Federal Register · Notice · Aug 13, 1997
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 43365Nuclear Regulatory CommissionBiweekly NoticeAdvanced Medical Systems, Inc., Issuance of Director's Decision under 10 CFR Sec. 2.206
Federal Register · Notice · Jun 20, 1997
Nuclear Regulatory Commission, has acted on a Petition for action under 10 CFR 2.206 dated March 3, 1993, filed by William B. … The ponds were then cleaned for the first time from December 1982 to March 1983.
62 FR 33682Nuclear Regulatory CommissionFederal Register · Notice · Jun 28, 2000
NRC is publishing the proposed Agreement for public comment, as required by the Act. … Comments are invited on (a) the proposed Agreement, especially its effect on public health and safety, and (b) the NRC staff assessment. DATES: The comment period expires July 7, 2000.
65 FR 39966Nuclear Regulatory CommissionFederal Register · Notice · Oct 17, 2002
NRC is fulfilling its responsibilities under the Atomic Energy Act and the National Environmental Policy Act to make a decision on a proposed license amendment for building dismantlement and deconstruction … In its letter dated September 23, 2002, which commented on draft EA, the State of Connecticut's only comment was that an additional alternative exists regarding the proposed action.
67 FR 64147Nuclear Regulatory CommissionCommonwealth Edison Company (Zion Nuclear Power Station, Unit Nos. 1 and 2)
Federal Register · Notice · Dec 26, 1995
II Sections III.C and III.D.3 of 10 CFR part 50, appendix J, require that Type C local leak rate periodic tests shall be performed during reactor shutdown for refueling, or other convenient intervals … On August 16, 1995 the staff authorized in writing, continued operation of the Zion units in a notice of enforcement discretion (NOED) until such time as the staff acted on the exemption requests.
60 FR 66805Nuclear Regulatory CommissionFederal Register · Notice · Aug 25, 2009
The State agreed with the conclusions of the EA, and otherwise had no comments. … Therefore, no further consultation is required under section 7 of the Endangered Species Act.
74 FR 42942Nuclear Regulatory CommissionDepartment of the Air Force; Environmental Assessment and Finding of No Significant Impact
Federal Register · Notice · Mar 25, 2021
Therefore, the short extension from a 2-year period to the 5-year period is unlikely to result in abandonment of a site or affect the AF's ability to perform decommissioning. … Consultations Section 7 of the Endangered Species Act (Act) [16 U.S.C. 1531 et seq. ] outlines the procedures for Federal interagency cooperation to conserve Federally listed species and designated
86 FR 15970Nuclear Regulatory CommissionFederal Register · Notice · May 18, 2023
In 1997, WCS began accepting Resource Conservation and Recovery Act (RCRA) and Toxic Substance Control Act wastes for treatment, storage, and disposal. … monitors would be used to sample the air.
88 FR 31829Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Aug 3, 1994
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Aug 8, 2023
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
88 FR 53537Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2001
Federal Register · Proposed Rule · Mar 28, 2001
DATES: The comment period expires April 27, 2001. … tailings impoundments, and groundwater clean-up.
66 FR 16982Nuclear Regulatory CommissionFederal Register · Notice · Jan 24, 2023
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance
88 FR 4216Nuclear Regulatory CommissionDraft Regulatory Issue Summary: Combined License Review Performance and Reporting
Federal Register · Notice · Sep 3, 2025
review in accordance with the requirements in Section 207 of the ADVANCE Act (Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024). … The NRC staff conducted public meetings on December 12, 2024, and January 28, 2025, to receive comments, feedback, and ideas on how the NRC should implement the requirement in ADVANCE Act Section 207.
90 FR 42622Nuclear Regulatory CommissionFederal Register · Notice · Jan 17, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 2586Nuclear Regulatory CommissionFederal Register · Notice · Nov 6, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 62685Nuclear Regulatory CommissionFederal Register · Rule · Jan 27, 2006
Comment Analysis The period for submitting comments on the proposed DCR, AP1000 DCD, or draft environmental assessment (EA) expired on July 5, 2005. … The NRC disagrees with these comments. The site parameters for the AP1000 design include minimum and maximum air temperatures (see DCD Table 2-1).
71 FR 4464Nuclear Regulatory CommissionFederal Register · Notice · May 30, 2001
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … Madden, Acting.
66 FR 29349Nuclear Regulatory CommissionFederal Register · Notice · Jul 14, 2011
The consultations ensured that the requirements of Section 7 of the Endangered Species Act and Section 106 of the National Historic Preservation Act were met and provided the designated state liaison agency … the opportunity to comment on the proposed action.
76 FR 41528Nuclear Regulatory CommissionFederal Register · Notice · Nov 13, 1995
The State official has no comments. … Hickman, Acting Director, Project Directorate III-I, Division of Reactor Projects--III/IV, Office of Nuclear Reactor Regulation. [FR Doc. 95-27917 Filed 11-9-95; 8:45 am] BILLING CODE 7590-01-P
60 FR 57025Nuclear Regulatory CommissionFederal Register · Notice · Nov 28, 1995
Continued operation of the Zion units was authorized by a Notice of Enforcement Discretion (NOED) orally granted on August 15, 1995, until such time as the staff acted on the exemption requests. … compressors and Nitrogen) and emergency power supplies [[Page 58688]] (c) Periodic testing requirements for compressors.
60 FR 58686Nuclear Regulatory Commission