Federal Register · Notice · May 18, 2010
For a simpler method of submitting text only comments, click on “Quick Comment.” … Participants should meet at Scenic Mountain Air boat launch, 31702 Depot Road, Moose Pass, AK 99631.
75 FR 27775Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 11, 2016
CP15-88-000 pursuant to sections 7(b) and 7(c) of the Natural Gas Act, requesting a certificate of public convenience and necessity to construct, operate, and maintain certain natural gas pipeline facilities … by the commentors included concerns about increasing pressure in older pipelines, exposed pipelines, and corrosion; concerns about repurposing existing pipelines for transport of natural gas liquids; air
81 FR 44855Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 20, 1999
DATES: Comments on the proposed action due on or before August 4, 1999. … Airlift recirculation wells provide a means for removing VOCs from contaminated groundwater, through a combination of in place air stripping and airlift pumping processes.
64 FR 38899Energy DepartmentFederal Register · Notice · Apr 23, 2012
A below grade transition with an above ground air relief inlet pipe would convey water to a buried High Density Polyethylene Pipe (HDPE) pipeline. … Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.
77 FR 24196Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 22, 2012
A below grade transition with an above ground air relief inlet pipe would convey water to a buried High Density Polyethylene Pipe (HDPE) pipeline. … Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.
77 FR 10504Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 23, 2012
The 2012 Annual Plan is in compliance with the Energy Policy Act of 2005, Subtitle J, Section 999B(e)(3) which requires the publication of this plan and all written comments in the Federal Register … Onshore, research on Unconventional Resources will focus on protecting groundwater and air quality, understanding rock and fluid interactions, and integrated environmental protection, including water treatment
77 FR 51021Energy DepartmentFederal Register · Notice · Feb 14, 2017
If you are filing a comment on a particular project, please select “Comment on a Filing” as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address … Project facilities under these general headings: • Geology and soils; • land use, recreation, and visual resources; • water resources, and wetlands; • cultural resources; • vegetation and wildlife; • air
82 FR 10570Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 20, 2020
In response to the NOI, the Commission received seven comments from the public. … All substantive comments will be addressed in the EA.
85 FR 51422Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 26, 2018
The draft EIS assesses the potential environmental effects of the construction and operation of the Jacksonville Project in accordance with the requirements of the National Environmental Policy Act (NEPA … • ground flare and cold vent systems; and • utilities and support facilities ( e.g., administration, control, and workshop buildings; roads and parking areas; power and communications; water, air
83 FR 60414Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 16, 2015
CP15-150-000, requesting authorization and a Certificate of Public Convenience and Necessity pursuant to section 7(b) and 7(c) of the Natural Gas Act, to abandon, modify, and install certain natural gas … In response to the NOI, the Commission received comments from non-government organizations, and federal and state agencies.
80 FR 78216Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 31, 2016
CP16-9-000 requesting a Certificate of Public Convenience and Necessity pursuant to Section 7 of the Natural Gas Act to construct, abandon, and operate certain natural gas pipeline facilities. … Commenters also stated concerns about impacts on water supplies, wetlands, vegetation, wildlife, air quality, and safety. The U.S.
81 FR 18621Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 4, 2017
CP17-458-000 requesting a Certificate of Public Convenience and Necessity pursuant to section 7(c) of the Natural Gas Act (NGA) and part 157 of the Commission's regulations to construct, own, operate, … potential for induced seismicity; possible alternative routes; and potential impacts on agricultural lands, cattle grazing, threatened and endangered species, surface water and groundwater resources, air
82 FR 57248Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Nov 15, 2019
After the close of the comment period, DOE will review the public comments received any may begin collecting data and conducting the analyses discussed in this RFI. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
84 FR 62470Energy DepartmentFederal Register · Notice · Aug 23, 2004
SUMMARY: Periodically, the Department of Energy (“Department” or “DOE”) publishes a list of facilities covered under the Energy Employees Occupational Illness Compensation Program Act of 2000 (“Act”), … NY—Linde Air Products Buffalo AWE New York. NY—Linde Ceramics Plant Tonawanda AWE DOE New York. NY—New York University New York AWE New York.
69 FR 51825Energy DepartmentFederal Register · Notice · Oct 1, 2002
Western will ensure that its responsibilities under the National Historic Preservation Act (NHPA) and the Endangered Species Act (ESA) are met before the modifications are implemented. … There will be no air, noise, land use, or socioeconomic impacts stemming from phase one of Western's action. For the Project as a whole, there will be no long-term impacts to air quality.
67 FR 61619Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Feb 8, 2012
A below grade transition with an above ground air relief inlet pipe would convey water to a buried High Density Polyethylene Pipe (HDPE) pipeline. … Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp .
77 FR 6555Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 5, 2006
The final EIS was prepared to satisfy the requirements of the National Environmental Policy Act (NEPA). … Should the Commission authorize the proposed Project, it would be subject to a 30-day rehearing period.
71 FR 26493Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 1, 2002
Filed Pursuant to : Federal Power Act 16 U.S.C. §§ 791(a)-825(r). h. Applicant Contact : James B. Price, W.V. Hydro, Inc., P.O. … Agencies who would like to request cooperating status should follow the instructions for filing comments described in item k below. k.
67 FR 44194Energy DepartmentFederal Energy Regulatory CommissionWorthington Generation L.L.C., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Apr 28, 2000
McMonagle tendered for filing with the Federal Energy Regulatory Commission (Commission) an application pursuant to Section 305(b) of the Federal Power Act, 16 U.S.C. 825d(b), and orders of the Commission … ER00-2212-000] Take notice that on April 14, 2000, Entergy Services, Inc., on behalf of Entergy Arkansas, Inc., and Entergy Gulf States, Inc., tendered for filing generator imbalance agreements with Air
65 FR 24950Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 20, 2018
the potential environmental effects of the construction and operation of the Plaquemines LNG and Gator Express Pipeline Project in accordance with the requirements of the National Environmental Policy Act … or blocks) to be constructed in two phases (nine blocks in each phase); ○ four 200,000-cubic-meter aboveground LNG storage tanks; ○ three LNG loading docks within a common LNG berthing area; and ○ air-cooled
83 FR 58558Energy DepartmentFederal Energy Regulatory Commission