Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.25s
Federal Register · Notice · Jul 12, 1996
Army Corps of Engineers has agreed to be a cooperating agency because of its jurisdiction pursuant to Section 404 of the Clean Water Act. … Comments will also be requested. FERC and TVA will also hold a joint public meeting to elicit comments on the draft EIS.
61 FR 36723Energy DepartmentFederal Register · Notice · May 25, 2006
This draft EIS was prepared to satisfy the requirements of the National Environmental Policy Act. … The public comment meeting will be conducted jointly to also receive comments on the draft EIS prepared for the Clean Energy LNG Project.
71 FR 30128Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 29, 2011
The EA assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act (NEPA). … Jersey; • Installation of associated appurtenant aboveground facilities including mainline valves and pig 2 launchers and receivers; and 2 A pig is an internal tool that can be used to clean
76 FR 73618Energy DepartmentFederal Energy Regulatory CommissionApplication for Presidential Permit; Central Maine Power Company
Federal Register · Notice · Sep 27, 2017
DATES: Comments or motions to intervene must be submitted on or before October 27, 2017. … Procedural Matters: Any person may comment on this application by filing such comment at the address provided above.
82 FR 45013Energy DepartmentFederal Register · Notice · Jun 12, 2018
operation of the proposed project under these general headings: • Geology and soils; • Land use; • Water resources, fisheries, and wetlands; • Cultural resources; • Vegetation and wildlife; • Air … We will publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission.
83 FR 27320Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 23, 2024
In addition, the Oregon and Idaho Departments of Environmental Quality each issued a water quality certification under section 401 of the Clean Water Act for the Hells Canyon Project on May 24, 2019. … Comments on Draft EIS due September 2024. Commission issues Final EIS February 2024.
89 FR 45657Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 26, 2026
eleven mainline valves, and one pig launcher and one pig receiver, 4 access roads, contractor yards, and cathodic protection ground beds; and 4 A pig is an internal tool that can be used to clean … If you are filing a comment on a particular project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
91 FR 55089Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 7, 2001
A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing a Final EIS. … • The GSX Cherry Point Compressor Station would have an impact on air quality and the noise environment of the area.
66 FR 30730Energy DepartmentFederal Energy Regulatory CommissionEnvironmental Management Site-Specific Advisory Board, Northern New Mexico
Federal Register · Notice · Apr 23, 2008
—Consent Order, Los Alamos National Laboratory (LANL), Dave McInroy: • LANL EM Program Master Plan; • Progress in Clean-up; • Future Activities. 4:15 p.m. … Individuals wishing to make public comment will be provided a maximum of five minutes to present their comments.
73 FR 21925Energy DepartmentFederal Register · Notice · Mar 25, 2011
The EA assesses the potential environmental effects of the construction and operation of the Leader One Gas Storage Project in accordance with the requirements of the National Environmental Policy Act … Ancillary Facilities • Valves, meters, filtration, safety, and cleaning and inspection equipment; and • Buildings, communications and control equipment, emergency generation, and electrical supply.
76 FR 16765Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 4, 2020
Because the USACE must comply with the requirements of NEPA before issuing permits under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, it has elected to cooperate in … If you are filing a comment on a particular Project, please select “Comment on a Filing”; or (3) You can file a paper copy of your comments by mailing them to the Commission.
85 FR 70133Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 20, 2024
Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. … Reese, Acting Secretary. [FR Doc. 2024-21476 Filed 9-19-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 77122Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 22, 2017
The EA assesses the potential environmental effects of the construction and operation of the Projects in accordance with the requirements of the National Environmental Policy Act (NEPA). … Texas; piping modifications at its existing Angleton Station property in Brazoria County, Texas; a new 8,400 hp gas turbine unit at its existing Blessing Compressor Station in Matagorda County, Texas; clean
82 FR 44400Energy DepartmentFederal Energy Regulatory CommissionEnvironmental Management Site-Specific Advisory Board, Hanford
Federal Register · Notice · Oct 11, 2024
The Federal Advisory Committee Act requires that public notice of this meeting be announced in the Federal Register . DATES: Wednesday, November 6, 2024; 9 a.m.-4:30 p.m. PST. … Individuals wishing to make public comments will be provided a maximum of five minutes to present their comments.
89 FR 82597Energy DepartmentNotice of Request for Information (RFI) on FY 2021 Bioenergy Technologies Office Multi-Topics
Federal Register · Notice · Aug 24, 2020
to solicit feedback from industry, academia, research laboratories, government agencies, and other stakeholders on issues related to overcoming the technical barriers and challenges in the design of clean … Signing Authority: This document of the Department of Energy was signed on August 14, 2020, by Michael Berube, Acting Director of the Bioenergy Technologies Office, Office of Energy Efficiency and Renewable
85 FR 52109Energy DepartmentEnvironmental Management Site-Specific Advisory Board, Rocky Flats
Federal Register · Notice · Jul 26, 1999
The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. … Each individual wishing to make public comment will be provided a maximum of five minutes to present their comments.
64 FR 40358Energy DepartmentFederal Register · Notice · Oct 6, 2020
In response to the NOI, the Commission received comments from the U.S. … All substantive comments will be addressed in the EA.
85 FR 63107Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 15, 2002
A 45-day comment period will be allotted for review of the Draft EIS. We will consider all comments on the Draft EIS and revise the document, as necessary, before issuing a Final EIS. … Impact on Federally-listed species —Impact on FS, BLM, and state sensitive species • Socioeconomic Impacts • Public Safety • Cumulative Impacts —Discussion of regional coal bed methane development • Air
67 FR 63643Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 20, 2013
EA assesses the potential environmental effects of the construction and operation of the Virginia Southside Expansion Project in accordance with the requirements of the National Environmental Policy Act … meter station, line heaters, and pig 1 receiver at the terminus of the Brunswick Lateral; and 1 A “pig” is a tool that is inserted into and moves through the pipeline, and is used for cleaning
78 FR 37214Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 19, 2019
potential environmental effects of the construction and operation of the Palmyra to South Sioux City A-Line Abandonment Project in accordance with the requirements of the National Environmental Policy Act … Palmyra D-Line Loop and a pig receiver and one valve site at the end of the pipeline loop; and 2 A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning
84 FR 69740Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.