Federal Register · Notice · Aug 23, 2011
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
76 FR 52699Nuclear Regulatory CommissionFederal Register · Notice · Dec 3, 1997
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 63970Nuclear Regulatory CommissionFederal Register · Notice · Apr 5, 2002
Additionally, there have been no reports of a noticeable decline in angler success during the subsequent fishing period. … Construction and operation of a coal plant would create impacts to air quality, land use and waste management. Construction and operation of a gas plant would also impact air quality and land use.
67 FR 16459Nuclear Regulatory CommissionCharles T. Gallagher, Gammatron, Inc.; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Apr 19, 2001
The letter also disagrees with the petitioner's belief that financial assurance should be provided by a small business licensee over a longer period of time, rather than all at one time upon licensing. … The licensee must have funding available to clean up a site and package the waste for disposal.
66 FR 20099Nuclear Regulatory CommissionFederal Register · Notice · Aug 27, 1998
In accordance with the February 8, 1996, staff position paper, a draft EA and finding of no significant impact is being published in the Federal Register for a 30-day public comment period. … DATES: The comment period will expire 30 days after publication.
63 FR 45874Nuclear Regulatory CommissionDominion Energy Kewaunee, Inc.; Kewaunee Power Station
Federal Register · Notice · Nov 5, 2014
This time period is based on a heat-up calculation which uses several simplifying assumptions. … Among the changes, the definition of “hostile action” was added as an act directed toward a nuclear power plant or its personnel.
79 FR 65715Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2006
Federal Register · Rule · May 30, 2006
The NRC received three comments dated on or before the close of the comment period (March 13, 2006) and four additional comments thereafter, for a total of seven comments that were considered in this fee … tailings impoundments, and groundwater clean-up.
71 FR 30722Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 1998
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 40321Nuclear Regulatory CommissionFederal Register · Rule · Jun 22, 1995
Subsequent plan changes need not have the offsite comment period unless the plan changes affect the offsite response organizations. … Subsequent plan changes need not have the offsite comment period unless the plan changes affect the offsite response organizations.
60 FR 32430Nuclear Regulatory CommissionFederal Register · Notice · Aug 15, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 38714Nuclear Regulatory CommissionFederal Register · Notice · Jun 29, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 37471Nuclear Regulatory CommissionFederal Register · Proposed Rule · Dec 27, 2018
Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action in the event the direct final rule is withdrawn. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; the Nuclear Waste Policy Act of 1982, as
83 FR 66644Nuclear Regulatory CommissionFederal Register · Notice · Oct 15, 2002
provision of section 189 of the Act. … Andersen, Acting.
67 FR 63687Nuclear Regulatory CommissionFederal Register · Notice · May 2, 2001
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
66 FR 22021Nuclear Regulatory CommissionFederal Register · Notice · Jun 5, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 28604Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Mar 30, 2000
Routine activities which generate waste oil and cleanup materials include periodic PCP oil changes, pumpdown of oil collection tanks, PCP oil system piping and equipment repairs, and cleaning of equipment … The State official had no comments.
65 FR 16971Nuclear Regulatory CommissionFederal Register · Notice · Oct 27, 2003
Under accident conditions, higher concentrations of materials could be released to the environment over a short period of time. … On August 22, 2003, the Director responded that they had reviewed the draft EA and had no comments.
68 FR 61235Nuclear Regulatory CommissionFederal Register · Notice · Jun 12, 2015
The SCE's analysis of a beyond-design-basis accident involving a complete loss of SFP water inventory, where adequate fuel handling building air exchange with the environment and air cooling of the stored … This time period is based on a heat-up calculation which uses several simplifying assumptions.
80 FR 33558Nuclear Regulatory CommissionFederal Register · Notice · Jun 11, 2002
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … for Primary Containment and the Personnel Airlocks seal air systems.
67 FR 40019Nuclear Regulatory CommissionFederal Register · Notice · Jun 16, 1999
provision of section 189 of the Act. … The steam/air mixture becomes mixed with the air volume in that area of the Auxiliary Building but was all assumed to be available for inleakage to the Control Room and AEER.
64 FR 32284Nuclear Regulatory Commission