Transportation Conformity Rule Amendments: Response to Court Decision and Additional Rule Changes

FederalRegulations

Ask Donna

How this section applies to your facts.

Federal Register › Vol. 68 › 68 FR 38974

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

Part IV

Environmental Protection Agency

-----------------------------------------------------------------------

40 CFR Part 93

Transportation Conformity Rule Amendments: Response to Court Decision

and Additional Rule Changes; Proposed Rule

Proposed Rules

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 93

[FRL-7513-5]

RIN 2060-AI56

Transportation Conformity Rule Amendments: Response to Court

Decision and Additional Rule Changes

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: Today we (EPA) are proposing to amend the transportation

conformity rule to address a March 2, 1999, ruling by the U.S. Court of

Appeals for the District of Columbia Circuit (Environmental Defense

Fund v. EPA, et al., 167 F. 3d 641, DC Cir. 1999; hereinafter referred

to as the ``court decision''). Our proposal would incorporate into the

transportation conformity rule the EPA and Department of Transportation

(DOT) guidance that has been used in place of certain regulatory

provisions of the rule since the March 1999 court decision. EPA

consulted with DOT on the development of our implementation strategy to

address the court's decision and DOT concurs with this proposal.

Consistent with the court's ruling and existing federal guidance on

transportation conformity, we are proposing that certain federal and

non-federal highway and transit projects cannot be advanced in areas

without a currently conforming transportation plan and transportation

improvement program (TIP), unless they have previously received

appropriate approvals and funding commitments. As directed by the

court, our proposal also would modify the process for deciding whether

the motor vehicle emissions budgets in newly submitted state air

quality plans are adequate for use in the conformity process

ithout a currently conforming transportation plan and transportation

improvement program (TIP), unless they have previously received

appropriate approvals and funding commitments. As directed by the

court, our proposal also would modify the process for deciding whether

the motor vehicle emissions budgets in newly submitted state air

quality plans are adequate for use in the conformity process. Other

provisions affected by the court decision and included in our proposal

are the timing of conformity consequences following the disapproval of

certain types of SIPs, and the use of submitted safety margins for

transportation conformity in areas that have approved SIPs that were

submitted prior to November 24, 1993.

The proposal also includes several additional amendments to

provisions of the rule that the court decision did not directly affect.

These amendments are being proposed to improve the rule and/or to

provide clarification of existing requirements.

DATES: Written comments on this proposal must be received on or before

July 30, 2003.

ADDRESSES: Comments may be submitted by mail to: Air Docket,

Environmental Protection Agency, Mailcode: 6102T, 1200 Pennsylvania

Ave., NW., Washington, DC 20460, Attention Docket ID No. OAR-2003-0063.

Comments may also be submitted electronically, by facsimile, or through

hand delivery/courier. Follow the detailed instructions as provided in

section I.C. of the SUPPLEMENTARY INFORMATION section.

FOR FURTHER INFORMATION CONTACT: Angela Spickard, State Measures and

Conformity Group, Transportation and Regional Programs Division, U.S.

Environmental Protection Agency, 2000 Traverwood Road, Ann Arbor, MI

48105, [email protected], (734) 214-4283; or, Meg Patulski, State

Measures and Conformity Group, Transportation and Regional Programs

Division, U.S. Environmental Protection Agency, 2000 Traverwood Road,

Ann Arbor, MI 48105, [email protected], (734) 214-4842.

SUPPLEMENTARY INFORMATION: The contents of this preamble are listed in

the following outline:

ncy, 2000 Traverwood Road, Ann Arbor, MI

48105, [email protected], (734) 214-4283; or, Meg Patulski, State

Measures and Conformity Group, Transportation and Regional Programs

Division, U.S. Environmental Protection Agency, 2000 Traverwood Road,

Ann Arbor, MI 48105, [email protected], (734) 214-4842.

SUPPLEMENTARY INFORMATION: The contents of this preamble are listed in

the following outline:

I. General Information

A. Regulated Entities

B. How Can I Get Copies of This Document?

C. How and to Whom Do I Submit Comments?

D. How Should I Submit CBI to the Agency?

E. What Should I Consider as I Prepare My Comments for EPA?

II. Background on the Transportation Conformity Rule

III. Federal Projects

A. What Are We Proposing?

B. Why Are We Proposing These Changes?

C. What Is the Practical Impact of the Proposal?

IV. Using Motor Vehicle Emissions Budgets from Submitted SIPs for

Transportation Conformity Determinations

A. Background

B. What Are We Proposing?

C. Why Are We Proposing These Changes?

D. EPA's Adequacy Process

E. Why Is EPA Using the Website Instead of the Federal Register

to Notify the Public in the Adequacy Process?

F. What Typical SIP Submissions Will We Review for Adequacy?

G. Does EPA Review Adequacy of SIPs That Do Not Establish

Specific Budgets?

V. Non-Federal Projects

A. What Are Non-federal Projects?

B. What Are We Proposing?

C. Why Are We Proposing This Change?

D. At What Point Is a Regionally Significant Non-federal Project

``Approved''?

VI. Conformity Consequences of SIP Disapprovals

A. What Are the Conformity Consequences of EPA Disapproving a

Control Strategy SIP Without a Protective Finding?

B. What Are We Proposing?

C. Why Are We Proposing This Change?

D. What Is the Practical Impact of This Change?

VII. Safety Margins

A. What Is a Safety Margin?

B. What Are We Proposing?

C. Why Are We Proposing This Change?

D. Can Safety Margins Still Be Allocated to Motor Vehicle

Emissions Budgets for Use in Conformity Determinations?

VIII

Control Strategy SIP Without a Protective Finding?

B. What Are We Proposing?

C. Why Are We Proposing This Change?

D. What Is the Practical Impact of This Change?

VII. Safety Margins

A. What Is a Safety Margin?

B. What Are We Proposing?

C. Why Are We Proposing This Change?

D. Can Safety Margins Still Be Allocated to Motor Vehicle

Emissions Budgets for Use in Conformity Determinations?

VIII. Streamlining the Frequency of Conformity Determinations

A. Eliminating the Requirement for Conformity of the TIP Within

Six Months of the Transportation Plan

B. Streamlining the 18-month SIP Triggers for New Conformity

Determinations

IX. Latest Planning Assumptions

A. What Are We Proposing?

B. Why Are We Proposing this Change?

X. Horizon Years for Hot-spot Analyses

A. What Are We Proposing?

B. Why Are We Proposing This Clarification?

XI. Additional Changes and Clarifications to the Rule

A. Definitions

B. Budget Test Requirements for the Attainment Year

C. Budget Test Requirements Once a Maintenance Plan is Submitted

D. Relying on a Previous Regional Emissions Analysis

E. Exempt Projects

XII. How Does Today's Proposal Affect Conformity SIPs?

XIII.Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review

B. Paperwork Reduction Act

C. Regulatory Flexibility Act

D. Unfunded Mandates Reform Act

E. Executive Order 13132: Federalism

F. Executive Order 13175: Consultation and Coordination with

Indian Tribal Governments

G. Executive Order 13045: Protection of Children from

Environmental Health and Safety Risks

H. Executive Order 13211: Actions that Significantly Affect

Energy Supply, Distribution or Use

I. National Technology Transfer Advancement Act

I. General Information

A. Regulated Entities

Entities potentially regulated by the conformity rule are those

that adopt, approve, or fund transportation plans, programs, or

projects under title 23 U.S.C. or title 49 U.S.C. Regulated categories

and entities affected by today's action include:

ficantly Affect

Energy Supply, Distribution or Use

I. National Technology Transfer Advancement Act

I. General Information

A. Regulated Entities

Entities potentially regulated by the conformity rule are those

that adopt, approve, or fund transportation plans, programs, or

projects under title 23 U.S.C. or title 49 U.S.C. Regulated categories

and entities affected by today's action include:

------------------------------------------------------------------------

Category Examples of regulated entities

------------------------------------------------------------------------

Local government....................... Local transportation and air

quality agencies, including

metropolitan planning

organizations (mpos).

State government....................... State transportation and air

quality agencies.

Federal government..................... Department of Transportation

(Federal Highway

Administration (FHWA) and

Federal Transit Administration

(FTA)).

------------------------------------------------------------------------

This table is not intended to be exhaustive, but rather provides a

guide for readers regarding entities likely to be affected by this

rule. This table lists the types of entities of which EPA is aware that

potentially could be regulated by the conformity rule. Other types of

entities not listed in the table could also be regulated. To determine

whether your organization is regulated by this action, you should

carefully examine the applicability requirements in 40 CFR 93.102 of

the transportation conformity rule. If you have questions regarding the

applicability of this action to a particular entity, consult the

persons listed in the preceding FOR FURTHER INFORMATION CONTACT

section.

B. How Can I Get Copies of This Document?

ermine

whether your organization is regulated by this action, you should

carefully examine the applicability requirements in 40 CFR 93.102 of

the transportation conformity rule. If you have questions regarding the

applicability of this action to a particular entity, consult the

persons listed in the preceding FOR FURTHER INFORMATION CONTACT

section.

B. How Can I Get Copies of This Document?

1. Docket

EPA has established an official public docket for this action under

Docket ID No. OAR-2003-0063. The official public docket consists of the

documents specifically referenced in this action, any public comments

received, and other information related to this action. Although a part

of the official docket, the public docket does not include Confidential

Business Information (CBI) or other information whose disclosure is

restricted by statute. The official public docket is the collection of

materials that is available for public viewing at the Air Docket in the

EPA Docket Center, (EPA/DC) EPA West, Room B102, 1301 Constitution

Ave., NW., Washington, DC. The EPA Docket Center Public Reading Room is

open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding

legal holidays. The telephone number for the Public Reading Room is

(202) 566-1744, and the telephone number for the Air Docket is (202)

566-1742. This Docket Facility is open from 8:30 a.m. to 4:30 p.m.

Monday through Friday, excluding legal holidays. The Docket telephone

number is 202-566-1742.

2. Electronic Access

You may access this Federal Register document electronically

through EPA's Transportation Conformity website at: http://www.epa.gov/otaq/transp/traqconf.htm. You may also access this document

electronically under the ``Federal Register'' listings at http://www.epa.gov/fedrgstr/.

An electronic version of the public docket is available through

EPA's electronic public docket and comment system, EPA Dockets

cess this Federal Register document electronically

through EPA's Transportation Conformity website at: http://www.epa.gov/otaq/transp/traqconf.htm. You may also access this document

electronically under the ``Federal Register'' listings at http://www.epa.gov/fedrgstr/.

An electronic version of the public docket is available through

EPA's electronic public docket and comment system, EPA Dockets. You may

use EPA Dockets at http://www.epa.gov/edocket/ to submit or view public

comments, access the index listing of the contents of the official

public docket, and to access those documents in the public docket that

are available electronically. Once in the system, select ``search,''

then key in the appropriate docket identification number.

Certain types of information will not be placed in the EPA Dockets.

Information claimed as CBI and other information for which disclosure

is restricted by statute is not included in the official public docket

and will not be available for public viewing in EPA's electronic public

docket. EPA's policy is that copyrighted material will not be placed in

EPA's electronic public docket but will be available only in printed,

paper form in the official public docket. To the extent feasible,

publicly available docket materials will be made available in EPA's

electronic public docket. When a document is selected from the index

list in EPA Dockets, the system will identify whether the document is

available for viewing in EPA's electronic public docket. Although not

all docket materials may be available electronically, you may still

access any of the publicly available docket materials through the

docket facility identified in section I.B.1. above. EPA intends to work

towards providing electronic access to all of the publicly available

docket materials through EPA's electronic public docket

able for viewing in EPA's electronic public docket. Although not

all docket materials may be available electronically, you may still

access any of the publicly available docket materials through the

docket facility identified in section I.B.1. above. EPA intends to work

towards providing electronic access to all of the publicly available

docket materials through EPA's electronic public docket.

For public commenters, it is important to note that EPA's policy is

that public comments, whether submitted electronically or in paper,

will be made available for public viewing in EPA's electronic public

docket as EPA receives them and without change, unless the comment

contains copyrighted material, CBI, or other information for which

disclosure is restricted by statute. When EPA identifies a comment

containing copyrighted material, EPA will provide a reference to that

material in the version of the comment that is placed in EPA's

electronic public docket. The entire printed comment, including the

copyrighted material, will be available in the public docket.

Public comments submitted on computer disks that are mailed or

delivered to the docket will be transferred to EPA's electronic public

docket. Public comments that are mailed or delivered to the Docket will

be scanned and placed in EPA's electronic public docket. Where

practical, physical objects will be photographed, and the photograph

will be placed in EPA's electronic public docket along with a brief

description written by the docket staff.

For additional information about EPA's electronic public docket

visit EPA Dockets online or see 67 FR 38102, May 31, 2002.

C. How and to Whom Do I Submit Comments?

and placed in EPA's electronic public docket. Where

practical, physical objects will be photographed, and the photograph

will be placed in EPA's electronic public docket along with a brief

description written by the docket staff.

For additional information about EPA's electronic public docket

visit EPA Dockets online or see 67 FR 38102, May 31, 2002.

C. How and to Whom Do I Submit Comments?

You may submit comments electronically, by mail, by facsimile, or

through hand delivery/courier. To ensure proper receipt by EPA,

identify the appropriate docket identification number in the subject

line on the first page of your comment. Please ensure that your

comments are submitted within the specified comment period. Comments

received after the close of the comment period will be marked ``late.''

EPA is not required to consider these late comments.

1. Electronically

If you submit an electronic comment as prescribed below, EPA

recommends that you include your name, mailing address, and an e-mail

address or other contact information in the body of your comment. Also

include this contact information on the outside of any disk or CD ROM

you submit, and in any cover letter accompanying the disk or CD ROM.

This ensures that you can be identified as the submitter of the comment

and allows EPA to contact you in case EPA cannot read your comment due

to technical difficulties or needs further information on the substance

of your comment. EPA's policy is that EPA will not edit your comment,

and any identifying or contact information provided in the body of a

comment will be included as part of the comment that is placed in the

official public docket, and made available in EPA's electronic public

docket. If EPA cannot read your

comment due

to technical difficulties or needs further information on the substance

of your comment. EPA's policy is that EPA will not edit your comment,

and any identifying or contact information provided in the body of a

comment will be included as part of the comment that is placed in the

official public docket, and made available in EPA's electronic public

docket. If EPA cannot read your

comment due to technical difficulties and cannot contact you for

clarification, EPA may not be able to consider your comment.

i. EPA Dockets. Your use of EPA's electronic public docket to

submit comments to EPA electronically is EPA's preferred method for

receiving comments. Go directly to EPA Dockets at http://www.epa.gov/edocket, and follow the online instructions for submitting comments. To

access EPA's electronic public docket from the EPA Internet Home Page,

select ``Information Sources,'' ``Dockets,'' and ``EPA Dockets.'' Once

in the system, select ``search,'' and then key in Docket ID No. OAR-

2003-0063. The system is an ``anonymous access'' system, which means

EPA will not know your identity, e-mail address, or other contact

information unless you provide it in the body of your comment.

ii. E-mail. Comments may be sent by electronic mail (e-mail) to [email protected], Attention Air Docket ID No. OAR-2003-0063. In

contrast to EPA's electronic public docket, EPA's e-mail system is not

an ``anonymous access'' system. If you send an e-mail comment directly

to the Docket without going through EPA's electronic public docket,

EPA's e-mail system automatically captures your e-mail address. E-mail

addresses that are automatically captured by EPA's e-mail system are

included as part of the comment that is placed in the official public

docket, and made available in EPA's electronic public docket.

iii. Disk or CD ROM. You may submit comments on a disk or CD ROM

that you mail to the mailing address identified in section I.C.2

e-mail system automatically captures your e-mail address. E-mail

addresses that are automatically captured by EPA's e-mail system are

included as part of the comment that is placed in the official public

docket, and made available in EPA's electronic public docket.

iii. Disk or CD ROM. You may submit comments on a disk or CD ROM

that you mail to the mailing address identified in section I.C.2. These

electronic submissions will be accepted in WordPerfect or ASCII file

format. Avoid the use of special characters and any form of encryption.

2. By Mail. Send two copies of your comments to: Air Docket,

Environmental Protection Agency, Mailcode: 6102T, 1200 Pennsylvania

Ave., NW, Washington, DC, 20460, Attention Docket ID No. OAR-2003-0063.

3. By Hand Delivery or Courier. Deliver your comments to: EPA

Docket Center, Room B102, EPA West Building, 1301 Constitution Avenue,

NW., Washington, DC., Attention Air Docket ID No. OAR-2003-0063. Such

deliveries are only accepted during the Docket's normal hours of

operation as identified in section I.B.1.

4. By Facsimile. Fax your comments to: (202) 566-1741, Attention

Docket ID. No. OAR-2003-0063.

D. How Should I Submit CBI to the Agency?

Do not submit information that you consider to be CBI

electronically through EPA's electronic public docket or by e-mail.

Send or deliver information identified as CBI only to the following

address: Attention: Angela Spickard, U.S. EPA, National Vehicle and

Fuel Emissions Laboratory, Transportation and Regional Programs

Division, 2000 Traverwood Drive, Ann Arbor, MI 48105, Docket ID No.

OAR-2003-0063. You may claim information that you submit to EPA as CBI

by marking any part or all of that information as CBI (if you submit

CBI on disk or CD ROM, mark the outside of the disk or CD ROM as CBI

and then identify electronically within the disk or CD ROM the specific

information that is CBI). Information so marked will not be disclosed

except in accordance with procedures set forth in 40 CFR Part 2

may claim information that you submit to EPA as CBI

by marking any part or all of that information as CBI (if you submit

CBI on disk or CD ROM, mark the outside of the disk or CD ROM as CBI

and then identify electronically within the disk or CD ROM the specific

information that is CBI). Information so marked will not be disclosed

except in accordance with procedures set forth in 40 CFR Part 2.

In addition to one complete version of the comment that includes

any information claimed as CBI, a copy of the comment that does not

contain the information claimed as CBI must be submitted for inclusion

in the public docket and EPA's electronic public docket. If you submit

the copy that does not contain CBI on disk or CD ROM, mark the outside

of the disk or CD ROM clearly that it does not contain CBI. Information

not marked as CBI will be included in the public docket and EPA's

electronic public docket without prior notice. If you have any

questions about CBI or the procedures for claiming CBI, please consult

the person identified in the FOR FURTHER INFORMATION CONTACT section.

E. What Should I Consider as I Prepare My Comments for EPA?

You may find the following suggestions helpful for preparing your

comments:

1. Explain your views as clearly as possible.

2. Describe any assumptions that you used.

3. Provide any technical information and/or data you used that

support your views.

4. If you estimate potential burden or costs, explain how you

arrived at your estimate.

5. Provide specific examples to illustrate your concerns.

6. Offer alternatives.

7. Make sure to submit your comments by the comment period deadline

identified.

8. To ensure proper receipt by EPA, identify the appropriate docket

identification number in the subject line on the first page of your

response. It would also be helpful if you provided the name, date, and

Federal Register citation related to your comments.

II. Background on the Transportation Conformity Rule

.

7. Make sure to submit your comments by the comment period deadline

identified.

8. To ensure proper receipt by EPA, identify the appropriate docket

identification number in the subject line on the first page of your

response. It would also be helpful if you provided the name, date, and

Federal Register citation related to your comments.

II. Background on the Transportation Conformity Rule

Transportation conformity is required under section 176(c) of the

Clean Air Act (42 U.S.C. 7506(c)) to ensure that federally supported

highway and transit project activities are consistent with (``conform

to'') the purpose of a state air quality implementation plan (SIP).

Conformity to the purpose of the SIP means that transportation

activities will not cause new air quality violations, worsen existing

violations, or delay timely attainment of the national ambient air

quality standards. EPA's transportation conformity rule establishes the

criteria and procedures for determining whether transportation

activities conform to the state air quality plan.

EPA first published the transportation conformity rule on November

24, 1993 (58 FR 62188). Minor revisions were made to the rule in 1995

(60 FR 40098, August 7, 1995, and 60 FR 57179, November 14, 1995), and

more recently in the spring of 2000 (65 FR 18911, April 10, 2000) and

on August 6, 2002 (67 FR 50808).

On August 15, 1997, EPA published a comprehensive set of amendments

that clarified and streamlined language from the 1993 transportation

conformity rule (62 FR 43780) and subsequent 1995 amendments. However,

a decision made on March 2, 1999, by the U.S. Court of Appeals for the

District of Columbia Circuit affected several provisions of the 1997

rulemaking (Environmental Defense Fund v. EPA, et al., 167 F. 3d 641,

DC Cir. 1999; hereinafter referred to as the ``court decision'').

Specifically, the court's ruling affected provisions that pertain to

five aspects of the conformity rule, including:

,

a decision made on March 2, 1999, by the U.S. Court of Appeals for the

District of Columbia Circuit affected several provisions of the 1997

rulemaking (Environmental Defense Fund v. EPA, et al., 167 F. 3d 641,

DC Cir. 1999; hereinafter referred to as the ``court decision'').

Specifically, the court's ruling affected provisions that pertain to

five aspects of the conformity rule, including:

(1) Federal approval and funding of transportation projects in

areas without a currently conforming transportation plan and

transportation improvement program (TIP);

(2) Provisions allowing motor vehicle emissions budgets from

submitted SIPs to be used in transportation conformity determinations

before the SIP has been approved;

(3) the adoption and approval of non-federal transportation

projects in areas without a currently conforming transportation plan

and TIP;

(4) the timing of conformity consequences following an EPA

disapproval of a control strategy SIP (e.g., reasonable further

progress SIPs

and attainment demonstrations) without a protective finding; and,

(5) the use of submitted safety margins in areas with approved SIPs

that were submitted prior to November 24, 1993.

In response to the court decision, the EPA and U.S. Department of

Transportation (DOT) issued guidance \1\ to address the provisions

directly affected by the court decision. DOT subsequently modified its

June 18, 1999, guidance and replaced it with revised guidance issued on

January 2, 2002, and announced in the Federal Register on February 7,

2002, (67 FR 5882).\2\ DOT issued supplemental guidance \3\ in May 2003

to clarify the conformity requirements as they relate to FHWA/FTA's

approval of a final environmental impact statement and the National

Environmental Policy Act (NEPA) process completion

18, 1999, guidance and replaced it with revised guidance issued on

January 2, 2002, and announced in the Federal Register on February 7,

2002, (67 FR 5882).\2\ DOT issued supplemental guidance \3\ in May 2003

to clarify the conformity requirements as they relate to FHWA/FTA's

approval of a final environmental impact statement and the National

Environmental Policy Act (NEPA) process completion. In addition, FTA

issued guidance on April 9, 2003, that further clarified which

approvals are necessary for transit projects to proceed during a

lapse.\4\ The EPA and DOT memoranda serve as the basis for today's

proposed amendments to the transportation conformity rule. EPA and DOT

consulted with each other on the development of all guidance documents

implementing the March 2, 1999, court decision. See EPA's

transportation conformity web site listed in section I.B.2. to download

an electronic copy of these guidance documents.

---------------------------------------------------------------------------

\1\ May 14, 1999, Memorandum from Gay MacGregor, then-Director

of the Regional and State Programs Division of EPA's Office of

Transportation and Air Quality, to Regional Air Division Directors,

``Conformity Guidance on Implementation of March 2, 1999, Conformity

Court Decision'; and, June 18, 1999, Memorandum from Kenneth R.

Wykle, then-Administrator, Federal Highway Administration (FHWA),

and Gordon J. Linton, then-Administrator, Federal Transit

Administration (FTA), to FHWA Division Administrators, Federal Lands

Highway Division Engineers, and FTA Regional Administrators,

``Additional Supplemental Guidance for the Implementation of the

Circuit Court Decision Affecting Transportation Conformity.''

\2\ January 2, 2002, Memorandum from Mary E. Peters,

Administrator, Federal Highway Administration (FHWA), and Jennifer

L

ederal Transit

Administration (FTA), to FHWA Division Administrators, Federal Lands

Highway Division Engineers, and FTA Regional Administrators,

``Additional Supplemental Guidance for the Implementation of the

Circuit Court Decision Affecting Transportation Conformity.''

\2\ January 2, 2002, Memorandum from Mary E. Peters,

Administrator, Federal Highway Administration (FHWA), and Jennifer

L. Dorn, Administrator, Federal Transit Administration (FTA), to

FHWA Division Administrators, Federal Lands Highway Division

Engineers, and FTA Regional Administrators, ``Revised Guidance for

Implementing the March 1999 Circuit Court Decision Affecting

Transportation Conformity''; February 7, 2002, Notice, Issuance of

Revised Guidance for Implementing the March 1999 Circuit Court

Decision Affecting Transportation Conformity, Federal Register, 67

FR 5882.

\3\ May 2003, Memorandum from Federal Highway Administration and

Federal Transit Administration, ``INFORMATION: Clarification of

Transportation Conformity Requirements for FHWA/FTA Projects

Requiring Environmental Impact Statements.''

\4\ April 9, 2003, Memorandum from Jennifer L. Dorn,

Administrator, Federal Transit Administration, to Regional

Administrators, Regions 1-10, ``INFORMATION: Revised FTA Procedures

for a Conformity Lapse.''

---------------------------------------------------------------------------

In addition to addressing the impact of the court decision, today's

proposal would also amend several other provisions of the conformity

rule. These proposed rule amendments include: New definitions for

``donut areas'' and ``isolated rural nonattainment and maintenance

areas'; streamlining of the current requirements affecting frequency of

conformity determinations; EPA's revised interpretation of the

requirements for using the latest planning assumptions; clarification

of the appropriate horizon years for hot-spot analyses; a minor update

to the current list of exempt projects; and, several minor

clarifications to Sec

d rural nonattainment and maintenance

areas'; streamlining of the current requirements affecting frequency of

conformity determinations; EPA's revised interpretation of the

requirements for using the latest planning assumptions; clarification

of the appropriate horizon years for hot-spot analyses; a minor update

to the current list of exempt projects; and, several minor

clarifications to Sec. 93.118 of the conformity rule (``Criteria and

procedures: Motor vehicle emissions budget.'') that are aimed at

improving the implementation of this section of the conformity

regulation. Additional background information and rationale for these

proposed rule changes are included in our discussion below.

III. Federal Projects

A. What Are We Proposing?

Today's proposal would modify 40 CFR 93.102(c) so that no new

federal approvals or funding commitments for non-exempt projects can

occur during a transportation conformity lapse. A conformity lapse

generally occurs if transportation plan and TIP conformity

determinations are not made within specified time frames. During a

conformity lapse no new conformity determinations for FHWA or FTA non-

exempt projects may be made.

Section 93.102(c)(1) of the 1997 conformity rule (62 FR 43780)

allowed a highway or transit project to receive additional federal

approvals and funding commitments during a lapse if the project came

from a previously conforming plan and TIP, a conformity determination

for the project had been made and the NEPA process was completed before

the lapse. Section 93.101 of the rule defines ``NEPA process

completion'' as ``the point at which there is a specific action to make

a determination that a project is categorically excluded [CE], to make

a Finding of No Significant Impact [FONSI], or to issue a record of

decision on a Final Environmental Impact Statement [FEIS] * * *'' In

its March 2, 1999, decision, the court held that Sec. 93.102(c)(1) was

unlawful and remanded this section to EPA for further rulemaking

e point at which there is a specific action to make

a determination that a project is categorically excluded [CE], to make

a Finding of No Significant Impact [FONSI], or to issue a record of

decision on a Final Environmental Impact Statement [FEIS] * * *'' In

its March 2, 1999, decision, the court held that Sec. 93.102(c)(1) was

unlawful and remanded this section to EPA for further rulemaking.

To address the court decision, EPA is eliminating the current Sec.

93.102(c)(1) provision and proposing new regulatory language under

Sec. 93.102(c). Under this proposed provision, non-exempt

transportation project phases that have received all required FHWA or

FTA approvals or funding commitments and that have met associated

conformity requirements before a lapse could be implemented during the

lapse; however, no new federal approvals or funding commitments for

subsequent or new phases could be made during the lapse.

Today's proposal would also move Sec. 93.102(c)(2) requirements to

Sec. 93.104(d) to limit redundancy and improve organization of the

conformity rule. This proposed organizational change would not change

the substantive requirements of Sec. 93.102(c)(2). The conformity rule

would continue to require a new conformity determination when a

significant change in a project's design concept and scope has

occurred, a supplemental environmental document for air quality

purposes is initiated, or three years have elapsed since the most

recent major step to advance a project. A major step is defined in the

conformity rule as ``* * * NEPA process completion; start of final

design; acquisition of a significant portion of the right-of-way; or

approval of plans, specifications and estimates * * * '' (40 CFR

93.104(d)).

Today's proposed changes are consistent with the latest EPA and DOT

guidance issued to implement the court decision. EPA and DOT consulted

on the development of these guidance documents

ormity rule as ``* * * NEPA process completion; start of final

design; acquisition of a significant portion of the right-of-way; or

approval of plans, specifications and estimates * * * '' (40 CFR

93.104(d)).

Today's proposed changes are consistent with the latest EPA and DOT

guidance issued to implement the court decision. EPA and DOT consulted

on the development of these guidance documents. On January 2, 2002, DOT

revised its guidance on how most projects that receive federal approval

or funding are affected during a lapse, and announced the release of

the new guidance in the Federal Register on February 7, 2002 (67 FR

5882). DOT issued supplemental guidance in May 2003 to clarify the

conformity requirements as they relate to FHWA/FTA's approval of a

final environmental impact statement and the NEPA process completion.

In addition, FTA issued guidance on April 9, 2003, that further

clarified which approvals are necessary for transit projects to proceed

during a lapse. DOT's revised guidance and memoranda supersede previous

guidance issued on June 18, 1999. The revised guidance clarifies that

only project phases that have met conformity requirements and received

federal approval or funding commitments before a lapse can proceed

during a lapse. See EPA's conformity website listed in section I.B.2.

to download an electronic copy of these guidance documents.

B. Why Are We Proposing These Changes?

upersede previous

guidance issued on June 18, 1999. The revised guidance clarifies that

only project phases that have met conformity requirements and received

federal approval or funding commitments before a lapse can proceed

during a lapse. See EPA's conformity website listed in section I.B.2.

to download an electronic copy of these guidance documents.

B. Why Are We Proposing These Changes?

Today's proposal is necessary to make the conformity regulation

consistent with the March 1999 court decision. The court held that

Sec. 93.102(c)(1) of the 1997 conformity rule was inconsistent with

the Clean Air Act since it allowed transportation projects that had

previously been found to conform and had completed the NEPA process

(``grandfathered'' projects) to receive further federal approvals or

funding commitments and advance towards construction during a lapse. In

effect, this provision allowed project phases that weren't approved

prior to a lapse to proceed during the lapse. The D.C. Circuit Court

ruled that Clean Air Act section 176(c)(2)(C) prohibits FHWA and FTA

from approving or funding new project phases in nonattainment and

maintenance areas in the absence of a currently conforming

transportation plan and TIP. Clean Air Act section 176(c)(2)(C)(i)

states that project approvals can only occur if ``such a project comes

from a conforming plan and program.''

EPA believes that its proposal to allow previously authorized

project phases to be implemented during a lapse is a reasonable

interpretation that is consistent with Clean Air Act section

176(c)(2)(C), since no federal approvals or funding commitments could

be made for new project phases during a lapse

ct approvals can only occur if ``such a project comes

from a conforming plan and program.''

EPA believes that its proposal to allow previously authorized

project phases to be implemented during a lapse is a reasonable

interpretation that is consistent with Clean Air Act section

176(c)(2)(C), since no federal approvals or funding commitments could

be made for new project phases during a lapse. The court did not

explicitly rule on the issue of how previously authorized right-of-way

(ROW) acquisition, final design, or construction projects are affected

during a lapse, but its decision leads EPA to the conclusion that a

project phase that has previously received all federal approvals and

funding commitments can be implemented during a conformity lapse.

Therefore, today's proposal provides consistency in implementing

all federal authorizations, as described in DOT's Federal Register

notice for its January 2, 2002, guidance. The proposal consistently

applies the principle that to ``fund'' a project actually means the

point at which DOT commits to funding a particular project phase (e.g.,

ROW acquisition).

This interpretation differs from what was outlined in DOT's June

18, 1999, guidance, which asserted that when the Clean Air Act states

that DOT cannot ``fund'' a project unless it conforms, ``fund''

actually meant only the point at which DOT committed to fund a project

for final construction. As a result, only projects that had received

funding commitments for final construction prior to a conformity lapse

could proceed during a lapse. However, under the 1999 guidance,

reimbursements for previously authorized ROW acquisition and final

design activities could not proceed during a lapse, resulting in the

federal government suspending its previously authorized commitments to

these activities

lt, only projects that had received

funding commitments for final construction prior to a conformity lapse

could proceed during a lapse. However, under the 1999 guidance,

reimbursements for previously authorized ROW acquisition and final

design activities could not proceed during a lapse, resulting in the

federal government suspending its previously authorized commitments to

these activities. As explained in DOT's January 2, 2002, revised

guidance, EPA and DOT now believe that suspending such authorized

commitments is not required by the Clean Air Act as interpreted in the

court's decision, and therefore, this proposal does not incorporate the

superseded June 1999 guidance.

C. What Is the Practical Impact of the Proposal?

This proposal would only affect those areas that are unable to meet

a conformity deadline and as a result enter into a conformity lapse.

Although even short-term conformity lapses can affect transportation

planning and project development processes, EPA anticipates that this

proposal would primarily affect areas that are in a conformity lapse

for a significant period of time. In contrast, this proposal would have

no impact in areas where a lapse is short or in lapsed areas that have

few transportation projects if no new FHWA/FTA non-exempt projects are

pending in these cases.

When an area has a conformity lapse, no new FHWA/FTA approvals or

funding commitments for subsequent or new project phases (i.e., NEPA,

final design, ROW acquisition, or construction) could be made. The only

projects that can receive further FHWA/FTA approvals or funding during

a plan and TIP conformity lapse are: (1) Projects exempt from the

conformity process; and (2) transportation control measures (TCMs) that

are specifically included in an approved state implementation plan

(SIP). Exempt projects are FHWA or FTA projects that are listed in

Sec. 93.126, Sec. 93.127, or Sec. 93.128 of the conformity rule

at can receive further FHWA/FTA approvals or funding during

a plan and TIP conformity lapse are: (1) Projects exempt from the

conformity process; and (2) transportation control measures (TCMs) that

are specifically included in an approved state implementation plan

(SIP). Exempt projects are FHWA or FTA projects that are listed in

Sec. 93.126, Sec. 93.127, or Sec. 93.128 of the conformity rule. A

conformity lapse ends when DOT makes a new transportation plan and TIP

conformity determination.

For FHWA-funded non-exempt projects, project phases (i.e., final

design, ROW acquisition, or construction) that received funding

commitments or an equivalent approval or authorization prior to a

conformity lapse may continue during the lapse. The execution of a

project agreement (which includes Federal approval of the plans,

specifications, and estimates) indicates funding commitment.

For FTA-funded non-exempt projects, the largest projects are

handled with a full funding grant agreement (FFGA). If an FFGA was

executed prior to a conformity lapse, the project can continue to

utilize all federal grant funds during the lapse. If the FFGA was not

completed by the date of the lapse, the project sponsor may only

complete the current phase of project development (e.g., final design

or land acquisition). Transit projects not handled with FFGAs may

proceed during a lapse if FTA approved a grant for construction or

vehicle acquisition prior to the lapse. If a construction grant was not

approved before the lapse, the project sponsor may only complete the

current phase of project development.

Subsequent phases of a project for which FHWA or FTA has not taken

an approval action or awarded a funding commitment may not proceed in

the absence of a conforming plan and TIP

approved a grant for construction or

vehicle acquisition prior to the lapse. If a construction grant was not

approved before the lapse, the project sponsor may only complete the

current phase of project development.

Subsequent phases of a project for which FHWA or FTA has not taken

an approval action or awarded a funding commitment may not proceed in

the absence of a conforming plan and TIP. For federal transportation

project phases not requiring a project specific project agreement/

authorization approval, the State or local transportation agency should

not take any action committing the State or local agency to proceed

with the project phase during a lapse unless the project phase has

already received full approval or authorization for funding before the

lapse.

Highway projects using design-build contracting can proceed with

all project phases that were included in the design-build contract if

FHWA authorized the contract and determined conformity before the lapse

(23 CFR 635.309). Similarly, transit projects using design-build

contracting can proceed with design and construction if a grant for

design and construction was made by FTA prior to the lapse.

Highway projects that require federal approval but no federal

funding can proceed during a lapse if all necessary approvals occurred

before the lapse. For example, consider a proposed regionally

significant state toll road that connects to a federal interstate

highway. The proposed road has received a conformity determination,

federal NEPA approval, FHWA approval of the new interstate access

point, and the project does not require FHWA approvals or funding

commitments for subsequent project phases. In this case where no

further FHWA actions are required, the project could proceed to

construction during a conformity lapse, as long as no additional

approvals by recipients of federal funds are needed. As always, the

project would continue to be considered in the regional emissions

analysis for the nonattainment or maintenance area

vals or funding

commitments for subsequent project phases. In this case where no

further FHWA actions are required, the project could proceed to

construction during a conformity lapse, as long as no additional

approvals by recipients of federal funds are needed. As always, the

project would continue to be considered in the regional emissions

analysis for the nonattainment or maintenance area. See Section IV.

``Non-Federal Projects'' of today's proposal for more information on

how non-federal project approvals are affected during a conformity

lapse.

Preliminary engineering for project development activities that are

necessary to assess social, economic, and environmental effects of the

proposed action or alternatives as part of the NEPA process for a non-

exempt project may continue during a lapse, since such activities are

exempt according to 40 CFR 93.126. However, FHWA or FTA cannot approve

a categorical exclusion (CE), finding of no significant impact (FONSI),

or a record of decision (ROD) for a non-exempt project during a

conformity lapse. The NEPA process for new projects can be completed

only for exempt projects and TCMs in an approved SIP during a

conformity lapse.

When an area is facing a lapse within six months, FHWA, FTA, and

EPA will meet and jointly evaluate the potential consequences of the

lapse and assess any concerns. FHWA, FTA, and EPA established

consultation procedures to be used prior to a lapse in the April 19,

2000, National Memorandum of Understanding (MOU). The MOU can be found

on EPA's conformity website as listed in section I.B.2. of this notice.

As described in the MOU, the FHWA, FTA, and EPA will meet at least 90

days before a lapse to determine which projects could receive approvals

or funding commitments before the lapse, which projects could

potentially be delayed, and which actions would be necessary to correct

the lapse.

IV. Using Motor Vehicle Emissions Budgets From Submitted SIPs for

Transportation Conformity Determinations

A. Background

n the MOU, the FHWA, FTA, and EPA will meet at least 90

days before a lapse to determine which projects could receive approvals

or funding commitments before the lapse, which projects could

potentially be delayed, and which actions would be necessary to correct

the lapse.

IV. Using Motor Vehicle Emissions Budgets From Submitted SIPs for

Transportation Conformity Determinations

A. Background

Control strategy SIPs and maintenance plans in ozone, CO, PM-10,

and NO2 areas create motor vehicle emission budgets for criteria

pollutants and/or their precursors. Control strategy SIPs include

reasonable further progress SIPs and attainment demonstrations. The

budget is the portion of the total allowable emissions that is

allocated to highway and transit vehicle use and emissions (40 CFR

93.101). In a conformity determination, the budget serves as a ceiling

on emissions from an area's planned transportation system.

If an area does not have a budget that applies to a particular

pollutant and standard it uses one or two of the emission reduction

tests, depending on its classification (see 40 CFR 93.119). Prior to

the 1997 conformity rule, if an area did not have a budget from an

approved SIP to use for conformity, it had to use the emission

reduction test(s). In 1995 and 1996, we consulted with conformity

implementers and determined that a budget in a submitted SIP is a more

relevant basis for determining conformity than the ``build/no-build''

test, one of the emission reduction tests. (See 62 FR 43781--4 for this

discussion.) In response to this input, we changed the rule in 1997 to

allow the budget test to be used when an area had a submitted, but not

yet approved, SIP. This change eliminated the use of the emission

reduction test(s) sooner for many areas, since they could use the

budget for conformity before the SIP is approved. Under the 1997 rule,

if EPA had not yet made an adequacy finding within 45 days of receiving

a SIP, the SIP's budgets automatically applied for conformity

dget test to be used when an area had a submitted, but not

yet approved, SIP. This change eliminated the use of the emission

reduction test(s) sooner for many areas, since they could use the

budget for conformity before the SIP is approved. Under the 1997 rule,

if EPA had not yet made an adequacy finding within 45 days of receiving

a SIP, the SIP's budgets automatically applied for conformity. The 1997

conformity rule also included provisions for EPA to review a budget(s)

from a submitted SIP for adequacy.

B. What Are We Proposing?

Today's proposal would continue to allow budgets to be used before

the SIP is approved, but would modify several provisions under 40 CFR

93.109 and 93.118, which are the sections of the conformity rule that

address the use of SIP budgets for conformity purposes.

First, the proposal would eliminate those provisions in Sec. Sec.

93.109 and 93.118(e) that require areas to use a budget from a

submitted SIP in 45 days if EPA has not yet made an adequacy finding.

Instead, we are proposing that before a budget from a submitted SIP can

be used for conformity, EPA must find it adequate using the criteria in

Sec. 93.118(e)(4). The budget could not be used until the effective

date of the Federal Register notice that announces that EPA has found

the budget adequate, which we propose would be 15 days from the date of

notice publication.

Second, today's proposal would incorporate into Sec. 93.118 of the

conformity rule the basic framework of the adequacy process described

in EPA's May 14, 1999, guidance. A description of the adequacy process

and the SIPs that are affected are found in section III.D and sections

III.F. and G. of this preamble, respectively.

EPA is also adding a minor clarification to a sentence in Sec.

93.118(e)(1). In paragraph (e), the rule explains that a submitted SIP

cannot override an approved SIP until the submitted SIP is approved

ibed

in EPA's May 14, 1999, guidance. A description of the adequacy process

and the SIPs that are affected are found in section III.D and sections

III.F. and G. of this preamble, respectively.

EPA is also adding a minor clarification to a sentence in Sec.

93.118(e)(1). In paragraph (e), the rule explains that a submitted SIP

cannot override an approved SIP until the submitted SIP is approved.

Today's change more fully describes this point: Budgets from a

submitted SIP cannot be used for conformity if an area already has an

approved SIP that addresses the same pollutant and Clean Air Act

requirement (e.g., rate-of-progress or attainment) and has budgets

established for the same year. However, budgets from a submitted SIP

are used for conformity (once they are adequate) if the submitted SIP's

budgets address either a different Clean Air Act requirement or are for

a different year than budgets in an approved SIP, i.e., the budgets are

from an ``initial SIP submission.'' Section III.F. includes further

explanation. Discussion of initial SIP submissions can also be found at

66 FR 50956--50957, the preamble of the proposed rule titled,

``Transportation Conformity Rule Amendments: Minor Revision of 18-Month

Requirement for Initial SIP Submissions and Addition of Grace Period

for Newly Designated Nonattainment Areas.''

Today's proposed changes to these sections are consistent with

procedures already in place as a result of EPA's May 14, 1999, guidance

issued to implement the court's decision. The guidance notified

stakeholders that budgets in submitted SIPs could be used for

conformity only after EPA has found them adequate. The guidance also

outlined a process for determining adequacy of budgets that includes an

opportunity for public comment. Today's proposal is consistent with

that guidance. Therefore, under this proposed rule existing adequacy

procedures would remain the same as they have been for the past several

years

ts in submitted SIPs could be used for

conformity only after EPA has found them adequate. The guidance also

outlined a process for determining adequacy of budgets that includes an

opportunity for public comment. Today's proposal is consistent with

that guidance. Therefore, under this proposed rule existing adequacy

procedures would remain the same as they have been for the past several

years.

We are not proposing any changes to the adequacy criteria in

today's proposal; the existing criteria are being retained as described

by the 1997 rule. The adequacy criteria were not affected by the court

decision. These criteria include consideration of the technical details

of the SIP, such as whether the budget is consistent with the SIP's

purpose and the area's emissions inventory for all sources, and whether

a clear relationship among the budget, control measures, and emissions

inventory is shown. The adequacy criteria also include procedural

criteria such as whether the SIP has been endorsed by the State

governor or designee, whether the SIP was subject to a public hearing,

and whether interagency consultation has occurred.

In addition to the adequacy criteria, the rule continues to provide

that reliance on a submitted budget for determining conformity is

deemed to be a statement by the MPO and DOT that they are not aware of

any information that would indicate that emissions consistent with such

a budget would cause or contribute to any new violation, increase the

frequency or severity of an existing violation, or delay timely

attainment of the relevant standards (Sec. 93.118(e)(6)). This

provision provides another important check that helps to ensure that

plans

ment by the MPO and DOT that they are not aware of

any information that would indicate that emissions consistent with such

a budget would cause or contribute to any new violation, increase the

frequency or severity of an existing violation, or delay timely

attainment of the relevant standards (Sec. 93.118(e)(6)). This

provision provides another important check that helps to ensure that

plans

and TIPs that conform to a submitted budget are consistent with the

Clean Air Act requirements, and reinforces EPA's position which has

been endorsed by a court that using an adequate budget for conformity

prior to full approval of a SIP is consistent with the Clean Air Act.

See 1000 Friends of Maryland v. Carol Browner, et al., 265 F.3d 216

(4th Cir. 2001).

Though today's proposal amends the rule language in Sec.

93.118(e)(3) to remove the reference that a budget must be used after

45 days if EPA has not made a finding, the main point of Sec.

93.118(e)(3) is retained. That is, a conformity determination based on

budgets that were found adequate remains valid even if EPA later, upon

further analysis, finds the budgets inadequate. The fact that new

information subsequently became available that changed the finding of

adequacy for the future does not affect the validity of a prior

conformity determination; a subsequent conformity determination would

have to take the new information into account in that only new,

adequate budgets could be used.

C. Why Are We Proposing These Changes?

alysis, finds the budgets inadequate. The fact that new

information subsequently became available that changed the finding of

adequacy for the future does not affect the validity of a prior

conformity determination; a subsequent conformity determination would

have to take the new information into account in that only new,

adequate budgets could be used.

C. Why Are We Proposing These Changes?

In its ruling, the court remanded 40 CFR 93.118(e)(1) to EPA for

further rulemaking consistent with the opinion. This section of the

conformity rule, among other things, had allowed submitted budgets to

be used in conformity determinations after 45 days even if EPA had not

made an adequacy finding on the submitted budgets. However, the court

stated that a budget could only be used for conformity purposes if EPA

had found it adequate.

The court stated specifically that ``where EPA fails to determine

the adequacy of motor vehicle emissions budgets in a SIP revision

within 45 days of submission, * * * there is no reason to believe that

transportation plans and programs conforming to the submitted budgets

``will not--(i) cause or contribute to any new violation of any

standard in any area; (ii) increase the frequency or severity of any

existing violation of any standard in any area; or (iii) delay timely

attainment of any standard * * *' 42 U.S.C. 7506(c)(1)(B).'' Therefore,

the court remanded section 93.118(e)(1) to EPA so we could harmonize it

with these Clean Air Act requirements.

In response to the court decision, EPA established the current

process for determining the adequacy of submitted SIPs in its May 14,

1999, guidance. This guidance has been fully operational since it was

issued and serves as the basis for this proposal. Under the current

guidance and proposed rule (Sec. 93.118(e)(1)), budgets from submitted

SIPs cannot be used in a conformity determination until EPA has found

them adequate

on, EPA established the current

process for determining the adequacy of submitted SIPs in its May 14,

1999, guidance. This guidance has been fully operational since it was

issued and serves as the basis for this proposal. Under the current

guidance and proposed rule (Sec. 93.118(e)(1)), budgets from submitted

SIPs cannot be used in a conformity determination until EPA has found

them adequate.

We believe that the court's direction on the use of submitted

budgets was strictly confined to a need to make an affirmative finding

on the adequacy of a submitted SIP's budgets before they can be used

for conformity purposes. The court remanded only the aspect of EPA's

regulations that allows the use of a budget from a submitted SIP which

EPA has not yet found adequate. The court did not remand EPA's

regulations at 40 CFR 93.118(e)(4) establishing criteria for finding a

budget adequate, 93.118(e)(6) requiring additional findings by Federal

agencies and MPOs where a conformity determination is made using a

budget from a submitted SIP, or any other parts of Sec. 93.118(e).

Therefore, EPA believes that conformity determinations consistent

with the proposed provisions and the adequacy process are consistent

with the Act's requirements in 42 U.S.C. 7506(c)(1)(B) and the court's

opinion. Further, as noted above, a second court of appeals recently

concluded that showing conformity to submitted SIPs in these

circumstances was not in violation of the Clean Air Act (1000 Friends

of Maryland v. Browner, supra). EPA continues to believe the adequacy

criteria in the conformity rule provide a sound basis for preliminarily

reviewing submitted motor vehicle emissions budgets for conformity

purposes prior to EPA's full approval action.

EPA's adequacy review of budgets from submitted SIPs is separate

from EPA's completeness review for purposes of SIP processing, and EPA

uses different criteria for each of these reviews

to believe the adequacy

criteria in the conformity rule provide a sound basis for preliminarily

reviewing submitted motor vehicle emissions budgets for conformity

purposes prior to EPA's full approval action.

EPA's adequacy review of budgets from submitted SIPs is separate

from EPA's completeness review for purposes of SIP processing, and EPA

uses different criteria for each of these reviews. Similarly, EPA's SIP

approval process requires a more detailed examination of the SIP's

control measures and technical analyses than the conformity adequacy

process. Although the adequacy criteria allow EPA to review submitted

budgets for conformity purposes, EPA recognizes that other elements

must also be in the SIP for it ultimately to be approved. EPA's

adequacy review should not be used to prejudge EPA's approval or

disapproval of the SIP, since additional information may be submitted

and more extensive review may change some conclusions. As we have

stated previously (62 FR 43782), EPA cannot fully ensure that a

submitted SIP is consistent with reasonable further progress,

attainment or maintenance until EPA has completed its formal review

process and the SIP has been approved or disapproved through notice-

and-comment rulemaking. Therefore, a budget that is found adequate in

our adequacy review could later be disapproved based on further

analysis when reviewed with the entire SIP submission.

D. EPA's Adequacy Process

onsistent with reasonable further progress,

attainment or maintenance until EPA has completed its formal review

process and the SIP has been approved or disapproved through notice-

and-comment rulemaking. Therefore, a budget that is found adequate in

our adequacy review could later be disapproved based on further

analysis when reviewed with the entire SIP submission.

D. EPA's Adequacy Process

1. What Is the General Process EPA Would Use To Examine Adequacy of

Budgets in a SIP?

Today's proposal is based on EPA's existing adequacy process

described in the May 14, 1999, guidance, and consists of three basic

steps: Public notification of SIP submission, a public comment period,

and EPA's adequacy finding. These three steps are described below. EPA

generally intends to review the adequacy of a newly submitted budget

through this process within 90 days of EPA's receipt of a full SIP

submission, however the adequacy review could take longer particularly

when EPA receives significant public comments.

Notification of SIP submissions: After a State officially submits a

control strategy SIP or maintenance plan to EPA, we would notify the

public by posting a notice on EPA's adequacy Web site and would attempt

to do so within 10 days of submission. EPA's adequacy Web site is the

central location for adequacy information for the entire U.S.

Currently, the Web site is found at http://www.epa.gov/otaq/traq/traqconf/adequacy.htm. We would consider a SIP submission to be

formally submitted on the date that the EPA regional office receives it

in full. If a member of the public would like to be notified when we

receive a relevant SIP submission for a particular State or area, he or

she should contact the EPA regional employee listed on the Web site for

that particular State. EPA's Web site provides EPA regional contact

information so that interested parties can arrange or discuss

notification processes

regional office receives it

in full. If a member of the public would like to be notified when we

receive a relevant SIP submission for a particular State or area, he or

she should contact the EPA regional employee listed on the Web site for

that particular State. EPA's Web site provides EPA regional contact

information so that interested parties can arrange or discuss

notification processes. For example, EPA could use postcards, letters,

email or phone calls to notify requesters, as agreed on by the

interested party and EPA. The adequacy Web site also includes

information on how to obtain a copy of a SIP submission under adequacy

review.

Public comment: A 30-day public comment period would start

immediately upon the posting of the notice on the EPA adequacy Web site

in either of the following cases: (1) If the State has made the entire

SIP submission electronically available to the public via a Web site,

electronic bulletin board, etc.; or (2) if no one has requested copies

of the SIP within 15 days after the date of EPA posting

notification. If the SIP submission is available via the internet

(electronically), EPA would include a link to the State Web site. In

the case where the SIP is not available via the internet or is only

available in part, if someone requests a paper copy and EPA receives

the request within the first 15 days, the 30-day public comment period

would restart on the date that EPA mails the requested copy. EPA is not

committing to make SIP submissions electronically available on our

adequacy Web site. Our Web site will state when the public comment

period begins and ends, and to whom to send comments. If someone

requests a copy of the SIP, the Web site would be updated to reflect

any extension of the public comment period

ment period

would restart on the date that EPA mails the requested copy. EPA is not

committing to make SIP submissions electronically available on our

adequacy Web site. Our Web site will state when the public comment

period begins and ends, and to whom to send comments. If someone

requests a copy of the SIP, the Web site would be updated to reflect

any extension of the public comment period.

EPA's adequacy determination: After a thorough review of all public

comments received and evaluation of whether the adequacy criteria have

been met, the appropriate EPA regional office would conclude that the

submitted SIP's budgets are adequate or inadequate and send a letter

indicating EPA's conclusions to the State or local air agency and other

relevant agencies such as the MPO and State DOT. The EPA regional

office would also mail or email a copy of the letter and response to

comments to others who request it.

The EPA regional office would also subsequently announce the

adequacy determination in the Federal Register. If EPA finds a budget

adequate, it can be used for conformity on the effective date of the

Federal Register notice, which would be 15 days after it is published.

We would post EPA's adequacy letter, our response to any comments, and

the Federal Register notice on the EPA adequacy Web site. Adequate

budgets must be used in all future conformity determinations after the

effective date of an adequacy finding; budgets cannot be used for

conformity once EPA finds them inadequate.

2. Will EPA's Adequacy Finding Always Be Announced in the Federal

Register?

Yes, EPA will always use the Federal Register to announce that

budgets are adequate or inadequate. However, in cases where EPA is

finding budgets adequate, we may use the proposed or final rulemaking

notice for a control strategy or maintenance plan to announce our

adequacy determination, instead of first sending a separate letter to

the relevant agencies and following it with a Federal Register notice

ill always use the Federal Register to announce that

budgets are adequate or inadequate. However, in cases where EPA is

finding budgets adequate, we may use the proposed or final rulemaking

notice for a control strategy or maintenance plan to announce our

adequacy determination, instead of first sending a separate letter to

the relevant agencies and following it with a Federal Register notice.

For example, if EPA is about to propose or finalize a rulemaking

action on a control strategy or maintenance plan at the point when we

are ready to announce our adequacy finding on this SIP, EPA could

announce its adequacy determination as part of the proposed or final

rulemaking notice. In this case, EPA would not send a letter to the

State or other agencies or publish a separate adequacy announcement in

the Federal Register. Instead, EPA would announce our adequacy finding

in the Federal Register through a proposed or final rulemaking for that

same SIP. We would also update the adequacy Web site to reflect this

finding.

EPA could also make an adequacy finding via a direct final approval

of a SIP. When EPA promulgates a direct final approval of a SIP, a

proposed approval and a direct final approval are published in the

Federal Register on the same date. The public has at least 30 days to

comment on EPA's action, and if EPA receives no adverse comments and no

other information or analysis changes EPA's position in that time

period, the approval becomes final 60 days after publication according

to the date indicated in the Federal Register notice. However, if

adverse comments are received or EPA's position changes as a result of

further information or analysis, the direct final approval is withdrawn

prior to its effective date. EPA would then consider the submitted

comments and address them in a final action just as we would for any

proposal

inal 60 days after publication according

to the date indicated in the Federal Register notice. However, if

adverse comments are received or EPA's position changes as a result of

further information or analysis, the direct final approval is withdrawn

prior to its effective date. EPA would then consider the submitted

comments and address them in a final action just as we would for any

proposal.

In cases where EPA would use a direct final rulemaking to make an

adequacy finding, the adequacy process would be substantively the same

as that which we have outlined in section III.D.1. EPA would indicate

that we are using the direct final rulemaking to announce our adequacy

finding in the Federal Register notices, and would also announce the

beginning of the public comment period on the adequacy Web site. The

public would have 30 days to comment on adequacy as well as on the

approvability of the SIP. If EPA received adverse comments, we would

withdraw the direct final rule and would address these comments in a

later final action on the SIP. We would also use the adequacy Web site

to inform the public when we have found the budgets adequate or if we

received comments that resulted in withdrawal of our direct final

approval.

When EPA employs a direct final rule that receives no adverse

comments, the budgets are found adequate and the SIP is approved on the

date indicated in the direct final Federal Register notices. That is,

the budgets in a SIP approved via a direct final approval can only be

used on or after the effective date of the direct final rule. This is

in contrast to the ``typical'' proposal and final rulemaking process,

where approved budgets can be used for conformity immediately upon

publication of the final rule. Direct final rules typically include a

30-day comment period followed by an additional 30-day period for EPA

to consider any comments received and withdraw the rule if necessary

before it takes effect

irect final rule. This is

in contrast to the ``typical'' proposal and final rulemaking process,

where approved budgets can be used for conformity immediately upon

publication of the final rule. Direct final rules typically include a

30-day comment period followed by an additional 30-day period for EPA

to consider any comments received and withdraw the rule if necessary

before it takes effect. Thus, budgets in a direct final rule can not be

used upon publication of the final action but may be used only after

the final rule becomes effective, because, in essence, EPA has not

taken the final action to approve these budgets until the effective

date.

3. Could EPA Parallel Process Its Adequacy Review?

Yes, EPA could parallel process the adequacy review if requested to

do so by a State. Under parallel processing, a State would submit its

proposed SIP to EPA, and the State and EPA would then request public

comment on the proposed SIP and the adequacy of the budgets included in

the SIP at the same time. If no significant adverse comments are

received at either the State or Federal levels, EPA could then make an

adequacy finding as soon as the State formally adopts the SIP and

submits it to EPA, as long as no substantive changes to the SIP have

occurred.

If there are any adverse comments sent either to the State or to

EPA, EPA would consider them in our adequacy decision, as described in

Sec. 93.118(e)(5) of the rule, and today's proposed Sec. 93.118(f).

Section 93.118(e)(5) states that EPA will review the State's

compilation of public comments and response to comments as part of its

adequacy decision. Today's proposed Sec. 93.118(f) includes a

provision for the public to comment directly to EPA on the adequacy of

a budget

sider them in our adequacy decision, as described in

Sec. 93.118(e)(5) of the rule, and today's proposed Sec. 93.118(f).

Section 93.118(e)(5) states that EPA will review the State's

compilation of public comments and response to comments as part of its

adequacy decision. Today's proposed Sec. 93.118(f) includes a

provision for the public to comment directly to EPA on the adequacy of

a budget.

In cases where we parallel process the adequacy of a SIP, we would

post a notice on the adequacy website that we are starting the adequacy

review process and taking comment on the adequacy of a budget or

budgets from a proposed SIP that a State is preparing to take to public

hearing. The website would include information on how to obtain a copy

of a SIP under adequacy review. Although the State would not have

formally submitted the SIP for our approval, we would begin to evaluate

the budgets in the proposed SIP for their adequacy. If the State adopts

and formally submits that SIP to us for approval and there have been no

changes that would affect the adequacy of the budgets, we could

complete the adequacy process quickly because we would have already

finished the public review portion of the process. However, if the

formal submission has changed significantly from the proposed

SIP in a way that affects the adequacy of a budget, the adequacy review

process would start over: EPA would announce that we have a submitted

SIP under adequacy review and reopen the comment period through

notification on the adequacy website.

4. Can EPA Change an Adequacy Finding?

Yes, EPA can change an adequacy finding from adequate to inadequate

or from inadequate to adequate. EPA would do so for a specific reason

such as receiving new information that affects our previous adequacy

finding. For example, EPA might change a finding if a State submits

more information after we've found a budget in a SIP submission to be

inadequate

4. Can EPA Change an Adequacy Finding?

Yes, EPA can change an adequacy finding from adequate to inadequate

or from inadequate to adequate. EPA would do so for a specific reason

such as receiving new information that affects our previous adequacy

finding. For example, EPA might change a finding if a State submits

more information after we've found a budget in a SIP submission to be

inadequate. If the State submits additional materials to clarify or

support the adequacy of the budget, we will treat this additional

information as a supplement to the SIP submission. In this situation,

we would post a notice that we have received new information on the

adequacy website and begin a new 30-day public comment period. After

reviewing any comments received, we would make a new finding, as

appropriate.

In the case where we find the budgets in a submitted SIP adequate

but later discover based on additional information or further review

that they do not meet the criteria for adequacy, we could change our

finding to inadequate. In these cases where EPA reverses its finding of

adequate to inadequate, EPA is proposing for the reasons explained

below to make our subsequent inadequacy finding apply immediately upon

EPA's written notification to the State and other relevant agencies,

such as the MPO and State DOT. In EPA's letter to the State we would

indicate that the finding of inadequacy applies as of the date of our

letter and we would explain why our finding has changed. We would also

begin another 30-day comment period to allow the public to consider the

new information that has caused EPA to reverse its finding to

inadequate. If, after consideration of any comments received, EPA still

believes that the submitted SIP is inadequate we would issue a second

Federal Register notice and update the adequacy website as appropriate

plain why our finding has changed. We would also

begin another 30-day comment period to allow the public to consider the

new information that has caused EPA to reverse its finding to

inadequate. If, after consideration of any comments received, EPA still

believes that the submitted SIP is inadequate we would issue a second

Federal Register notice and update the adequacy website as appropriate.

EPA is seeking comment on whether the public should be provided an

opportunity to comment on any new information before EPA can reverse an

adequacy determination to a finding of inadequacy, or after. In cases

where we change a finding from adequate to inadequate, we do not

believe that it is in the best interest of public health to delay our

inadequacy finding until after the public comment period has ended.

Rather, we believe that having our inadequacy finding apply immediately

is necessary to ensure that no further conformity determinations are

made using budgets that may not be protective of the air quality

standards. We should note, however, that if conformity of a

transportation plan or TIP had already been determined by DOT using a

budget during the time that it was adequate, the conformity

determination remains valid as provided by Sec. 93.118(e)(3) of the

current rule.

Finally, EPA notes that in certain circumstances it could be so

obvious that a budget has become inadequate that it would be

unnecessary to provide for the subsequent public comment at all. For

instance, if a state has submitted a new SIP indicating that the prior

SIP submission no longer provided for attainment, it would be clear

that the prior submission is inadequate. Under such circumstances, EPA

could proceed on a case by case basis to make a final inadequacy

determination explaining these facts and publish a Federal Register

notice of that determination.

E. Why Is EPA Using the Website Instead of the Federal Register To

Notify the Public in the Adequacy Process?

longer provided for attainment, it would be clear

that the prior submission is inadequate. Under such circumstances, EPA

could proceed on a case by case basis to make a final inadequacy

determination explaining these facts and publish a Federal Register

notice of that determination.

E. Why Is EPA Using the Website Instead of the Federal Register To

Notify the Public in the Adequacy Process?

Today's proposal would codify our adequacy process that has been in

effect since May 14, 1999, when we published guidance in response to

the court decision on this matter. In that guidance, one of the key

components of our process for reviewing the adequacy of a submitted SIP

budget is to notify the public when EPA regional offices receive a SIP,

and provide the public with an opportunity to comment on the submitted

SIP's budgets. In the guidance and in today's proposal we rely on our

website, rather than the Federal Register, as the primary means for

requesting public comment and updating the public on the status of our

adequacy review of submitted SIP budgets.

EPA previously concluded that the notification and comment

procedures of the Administrative Procedures Act (APA) do not apply to

the adequacy review process because adequacy determinations are carried

out on an informal case-by-case basis rather than through

rulemaking.\5\ The March 1999 court decision did not address this

aspect of the adequacy process. Therefore, EPA is not reopening this

legal conclusion in today's proposal. However, we believe that

providing some opportunity for public involvement adds value to our

adequacy review. Specifically, we believe public comment can assist us

in making more informed decisions regarding submitted budgets and their

ability to ensure that new transportation activities will not cause or

contribute to new violations, worsen existing violations, or delay

timely attainment of the national ambient air quality standards. Our

existing conformity regulations, at Sec

our

adequacy review. Specifically, we believe public comment can assist us

in making more informed decisions regarding submitted budgets and their

ability to ensure that new transportation activities will not cause or

contribute to new violations, worsen existing violations, or delay

timely attainment of the national ambient air quality standards. Our

existing conformity regulations, at Sec. 93.118(e)(5) of the current

rule, already require us to review and consider all comments received

by a State during its development of the SIP. The adequacy process

provides additional opportunity for comment directly to EPA through the

web process that focuses specifically on the question of whether the

SIP submission meets our adequacy criteria.

---------------------------------------------------------------------------

\5\ August 15, 1997, 62 FR 43782-43783.

---------------------------------------------------------------------------

The website gives EPA the ability to notify the public and solicit

comment without undue delay. The intent of the adequacy process is to

allow areas to use a budget from a SIP even before it is approved.

Since an emissions budget is a more appropriate measure for achieving

the air quality standards, we believe using it for a conformity

determination is preferable to using the emission reduction test(s).

Using the website allows EPA to meet the dual goals of offering the

opportunity for public comment and completing the adequacy review in a

timely way.

We are proposing to publish notice of our finding of adequacy or

inadequacy in the Federal Register, as well as on the adequacy Web

site, so that we can be sure the public is fully informed of our

finding. We are also proposing to make an adequacy finding effective 15

days after it is announced in the Federal Register so that the public

would be aware that a SIP budget has been found adequate before it is

used in a conformity determination.

F. What Typical SIP Submissions Will We Review for Adequacy?

on the adequacy Web

site, so that we can be sure the public is fully informed of our

finding. We are also proposing to make an adequacy finding effective 15

days after it is announced in the Federal Register so that the public

would be aware that a SIP budget has been found adequate before it is

used in a conformity determination.

F. What Typical SIP Submissions Will We Review for Adequacy?

In general, EPA adequacy reviews are conducted for SIPs that

contain motor vehicle emissions budgets, which include control strategy

SIPs (e.g., reasonable further progress SIPs, attainment

demonstrations) and maintenance plans. If there is no approved SIP that

contains a budget for the same Clean Air Act requirement, pollutant,

and year, a budget from a newly submitted SIP can be used for

conformity as of the effective date of EPA's adequacy finding.

Therefore, EPA will review the adequacy of a motor vehicle emissions

budget from an initial submission of a control strategy SIP or

maintenance plan. In addition, EPA will review the adequacy of a budget

from a

control strategy SIP or maintenance plan that is submitted to revise a

previously submitted, but not yet approved, SIP. The next few examples

illustrate these principles.

First, an area submits a SIP for a different year and Clean Air Act

requirement. The area has an approved attainment demonstration that

contains budgets for 2005 and subsequently submits a maintenance plan

for the same pollutant that contains budgets for 2015. Though the area

already has an approved budget for the year 2005, the maintenance plan

addresses a different Clean Air Act requirement and contains budgets

for a different year. Therefore in this case, EPA would review the 2015

budgets in the submitted maintenance plan for adequacy.

In a second example, an area submits new budgets for the same year,

but for a different Clean Air Act requirement

ugh the area

already has an approved budget for the year 2005, the maintenance plan

addresses a different Clean Air Act requirement and contains budgets

for a different year. Therefore in this case, EPA would review the 2015

budgets in the submitted maintenance plan for adequacy.

In a second example, an area submits new budgets for the same year,

but for a different Clean Air Act requirement. The area has an approved

rate-of-progress (ROP) SIP with budgets for the years 1999, 2002, and

2005 and submits an attainment demonstration with budgets for the year

2005. EPA would review the 2005 attainment budgets for adequacy,

because although ROP budgets already exist for the year 2005, the

submitted attainment budgets address a different Clean Air Act

requirement than the approved ROP budgets. Once the attainment budgets

are adequate, both the 2005 ROP budgets and the 2005 attainment budgets

must be met for the 2005 analysis year. For analysis years beyond the

2005 attainment year, however, only conformity to the 2005 attainment

budgets is required (i.e., conformity to the 2005 ROP budgets is not

required in years after the attainment year, once attainment budgets

are established).

In a third example, an area submits a revision to a previously

submitted SIP, prior to EPA's approval of the first submission. The

area submits an attainment demonstration and we find it adequate.

Before it is approved however, the State decides that a revision is

necessary and submits a revised attainment demonstration to EPA.

Because the first attainment demonstration had not been approved, EPA

would review the adequacy of the budget from the revised attainment

demonstration. If the revised budget is then found to be adequate, the

revised budget would replace the previous adequate budget for use in

future conformity determinations on the effective date of the new

adequacy finding.

One final example concerns an area with ``outyear'' budgets

t demonstration had not been approved, EPA

would review the adequacy of the budget from the revised attainment

demonstration. If the revised budget is then found to be adequate, the

revised budget would replace the previous adequate budget for use in

future conformity determinations on the effective date of the new

adequacy finding.

One final example concerns an area with ``outyear'' budgets. EPA

allows SIPs to establish budgets for conformity purposes for years

beyond the timeframe that the SIP normally addresses. In this example,

an area has an approved attainment demonstration with budgets for its

2005 attainment year. The approved attainment SIP also contains outyear

budgets for the year 2015. Subsequently, the area submits a maintenance

plan with budgets for the year 2015. Since the maintenance plan

addresses a different Clean Air Act provision than the attainment

demonstration, EPA would review the 2015 budgets from the submitted

maintenance plan for adequacy even though the area already has budgets

for the year 2015 in its attainment SIP. If EPA finds the maintenance

budgets adequate, then both the 2015 outyear budgets and the 2015

maintenance year budgets must be met for conformity. That is to say,

the 2015 outyear budgets from the attainment demonstration would

continue to exist and apply for conformity in years 2015 and beyond,

unless the State revises the attainment demonstration SIP to remove

them. The 2015 outyear budgets would continue to apply for conformity

until EPA approved the SIP revision proposing to remove the outyear

budgets.

EPA generally will not review the adequacy of a budget from a

submitted SIP that revises an existing approved SIP with budgets for

the same year and Clean Air Act requirement, because as a matter of law

a submitted SIP may not supersede an approved SIP for the same Clean

Air Act requirement, year, and pollutant. A budget from such a

submitted SIP revision would not apply for conformity until EPA

actually approves the revision

dequacy of a budget from a

submitted SIP that revises an existing approved SIP with budgets for

the same year and Clean Air Act requirement, because as a matter of law

a submitted SIP may not supersede an approved SIP for the same Clean

Air Act requirement, year, and pollutant. A budget from such a

submitted SIP revision would not apply for conformity until EPA

actually approves the revision.

Exceptions to this general rule are SIPs for which EPA specifically

limits the duration of its approval of the motor vehicle emissions

budgets until replacement budgets have been found adequate. One example

where EPA limited the duration of our approval was the recently

approved 1-hour ozone attainment demonstrations and maintenance plans

that relied on interim MOBILE5-based estimates of Federal Tier 2

standards (65 FR 6698). In the proposed approvals for these SIPs, EPA

proposed that because States could not accurately analyze emissions

from these standards with the MOBILE5 model, EPA would require States

to revise these SIPs with MOBILE6. EPA also proposed that our approval

of the MOBILE5-based budgets would be limited such that when the

MOBILE5-based budgets are revised using MOBILE6, the MOBILE6 budgets

could be used for conformity on the effective date of our adequacy

finding. MOBILE6 provides a more accurate estimate of the emission

benefits of the Tier 2 vehicle and fuel standards, and the revised

budgets should be used as soon as they are adequate. Therefore, EPA

will review the adequacy of the MOBILE6 budgets when these SIPs are

submitted since they will become effective once they are found adequate

under the terms of our limited approvals of the attainment

demonstrations.\6\ A second example of where EPA has limited the

duration of our approval is in the case of certain SIPs in the State of

California

ed as soon as they are adequate. Therefore, EPA

will review the adequacy of the MOBILE6 budgets when these SIPs are

submitted since they will become effective once they are found adequate

under the terms of our limited approvals of the attainment

demonstrations.\6\ A second example of where EPA has limited the

duration of our approval is in the case of certain SIPs in the State of

California. See 67 FR 69139 for further details on EPA's action that

limits our approval of these specific SIPs and allows submitted budgets

that have been found adequate to supersede previously approved budgets

for conformity.

---------------------------------------------------------------------------

\6\ For more information, see EPA's January 18, 2002, memorandum

titled, ``Policy Guidance on the Use of MOBILE6 for SIP Development

and Transportation Conformity,'' from John Seitz, Director, Office

of Air Quality Planning and Standards, and Margo Tsirigotis Oge,

Director, Office of Transportation and Air Quality, to EPA Regional

Air Division Directors.

---------------------------------------------------------------------------

G. Does EPA Review Adequacy of SIPs That Do Not Establish Specific

Budgets?

In addition to SIPs that establish a specific motor vehicle

emissions budget for a new year or Clean Air Act requirement, there are

other situations when EPA will conduct an adequacy review. In these

cases, we will use the same adequacy review process that we use for

SIPs that include specific budgets.

First, EPA will review the adequacy of limited maintenance plans.

Usually, a maintenance plan contains budgets for the last year of the

maintenance plan. If a maintenance plan does not explicitly identify

budgets, then EPA has said that the emissions projections for the last

year of the maintenance plan serve as the budgets (see the discussion

in the preamble to the November 24, 1993, conformity rule at 58 FR

62195)

e adequacy of limited maintenance plans.

Usually, a maintenance plan contains budgets for the last year of the

maintenance plan. If a maintenance plan does not explicitly identify

budgets, then EPA has said that the emissions projections for the last

year of the maintenance plan serve as the budgets (see the discussion

in the preamble to the November 24, 1993, conformity rule at 58 FR

62195). Limited maintenance plans, however, do not include budgets nor

even future motor vehicle emissions projections that could be

interpreted as budgets. Instead, a limited maintenance plan concludes

that the area will continue to maintain regardless of the quantity of

emissions from the on-road transportation sector; essentially, the

budget is unlimited. For limited maintenance plan submissions, EPA's

adequacy review will primarily focus on whether the area qualifies for

the applicable limited maintenance policies for ozone, CO, and PM-10

areas. In this case, a finding of adequacy means that the area does in

fact meet the criteria for submitting a limited maintenance plan. If

so, the area will be considered to automatically meet the budget test

for future conformity

determinations because the budget is essentially unlimited. For more

discussion of limited maintenance plans, please refer to 61 FR 36118

(the preamble of the July 9, 1996, proposed conformity rule).

Second, we will also review the adequacy of control strategy SIPs

and maintenance plans that do not establish budgets because they claim

that motor vehicle emissions are not a significant contributor to the

area's air quality problems. Areas submitting these plans are required

to demonstrate the insignificance of motor vehicle emissions based on a

number of factors. In these areas, our adequacy review will focus on

whether the SIP or maintenance plan demonstrates the claim of

insignificance. In this case, a finding of adequacy means that EPA

agrees that the motor vehicle emissions are insignificant

a's air quality problems. Areas submitting these plans are required

to demonstrate the insignificance of motor vehicle emissions based on a

number of factors. In these areas, our adequacy review will focus on

whether the SIP or maintenance plan demonstrates the claim of

insignificance. In this case, a finding of adequacy means that EPA

agrees that the motor vehicle emissions are insignificant. Additional

discussion of SIPs that explicitly demonstrate motor vehicles to be an

insignificant contributor can be found at 58 FR 62194 (November 24,

1993, final rule) and 61 FR 36118 (July 9, 1996, proposed rule).

In contrast, EPA will not review for adequacy a SIP that addresses

only a localized hot-spot nonattainment problem (for example, in a CO

area). These SIPs do not establish budgets and are not used as a basis

for a conformity test for regional emissions. These SIPs only address

localized emissions in areas where there is no regional air quality

problem.

V. Non-Federal Projects

A. What Are Non-Federal Projects?

Non-federal projects are projects that are funded or approved by a

recipient of federal funds designated under title 23 U.S.C. or the

Federal Transit Laws (49 U.S.C. Chapter 53) but that do not rely at all

on any FHWA/FTA funding or approvals. A State DOT or public transit

agency are examples of routine recipients of federal funds. The

conformity rule only applies to non-federal projects that are

considered regionally significant, in that these projects must be

included in a conforming transportation plan and TIP and/or the

regional emissions analysis supporting a conforming plan and TIP.

Regionally significant, non-federal projects are not, however, subject

to any of the requirements for project-level conformity, such as the

requirements for hot-spot analysis found at Sec. 93.116 and Sec.

93.123 of the conformity rule

n that these projects must be

included in a conforming transportation plan and TIP and/or the

regional emissions analysis supporting a conforming plan and TIP.

Regionally significant, non-federal projects are not, however, subject

to any of the requirements for project-level conformity, such as the

requirements for hot-spot analysis found at Sec. 93.116 and Sec.

93.123 of the conformity rule.

We encourage areas to use the interagency consultation process to

determine which entities are recipients of federal funds and whether a

project is regionally significant. The terms ``recipient of funds

designated under title 23 U.S.C. or the Federal Transit Laws'' and

``regionally significant project'' are defined under Sec. 93.101 of

the conformity rule.

B. What Are We Proposing?

EPA is proposing to amend Sec. 93.121(a) of the 1997 conformity

rule so that regionally significant non-federal projects can no longer

advance during a conformity lapse unless they have received all

necessary State and local approvals prior to the lapse. Under this

proposal, recipients of federal funds designated under title 23 U.S.C

or the Federal Transit Laws can not adopt or approve a regionally

significant, non-federal project unless it is included in a currently

conforming plan and TIP or in the regional emissions analysis

supporting a currently conforming plan and TIP.

By amending Sec. 93.121(a) as proposed, the conformity rule will

again be consistent with the previous requirements of our 1993 rule.

Today's proposal is also consistent with our May 14, 1999, guidance

implementing the court decision, and does not affect the current,

general implementation of non-federal projects.

C. Why Are We Proposing This Change?

ting a currently conforming plan and TIP.

By amending Sec. 93.121(a) as proposed, the conformity rule will

again be consistent with the previous requirements of our 1993 rule.

Today's proposal is also consistent with our May 14, 1999, guidance

implementing the court decision, and does not affect the current,

general implementation of non-federal projects.

C. Why Are We Proposing This Change?

In its ruling, the court found Sec. 93.121(a)(1) of the 1997

conformity rule, that allowed State or local approval of transportation

projects in the absence of a currently conforming plan/TIP, to be in

violation of section 176(c)(2)(C) of the Clean Air Act. In its ruling

the court asserted that all non-exempt projects subject to the

conformity rule, including regionally significant non-federal projects,

must come from a conforming plan and TIP (or their supporting regional

emissions analysis). However, the court also noted that once a non-

federal project receives all appropriate State or local approvals, it

need not meet any further conformity requirements.

D. At What Point Is a Regionally Significant Non-Federal Project

``Approved''?

The definition of non-federal project ``approval'' is decided on an

area-specific basis at the State and local level through the

interagency consultation process, and should be formalized in the

area's ``conformity SIP.'' Conformity SIPs are required by 40 CFR

51.390, and include area-specific conformity procedures tailored to

State and local agency needs and consistent with our federal

requirements for conformity. Conformity SIPs do not contain motor

vehicle emissions budgets. If EPA has not yet approved a conformity SIP

for an area, the interagency consultation process should be used to

determine the point of approval for non-federal projects

FR

51.390, and include area-specific conformity procedures tailored to

State and local agency needs and consistent with our federal

requirements for conformity. Conformity SIPs do not contain motor

vehicle emissions budgets. If EPA has not yet approved a conformity SIP

for an area, the interagency consultation process should be used to

determine the point of approval for non-federal projects.

EPA discussed defining non-federal project ``approval'' as a

national matter in the preamble to the November 24, 1993,

transportation conformity rule: ``EPA believes that adoption/approval

is never later than the execution of a contract for site preparation or

construction. Adoption/approval will often be earlier, for example,

when an elected or appointed commission or administrator takes a final

action allowing or directing lower-level personnel to proceed'' (58 FR

62205, November 24, 1993). Some examples of definitions used by areas

to identify the point of final adoption/approval for a regionally

significant highway or transit project include, but are not limited to,

one of the following actions:

(a) The final policy board action or resolution that is necessary

for a regionally significant project to proceed;

(b) Administrative permits issued under the authority of the

agency, policy board, or commission for a regionally significant

project;

(c) The execution of a contract to construct, or any final action

by an elected or appointed commission or administrator directing or

authorizing the commencement of construction of a regionally

significant project; or

ionally significant project to proceed;

(b) Administrative permits issued under the authority of the

agency, policy board, or commission for a regionally significant

project;

(c) The execution of a contract to construct, or any final action

by an elected or appointed commission or administrator directing or

authorizing the commencement of construction of a regionally

significant project; or

(d) Providing the grants, loans or similar financial support,

necessary for the construction of a regionally significant project.

EPA believes that it is appropriate to define the point at which

project approval occurs through the interagency consultation process,

because areas have varying State and local requirements for determining

when projects are approved. Specific questions about how a particular

area defines the point of adoption/approval for non-federal projects

should be directed to the appropriate local or State air or

transportation agency.

Finally, as stated above, a regionally significant non-federal

project must be included in a currently conforming transportation plan

and TIP, or be included in the supporting regional emissions analysis

for a conforming plan and TIP, to be approved.

VI. Conformity Consequences of SIP Disapprovals

A. What Are the Conformity Consequences of EPA Disapproving a Control

Strategy SIP Without a Protective Finding?

When EPA disapproves a control strategy SIP, we may issue a

protective

a currently conforming transportation plan

and TIP, or be included in the supporting regional emissions analysis

for a conforming plan and TIP, to be approved.

VI. Conformity Consequences of SIP Disapprovals

A. What Are the Conformity Consequences of EPA Disapproving a Control

Strategy SIP Without a Protective Finding?

When EPA disapproves a control strategy SIP, we may issue a

protective

finding for conformity purposes if the submitted SIP contains adopted

control measures, or written commitments to adopt enforceable control

measures, that fully satisfy the emission reduction requirements

relevant to the statutory provision for which the SIP was submitted

(see Sec. 93.101 of the conformity rule for the definition of the term

``protective finding''). A control strategy SIP that is disapproved

with a protective finding generally possesses deficiencies such as a

failure to include all control measures in a fully adopted, enforceable

form. Such SIPs are not fully acceptable for SIP purposes, but are

sufficient for conformity purposes since the State has adopted or

committed to all measures necessary to meet all applicable SIP

requirements.

In contrast, we will disapprove a submitted SIP without giving it a

protective finding if it does not contain enough emission reduction

measures, or commitments to these measures, to achieve its specific

purpose of either demonstrating further progress or attainment.

In situations where EPA disapproves a control strategy SIP with a

protective finding, the submitted motor vehicle emissions budgets can

still be used in future conformity determinations. Conversely, if the

EPA disapproves a SIP without giving it a protective finding the

budgets cannot be used for conformity upon the effective date of EPA's

disapproval action.

Control strategy SIPs include reasonable further progress SIPs and

attainment demonstrations

th a

protective finding, the submitted motor vehicle emissions budgets can

still be used in future conformity determinations. Conversely, if the

EPA disapproves a SIP without giving it a protective finding the

budgets cannot be used for conformity upon the effective date of EPA's

disapproval action.

Control strategy SIPs include reasonable further progress SIPs and

attainment demonstrations. The 1997 transportation conformity rule

created a 120-day grace period following our disapproval of a control

strategy SIP without a protective finding, after which conformity

freezes. A conformity ``freeze'' means that only projects in the first

three years of the transportation plan and TIP can proceed. No new

plans, TIPs, or plan/TIP amendments can be found to conform during a

conformity freeze. The transportation plan and TIP remain frozen until

a new control strategy implementation plan fulfilling the same Clean

Air Act requirement as that which EPA disapproved is submitted, and EPA

finds the motor vehicle emissions budgets adequate for conformity.

Failure to submit a new control strategy implementation plan within two

years of the effective date of EPA's disapproval will result in the

imposition of highway sanctions and a lapse of conformity. However, a

conformity lapse could occur sooner, if during a freeze the

transportation plan or TIP expires. We should also note that a

conformity freeze does not result from EPA's disapproval of a

maintenance plan, as the Clean Air Act does not require nonattainment

areas that have successfully demonstrated achievement of a given air

quality standard to submit this type of air quality plan unless they

request redesignation to attainment; i.e., such submissions are

discretionary. See the preamble to the 1997 conformity rule (62 FR

43796-43797) for more information about SIP disapprovals, protective

findings, and conformity freezes.

B. What Are We Proposing?

as that have successfully demonstrated achievement of a given air

quality standard to submit this type of air quality plan unless they

request redesignation to attainment; i.e., such submissions are

discretionary. See the preamble to the 1997 conformity rule (62 FR

43796-43797) for more information about SIP disapprovals, protective

findings, and conformity freezes.

B. What Are We Proposing?

We are proposing to change the point at which conformity

consequences apply when EPA disapproves a control strategy SIP without

a protective finding. Specifically, we are proposing to delete the 120-

day grace period from Sec. 93.120(a)(2) of the conformity rule, so

that a conformity freeze would occur immediately upon the effective

date of EPA's final disapproval.

Today's proposal, however, retains the 1997 conformity rule's

flexibility that aligned conformity lapses with Clean Air Act highway

sanctions. Like the 1997 rule, conformity of the plan/TIP would lapse

when highway sanctions are imposed (usually two years after the

effective date of EPA's final disapproval) as a result of a control

strategy SIP disapproval, or when the applicable update of the plan

and/or TIP was required under the transportation planning regulations,

whichever comes first. See sections II. ``Federal Projects'' and IV.

``Non-federal Projects'' of this proposal for more details on what

projects can advance during a conformity lapse.

Finally, this proposal does not impact the 1997 conformity rule's

provisions for SIP disapprovals with a protective finding. Conformity

consequences of control strategy SIP disapprovals with a protective

finding would not occur unless highway sanctions are imposed; i.e.,

conformity of an area's plan and TIP generally would not lapse until

two years after the effective date of EPA's disapproval action with a

protective finding.

C. Why Are We Proposing This Change?

ons for SIP disapprovals with a protective finding. Conformity

consequences of control strategy SIP disapprovals with a protective

finding would not occur unless highway sanctions are imposed; i.e.,

conformity of an area's plan and TIP generally would not lapse until

two years after the effective date of EPA's disapproval action with a

protective finding.

C. Why Are We Proposing This Change?

In its ruling, the court found Sec. 93.120(a)(2) of the 1997

conformity rule to be in violation of the Clean Air Act, section

176(c)(1), and remanded it to EPA for further rulemaking. Specifically,

the court said that where EPA disapproves a SIP without a protective

finding there is no basis to believe that conformity of transportation

plans and TIPs to the submitted budgets in the disapproved SIP will not

cause or contribute to new violations, increase the frequency or

severity of existing violations, or delay timely attainment of the air

quality standards.

Under Sec. 93.120(a)(2) of the current rule, if EPA disapproved a

submitted SIP or SIP revision without a protective finding, areas could

have used the 120-day grace period to complete a conformity

determination that was already in progress, and therefore experience

minimal disruption to the transportation planning process. The court

felt that this grace period was not authorized by the statute because

it would allow conformity to be demonstrated to a SIP that was deemed

not protective of the air quality standards.

Therefore, after thorough consideration of the court's ruling, we

are proposing to eliminate the 120-day grace period from the conformity

rule; this change to the rule is consistent with our May 14, 1999,

guidance implementing the court decision.

D. What Is the Practical Impact of This Change?

conformity to be demonstrated to a SIP that was deemed

not protective of the air quality standards.

Therefore, after thorough consideration of the court's ruling, we

are proposing to eliminate the 120-day grace period from the conformity

rule; this change to the rule is consistent with our May 14, 1999,

guidance implementing the court decision.

D. What Is the Practical Impact of This Change?

EPA anticipates minimal practical impacts from this proposed rule

change. Since promulgating the 1997 conformity rule amendments, EPA has

disapproved control strategy SIPs without a protective finding in only

three instances and has no reason to believe that the future number of

SIP disapprovals will significantly increase. Therefore, we believe

this proposed rule will impact very few areas as did the guidance.

We also believe that the overall purpose of the 120-day grace

period, that is, to minimize disruption to the transportation planning

process, can still be achieved to an extent under this proposal. The

notice-and-comment rulemaking process for disapproving SIPs provides

transportation planners with advanced notice of when a SIP disapproval

without a protective finding will occur. Prior to a conformity freeze,

EPA proposes disapproval, provides for public comment, and then issues

a final disapproval notice only after thorough consideration of any

comments received has been completed. A proposed disapproval would

address whether or not EPA plans to issue a protective finding for the

SIP, so that transportation agencies would know well in advance if a

conformity freeze is a possibility. This process generally provides

sufficient notice for transportation agencies to prepare for the

consequences of a disapproval without a protective finding by, for

example, quickly completing any pending conformity determinations as

appropriate.

plans to issue a protective finding for the

SIP, so that transportation agencies would know well in advance if a

conformity freeze is a possibility. This process generally provides

sufficient notice for transportation agencies to prepare for the

consequences of a disapproval without a protective finding by, for

example, quickly completing any pending conformity determinations as

appropriate.

In addition, EPA has administrative discretion, where appropriate,

to make disapprovals of control strategy SIPs effective 60-90 days

after the publication of the disapproval in the Federal Register. There

may be some situations where delaying the effective date for a short

period of time beyond the usual 30 days is appropriate, for example,

when transportation agencies are very close to completing a conformity

determination that was well underway before EPA completed a SIP

disapproval. Transportation plan and TIP updates and amendments must

meet transportation planning and conformity requirements and undergo

public review and comment; these processes typically require a

significant amount of time. A relatively short delayed effective date

could assist in finalizing the remaining administrative requirements

for a determination that is nearing completion at the time of EPA's

published notice for disapproval.

Sufficient notice also occurs in the limited case where a

conditional SIP approval converts to disapproval without a protective

finding. Unlike other types of SIP actions, conditional approvals

automatically convert to SIP disapprovals if the condition of EPA's

approval is not met within a fixed period not to exceed one year. In

these cases, a conformity freeze would begin immediately upon the

effective date of EPA's Federal Register notice of the conversion of a

conditional approval to a disapproval without a protective finding

like other types of SIP actions, conditional approvals

automatically convert to SIP disapprovals if the condition of EPA's

approval is not met within a fixed period not to exceed one year. In

these cases, a conformity freeze would begin immediately upon the

effective date of EPA's Federal Register notice of the conversion of a

conditional approval to a disapproval without a protective finding.

Therefore, conditional approvals, by their very nature, inform

transportation agencies well in advance that future conformity

consequences could result if the conditions of the approval are not

met. Because transportation agencies would be aware of potential

conformity impacts generally at least one year before they could occur,

EPA believes that there will be minimal practical impact of not

providing a delayed effective date in these cases.

VII. Safety Margins

A. What Is a Safety Margin?

A safety margin is the amount by which the total projected level of

emissions from all sources identified in a SIP for a given pollutant

are less than the total emissions that would, at a minimum, satisfy the

applicable Clean Air Act requirements for reasonable further progress,

attainment or maintenance. For example, if an area projects that it

will emit a total of 300 tons per day (tpd) of carbon monoxide (CO)

from all sources, but the SIP demonstrates that the area can emit up to

350 tpd of CO and still attain the air quality standard, the area has a

safety margin of 50 tpd. In this example, CO emissions are estimated

from all sources, including: Large stationary sources, such as steel

mills; area sources, such as wood-burning stoves; on-road mobile

sources, such as cars and trucks; and off-road mobile sources, such as

construction and farm equipment. This area could allocate, through a

revision to its SIP, all or some portion of the 50 tpd safety margin to

their motor vehicle emissions budget for future conformity

determinations, if desired.

B. What Are We Proposing?

eel

mills; area sources, such as wood-burning stoves; on-road mobile

sources, such as cars and trucks; and off-road mobile sources, such as

construction and farm equipment. This area could allocate, through a

revision to its SIP, all or some portion of the 50 tpd safety margin to

their motor vehicle emissions budget for future conformity

determinations, if desired.

B. What Are We Proposing?

We are proposing to delete Sec. 93.124(b) of the conformity rule,

that provided a narrowly targeted flexibility to areas with SIPs that

had been submitted prior to the original publication date of the

initial November 24, 1993 conformity rule. Under that provision, if the

approved SIP had included a safety margin, but did not specify how the

safety margin was to be used, an area could submit a revision to the

SIP and specifically allocate all or a portion of the safety margin to

the SIP's motor vehicle emissions budget(s). The 1997 rule allowed this

SIP revision to become effective for conformity purposes before the

revision had been approved by EPA. EPA is not aware of any

nonattainment or maintenance areas that are currently affected by the

elimination of this flexibility.

C. Why Are We Proposing This Change?

The court decision found that Sec. 93.124(b) violates the Clean

Air Act because it allows a submitted but unapproved SIP revision to

supersede an approved SIP. The court ruled that EPA must fully approve

these safety margin allocations into the SIP before they can be used

for conformity.

D. Can Safety Margins Still Be Allocated to Motor Vehicle Emissions

Budgets for Use in Conformity Determinations?

t decision found that Sec. 93.124(b) violates the Clean

Air Act because it allows a submitted but unapproved SIP revision to

supersede an approved SIP. The court ruled that EPA must fully approve

these safety margin allocations into the SIP before they can be used

for conformity.

D. Can Safety Margins Still Be Allocated to Motor Vehicle Emissions

Budgets for Use in Conformity Determinations?

Yes. Although the court eliminated a narrowly targeted flexibility

related to the use of safety margins in previously approved SIPs in

Sec. 93.124(b), the majority of areas that have allocated safety

margins to their emissions budgets after November 24, 1993, are not

affected by the court's ruling. For most of these areas, either EPA has

already approved their safety margin allocations or they had no

previously approved SIP. In general, areas that do not have approved

SIPs can use submitted safety margins in conformity determinations once

EPA finds the submitted SIP (and safety margin) adequate. Areas with

approved SIPs that want to reallocate their safety margin for

conformity purposes can do so once EPA has approved a SIP revision that

specifically allocates all or a portion of the safety margin to an

emissions budget.

VIII. Streamlining the Frequency of Conformity Determinations

In addition to those provisions directly affected by the U.S. Court

of Appeals decision, EPA is also proposing several changes to other

provisions of the conformity regulation in this rulemaking. One of

these additional proposals would affect several provisions under 40 CFR

93.104, the section of the rule that describes when conformity

determinations must be made for transportation plans, TIPs, and

projects. In the first conformity rule proposal made in January 1993,

we stated, ``EPA believes conformity determinations should be made

frequently enough to ensure that the conformity process is meaningful

tional proposals would affect several provisions under 40 CFR

93.104, the section of the rule that describes when conformity

determinations must be made for transportation plans, TIPs, and

projects. In the first conformity rule proposal made in January 1993,

we stated, ``EPA believes conformity determinations should be made

frequently enough to ensure that the conformity process is meaningful.

At the same time, EPA believes it is important to limit the number of

triggers for conformity determinations in order to preserve the

stability of the transportation planning process'' (58 FR 3775). EPA

continues to have these dual goals. Today we are proposing to eliminate

some of the frequency requirements found in Sec. 93.104, and

streamline others. EPA believes that our proposal would simplify the

current conformity requirements without compromising the benefits of

the conformity program.

Under today's proposal EPA concludes that conformity determinations

will continue to be required frequently enough to ensure that the

process is meaningful and consistent with the Clean Air Act. EPA is not

proposing to change the requirements to determine conformity of new or

revised plans, TIPs, and projects before they can be adopted, and the

requirement to determine conformity of transportation plans and TIPs at

least every three years remains, as required by section 176(c) of the

Clean Air Act. EPA proposes to eliminate only those frequency

requirements which are not required by the Clean Air Act and which now

we believe are either outdated or redundant with other requirements.

A. Eliminating the Requirement for Conformity of the TIP Within Six

Months of the Transportation Plan

First, we propose to eliminate Sec. 93.104(c)(4), which requires

an MPO and DOT to determine conformity of the TIP within six months of

the date that

requirements which are not required by the Clean Air Act and which now

we believe are either outdated or redundant with other requirements.

A. Eliminating the Requirement for Conformity of the TIP Within Six

Months of the Transportation Plan

First, we propose to eliminate Sec. 93.104(c)(4), which requires

an MPO and DOT to determine conformity of the TIP within six months of

the date that

DOT determined conformity of the transportation plan. We propose to

remove the six-month conformity requirement for TIPs because we believe

this requirement is not necessary for ensuring air quality goals given

other existing transportation planning and conformity requirements, as

described below. When we initially proposed this requirement, we

anticipated that updating the TIP to match a revised plan would not

otherwise occur. In the initial January 1993 transportation conformity

proposal, we stated, ``EPA's proposal allows a reasonable interval of

six months after a plan is amended or a new plan is adopted during

which the TIP could be revised and a new conformity determination made

by the MPO and DOT'' (58 FR 3775). Also, in the proposal to the 1997

conformity rule, we stated that ``this requirement should be retained

because of ISTEA's (and hence conformity's) expectation that the TIP

will flow from, and be consistent with, the transportation plan'' (July

9, 1996; 61 FR 36129).

However, EPA now believes that Sec. 93.104(c)(4) is unnecessary

given other requirements and actual experience in implementing

conformity. The TIP must already be consistent with the plan according

to 23 U.S.C. 134(h)(3)(C), so plans and TIPs should always include the

same projects for years that are covered by both planning documents.

This statutory provision is also found in DOT's metropolitan planning

regulations at 23 CFR 450.324(f)(2). Because of this requirement, in

practice areas typically revise and determine conformity of the plan

and TIP at the same time

th the plan according

to 23 U.S.C. 134(h)(3)(C), so plans and TIPs should always include the

same projects for years that are covered by both planning documents.

This statutory provision is also found in DOT's metropolitan planning

regulations at 23 CFR 450.324(f)(2). Because of this requirement, in

practice areas typically revise and determine conformity of the plan

and TIP at the same time. In addition, since the TIP is a subset of the

plan, the regional emissions analysis for the plan includes all of the

projects in the TIP. Therefore, the air quality impacts of the TIP are

essentially assured when conformity of the plan is demonstrated.

Furthermore, the current conformity rule contains other frequency

requirements under Sec. 93.104 that ensure that new federally-funded

or approved transportation activities are consistent with clean air

goals before they are funded or approved. Such requirements include the

requirement to determine conformity of new or revised plans, TIPs, and

projects before they can be adopted, and the requirement to determine

conformity of transportation plans and TIPs at least every three years.

As a result of these existing transportation planning and conformity

requirements, we believe that today's proposal to eliminate the

specific provision that requires conformity of the TIP to be determined

within six months of determining conformity of the plan would work to

simplify the existing conformity rule without compromising its

benefits.

B. Streamlining the 18-Month SIP Triggers for New Conformity

Determinations

transportation planning and conformity

requirements, we believe that today's proposal to eliminate the

specific provision that requires conformity of the TIP to be determined

within six months of determining conformity of the plan would work to

simplify the existing conformity rule without compromising its

benefits.

B. Streamlining the 18-Month SIP Triggers for New Conformity

Determinations

EPA is also proposing to make several rule revisions to streamline

Sec. 93.104(e), which requires new conformity determinations to be

made within 18 months of certain SIP actions, or ``triggers.'' EPA

believes that some of the current SIP triggers for conformity can be

eliminated altogether, and some of them can be simplified to improve

implementation of the conformity program without any adverse

consequences in assuring that transportation activities conform to air

quality plans.

Specifically, we propose to eliminate Sec. 93.104(e)(1). This

provision required all nonattainment and maintenance areas to determine

conformity within 18 months of November 24, 1993, which was the date

that EPA initially promulgated the conformity rule (58 FR 62188). At

this point, this requirement is no longer relevant for any area and we

propose to remove it from the rule for clarity.

EPA is not proposing any changes to Sec. 93.104(e)(2), as this

section was recently updated in a final rule published August 6, 2002

(67 FR 50808). The August 2002 rule realigned the 18-month conformity

requirement for initial SIP submissions by requiring a conformity

determination within 18 months of the effective date of EPA's adequacy

finding on the motor vehicle emissions budgets in an initial SIP

submission.

EPA proposes two changes to Sec. 93.104(e)(3), the requirement to

determine conformity within 18 months of EPA's approval of a SIP that

establishes or revises a motor vehicle emissions budget. First, we

propose that this 18-month clock would begin on the effective date of

EPA's approval of the SIP

of EPA's adequacy

finding on the motor vehicle emissions budgets in an initial SIP

submission.

EPA proposes two changes to Sec. 93.104(e)(3), the requirement to

determine conformity within 18 months of EPA's approval of a SIP that

establishes or revises a motor vehicle emissions budget. First, we

propose that this 18-month clock would begin on the effective date of

EPA's approval of the SIP. This proposed clarification will resolve an

ambiguity in the current rule as to whether this 18-month clock begins

on the date that the Federal Register publishes the approval notice or

the effective date of that notice. This proposed change would also make

Sec. 93.104(e)(3) consistent with Sec. 93.104(e)(2), which requires

that conformity be determined within 18 months of the effective date of

EPA's adequacy finding. Likewise, this change would be consistent with

our proposed revision to Sec. 93.120, which would require the

consequences of a SIP disapproval to apply upon the effective date of

EPA's disapproval. (See section V. ``Conformity Consequences of SIP

Disapprovals'' for the discussion of EPA's proposed change to Sec.

93.120.) Having all of these requirements apply as of the effective

date of the relevant EPA action would provide consistency, avoid

confusion and thus benefit planners in implementing these specific

requirements.

The second change we propose to Sec. 93.104(e)(3) is to require a

conformity determination within 18 months of EPA's approval of a SIP

that affects a budget only when a conformity determination has not

already been made using the budgets from the newly-approved SIP. That

is, if an area determined conformity using adequate budgets from a

submitted SIP, and those budgets had not changed when EPA subsequently

approved the submitted SIP, then the area would not have to redetermine

conformity within 18 months of EPA's approval of the SIP

ects a budget only when a conformity determination has not

already been made using the budgets from the newly-approved SIP. That

is, if an area determined conformity using adequate budgets from a

submitted SIP, and those budgets had not changed when EPA subsequently

approved the submitted SIP, then the area would not have to redetermine

conformity within 18 months of EPA's approval of the SIP. EPA believes

that if the approved budgets have already been used in a conformity

determination, there is no added environmental benefit in requiring

another conformity determination to be made within 18 months of EPA's

approval of a SIP that contains these same budgets. EPA notes that

budgets are unchanged if they are for the same pollutant or precursor,

the same quantity of emissions, and the same year.

EPA also proposes to eliminate Sec. 93.104(e)(4), which requires a

conformity determination to be made within 18 months of EPA's approval

of a SIP that adds, deletes, or changes a TCM. EPA believes that this

requirement is redundant with the requirements in Sec. Sec.

93.104(e)(2) and (3), and therefore, is unnecessary. That is, if a SIP

adds, deletes, or changes a TCM and that addition, deletion, or change

affects a budget in a SIP, then a new conformity determination would be

triggered by either an adequacy finding on the budget in the submitted

SIP (if it is an initial SIP) under Sec. 93.104(e)(2), or EPA's

approval of the SIP (if the budget has not already been used in a

conformity determination) under Sec. 93.104(e)(3). If the addition,

deletion, or change to a TCM did not affect any applicable budget, then

EPA concludes that a new conformity determination would not be needed,

since such a SIP revision would not result in any new air quality

information (i.e., a new budget) necessary to include in the

transportation planning and conformity processes.

Finally, EPA proposes two changes to Sec

c. 93.104(e)(3). If the addition,

deletion, or change to a TCM did not affect any applicable budget, then

EPA concludes that a new conformity determination would not be needed,

since such a SIP revision would not result in any new air quality

information (i.e., a new budget) necessary to include in the

transportation planning and conformity processes.

Finally, EPA proposes two changes to Sec. 93.104(e)(5), which

requires a new conformity determination within 18 months of EPA's

promulgation of a

federal implementation plan (FIP). First, we propose to start the clock

for this requirement on the effective date of EPA's promulgation of a

FIP, to be consistent with the start date of the other SIP triggers of

conformity discussed above. Second, EPA proposes to delete the phrase

``or adds, deletes, or changes TCMs,'' for the same reasons that we

propose to delete Sec. 93.104(e)(4) as described above. Again, EPA

believes that the purpose of this provision will be adequately served

by the requirement to show conformity after EPA promulgation of a FIP

containing new budgets, or alternatively, the provision would be

unnecessary if no budget changes are made.

IX. Latest Planning Assumptions

A. What Are We Proposing?

We are proposing to amend Sec. 93.110(a) to change the point in

the conformity process when the latest planning assumptions are

determined. The proposal would allow conformity determinations to be

based on the latest planning assumptions that are available at the time

the conformity analysis begins. The current conformity rule requires

that the determination rely on the latest assumptions available at the

time of DOT's conformity determination for a transportation plan, TIP,

or project

latest planning assumptions are

determined. The proposal would allow conformity determinations to be

based on the latest planning assumptions that are available at the time

the conformity analysis begins. The current conformity rule requires

that the determination rely on the latest assumptions available at the

time of DOT's conformity determination for a transportation plan, TIP,

or project. EPA and DOT have previously defined the ``latest''

assumptions as ``the most current information that is available to

State and local planners (e.g., the MPO or other agency can obtain the

information from another agency, the information is appropriate for the

current conformity determination, the information is readily

transferable for use in the transportation and/or emissions modeling,

etc.).'' \7\

---------------------------------------------------------------------------

\7\ For more information, see Question 2 in the January 18,

2001, EPA and DOT memorandum entitled, ``Use of Latest Planning

Assumptions in Conformity Determinations.'' See EPA's conformity web

site llisted in section I.B.2. of this proprosal to download an

electronic copy of this guidance document.

---------------------------------------------------------------------------

EPA intends for the start of the regional conformity analysis to be

the point at which the MPO begins to model the impact of the proposed

transportation plan/TIP on travel and/or emissions. The start of the

conformity analysis should be a point after which significant work

would be required to incorporate new data. EPA and DOT are asking for

comment on how MPOs, State departments of transportation, transit

agencies, and air quality agencies would define the ``start of the

conformity analysis'' for transportation plan and TIP conformity

determinations in individual areas.

Today's proposal would rely on the interagency consultation process

required by Sec. 93.105(c)(1)(i) to determine when a conformity

analysis reasonably begins in a given area

MPOs, State departments of transportation, transit

agencies, and air quality agencies would define the ``start of the

conformity analysis'' for transportation plan and TIP conformity

determinations in individual areas.

Today's proposal would rely on the interagency consultation process

required by Sec. 93.105(c)(1)(i) to determine when a conformity

analysis reasonably begins in a given area. Section 93.105(c)(1)(i)

already requires the consultation process to be used to decide which

planning assumptions and motor vehicle emissions model are available

for use by the MPO or other designated agencies responsible for

conducting conformity analyses.

Specific interagency consultation procedures are already required

in nonattainment and maintenance areas to determine such things as

which projects are regionally significant and to evaluate models and

methods. During this existing process, the starting date of the

conformity analysis should be well documented by the interagency

consultation group and established so that there is sufficient time for

the MPO to meet transportation planning and conformity requirements,

including to complete the modeling analysis, prepare documents, conduct

the public participation process and allow the MPO and DOT to complete

conformity determinations by any required deadline. New information

(e.g., population or fleet data) that becomes available after the start

of the conformity analysis would not be required to be incorporated

into the current analysis if the analysis is on schedule, although an

area could voluntarily include the new information at any time as

appropriate.

The interagency consultation process should also be used to

determine whether significant delays in completing the conformity

analysis would accommodate the inclusion of more recent planning

assumptions that become available after the initially designated

conformity analysis start date

is on schedule, although an

area could voluntarily include the new information at any time as

appropriate.

The interagency consultation process should also be used to

determine whether significant delays in completing the conformity

analysis would accommodate the inclusion of more recent planning

assumptions that become available after the initially designated

conformity analysis start date. If, for example, a substantial delay in

the conformity process occurs and new planning assumptions become

available, EPA believes that such assumptions should not be ignored if

the conformity analysis is in its initial stages.

State and local transportation and air quality planners should

align the updates of planning assumptions with the start of the

conformity analysis whenever possible. The consultation process should

continue to be used to determine what are the most recent assumptions

available for SIP development, so that they can be incorporated into

the conformity process expeditiously. For example, if EPA is expected

to find a new SIP budget adequate before the MPO or DOT's conformity

determination, conformity to the new SIP budget would be required for

the current conformity determination. In such a case, transportation

planners should use the more recent SIP assumptions and consider them

at the start of the current conformity analysis, since the more recent

assumptions would have been available through the consultation process

when the SIP was being developed. State and local air agencies should

continue to inform their transportation counterparts of new assumptions

as they become available.

The proposal would not change the requirement that DOT's conformity

determination of the transportation plan and TIP be based on an

analysis that is consistent with the proposed transportation system

h the consultation process

when the SIP was being developed. State and local air agencies should

continue to inform their transportation counterparts of new assumptions

as they become available.

The proposal would not change the requirement that DOT's conformity

determination of the transportation plan and TIP be based on an

analysis that is consistent with the proposed transportation system.

For example, if a regionally significant project is significantly

changed after the start of the conformity analysis, such a change must

be reflected in the conformity analysis for the current determination.

Likewise, a significant change in the design concept and scope of an

emission reduction program would also have to be reflected before DOT

makes its conformity determination.

Today's proposal does not change the requirements of Sec.

93.122(a) which describes when emissions reduction credit can be taken

in regional emissions analyses. Section 93.122(a)(2) continues to

require that analyses reflect the latest information regarding the

implementation of transportation control measures (TCMs) or other

control measures in an approved SIP, even if a measure is cancelled or

changed after the start of the conformity analysis. In addition, Sec.

93.122(a)(3) continues to require that DOT's conformity determination

only be made when regulatory control programs have been assured and

will be implemented as described in the SIP. However, today's proposal

would allow areas to rely upon the latest existing information as

documented at the start of the conformity analysis regarding the

effectiveness of SIP control programs that are being implemented as

described in the SIP (Sec. 93.110(e)).

Finally, Sec. 93.122(a)(6) is not amended by today's action. The

conformity rule continues to require that the conformity analysis be

based on the same ambient temperature and other factors used to

establish the SIP's motor vehicle emissions budget.

B. Why Are We Proposing This Change?

effectiveness of SIP control programs that are being implemented as

described in the SIP (Sec. 93.110(e)).

Finally, Sec. 93.122(a)(6) is not amended by today's action. The

conformity rule continues to require that the conformity analysis be

based on the same ambient temperature and other factors used to

establish the SIP's motor vehicle emissions budget.

B. Why Are We Proposing This Change?

Today's proposal would make the conformity rule more workable for

implementers while continuing to meet the basic Clean Air Act

requirement that the latest planning assumptions be used in conformity

determinations. EPA is

proposing this change for several reasons.

EPA believes that today's proposal is supported by section

176(c)(1) of the Clean Air Act which requires that ``[t]he

determination of conformity shall be based on the most recent estimates

of emissions, and such estimates shall be determined from the most

recent population, employment, travel and congestion estimates as

determined by the metropolitan planning organization or other agency

authorized to make such estimates.'' However, the Clean Air Act did not

explicitly define the point in the conformity process when the ``most

recent estimates'' should be determined. EPA believes that this

ambiguity in the Clean Air Act allows for a procedural change in how

the latest planning assumptions requirement is implemented.

When EPA originally wrote the conformity rule in 1993, we did not

fully envision how the requirement for the use of latest planning

assumptions would be implemented in practice. Under the current

conformity rule, if an MPO has completed a regional emissions analysis

for its plan and TIP conformity determinations, and new information

becomes available as late as the day before DOT makes its conformity

determination, DOT would not be able to complete its action, as the MPO

would have to re-start the conformity process to incorporate the new

data

plemented in practice. Under the current

conformity rule, if an MPO has completed a regional emissions analysis

for its plan and TIP conformity determinations, and new information

becomes available as late as the day before DOT makes its conformity

determination, DOT would not be able to complete its action, as the MPO

would have to re-start the conformity process to incorporate the new

data. In such a case, significant state and local resources may be

required to incorporate new data, and the transportation planning

process may be unnecessarily disrupted. EPA does not believe this is

appropriate or consistent with the overall intent of the Clean Air Act.

The proposal would also be more consistent with how EPA applies the

requirement for the use of the latest motor vehicle emissions model.

The current conformity rule provides areas a grace period before a new

emissions model must be used in the conformity process. Section

93.111(b) states that EPA, in consultation with DOT, will establish a

grace period ``no less than three months and no more than 24 months

after notice of availability is published in the Federal Register.''

During the grace period, areas can use the previous emissions model for

conformity. Section 93.111(c) of the conformity rule allows for the use

of a previous emissions model in conformity analyses for a given length

of time after a new model has been released. That is, as long as the

analysis using the previous model has begun before or during the

established grace period for a new version of the model, the analysis

is acceptable. Today's proposal for the use of latest planning

assumptions is similar: Areas would use the latest planning assumptions

available when they start the analysis, and would be able to complete

the analysis even if new assumptions become available prior to

completion

previous model has begun before or during the

established grace period for a new version of the model, the analysis

is acceptable. Today's proposal for the use of latest planning

assumptions is similar: Areas would use the latest planning assumptions

available when they start the analysis, and would be able to complete

the analysis even if new assumptions become available prior to

completion. EPA's policy for incorporating the latest emissions models

into the conformity process was most recently discussed in our January

18, 2002 guidance for the use of MOBILE6 in SIP development and

conformity determinations. See EPA's conformity web site listed in

section I.B.2. to download an electronic copy of this guidance

document.

Finally, due to the iterative nature of the conformity process, new

information that becomes available late in the planning process would

still be incorporated in the conformity process in a timely manner, as

the use of such information would be required in the next conformity

determination.

EPA seeks comment on this proposal to incorporate new data into the

conformity process and to determine latest planning assumptions at the

start of the conformity analysis.

X. Horizon Years for Hot-Spot Analyses

A. What Are We Proposing?

EPA is clarifying Sec. 93.116 so that future hot-spot analyses

demonstrate that a project's emissions are not expected to worsen air

quality during the entire time frame of the transportation plan. The

current rule requires localized or ``hot-spot'' analyses to demonstrate

that new projects will not cause or contribute to any new or existing

violations in CO and PM-10 nonattainment and maintenance areas.

However, the current rule does not specify what time frame should be

covered by such analyses

ot expected to worsen air

quality during the entire time frame of the transportation plan. The

current rule requires localized or ``hot-spot'' analyses to demonstrate

that new projects will not cause or contribute to any new or existing

violations in CO and PM-10 nonattainment and maintenance areas.

However, the current rule does not specify what time frame should be

covered by such analyses.

Today's proposal would clarify that project-level hot-spot analyses

in metropolitan nonattainment and maintenance areas must consider the

full time frame of an area's transportation plan at the time the

analysis is conducted.\8\ Alternatively, hot-spot analyses for new

projects in isolated rural nonattainment and maintenance areas, as

defined in today's proposal, should consider the full time frame of the

area's regional emissions analysis since these areas are not required

to develop a transportation plan and TIP under DOT's regulation. All

areas should use the interagency consultation process to select the

specific methods and assumptions for conducting both quantitative and

qualitative hot-spot analyses in accordance with Sec. 93.123 of the

current rule(Sec. 93.105(c)(1)(i)).

---------------------------------------------------------------------------

\8\ Under DOT's current planning regulation, transportation

plans in metropolitan nonattainment and maintenance areas need to be

updated every three years and cover at least a 20-year planning

horizon (23 CFR 450.322(a)).

---------------------------------------------------------------------------

ec. 93.105(c)(1)(i)).

---------------------------------------------------------------------------

\8\ Under DOT's current planning regulation, transportation

plans in metropolitan nonattainment and maintenance areas need to be

updated every three years and cover at least a 20-year planning

horizon (23 CFR 450.322(a)).

---------------------------------------------------------------------------

EPA does not anticipate that today's clarification would

significantly change how project-level analyses are being done in

practice. To ensure that the requirement for hot-spot analysis is being

satisfied for all relevant periods, areas should examine the year(s)

within the transportation plan or regional emissions analysis, as

appropriate, during which peak emissions from the project are expected

and a violation would most likely occur due to the cumulative impacts

of the project and background regional emissions in the project area.

EPA believes that if areas demonstrate that no hot-spot impacts occur

in the years of highest expected emissions, then they will have shown

that no adverse impacts will occur in any years within the time frame

of the plan (or regional emissions analysis).

Without this clarification, however, we believe that it is

difficult for implementers to decide which year(s) to analyze to

demonstrate that the conformity requirement for hot-spot analysis is

satisfied. For example, some could read our existing requirement to

mean that the demonstration regarding local violations must consider

only the year of project completion, or alternatively, must consider

every single future year.

In practice, many areas have examined trends from their regional

emissions analysis and/or other factors to determine the year(s)

expected to have the highest emissions. For example, some areas have

reviewed trends in the future number of projects, changes in emissions

factors and/or the economic and population growth

ject completion, or alternatively, must consider

every single future year.

In practice, many areas have examined trends from their regional

emissions analysis and/or other factors to determine the year(s)

expected to have the highest emissions. For example, some areas have

reviewed trends in the future number of projects, changes in emissions

factors and/or the economic and population growth. The specific

methodology for selecting the most appropriate analysis year(s) to

satisfy the hot-spot requirements for new transportation projects

should be decided through interagency consultation.

Today's proposal would not change the procedural requirements for

hot-spot analyses outlined in Sec. 93.123, nor the flexibility for

areas to decide how best to meet these requirements through interagency

consultation. We believe our proposed clarification to Sec. 93.116, in

combination with the rule's existing consultation and modeling

requirements, is sufficient to ensure that the years of peak emissions

within the full term of the transportation plan are appropriately

considered in hot-spot analyses for new transportation projects.

Finally, as background, in CO nonattainment and maintenance areas,

the impact of new transportation projects on local emissions must be

demonstrated through quantitative or qualitative analysis (40 CFR

93.123). In PM-10 nonattainment and maintenance areas, the localized

emissions impact of new projects should be demonstrated through a

qualitative analysis at this time. According to section Sec.

93.123(b)(4) of the rule, quantitative PM-10 hot-spot analyses are not

required until EPA releases modeling guidance on this subject; a

project's impact on localized PM-10 violations must be qualitatively

considered until this guidance is issued

areas, the localized

emissions impact of new projects should be demonstrated through a

qualitative analysis at this time. According to section Sec.

93.123(b)(4) of the rule, quantitative PM-10 hot-spot analyses are not

required until EPA releases modeling guidance on this subject; a

project's impact on localized PM-10 violations must be qualitatively

considered until this guidance is issued. On September 12, 2001, DOT

issued ``Guidance for Qualitative Project Level `Hot Spot' Analysis in

PM-10 Nonattainment and Maintenance Areas.'' DOT consulted with EPA on

the development of this guidance; the guidance is available on EPA's

conformity Web site listed in section I.B.2. of this proposal.

B. Why Are We Proposing This Clarification?

On May 26, 1994, Environmental Defense, Natural Resource Defense

Council and Sierra Club collectively submitted to EPA a Petition for

Reconsideration of the November 1993 conformity rule (58 FR 62188). In

the preamble to an April 2000 conformity rule amendment (65 FR 18913,

April 10, 2000), we addressed four remaining issues raised in this

petition, one of which was the issue regarding horizon years for hot-

spot analyses. Specifically, the petitioners requested that we alter

the rule to ensure that areas examine the 20-year time frame of the

transportation plan when conducting hot-spot analyses. The existing

transportation conformity rule does not clearly specify a time frame to

be considered for hot-spot analyses.

In the preamble to the 2000 amendment, we acknowledged that hot-

spot analyses should address the full time frame of the transportation

plan to ensure that new projects will not cause or worsen any new or

existing hot-spot violations. In addition, we clarified that in some

cases modeling the last year of the transportation plan or the year of

project completion may not be sufficient to satisfy this requirement

o the 2000 amendment, we acknowledged that hot-

spot analyses should address the full time frame of the transportation

plan to ensure that new projects will not cause or worsen any new or

existing hot-spot violations. In addition, we clarified that in some

cases modeling the last year of the transportation plan or the year of

project completion may not be sufficient to satisfy this requirement.

EPA believes that the most effective means to meet this requirement

would be to have the hot-spot analysis examine the year(s) during the

time frame of the plan in which project emissions, in addition to

background regional emissions in the project area, are expected to be

the highest.

In our 2000 amendment, however, we were unable to make the

described regulatory clarification to Sec. 93.116 because we had not

previously proposed this change to the rule. Instead, we committed to

propose this clarification in today's action.

XI. Additional Changes and Clarifications to the Rule

A. Definitions

EPA is proposing two new definitions for areas known as ``donut

areas'' and ``isolated rural nonattainment and maintenance areas'' in

Sec. 93.101. In today's proposal, ``donut areas'' are defined as

geographic areas outside a metropolitan planning area boundary as

designated under 23 U.S.C. 134 and 49 U.S.C. 5303, but inside the

boundary of a designated nonattainment/maintenance area that is

dominated by a metropolitan area(s). In contrast, ``isolated rural

nonattainment and maintenance areas'' are defined as any nonattainment

or maintenance area that does not contain or is not part of any

metropolitan planning area as designated under 23 U.S.C. 134 and 49

U.S.C. 5303. Isolated rural areas do not have metropolitan

transportation plans or TIPs required under 23 U.S.C. 134 and 49 U.S.C.

5303 and 5304 and do not have projects that are part of the emissions

analysis of any MPO's metropolitan transportation plan or TIP

or maintenance area that does not contain or is not part of any

metropolitan planning area as designated under 23 U.S.C. 134 and 49

U.S.C. 5303. Isolated rural areas do not have metropolitan

transportation plans or TIPs required under 23 U.S.C. 134 and 49 U.S.C.

5303 and 5304 and do not have projects that are part of the emissions

analysis of any MPO's metropolitan transportation plan or TIP. Projects

in such areas are instead included only in statewide transportation

improvement programs.

These proposed definitions would be used in conformity rule

provisions that clarify how areas that are designated nonattainment or

maintenance, but that are not within the planning boundary of any MPO's

jurisdiction, should be considered with regard to the applicable

conformity requirements. The conformity requirements for donut areas

are generally the same as those for metropolitan areas. However, the

transportation planning requirements in donut areas may differ. The

conformity requirements for isolated rural nonattainment and

maintenance areas are stated in Sec. 93.109(g) of the current rule and

generally exclude most conformity determination frequency requirements

and triggers. Conformity determinations in these areas are required

only when a new non-exempt FHWA/FTA project needs funding or approval.

State approvals and funding for regionally significant non-federal

projects would also require that such projects are included in a

regional emissions analysis that conforms. The requirements for

isolated rural areas also offer greater flexibility for demonstrating

conformity in years after the attainment year or after the last year of

the maintenance plan. Given these differences in conformity

requirements, EPA believes the proposed definitions will help to

alleviate confusion over how metropolitan and rural areas are

distinguished so that the conformity program can be more efficiently

and practicably implemented in these different areas.

B. Budget Test Requirements for the Attainment Year

t year or after the last year of

the maintenance plan. Given these differences in conformity

requirements, EPA believes the proposed definitions will help to

alleviate confusion over how metropolitan and rural areas are

distinguished so that the conformity program can be more efficiently

and practicably implemented in these different areas.

B. Budget Test Requirements for the Attainment Year

We are proposing a minor revision to clarify how Sec. 93.118(b)

and (d) should be implemented when a budget is established for a year

prior to the attainment year. Specifically, we are proposing that once

an area has any control strategy SIP budget available for conformity

purposes, conformity must be demonstrated using the ``budget test'' for

the attainment year if the attainment year is within the time frame of

the transportation plan. Today's proposal would address questions

raised by some State and local conformity implementers.

As background, the ``budget test'' is completed by comparing the

regional emissions produced by a proposed transportation plan and TIP

to the SIP's motor vehicle emissions budget(s) for a given year. If the

emissions from the plan and TIP are equal to or less than the

applicable SIP budget(s), the plan and TIP conform. Section Sec.

93.118(d)(2) describes the years for which regional emissions from the

plan and TIP must be estimated, and Sec. 93.118(b) describes the years

for which consistency with the budgets must be demonstrated, including

which submitted or approved budget applies for a given year.

Section 93.118(d)(2) of the current rule require

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Transportation Conformity Rule Amendments: Response to Court Decision and Additional Rule Changes · 68 FR 38974 | Frix