§ 111.10-9 Ship's service supply transformers; two required.

FederalRegulations

Ask Donna

How this section applies to your facts.

Title 46 CFR: Shipping › Chapter I: COAST GUARD, DEPARTMENT OF HOMELAND SECURITY › Part 111: ELECTRIC SYSTEMS—GENERAL REQUIREMENTS › Subpart 111.10: Subpart 111.10—Power Supply › § 111.10-9: § 111.10-9 Ship's service supply transformers; two required.

This text was captured on Aug 14, 2026. It is a snapshot, not a live feed, so check the official code before relying on it.

Text

If transformers are used to supply the ship's service distribution system required by this subpart for ships and mobile offshore drilling units, there must be at least two installed, independent power transformers. With the largest transformer out of service, the capacity of the remaining units must be sufficient to supply the ship service loads.

Note to § 111.10-9:

A ship's service supply system would consist of transformers, overcurrent protection devices, and cables, and would normally be located in the system between a medium voltage bus and a low voltage ship's service switchboard. It is not the intent, nor is it required, that transformers fed by the ship's service switchboard, such as 480/120 transformers, be duplicated.

[CGD 94-108, 61 FR 28277, June 4, 1996; 61 FR 33045, June 26, 1996; USCG-2020-0075, 88 FR 16360, Mar. 16, 2023]

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

§ 111.10-9 Ship's service supply transformers; two required. · 46 C.F.R. § 111.10-9 (2026) | Frix