference business practice and communication

standards proposed by the Gas Industry Standards Board (GISB).8

These standards will be implemented by pipelines in the spring of 1997.

---------------------------------------------------------------------------

\8\ Standards for Business Practices of Interstate Natural Gas

Pipelines, Order No. 587, 76 FERC para. 61,042 (1996). GISB is a

consensus standards organization open to all members of the gas

industry. Under GISB procedures, standards must be approved by a

consensus of the five segments of the industry--pipelines, LDCs,

producers, end-users, and services (including marketers and third-

party computer service providers).

---------------------------------------------------------------------------

The standards require changes in pipelines' capacity release

procedures and in their methods of communicating capacity release

information. An important procedural change is the establishment of a

capacity release timeline.9 This timeline provides that, if

pipelines are notified of a non-biddable capacity release transaction

by 9:00 a.m. the day of nomination, the replacement shipper can

nominate the same day (at 11:30 a.m.). For biddable transactions (of

less than five months), the timeline provides that if a pre-arranged

transaction (or a shipper's offer soliciting bids) is posted to the

pipeline by 1:00 p.m., the pipeline must complete the bidding and

matching process by 5:00 p.m., and the replacement shipper can nominate

the next day.10

---------------------------------------------------------------------------

or biddable transactions (of

less than five months), the timeline provides that if a pre-arranged

transaction (or a shipper's offer soliciting bids) is posted to the

pipeline by 1:00 p.m., the pipeline must complete the bidding and

matching process by 5:00 p.m., and the replacement shipper can nominate

the next day.10

---------------------------------------------------------------------------

\9\ Capacity Release Standard 5.3.2. All times used in the

standards are central clock time (which is central standard time,

without a daylight savings time adjustment).

\10\ Longer-term transactions, those of five months or longer,

have a 4-day bidding period.

---------------------------------------------------------------------------

The communication standards require pipelines to process file

uploads of pre-arranged transactions. This change complements the file

downloads previously required by Order No. 563, because shippers and

third-party service providers now will be able to transmit pre-arranged

deals to the pipelines without being burdened by the inconsistent and

irregular procedures of individual pipeline EBBs. Instead, they will be

able to efficiently transmit this information to every pipeline using

the same file formats and protocols.

Proposed Revisions

The Commission proposes revisions to Sec. 284.243 to further

improve the efficiency of the capacity release mechanism and thereby

create an even more robust secondary market. The revisions are intended

to encourage greater use of capacity release and make capacity release

more competitive with other means of acquiring capacity, such as the

pipelines' interruptible and short-term firm services as well as the

so-called ``gray market.'' The gray market generally refers to LDCs'

use of their firm transportation capacity to make targeted bundled

transportation/gas sales to specific purchasers either on-system or

off-system

apacity release and make capacity release

more competitive with other means of acquiring capacity, such as the

pipelines' interruptible and short-term firm services as well as the

so-called ``gray market.'' The gray market generally refers to LDCs'

use of their firm transportation capacity to make targeted bundled

transportation/gas sales to specific purchasers either on-system or

off-system.

Specifically, as discussed below, the Commission proposes three

major revisions to its capacity release regulations and policies.

First, the Commission is proposing to revise its regulations as well as

change policies to improve the operation of the capacity release

program. Second, the Commission proposes to eliminate the competitive

bidding requirement. Third, the Commission proposes to permit shippers

to release capacity, and pipelines to sell interruptible and short-term

firm service, at rates above the rate

cap when the shipper or pipeline has demonstrated that it does not

exercise market power. In addition, the Commission is revising its

regulations to reflect the long-standing policy that pipelines must

permit permanent releases of capacity--releases where the replacement

shipper takes over the remaining term of the releasing shipper's

contract, and the releasing shipper is relieved of its obligations

under its pipeline contract.11

---------------------------------------------------------------------------

\11\ El Paso Natural Gas Company, 61 FERC para. 61,333, at

62,311-12, aff'd, 62 FERC para. 61,311, at 62,999-17-999-18 (1993).

---------------------------------------------------------------------------

A. Improvements to the Mechanism

the releasing shipper is relieved of its obligations

under its pipeline contract.11

---------------------------------------------------------------------------

\11\ El Paso Natural Gas Company, 61 FERC para. 61,333, at

62,311-12, aff'd, 62 FERC para. 61,311, at 62,999-17-999-18 (1993).

---------------------------------------------------------------------------

A. Improvements to the Mechanism

1. Comparability Between Released Capacity and Pipeline Short-Term

Services

The Commission proposes to add a requirement in its regulations

requiring pipelines to treat all short-term transportation--capacity

release, interruptible, and short-term firm--in a comparable manner.

This proposal ensures that the pipeline procedures are not inherently

biased in favor of pipeline services, so that capacity release can

compete on an even basis.

The recently adopted GISB standards go a long way towards achieving

such comparability. Interruptible shippers can submit a nomination

under their interruptible contract on the day they determine they need

service. While not identical, the GISB capacity release standards

permit replacement shippers (with pre-arranged transactions not subject

to bidding) to nominate the same day the pipeline is notified of the

capacity release transaction. If shippers submit a pre-arranged non-

biddable transaction to the pipeline by 9:00 a.m., the pipeline will

complete the contracting process by 10:00 a.m., thereby enabling the

replacement shipper to nominate by the 11:30 a.m. nomination

deadline.12

---------------------------------------------------------------------------

\12\ For transactions subject to bidding, the standards impose a

one-day delay between notification of the pipeline and the ability

to nominate to permit the pipeline to complete the bidding process.

This aspect of comparability is discussed in the competitive bidding

section, infra.

---------------------------------------------------------------------------

---------------------------------

\12\ For transactions subject to bidding, the standards impose a

one-day delay between notification of the pipeline and the ability

to nominate to permit the pipeline to complete the bidding process.

This aspect of comparability is discussed in the competitive bidding

section, infra.

---------------------------------------------------------------------------

The Commission requests comment on whether the GISB standard should

be deemed sufficient to satisfy the proposed comparability requirement.

While non-biddable capacity releases must be posted to the pipeline

2\1/2\ hours prior to notification, interruptible shippers have no pre-

nomination notice requirement; they can simply submit a nomination at

the 11:30 a.m. nomination deadline. Comments should discuss whether the

2\1/2\ hour time differential between capacity release and

interruptible nominations is of competitive significance.

The comments also should address methods for making the capacity

release procedures parallel even more closely the procedures used by

the pipelines for interruptible service. For example, interruptible

shippers are pre-approved for creditworthiness and have master

contracts that enable them to submit nominations without any further

procedures. Similarly, pipelines could pre-approve replacement shippers

for creditworthiness and execute a master contract with all pre-

approved shippers. Once pre-approved, a replacement shipper, like an

interruptible shipper, could nominate pursuant to a capacity release

transaction so long as the pipeline is notified of the transaction

anytime prior to the nomination deadline.

In addition, for replacement shippers that have not been pre-

approved, the Commission could relax the policy, adopted in Order No

ract with all pre-

approved shippers. Once pre-approved, a replacement shipper, like an

interruptible shipper, could nominate pursuant to a capacity release

transaction so long as the pipeline is notified of the transaction

anytime prior to the nomination deadline.

In addition, for replacement shippers that have not been pre-

approved, the Commission could relax the policy, adopted in Order No.

636, that releasing shippers can never be liable for usage charges and

penalties incurred by replacement shippers.13 The Commission's

rationale for the policy was that such charges are unrelated to the

reservation of capacity and primarily are designed to recover the

variable costs of replacement shippers' use of the pipeline or to deter

replacement shippers from engaging in prohibited conduct. Since the

releasing shipper has no control over the conduct of the replacement

shipper after the release, the Commission found no purpose in requiring

the releasing shipper to be responsible for these charges.

---------------------------------------------------------------------------

\13\ Order No. 636-A, FERC Stats. & Regs. Preambles [January

1991-June 1996] at 30,564-65; Order No. 636-B, 61 FERC at 61,998.

---------------------------------------------------------------------------

While the Commission still finds this rationale generally

persuasive, it should not be invoked unnecessarily to impede capacity

release transactions. Thus, the Commission could permit a releasing

shipper to assume liability for usage and related charges for a limited

period during which the pipeline completes the credit check and the

contracting process.

2. Flexibility in the Use of Capacity

One of the Commission's goals is to provide shippers with the

utmost flexibility to manage their capacity, so they can derive the

maximum benefit from that capacity whether through their own use or

through release

liability for usage and related charges for a limited

period during which the pipeline completes the credit check and the

contracting process.

2. Flexibility in the Use of Capacity

One of the Commission's goals is to provide shippers with the

utmost flexibility to manage their capacity, so they can derive the

maximum benefit from that capacity whether through their own use or

through release. The Commission, therefore, has adopted policies

requiring pipelines to permit shippers to segment or aggregate capacity

or use their capacity to effect backhauls and exchanges.14 In the

oft-quoted example of such flexibility in Order No. 636, the Commission

explained that a shipper with capacity from the Gulf of Mexico to New

York City could release the portion from the Gulf to Atlanta, Georgia,

and separately release the portion from Atlanta to New York or retain

the Atlanta to New York portion for the releasing shipper's own

use.15

---------------------------------------------------------------------------

\14\ Order No. 636, FERC Stats. & Regs. Preambles [January 1991-

June 1996] at 30,420-21; Order No. 636-A, FERC Stats. & Regs.

Preambles [January 1991-June 1996] at 30,558; Order No. 636-B, 61

FERC at 61,997.

\15\ Id.

---------------------------------------------------------------------------

The Commission also requires pipelines to provide for flexible

receipt and delivery points. Under this policy, any firm shipper can

switch its primary firm receipt or delivery points to any available

point and also use any available point on a secondary basis (with a

lower priority than a shipper using the point as a primary point, but a

greater priority than interruptible transportation, since the use of

the alternate point is for firm capacity).16

---------------------------------------------------------------------------

witch its primary firm receipt or delivery points to any available

point and also use any available point on a secondary basis (with a

lower priority than a shipper using the point as a primary point, but a

greater priority than interruptible transportation, since the use of

the alternate point is for firm capacity).16

---------------------------------------------------------------------------

\16\ Order No. 636, FERC Stats. & Regs. Preambles [January 1991-

June 1996] at 30,428-29; Order No. 636-A, FERC Stats. & Regs.

Preambles [January 1991-June 1996] at 30,583.

---------------------------------------------------------------------------

In some cases, releasing and replacement shippers may not be

getting the full flexibility in managing their capacity that the

Commission envisioned in Order No. 636. Thus, the Commission will fully

enforce its current policies, and supplement those policies as

necessary, so that shippers have the tools to structure their use or

release of capacity to best meet their needs.

a. Segmentation of Capacity

During the informal discussions with Commission staff, several

participants stated that segmentation on some pipelines was difficult,

particularly in the supply area. The Commission also has become aware

of segmentation problems in some cases.17

---------------------------------------------------------------------------

\17\ See ANR Pipeline Company, 75 FERC para. 61,082, at 61,242

and 75 FERC para. 61,083 (1996).

---------------------------------------------------------------------------

As the Commission stated recently in Opinion No. 405,18 the

ability to segment capacity is an integral feature of the capacity

release mechanism. Segmentation can increase both releasing and

replacement shippers' access to supply sources. For example, through

segmentation, a releasing shipper can obtain access to an alternative

supply source while still recouping some of its investment by releasing

its supply area capacity to a

Opinion No. 405,18 the

ability to segment capacity is an integral feature of the capacity

release mechanism. Segmentation can increase both releasing and

replacement shippers' access to supply sources. For example, through

segmentation, a releasing shipper can obtain access to an alternative

supply source while still recouping some of its investment by releasing

its supply area capacity to a

replacement shipper. The release then provides the replacement shipper

with access to the supply area without having to obtain, and pay for,

the full mainline path of the releasing shipper. With the right to

segment capacity between interconnections, shippers can customize their

capacity reservations to match their precise transportation path needs.

---------------------------------------------------------------------------

\18\ Transcontinental Gas Pipe Line Corporation (Transco), 76

FERC para. 61,021, slip op. at 15, 18-19 (1996).

---------------------------------------------------------------------------

The Commission, therefore, will vigorously enforce segmentation

rights to ensure that the capacity release system operates as

effectively as possible. As summarized in Opinion No. 405, the

Commission's current policy requires that pipelines adhere to the

following four principles in order to provide shippers with full and

effective segmentation rights.

First, to the extent operationally feasible, pipelines must assign

specific rights to capacity, including storage capacity, and capacity

at receipt and delivery points.19 To ensure shippers are aware of

available capacity, pipelines must fully comply with the Commission

regulations to post available capacity at each receipt and delivery

point.20

---------------------------------------------------------------------------

onally feasible, pipelines must assign

specific rights to capacity, including storage capacity, and capacity

at receipt and delivery points.19 To ensure shippers are aware of

available capacity, pipelines must fully comply with the Commission

regulations to post available capacity at each receipt and delivery

point.20

---------------------------------------------------------------------------

\19\ See Texas Eastern Transmission Corp., 62 FERC para. 61,015

at 61,080 (1993); Arkla Energy Resources, 62 FERC para. 61,076 at

61,452 (1993).

\20\ 18 CFR 284.8(b)(3) (provide notice of capacity at all

receipt and delivery points); Standards for Electronic Bulletin

Boards Required Under Part 284 of the Commission's Regulations,

Order No. 563, 59 FR 516 (Jan. 5, 1994), FERC Stats. & Regs.

Preambles [January 1991-June 1996] para. 30,988 (Dec. 23 1993) at

31,007, order on reh'g, Order No. 563-A, 59 FR 23,624 (May 6, 1994),

FERC Stats. & Regs. Preambles [January 1991-June 1996] para. 30,994

(May 2, 1994), at 31,040-41, order on reh'g, Order No. 563-B, 68

FERC para. 61,002 (1994) (posting of operationally available

capacity).

---------------------------------------------------------------------------

Second, the releasing shipper must be able to schedule service up

to its contract demand (CD) level on any segment it retains, while the

replacement shipper can simultaneously schedule up to its CD level on

the released segment. The purpose of permitting segmented capacity

would be frustrated if different segments of the pipeline could not be

used simultaneously. Therefore, the pipeline should not impose a

Maximum Daily Quantity (MDQ) limitation that prevents the segmented use

of capacity.21

---------------------------------------------------------------------------

chedule up to its CD level on

the released segment. The purpose of permitting segmented capacity

would be frustrated if different segments of the pipeline could not be

used simultaneously. Therefore, the pipeline should not impose a

Maximum Daily Quantity (MDQ) limitation that prevents the segmented use

of capacity.21

---------------------------------------------------------------------------

\21\ See Texas Eastern Transmission Corp., 63 FERC para. 61,100

at 61,452 (1993); Texas Eastern Transmission Corp., 62 FERC para.

61,015 at 61,111 (1993); Panhandle Eastern Pipe Line Co., 61 FERC

para. 61,357 at 62,419 (1993).

---------------------------------------------------------------------------

Third, absent a condition in the release, the replacement shipper

must have the same right to use alternate receipt and delivery points

as other firm shippers.22

---------------------------------------------------------------------------

\22\ See El Paso Natural Gas Company, 62 FERC at 62,984, 62,991

(1993). The priority for scheduling service at alternate receipt and

delivery points is lower than that for primary receipt and delivery

points. Once scheduled, however, service at alternate points has the

same priority as service at primary points. Alternate firm receipt

and delivery points always have priority over interruptible service.

---------------------------------------------------------------------------

for scheduling service at alternate receipt and

delivery points is lower than that for primary receipt and delivery

points. Once scheduled, however, service at alternate points has the

same priority as service at primary points. Alternate firm receipt

and delivery points always have priority over interruptible service.

---------------------------------------------------------------------------

Fourth, segmented releases must be scheduled as quickly as non-

segmented releases. There should be no additional payments for

segmenting capacity, nor should pipelines limit the amount charged for

releases of segments of capacity except that the price for any single

release may not exceed a price cap set by the Commission.23 Thus,

releasing shippers can subdivide their capacity as many times as they

are able even if the total amount received for the various releases

exceeds the as-billed rate paid by the releasing shipper.

---------------------------------------------------------------------------

\23\ See Order No. 636 at 30,420-21.

---------------------------------------------------------------------------

In addition to the policies articulated in Opinion No. 405, the

Commission expects pipelines to adhere to the principle, established in

Order No. 636-B,24 that forward haul shippers should be permitted

to release their capacity for a backhaul. Backhauls are, in essence,

segmented releases, which should be permitted unless the pipeline can

document operational constraints.

---------------------------------------------------------------------------

\24\ Order No. 636-B, 61 FERC at 61,997.

---------------------------------------------------------------------------

shippers should be permitted

to release their capacity for a backhaul. Backhauls are, in essence,

segmented releases, which should be permitted unless the pipeline can

document operational constraints.

---------------------------------------------------------------------------

\24\ Order No. 636-B, 61 FERC at 61,997.

---------------------------------------------------------------------------

The Commission intends to apply these policies when it reviews

pipeline tariff filings or in other proceedings. Segmentation also is

an issue that the industry can examine through GISB to determine

whether standards for segmentation can be developed.

In addition, firm shippers should be able to use their own capacity

in segments. In the Commission's original formulation of the

segmentation requirement, it addressed segmentation only in the context

of capacity release; it did not specifically apply the policy to

shippers segmenting their capacity for their own use. There appears no

reason to distinguish between segmentation for capacity release and

segmentation for a shipper's own use. Permitting shippers to segment

capacity for their own use may enhance their ability to make full use

of capacity, as well as enhance the value of released capacity, because

the replacement shipper can segment the capacity it buys. The

Commission welcomes comments on whether pipelines should be required to

permit shippers to segment their capacity when not releasing capacity.

b. Use of Receipt and Delivery Points

o segment

capacity for their own use may enhance their ability to make full use

of capacity, as well as enhance the value of released capacity, because

the replacement shipper can segment the capacity it buys. The

Commission welcomes comments on whether pipelines should be required to

permit shippers to segment their capacity when not releasing capacity.

b. Use of Receipt and Delivery Points

During the restructuring proceedings mandated by Order No. 636, the

Commission permitted some pipelines to retain existing tariff

provisions that did not permit shippers' primary receipt and delivery

point CD rights to exceed their mainline rights.25 As a

consequence, the Commission accepted tariff provisions under which

releasing shippers would lose their rights to primary receipt or

delivery points if replacement shippers changed primary points under

the release.26 Even at the time, the Commission was skeptical

about the justifications for such restrictions,27 and rejected

applications to impose similar restrictions by pipelines without pre-

existing restrictions.28

---------------------------------------------------------------------------

\25\ Transwestern Pipeline Company, 62 FERC para. 61,090, at

61,659, 63 FERC para. 61,138, at 61,911-12 (1993).

\26\ A releasing shipper could preserve its right to return to

its primary point after the release by including a provision in its

notice of release restricting the replacement shipper's ability to

change points.

\27\ See Transwestern Pipeline Company, 62 FERC at 61,659, 63

FERC at 61,911-12 (1993); El Paso Natural Gas Company, 62 FERC para.

61,311, at 62,982-83 (1993).

\28\ See Northwest Pipeline Company, 63 FERC para. 61,124, at

61,806-08 n.72 (1993).

---------------------------------------------------------------------------

f release restricting the replacement shipper's ability to

change points.

\27\ See Transwestern Pipeline Company, 62 FERC at 61,659, 63

FERC at 61,911-12 (1993); El Paso Natural Gas Company, 62 FERC para.

61,311, at 62,982-83 (1993).

\28\ See Northwest Pipeline Company, 63 FERC para. 61,124, at

61,806-08 n.72 (1993).

---------------------------------------------------------------------------

The continuation of such restrictions appears to limit the utility

of the capacity release mechanism. A releasing shipper may be unwilling

to enter into a short term release if, in so doing, it loses priority

to its primary receipt and delivery points for the remainder of a 20-

year contract. On the other hand, a replacement shipper may need to use

receipt and delivery points different from those held by the releasing

shipper. The replacement shipper may be reluctant to bid on mainline

firm capacity if its ability to receive or deliver gas at a currently

available point is subject to bumping by shippers coming later in time.

The Commission, therefore, intends to look more closely at

restrictions on the ability of replacement shippers to change primary

receipt or delivery points in the future. As pointed out in Opinion No.

405, pipelines may not impose overly restrictive limits on the amount

of primary receipt and delivery point capacity that a shipper can

reserve, and any such limitations must be operationally justified.

Pipeline operational flow orders (OFOs) also may create

difficulties for replacement shippers using secondary points. An OFO

may give shippers at a primary point scheduling priority over those

using that point on a secondary basis even though the operational

problem giving rise to the OFO is not at the point in question, but

instead affects an upstream point on the mainline to which all the

shippers have equal firm rights. For example, according to OFO notices

that the Commission downloaded from pipeline EBBs during

ay give shippers at a primary point scheduling priority over those

using that point on a secondary basis even though the operational

problem giving rise to the OFO is not at the point in question, but

instead affects an upstream point on the mainline to which all the

shippers have equal firm rights. For example, according to OFO notices

that the Commission downloaded from pipeline EBBs during

the winter of 1996, some pipelines restricted scheduled secondary point

deliveries, but did not limit scheduled primary point

deliveries.29 In this situation, a replacement shipper's inability

to use an available primary point could result in a limitation on the

amount of gas it can receive during a peak period.

---------------------------------------------------------------------------

\29\ Also, a pipeline's OFO may require shippers to shift supply

from secondary to primary points. When this provision is coupled

with a restriction on the replacement shipper's ability to change

primary points at the initiation of a release, the replacement

shipper may be unable to deliver gas where needed when an OFO is

invoked. Compare Northwest Pipeline Company, 71 FERC para. 61,315

(1995) (OFO can require shippers to switch supply from secondary to

primary points) with Transwestern Pipeline Company, 62 FERC para.

61,090, at 61,659, 63 FERC para. 61,138, at 61,911-12 (1993)

(replacement shipper's ability to switch to a new primary point is

restricted).

---------------------------------------------------------------------------

hwest Pipeline Company, 71 FERC para. 61,315

(1995) (OFO can require shippers to switch supply from secondary to

primary points) with Transwestern Pipeline Company, 62 FERC para.

61,090, at 61,659, 63 FERC para. 61,138, at 61,911-12 (1993)

(replacement shipper's ability to switch to a new primary point is

restricted).

---------------------------------------------------------------------------

The Commission invites comment on whether pipeline OFOs have caused

problems for the use of secondary point capacity. Commenters should

suggest, based on their experience, ways in which OFOs can be more

narrowly focused or handled differently while still permitting the

pipelines to respond to operational problems on their systems. Comments

also should address whether primary and secondary receipt and delivery

points should be treated identically in OFO situations when the

operational constraint involves mainline capacity. This would be

consistent with the Commission's current policy that once gas is

scheduled, firm service is firm service, with no distinction in

priority between firm service designated for primary and secondary

points.

B. The Bidding Requirement

The current regulations exempt capacity release transactions from

competitive bidding if the transactions are at the maximum rate or are

for 31 days or less.30 Bidding is thus required for all discounted

releases (at less than the maximum tariff rate) longer than 31 days;

and for discounted 31 day-or-less transactions if the release is a

rollover or continuation of an exempt 31-day-or-less transaction

nt regulations exempt capacity release transactions from

competitive bidding if the transactions are at the maximum rate or are

for 31 days or less.30 Bidding is thus required for all discounted

releases (at less than the maximum tariff rate) longer than 31 days;

and for discounted 31 day-or-less transactions if the release is a

rollover or continuation of an exempt 31-day-or-less transaction. The

Commission's principal goal in requiring posting and bidding was to

make capacity release transactions open so other shippers could conduct

price discovery and could monitor transactions for potential

discrimination.31 The competitive bidding requirement was intended

to ensure that interstate transportation capacity would be allocated to

those placing the highest value on obtaining that capacity and to

prevent discriminatory allocation of interstate capacity at prices

below the going market price.

---------------------------------------------------------------------------

\30\ 18 CFR 284.243(h).

\31\ Order No. 636-A, FERC Stats. & Regs. Preambles [January

1991-June 1996] at 30,555.

---------------------------------------------------------------------------

The Commission has received a number of requests, particularly from

LDCs, to eliminate mandatory competitive bidding on pipeline EBBs.

Those advocating the removal of the bidding requirement contend bidding

adds delay to the capacity release process due to the administrative

cumbersomeness of the pipelines' bidding procedures. They maintain

bidding also adds uncertainty to the process because it creates a risk

for the replacement shipper that it will be unable to acquire capacity

at the price it expected. Bidding, they assert, thus can prevent

parties from negotiating mutually beneficial transactions. They further

maintain that, in the over two years the capacity release system has

been in effect, no significant pattern of abuse has been shown

ds uncertainty to the process because it creates a risk

for the replacement shipper that it will be unable to acquire capacity

at the price it expected. Bidding, they assert, thus can prevent

parties from negotiating mutually beneficial transactions. They further

maintain that, in the over two years the capacity release system has

been in effect, no significant pattern of abuse has been shown.

Proliance Energy LLC and Baltimore Gas and Electric Company filed

comments on the GISB standards in Docket No. RM96-1, arguing that, due

primarily to the bidding process, the GISB standards do not fully

achieve the Commission's goal of providing for comparability between

the capacity release process and the process of obtaining pipeline

short-term services, like interruptible or short-term firm. They

pointed out that interruptible shippers can nominate on the day they

want capacity, while the GISB standards require at least one day (if

not more) to complete transactions subject to bidding.

Based on the data collected by the Commission, bidding does not

appear to be widespread.32 From May 1, 1995, to June of

1996,33 competing bids were submitted on only 14% to 20% of all

transactions subject to bidding (which themselves comprise 28% of all

transactions).34 For transactions longer than 31 days, the

percentage on which competitive bids were made is in the range of 25%

to 31%.

---------------------------------------------------------------------------

to be widespread.32 From May 1, 1995, to June of

1996,33 competing bids were submitted on only 14% to 20% of all

transactions subject to bidding (which themselves comprise 28% of all

transactions).34 For transactions longer than 31 days, the

percentage on which competitive bids were made is in the range of 25%

to 31%.

---------------------------------------------------------------------------

\32\ The appendix provides more details of the capacity release

information the Commission has downloaded from the pipelines.

\33\ Although the capacity release mechanism has been in place

since the fall of 1993, the May 1, 1995 date was chosen so that the

analysis would be based on a consistent set of data reflecting the

current regulations. Prior to May 1, 1995, the exemption from the

bidding requirement applied only to less-than-one-calendar-month

transactions. For the period after May 1, 1995, Order No. 577

extended the bidding exemption to 31-day-or-less transactions.

\34\ As shown in the appendix, the differences in the

percentages in the range reflect the effect of adjustments to deal

with inconsistent, and contradictory data showing a transaction as

being non-biddable, but also showing competing bids having been

submitted.

---------------------------------------------------------------------------

The original purposes of the posting and bidding requirements were

first and foremost to ensure public disclosure of capacity release

transactions, for both price discovery and monitoring, and secondarily

to ensure that capacity was allocated to the shipper placing the

greatest value on the capacity. In light of the experience with

capacity release, the Commission has reconsidered whether the bidding

requirement continues to be warranted. Experience demonstrates that the

competitive bidding requirement introduces delay, uncertainty, and

inefficiency into the capacity release process and is used

infrequently

capacity was allocated to the shipper placing the

greatest value on the capacity. In light of the experience with

capacity release, the Commission has reconsidered whether the bidding

requirement continues to be warranted. Experience demonstrates that the

competitive bidding requirement introduces delay, uncertainty, and

inefficiency into the capacity release process and is used

infrequently.

Even with the improvements in the GISB standards, the bidding

process still creates at least a one-day delay, and consequent

uncertainty for replacement shippers, who cannot be sure that they will

obtain the needed capacity at the price they are willing to pay.35

The delays and uncertainty imposed by mandatory competitive bidding

just do not seem warranted given that the data show that, for all

biddable transactions, competitive bids are submitted, at most, one-

fifth of the time.

---------------------------------------------------------------------------

\35\ If the releasing shipper specifies methodologies for

determining the highest bid other than the three standard methods,

the bidding process may take longer, introducing even further delay.

The three standard methodologies for determining the highest bid are

the highest absolute rate (independent of time and quantity), the

highest net revenue (rate times quantity independent of when

revenues are received), and the highest net present value (rate

times quantity adjusting for when revenues are received). Capacity

Release Standard 5.3.3.

---------------------------------------------------------------------------

s for determining the highest bid are

the highest absolute rate (independent of time and quantity), the

highest net revenue (rate times quantity independent of when

revenues are received), and the highest net present value (rate

times quantity adjusting for when revenues are received). Capacity

Release Standard 5.3.3.

---------------------------------------------------------------------------

The delay and uncertainty created by the competitive bidding

requirement further interferes with the goal of ensuring comparable

treatment between capacity release and pipeline short-term services. As

discussed in the prior section, if bidding is eliminated, replacement

shippers can nominate under a timetable comparable to that of

interruptible shippers. If competitive bidding is retained, however,

the Commission does not see how comparability between biddable capacity

release transactions and pipeline services could reasonably be

achieved. The present GISB timetable requiring the posting, bidding,

and matching process to take place in a 4-hour window the day prior to

nomination seems about as fast as can be reasonably required.

In addition, the Commission is aware that parties have been able to

design means of avoiding the bidding requirement.36 Eliminating

bidding

ensures that those abiding by the rules are not disadvantaged compared

to those who skirt them. Trying to control these avoidance practices

would only be likely to introduce greater administrative inefficiencies

into the process, inefficiencies which the amount of competitive

bidding does not seem to justify.

---------------------------------------------------------------------------

bidding

ensures that those abiding by the rules are not disadvantaged compared

to those who skirt them. Trying to control these avoidance practices

would only be likely to introduce greater administrative inefficiencies

into the process, inefficiencies which the amount of competitive

bidding does not seem to justify.

---------------------------------------------------------------------------

\36\ Inside F.E.R.C.'s Gas Marketing Report for December 1, 1995

(McGraw-Hill) alludes to a ``well-developed set of tricks'' allowing

some capacity traders to circumvent the bidding and roll-over

requirements. One such tactic mentioned in the article is for the

buyer to use different company names to effect multi-month releases.

The buyer uses one name to purchase capacity under the 31-day-or-

less exemption in the first month and then avoids the bidding

requirement for the next month by using a different company name,

such as that of an affiliate.

---------------------------------------------------------------------------

Even with elimination of bidding, the Commission's paramount goal--

providing public disclosure of transactions--will still be achieved by

continuing, and strengthening, the posting requirement. Indeed,

elimination of bidding may well result in greater and more accurate

public disclosure of price data, because shippers may forego the

mechanisms they have been using to avoid the bidding requirement.

The elimination of bidding does not mean that a releasing shipper

can release its capacity in an unduly discriminatory fashion, and the

Commission can still take action if it detects a pattern of undue

favoritism. For example, a release of capacity cannot be tied to

conditions unrelated to the use of the interstate capacity, such as the

purchase of gas from the releaser.37

---------------------------------------------------------------------------

g shipper

can release its capacity in an unduly discriminatory fashion, and the

Commission can still take action if it detects a pattern of undue

favoritism. For example, a release of capacity cannot be tied to

conditions unrelated to the use of the interstate capacity, such as the

purchase of gas from the releaser.37

---------------------------------------------------------------------------

\37\ Order No. 636-A, FERC Stats. & Regs. Preambles [January

1991-June 1996] at 30,559. As an example of discriminatory use of

interstate capacity by an LDC, see Interstate Gas Marketing., Inc.

v. Pennsylvania Public Utility Commission, No. 377 C.D. 1995, 1996

Pa. Commw., Lexis 270 (June 24, 1996).

---------------------------------------------------------------------------

The posting requirements, however, need to be strengthened. In

downloading pipeline capacity release information, the Commission has

found that relevant information about completed transactions is not

available in a single dataset.38 Easily accessible and retrievable

information about release transactions is crucial for the Commission

and the industry to monitor capacity release transactions effectively.

Thus, additional standardization appears necessary. GISB should

coordinate with Commission staff in seeking to resolve these issues,

and, if necessary, staff can convene a technical conference.

---------------------------------------------------------------------------

bout release transactions is crucial for the Commission

and the industry to monitor capacity release transactions effectively.

Thus, additional standardization appears necessary. GISB should

coordinate with Commission staff in seeking to resolve these issues,

and, if necessary, staff can convene a technical conference.

---------------------------------------------------------------------------

\38\ For example, some relevant information about pre-arranged

transactions is found in the dataset for capacity release offers,

but is not transferred to the dataset providing information about

awards. Thus, the Commission has to download both datasets to obtain

the information. An additional complication is that some pipelines

purge their offer and bid datasets after a transaction is completed.

Thus, unless shippers or the Commission download daily, which adds

burden and expense, some of this detail is lost.

---------------------------------------------------------------------------

The Commission is proposing to discontinue the pipelines'

obligation to afford a posting and bidding option for those shippers

wanting to solicit competitive bids. Given the preponderance of pre-

arranged transactions,39 requiring pipelines to provide a bidding

service (and permitting them to recover the costs of this service in

their cost-of-service) does not appear warranted.

---------------------------------------------------------------------------

\39\ Ninety-two percent of all capacity release transactions are

pre-arranged.

---------------------------------------------------------------------------

s,39 requiring pipelines to provide a bidding

service (and permitting them to recover the costs of this service in

their cost-of-service) does not appear warranted.

---------------------------------------------------------------------------

\39\ Ninety-two percent of all capacity release transactions are

pre-arranged.

---------------------------------------------------------------------------

The proposal to eliminate the requirement for pipelines to provide

a bidding service does not signify that the Commission finds bidding

unimportant. Even if only a small percentage of capacity release

transactions are subject to bidding, the bidding results may provide

valuable information about the value of released capacity.

A mandatory requirement for pipelines to provide a bidding service,

however, does not appear necessary for releasing shippers to post

capacity for bid. Elimination of the requirement for bidding through

the pipelines will create an opportunity for the market to create even

more efficient, computerized capacity trading processes. At present,

third-party service providers cannot establish efficient bidding

programs for transactions subject to competitive bidding, because

transactions cannot be fully consummated on the third-parties' systems;

a pre-arranged transaction on the third-party boards still must be

transmitted to the pipeline and re-posted for a second round of bidding

according to the pipeline's bidding requirements. With the bidding

requirement removed, the dual posting will be eliminated, enabling

third-party service providers to complete transactions and then use the

GISB standards to upload the results to the pipelines for processing.

In addition, if they choose, pipelines still could institute a bidding

service in response to market demand

of bidding

according to the pipeline's bidding requirements. With the bidding

requirement removed, the dual posting will be eliminated, enabling

third-party service providers to complete transactions and then use the

GISB standards to upload the results to the pipelines for processing.

In addition, if they choose, pipelines still could institute a bidding

service in response to market demand.

The Commission requests comments on whether the requirement that

pipelines provide a posting and bidding service should be continued,

and, given that pipelines currently provide such a system on their

EBBs, how expensive it would be to continue providing the service.

Commenters, however, should take into account the possible need to

upgrade computer systems (for example, to permit file uploads of bids

and offers) as well as the additional costs of maintaining a bidding

mechanism if EBBs were replaced with more standardized Internet

technologies, as the industry is considering in the Business Practices

Rulemaking in Docket No. RM96-1.

Those commenters recommending retention of the bidding requirement

are requested to propose changes to improve the efficiency of the

current bidding mechanisms. For example, the Commission requests

comment on whether the efficiency of bidding could be improved if

third-party boards satisfied the bidding requirement. The Commission

requested and received some comments on substituting bidding on third-

party boards for pipeline bidding in response to the Business Practices

NOPR in Docket No. RM96-1. The few who commented on the issue opposed

the requirement on the grounds that locating capacity might be made

more difficult if shippers looking for capacity on one pipeline had to

monitor postings on all third-party boards. Commenters should consider

whether this problem outweighs the potential efficiency gains from

third-party bidding

e to the Business Practices

NOPR in Docket No. RM96-1. The few who commented on the issue opposed

the requirement on the grounds that locating capacity might be made

more difficult if shippers looking for capacity on one pipeline had to

monitor postings on all third-party boards. Commenters should consider

whether this problem outweighs the potential efficiency gains from

third-party bidding. Also, comments should discuss whether the

perceived problem--that pipeline listings will appear on multiple

third-party boards--is likely to occur or whether there are methods for

handling such problems. For example, the pipeline and its customers

could jointly solicit bids for, and choose, the third-party service

provider that will list offerings for that pipeline. Or, the Commission

could set standards that would ensure that shippers could access

multiple third-party displays on a single computer (for instance, by

using WindowsTM or Internet browsers).

The Price Cap

The Commission's regulations do not permit the rate for released

capacity to exceed the maximum rate in the pipelines' tariffs. The

Commission initially imposed this ceiling because the secondary market

had not been shown to be sufficiently competitive that releasing

shippers would be unable to exert market power.40

---------------------------------------------------------------------------

\40\ Order No. 636-A, FERC Stats. & Regs. Preambles [January

1991-June 1996] at 30,560.

---------------------------------------------------------------------------

The Commission's inquiry here is to determine whether the price cap

can be lifted because the secondary market is sufficiently competitive

so that releasing shippers cannot exercise market power. The Commission

recognizes that, on many pipelines, a large number of shippers hold

firm capacity and, due to the Commission's flexible receipt and

delivery point policy, numerous shippers may be able to compete in

offering capacity to potential

whether the price cap

can be lifted because the secondary market is sufficiently competitive

so that releasing shippers cannot exercise market power. The Commission

recognizes that, on many pipelines, a large number of shippers hold

firm capacity and, due to the Commission's flexible receipt and

delivery point policy, numerous shippers may be able to compete in

offering capacity to potential

replacement shippers. Pipeline short-term services, interruptible and

short-term firm, also potentially compete with capacity release

transactions. In addition, the Commission is mindful that removing the

cap for releases and for pipeline short-term services may produce more

efficient capacity utilization by permitting prices to rise to market

clearing levels. Removal of the cap also may remove the incentive for

releasers to use the ``gray market'' as a means of circumventing the

price cap.41

---------------------------------------------------------------------------

\41\ By making a bundled sale, releasers avoid the cap by, in

effect, adding the full price of capacity (even if above the cap) to

the unregulated price for gas to produce a total price to the buyer

fully reflective of the amount the buyer is willing to pay for

capacity.

---------------------------------------------------------------------------

The Commission, however, has some concerns about the potential for

the exercise of market power in certain situations. First, regardless

of the number of firm shippers on a pipeline, LDCs may still exercise

market power over customers behind their city-gate. Because a customer

behind an LDC's city-gate must use the LDC's system to transport gas to

its final destination, the LDC may be able to structure its intrastate

service so that the end-user's ability to obtain released interstate

capacity from shippers other than its own LDC is limited.42

---------------------------------------------------------------------------

omers behind their city-gate. Because a customer

behind an LDC's city-gate must use the LDC's system to transport gas to

its final destination, the LDC may be able to structure its intrastate

service so that the end-user's ability to obtain released interstate

capacity from shippers other than its own LDC is limited.42

---------------------------------------------------------------------------

\42\ See Questar Pipeline Company, 64 FERC para. 61,157, at

62,282-83 (1993); Meridian Oil Inc. v. Southern California Gas Co.,

65 FERC para. 61,379 (1993) (raising concerns about intrastate rate

structures effect on LDC customers' ability to seek interstate

capacity from sources other than their own LDC).

---------------------------------------------------------------------------

In addition, an LDC's control over take-away capacity at primary

delivery points may limit the capacity choices of a customer behind the

city-gate, and thus confer market power on the LDC. If a customer

behind an LDC's city-gate purchases capacity from its own LDC, it will

obtain access to the city-gate delivery point on a primary basis. If,

however, it buys mainline capacity from another firm shipper (with a

different primary delivery point), the customer would have to effect

delivery to the city-gate as a secondary delivery point. Particularly

during peak periods, the customer may not be able to use the secondary

point if it is preempted by the LDC's use of the point on a primary

basis. In this event, the customer would not have access to a

competitive market for capacity; it would have only one realistic

capacity option--the primary point capacity of its own LDC.

Second, on some pipelines or portions of systems, the market may

not be competitive, because one or only a few shippers control the firm

capacity, producing high concentration indices indicative of the

potential to exercise market power

omer would not have access to a

competitive market for capacity; it would have only one realistic

capacity option--the primary point capacity of its own LDC.

Second, on some pipelines or portions of systems, the market may

not be competitive, because one or only a few shippers control the firm

capacity, producing high concentration indices indicative of the

potential to exercise market power. For example, a downstream shipper

may possess market power because it holds a large percentage of the

available capacity on the last segment of the pipeline. This may be

particularly true on a telescoping pipeline where the capacity of the

system decreases the farther downstream one goes.

Third, interruptible capacity, standing alone, may not be a

sufficient competitive alternative to released capacity. In the first

place, interruptible service on a fully subscribed pipeline becomes

available only if firm shippers are not using or releasing their firm

capacity. On a peak day, for instance, a replacement shipper cannot

simply reject a high asking price for firm capacity release and count

on the use of interruptible service. If the replacement shipper rejects

the released firm capacity, and the releasing shipper either uses the

capacity itself or releases it to another replacement shipper, the

interruptible capacity may not be available. Even if the replacement

shipper is able to acquire interruptible capacity, its use of the

interruptible service is still subject to being bumped by firm service.

Although shippers potentially can use the ``gray market'' to avoid

the price cap, the Commission does not find the existence of the gray

market sufficient to warrant across-the-board removal of the price cap.

The Commission is unaware of any empirical data on the extent of gray

market activity, but the available information suggests that the gray

market is not a sufficiently attractive alternative that it will

replace capacity release

gray market'' to avoid

the price cap, the Commission does not find the existence of the gray

market sufficient to warrant across-the-board removal of the price cap.

The Commission is unaware of any empirical data on the extent of gray

market activity, but the available information suggests that the gray

market is not a sufficiently attractive alternative that it will

replace capacity release. For example, the amount of capacity

represented by capacity release transactions is growing and a

significant number of the transactions during peak periods take place

at maximum rates.43 The requests by LDCs to remove the price cap

from the release market further indicate that LDCs do not find the gray

market a completely satisfactory substitute for capacity release.

---------------------------------------------------------------------------

\43\ See Appendix, at p. 1 and 5. For example, according to the

Commission's data, 30% of releases during the peak heating season in

January 1996 were at the maximum rate.

---------------------------------------------------------------------------

Moreover, the Commission cannot abjure its statutory responsibility

to ensure that rates are just and reasonable simply because of the

potential for shippers to avoid the price cap.44 Unless a shipper

can show that it cannot exercise market power, the Commission cannot

conclude that the market-based rates the shipper would charge are

competitive and, therefore, just and reasonable. The appropriate

response to the gray market, therefore, is not to remove the rate cap

across-the-board, but to establish reasonable conditions that will

permit shippers to exceed the price cap when they cannot exercise

market power.

---------------------------------------------------------------------------

ed rates the shipper would charge are

competitive and, therefore, just and reasonable. The appropriate

response to the gray market, therefore, is not to remove the rate cap

across-the-board, but to establish reasonable conditions that will

permit shippers to exceed the price cap when they cannot exercise

market power.

---------------------------------------------------------------------------

\44\ If the Commission had information showing that a shipper

making a sale for resale used a bundled sale to exceed the maximum

rate for interstate transportation, the Commission has the statutory

authority to take action against that shipper. Such action could

include revocation or limitations on the shippers' blanket marketing

certificate to make sales for resale. 18 CFR 284.401-02. In

addition, if the gray market sale is a buy-sell, it is prohibited.

See Order No. 636, FERC Stats. & Regs. Preambles [January 1991-June

1996] at 30,416, aff'd, United Distribution Co. v. FERC, slip op. at

77-81.

---------------------------------------------------------------------------

The Commission, however, does have some concerns about whether the

gray market may reduce the efficiency and effectiveness of the capacity

release market and may permit undue discrimination to occur. In view of

the Court of Appeals decision in UDC, the Commission is interested in

exploring the extent of gray market activity and possible approaches

for achieving a consistent regulatory framework for both capacity

release and the gray market. Although the Commission does not wish to

disrupt economic transactions occurring in the gray market, it is

interested in receiving comments on alternatives for regulating

capacity release and gray market activities, such as whether gray

market transactions should be subject to after-the-fact posting

for achieving a consistent regulatory framework for both capacity

release and the gray market. Although the Commission does not wish to

disrupt economic transactions occurring in the gray market, it is

interested in receiving comments on alternatives for regulating

capacity release and gray market activities, such as whether gray

market transactions should be subject to after-the-fact posting.

The Commission proposes to lift the price cap for released,

interruptible, and short-term firm capacity when releasing shippers and

pipelines can demonstrate that they are unable to exercise market

power.45 The Commission is proposing to include in its capacity

release regulations at section 284.243(e) a provision authorizing

shippers to submit applications to remove the price cap. Consistent

with the Commission's Policy Statement on Alternatives to Cost-of-

Service Ratemaking,46 pipelines seeking to remove the cap for

interruptible service can file a request for a declaratory order.

---------------------------------------------------------------------------

\45\ The Commission may, in some circumstances, need to consider

the relationship between an LDC and its affiliate if that

affiliation bears upon the ability of the combined entity to

exercise market power.

\46\ 74 FERC para. 61,076 (1996).

---------------------------------------------------------------------------

LDCs (or in some cases other shippers controlling take-away

capacity at delivery points) would have an additional prerequisite to

establish that they cannot exercise market power. They will need to

establish that they provide the ability to obtain (either individually

or through aggregation) open access transportation on the LDC's

facilities. If an LDC does not provide

---------------------

LDCs (or in some cases other shippers controlling take-away

capacity at delivery points) would have an additional prerequisite to

establish that they cannot exercise market power. They will need to

establish that they provide the ability to obtain (either individually

or through aggregation) open access transportation on the LDC's

facilities. If an LDC does not provide

open access transportation, its intrastate rates and terms and

conditions of service may discourage its customers from seeking

capacity from other interstate shippers. If the LDC provides open

access transportation, however, a customer can be assured of

transportation on the LDC's facilities regardless of whether it

purchases interstate capacity from the LDC or another shipper. In

addition, an LDC's open access provisions need to deal with the market

power conveyed by the LDC's control over primary delivery points. Thus,

an acceptable open access service would need to include a right for

customers behind the city-gate to use the LDC's city-gate as a primary

delivery point, regardless of whether they purchase interstate capacity

from the LDC.

The Commission solicits comments on a number of aspects of this

proposal. Comments should address how to measure market power in the

secondary market, such as whether to use the traditional market power

analysis as used in the Policy Statement or whether modified criteria

can ease the evidentiary burden, without compromising the integrity of

the market power analysis. Comments should further address the minimum

criteria needed for an acceptable open access program and the

relationship between the open access definition and the required market

power showing

o use the traditional market power

analysis as used in the Policy Statement or whether modified criteria

can ease the evidentiary burden, without compromising the integrity of

the market power analysis. Comments should further address the minimum

criteria needed for an acceptable open access program and the

relationship between the open access definition and the required market

power showing. For example, should the Commission presume that there is

sufficient competition if an LDC's open access program includes an

assignment of its upstream interstate capacity rights to its customers

either individually or through aggregation? 47 By virtue of such

an assignment, there presumably would be such a large number of holders

of primary point capacity to the LDC's city-gate that any potential

buyer behind the city-gate would have a sufficient number of

alternative sources of capacity.

---------------------------------------------------------------------------

\47\ This assignment is akin to the assignment of pipeline

upstream 858 capacity to its customers in Order No. 636.

---------------------------------------------------------------------------

The Commission further requests comment on whether LDCs should be

permitted to directly assign their capacity, without going through the

pipeline's contracting process, in certain circumstances, such as when

they have demonstrated a lack of market power. Comments should address

whether a lack of market power provides adequate protection to permit

direct assignment and what limitations, if any, should be imposed on

direct assignment.

Comments also should consider how the Commission should determine

whether an LDC's open access program meets the necessary open access

criteria. For example, the Commission could review an LDC's program de

novo or it could first require challenges to made at the state level

and give deference to determinations by state Public Utility

Commissions

any, should be imposed on

direct assignment.

Comments also should consider how the Commission should determine

whether an LDC's open access program meets the necessary open access

criteria. For example, the Commission could review an LDC's program de

novo or it could first require challenges to made at the state level

and give deference to determinations by state Public Utility

Commissions.

The Commission is proposing to permit pipelines to file to have the

price cap lifted for interruptible and short-term firm service, because

these services appear to compete directly with capacity release. In the

staff paper attached to the February 8, 1995 request for comments on

market-based rates, the staff concluded that market-based rates for

pipeline interruptible service might be warranted upon a showing that

capacity release was a good substitute for pipeline interruptible

service, but that the ability, at that time, to make such a showing was

doubtful.48 With the revisions to the capacity release program to

make it comparable to pipeline short-term services, capacity release

should now become a sufficient alternative to pipeline capacity. The

Commission, however, requests comments on issues relating to the

release of the price cap for short-term firm service, such as how to

establish regulations dealing with roll-overs or extensions of short-

term firm contracts to ensure that shippers do not lose the protection

of the price cap when they purchase long-term firm capacity.

---------------------------------------------------------------------------

\48\ Alternatives to Traditional Cost-of-Service Ratemaking for

Natural Gas Pipelines, 70 FERC para. 61,139, at 61,415 (1995)

(Request for Comments on Alternative Pricing Methods).

---------------------------------------------------------------------------

n

of the price cap when they purchase long-term firm capacity.

---------------------------------------------------------------------------

\48\ Alternatives to Traditional Cost-of-Service Ratemaking for

Natural Gas Pipelines, 70 FERC para. 61,139, at 61,415 (1995)

(Request for Comments on Alternative Pricing Methods).

---------------------------------------------------------------------------

As an alternative to the maximum reservation rate limitation on all

capacity releases, or the complete elimination of the price cap, the

Commission requests comments on the appropriateness of permitting the

release and reassignment of capacity subject to a cost-based annual

revenue cap. Under such an approach, what reporting requirements should

be imposed on holders of capacity to ensure that the annual revenue

limitation is not exceeded? If the Commission adopts this revised

revenue cap, should it apply for short-term firm and interruptible

transactions as well? How should the interruptible rate under an annual

limitation be determined?

After receipt of comments on this proposal, the Commission intends

to hold a technical conference to explore issues related to removal of

the price cap and the best means of measuring market power in the

secondary market. In addition, to obtain additional record information

for determining whether, and how, to relax the price cap, the

Commission is proposing, in a separate order in this docket, to

establish an experimental, pilot program under which the cap will be

lifted for some LDCs and pipelines which meet the specified criteria.

The Commission will use the record developed from the comments, the

technical conference, and the pilot program to make its final

determination on whether, and how, to relax the price cap.

IV. Regulatory Flexibility Act Certification

er in this docket, to

establish an experimental, pilot program under which the cap will be

lifted for some LDCs and pipelines which meet the specified criteria.

The Commission will use the record developed from the comments, the

technical conference, and the pilot program to make its final

determination on whether, and how, to relax the price cap.

IV. Regulatory Flexibility Act Certification

The Regulatory Flexibility Act of 1980 (RFA) 49 generally

requires a description and analysis of final rules that will have

significant economic impact on a substantial number of small entities.

The proposed regulations would impose requirements only on interstate

pipelines, which are not small businesses, and, in fact, the overall

effect of these revisions is to reduce costs, not only for the

pipelines, but for those dealing with pipelines, including small

businesses. Accordingly, pursuant to section 605(b) of the RFA, the

Commission hereby certifies that the regulations proposed herein will

not have a significant adverse impact on a substantial number of small

entities.

---------------------------------------------------------------------------

\49\ 5 U.S.C. 601-612.

---------------------------------------------------------------------------

V. Environmental Analysis

The Commission is required to prepare an Environmental Assessment

or an Environmental Impact Statement for any action that may have a

significant adverse effect on the human environment.50 The

Commission has categorically excluded certain actions from these

requirements as not having a significant effect on the human

environment.51 The action taken here falls within categorical

exclusions in the Commission's regulations for rules that are

clarifying, corrective, or procedural, for information gathering,

analysis, and dissemination, and for sales, exchange, and

transportation of natural gas that requires no construction of

facilities.52 Therefore, an environmental assessment is

unnecessary and has not been prepared in this rulem

n taken here falls within categorical

exclusions in the Commission's regulations for rules that are

clarifying, corrective, or procedural, for information gathering,

analysis, and dissemination, and for sales, exchange, and

transportation of natural gas that requires no construction of

facilities.52 Therefore, an environmental assessment is

unnecessary and has not been prepared in this rulemaking.

---------------------------------------------------------------------------

\50\ Order No. 486, Regulations Implementing the National

Environmental Policy Act, 52 FR 47897 (Dec. 17, 1987), FERC Stats. &

Regs. Preambles 1986-1990 para. 30,783 (1987).

\51\ 18 CFR 380.4.

\52\ See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5), 380.4(a)(27).

---------------------------------------------------------------------------

VI. Information Collection Requirement

OMB's regulations at 5 CFR 1320.11 require that it approve certain

reporting and recordkeeping requirements (collections of information)

imposed by a Federal agency. Upon approval of a

collection of information, OMB shall assign an OMB control number and

an expiration date. Respondents subject to the filing requirements of

this proposed rule shall not be penalized for failing to respond to

these collections of information unless the collections of information

display valid OMB control numbers.

Title: FERC-545, Gas Pipeline Rates: Rate Change (Non-formal).

Action: Data Collection/Requirements.

OMB Control No.: 1902-0154.

Respondents: Interstate Natural Gas Pipelines (Not applicable to

small businesses).

Frequency of Responses: One-time tariff filings (First year).

Title: FERC-549B, Gas Pipeline Rates: Capacity Release Information.

Action: Reduction in Data Collection/Requirements.

OMB Control No.: 1902-0169.

Respondents: Interstate Natural Gas Pipelines (Not applicable to

small businesses).

Frequency of Responses: Continuing/Day-to-Day--Elimination of

Certain Capacity Release/Competitive Bidding Requirements (Annual

Burden/Cost Reduction)

rst year).

Title: FERC-549B, Gas Pipeline Rates: Capacity Release Information.

Action: Reduction in Data Collection/Requirements.

OMB Control No.: 1902-0169.

Respondents: Interstate Natural Gas Pipelines (Not applicable to

small businesses).

Frequency of Responses: Continuing/Day-to-Day--Elimination of

Certain Capacity Release/Competitive Bidding Requirements (Annual

Burden/Cost Reduction).

Necessity of Information: The subject Notice of Proposed Rulemaking

solicits public comments on the Commission's efforts to encourage

greater use of the capacity release mechanism and to make capacity

release more competitive with other means of acquiring capacity. The

implementation of the proposed revisions to the Commission's

regulations would help the Commission carry out its responsibilities

under the Natural Gas Act and coincide with the current regulatory

environment which the Commission instituted with Order Nos. 636, 563,

and 587 and the restructuring of the natural gas industry. The

Commission's Office of Pipeline Regulation (OPR) would use the tariff

data filed under FERC-545 in rate proceedings to review rate and tariff

changes by natural gas companies for the transportation of gas and for

general industry oversight. Based on experience over the last two

years, the Commission has determined that the competitive bidding

requirements may no longer be warranted and that their elimination may

increase industry efficiency. The information collected under FERC-545

in the subject NOPR would be reported to the Commission and be subject

to audit.

The Commission is submitting a copy of the subject NOPR to OMB for

its review. Interested persons may obtain information on the proposed

modifications to the Commission's regulations by contacting the Federal

Energy Regulatory Commission, 888 First Street N.E., Washington, DC

20426 [Attention: Michael Miller, Information Services Division,

reported to the Commission and be subject

to audit.

The Commission is submitting a copy of the subject NOPR to OMB for

its review. Interested persons may obtain information on the proposed

modifications to the Commission's regulations by contacting the Federal

Energy Regulatory Commission, 888 First Street N.E., Washington, DC

20426 [Attention: Michael Miller, Information Services Division,

(202)208-1415] or the Office of Management and Budget [Attention: Desk

Officer for the Federal Energy Regulatory Commission (202)395-3087].

VII. Comment Procedures

The Commission invites interested persons to submit written

comments on the matters proposed in this notice, including any related

matters or alternative proposals that commenters may wish to discuss.

An original and 14 copies of comments to this notice must be filed with

the Commission no later than October 7, 1996. Comments should be

submitted to the Office of the Secretary, Federal Energy Regulatory

Commission, 888 First Street, NE, Washington, DC 20426, and should

refer to Docket No. RM96-14-000. Additionally, the Commission strongly

encourages commenters to submit a computer diskette of their comments

in WordPerfect version 6.1 format or lower or in ASCII format, with the

name of the filer and Docket No. RM96-14-000 on the outside of the

diskette. Those providing files in ASCII format should take care to

examine the form of an ASCII conversion to ensure, for instance, that

it includes footnotes, headers, and footers, as these have often been

left out in past electronic filings. All written comments will be

placed in the Commission's public files and will be available for

inspection in the Commission's Public Reference Room at 888 First

Street, NE, Washington, DC 20426, during regular business hours.

List of Subjects in 18 CFR Part 284

Continental shelf, Natural gas, Reporting and recordkeeping

requirements, Incorporation by reference.

t in past electronic filings. All written comments will be

placed in the Commission's public files and will be available for

inspection in the Commission's Public Reference Room at 888 First

Street, NE, Washington, DC 20426, during regular business hours.

List of Subjects in 18 CFR Part 284

Continental shelf, Natural gas, Reporting and recordkeeping

requirements, Incorporation by reference.

By direction of the Commission.

Lois D. Cashell,

Secretary.

In consideration of the foregoing, the Commission proposes to amend

Part 284, Chapter I, Title 18, Code of Federal Regulations, as set

forth below.

PART 284--CERTAIN SALES AND TRANSPORTATION OF NATURAL GAS UNDER THE

NATURAL GAS POLICY ACT OF 1978 AND RELATED AUTHORITIES

1. The authority citation for part 284 continues to read as

follows:

Authority: 15 U.S.C. 717-717w, 3301-3432; 42 U.S.C 7101-7532; 43

U.S.C 1331-1356.

2. Sec. 284.243 is amended by removing paragraph (h), redesignating

paragraph (g) as paragraph (h), and revising paragraphs (b) through (f)

and adding paragraph (g) to read as follows:

Sec. 284.243 Release of firm capacity on interstate pipelines.

* * * * *

(b) Firm shippers must be permitted to release their capacity, in

whole or in part, on a permanent or short-term basis, without

restrictions on the terms and conditions of the release. A replacement

shipper is any shipper that obtains released capacity.

(c) A firm shipper that wants to release any or all of its firm

capacity must notify the pipeline of the replacement shipper to which

it wishes to release its capacity and the terms and conditions of the

release. The pipeline must provide a mechanism complying with

Sec. 284.10 of this part by which the shipper or its designated agent

can notify the pipeline of the terms of the release.

(d) The pipeline must provide notice of the name of the replacement

shipper and the terms and conditions of the release on its Electronic

Bulletin Board and in downloadable files required under Sec. 284.10 of

this part.

on a basis

comparable to shippers nominating and contracting for interruptible or

firm capacity from the pipeline.

* * * * *

Note.--The following appendix will not appear in the Code of

Federal Regulations.

Appendix--RM96-14-000

I. Capacity Release Award Characteristics

Source: Monthly EDI Downloads--30 Pipelines 1

---------------------------------------------------------------------------

\1\ Algonquin Gas Transmission, Alabama-Tennessee Natural Gas,

ANR Pipeline, Colorado Interstate Gas, CNG Transmission, Columbia

Gas, Columbia Gulf, East Tennessee Natural Gas, El Paso Natural Gas,

Florida Gas Transmission, Midwestern Gas Transmission, Mississippi

River Transmission, Natural Gas Pipeline, Noram Gas Transmission,

Northern Border Pipeline, Northern Natural Gas, Northwest Pipeline,

Pacific Gas Transmission, Paiute Pipeline, Panhandle Eastern Pipe

Line, Southern Natural Gas, Stingray Pipeline, Tennessee Gas

Pipeline, Texas Eastern Transmission, Texas Gas Transmission,

Trunkline Gas, Trailblazer Pipeline, Transcontinental Gas Pipe Line,

Transwestern Pipeline, Williams Natural Gas.

---------------------------------------------------------------------------

Released Capacity Held By Replacement Shippers

(Trillion Btu/day)

Capacity Held During the Month 2

---------------------------------------------------------------------------

\2\ Includes all capacity releases since 6/1/94 still in effect

during the indicated month.

---------------------------------------------------------------------------

(From Awards Between 06/01/94 and 04/30/96)

------

Released Capacity Held By Replacement Shippers

(Trillion Btu/day)

Capacity Held During the Month 2

---------------------------------------------------------------------------

\2\ Includes all capacity releases since 6/1/94 still in effect

during the indicated month.

---------------------------------------------------------------------------

(From Awards Between 06/01/94 and 04/30/96)

------------------------------------------------------------------------

Max Average

------------------------------------------------------------------------

January 1995........................................ 9.4 8.8

February 1995....................................... 10.8 10.1

March 1995.......................................... 10.5 9.9

April 1995.......................................... 11.7 11.2

May 1995............................................ 12.6 11.9

June 1995........................................... 14.1 13.3

July 1995........................................... 14.9 14.0

August 1995......................................... 17.0 16.0

September 1995...................................... 17.1 16.4

October 1995........................................ 16.1 15.5

November 1995....................................... 15.1 14.4

December 1995....................................... 14.1 13.5

January 1996........................................ 13.9 13.3

February 1996....................................... 15.1 14.6

March 1996.......................................... 15.2 14.7

April 1996.......................................... 17.5 16.7

------------------------------------------------------------------------

Note: The same 30 pipelines reported 86.5 trillion Btu/day firm

transportation quantities in their April 1, 1996 Index of Customers

filing.

y 1996....................................... 15.1 14.6

March 1996.......................................... 15.2 14.7

April 1996.......................................... 17.5 16.7

------------------------------------------------------------------------

Note: The same 30 pipelines reported 86.5 trillion Btu/day firm

transportation quantities in their April 1, 1996 Index of Customers

filing.

Capacity Release Awards By Term and Whether Prearranged

[Awards from 5/1/95-5/31/96] \3\

------------------------------------------------------------------------

Percent of

Term Prearranged No. of total

awards awards

------------------------------------------------------------------------

31 days..................... No.............. 172 1

Yes............. 2,007 10

-----------------------

2,179 11

All........................... No.............. 1,551 8

Yes............. 18,703 92

-----------------------

20,254 100

------------------------------------------------------------------------

\3\ Awards data for May 1996 is not complete.

Capacity Release Awards By Term and Whether Recallable

[Awards from 5/1/95-5/31/96]

------------------------------------------------------------------------

Percent of

Term Recallable No. of total

awards awards

------------------------------------------------------------------------

31 days..................... No.............. 911 4

Yes............. 1,128 6

-----------------------

2,039 10

All........................... No.............. 7,099 36

Yes............. 12,522 64

-----------------------

19,621 100

------------------------------------------------------------------------

II. Capacity Release Bidding

Source: Monthly EDI Downloads--30 Pipelines (Awards from 5/1/95-5/31/

96)

................ No.............. 911 4

Yes............. 1,128 6

-----------------------

2,039 10

All........................... No.............. 7,099 36

Yes............. 12,522 64

-----------------------

19,621 100

------------------------------------------------------------------------

II. Capacity Release Bidding

Source: Monthly EDI Downloads--30 Pipelines (Awards from 5/1/95-5/31/

96)

Capacity Release Awards By Term and Whether Biddable and Prearranged \4\

----------------------------------------------------------------------------------------------------------------

No. of

Term Biddable Prearranged awards Percent

----------------------------------------------------------------------------------------------------------------

31 days............................ Yes..................... Yes.................... 292 34

No..................... 34 4

No...................... Yes.................... 529 61

\5\ No................. 10 1

-----------------------

865 100

All.................................. Yes..................... Yes.................... 2,051 24

No..................... 344 4

No...................... Yes.................... 6,255 71

\5\ No................. 114 1

-----------------------

8,764 100

----------------------------------------------------------------------------------------------------------------

\4\ Analysis limited to awards with corresponding offer information in database. Resulting sample size is 43% of

all awards. Offer information is source for whether transaction is biddable.

\5\ This reported data is inconsistent, since it would seem that a transaction which is non-biddable should be

pre-arranged.

--------------------------------------------------------------------------------

\4\ Analysis limited to awards with corresponding offer information in database. Resulting sample size is 43% of

all awards. Offer information is source for whether transaction is biddable.

\5\ This reported data is inconsistent, since it would seem that a transaction which is non-biddable should be

pre-arranged.

Capacity Release Awards With Competitive Bidding 6

----------------------------------------------------------------------------------------------------------------

Percent

No. of Awards with with

Term Reported as biddable biddable competing competing

awards bids bids

----------------------------------------------------------------------------------------------------------------

31 days.................................. Yes.......................... 252 64 25

No \7\....................... 21 21 ...........

--------------------------

Total \8\.................... 273 85 31

All....................................... Yes.......................... 1,650 232 14

No \7\....................... 132 132 ...........

--------------------------

Total \8\.................... 1,782 364 20

----------------------------------------------------------------------------------------------------------------

\6\ Analysis limited to awards with corresponding offer and bid information in database. Resulting sample size

is 35% of all awards. Offer information is the source for whether transaction is biddable. Bid information

indicates whether competing bids were submitted.

\7\ This reported data is inconsistent, in that the underlying offers were coded as non-biddable but in fact

competitive bids were submitted.

\8\ This reflects the inclusion in the analysis of awards coded as non-biddable for which competitive bids were

actually submitted. Including these awards leads to the higher percentage of awards with competing bids shown

in the last column.

III. Capacity Release Discounts

s inconsistent, in that the underlying offers were coded as non-biddable but in fact

competitive bids were submitted.

\8\ This reflects the inclusion in the analysis of awards coded as non-biddable for which competitive bids were

actually submitted. Including these awards leads to the higher percentage of awards with competing bids shown

in the last column.

III. Capacity Release Discounts

Source: EDI Downloads--30 Pipelines (Awards from 6/1/94-5/31/96)

--------------------------------------------------------------------------------------------------------------------------------------------------------

Mean Mean

Percent of Percent of Percent of Percent of percent of percent of

No. of awards with awards at awards with awards at max. resv. max. volum.

Award date awards discounted max. resv. discounted max. volum. rate rate

included resv. rate rate volum. rate rate (discounted (discounted

awards) awards)

--------------------------------------------------------------------------------------------------------------------------------------------------------

June 1994.................................................... 900 62 6 31 1 42.2 33.6

July 1994.................................................... 856 68 6 26 0 28.5 19.3

August 1994.................................................. 973 65 6 29 1 18.4 25.5

September 1994............................................... 999 68 7 23 2 19.6 24.5

October 1994................................................. 1082 62 13 22 4 23.5 27.8

November 1994................................................ 907 57 12 28 4 28.0 28.9

December 1994................................................ 920 54 15 27 3 27.2 22.8

January 1995................................................. 1184 56 14 27 3 25.9 18.7

February 1995................................................ 1287 65 10 22 2 25.2 21.7

March 1995................................................... 1691 70 8 20 2 24.2 23.6

April 1995..................................................

994................................................ 920 54 15 27 3 27.2 22.8

January 1995................................................. 1184 56 14 27 3 25.9 18.7

February 1995................................................ 1287 65 10 22 2 25.2 21.7

March 1995................................................... 1691 70 8 20 2 24.2 23.6

April 1995................................................... 1726 70 6 21 3 22.3 20.6

May 1995..................................................... 1738 67 7 24 2 21.0 23.8

June 1995.................................................... 1450 63 5 31 1 22.0 24.1

July 1995.................................................... 1540 60 6 33 2 26.6 23.9

August 1995.................................................. 1597 59 5 34 1 24.2 28.5

September 1995............................................... 1776 60 16 23 1 28.6 33.6

October 1995................................................. 1804 58 19 22 1 25.1 37.0

November 1995................................................ 1462 58 17 21 3 34.5 46.0

December 1995................................................ 1048 48 25 24 3 43.8 39.3

January 1996................................................. 981 43 30 24 3 41.3 27.0

February 1996................................................ 922 46 29 21 3 40.9 20.5

March 1996................................................... 1555 56 24 17 3 37.0 21.3

April 1996................................................... 1357 66 19 14 2 31.2 17.8

May 1996..................................................... 609 52 18 29 2 29.8 23.5

June 1996.................................................... 97 70 7 23 . 15.9 19.6

30,461 60 13 24 2 27.7 26.3

--------------------------------------------------------------------------------------------------------------------------------------------------------

[FR Doc. 96-20048 Filed 8-6-96; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Secondary Market Transactions on Interstate Natural Gas Pipelines · 61 FR 41046 | Frix