Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.10s
Energy Conservation Program: Energy Conservation Standards for Metal Halide Lamp Fixtures
Federal Register · Proposed Rule · Oct 6, 2022
No later than 3 years after such a determination, under the Energy Policy and Conservation Act, as amended, DOE must periodically review these standards and publish either a notice of proposed rulemaking … DOE actively encourages the participation and interaction of the public during the comment period in this process.
87 FR 60555Energy DepartmentFederal Register · Notice · May 21, 2014
ACTION: Extension of public comment period. … The Air-Conditioning, Heating, and Refrigeration Institute (AHRI) requested that DOE extend the comment period by 30 days.
79 FR 29175Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Nov 17, 2021
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project Amendment. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
86 FR 64195Energy DepartmentFederal Energy Regulatory CommissionPolygraph Examination Regulation
Federal Register · Proposed Rule · Aug 18, 1999
DATES: The comment period for this proposed rule will end on October 4, 1999. … Introduction The Atomic Energy Act of 1954 (AEA or Atomic Energy Act) assigns to DOE certain atomic energy defense production and clean-up obligations that are discharged at various DOE-owned, contractor-operated
64 FR 45062Energy DepartmentTanner Electric Transmission Line Project
Federal Register · Notice · Aug 25, 2000
During the 30-day comment period on the Preliminary EA, BPA held an open house in the City of North Bend. … The following permit may be required and will be obtained, as needed: Clean Water Act Section 404 permit (U.S. Army Corps of Engineers).
65 FR 51817Energy DepartmentBonneville Power AdministrationFederal Register · Notice · Mar 16, 2026
Comment Date: 5 p.m. ET 3/31/26. Docket Numbers: ER26-1702-000. Applicants: RWE Clean Energy QSE, LLC. … Comment Date: 5 p.m. ET 3/31/26. Docket Numbers: ER26-1704-000. Applicants: RWE Clean Energy Solutions, Inc.
91 FR 12595Energy DepartmentFederal Energy Regulatory CommissionNotice of Intent To Prepare an Environmental Impact Statement for a Versatile Test Reactor
Federal Register · Notice · Aug 5, 2019
In defining the scope of the EIS, DOE will consider all comments received or postmarked by the end of the scoping period. … Comments received or postmarked after the scoping period end date will be considered to the extent practicable.
84 FR 38021Energy DepartmentFederal Register · Notice · Nov 12, 2024
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
89 FR 88995Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 24, 2023
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed Amendment. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
88 FR 47492Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Feb 14, 2023
Public Participation and Submission of Written Comments Members of the public will be heard in the order in which they sign up for the Public Comment Period. … Public comment and statements will be allowed prior to the close of each meeting.
88 FR 9407Energy DepartmentFederal Register · Notice · Jun 25, 2008
The comment period on the draft EIS will be coordinated, to the extent possible, with other jurisdictional agencies. … • Air Quality and Noise: ○ Effects on the local air quality and noise environment from construction and operation of the proposed facilities.
73 FR 36066Energy DepartmentFederal Energy Regulatory CommissionNotice of Availability of Guidance and Application for Hydroelectric Production Incentives
Federal Register · Notice · Mar 14, 2024
The hydroelectric production incentive payments are a benefit available for electric energy generated and sold for a specified 10-year period as authorized under the Energy Policy Act of 2005. … Applications must be submitted to the Clean Energy Infrastructure Funding Opportunity Exchange, https://infrastructure-exchange.energy.gov by no later than 5 p.m.
89 FR 18625Energy DepartmentFederal Register · Notice · Apr 8, 2022
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Pixelle Specialty Solutions Holding LLC, et al. Filed Date: 4/1/22. … Description: § 205(d) Rate Filing: Tariff Clean-Up Filing Effective 20220518 to be effective 5/18/2022. Filed Date: 4/4/22. Accession Number: 20220404-5098. Comment Date: 5 p.m.
87 FR 20829Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 19, 2010
Section 406 of the American Recovery and Reinvestment Act of 2009 (42 U.S.C. 16516; Recovery Act) amended Title XVII to create Section 1705 authorizing a new program for rapid deployment of renewable energy … In addition, the additional turbines that will be constructed likely would lengthen the construction period.
75 FR 64296Energy DepartmentInterconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD
Federal Register · Notice · Nov 27, 2009
Impacts on air, soil, and water resources (including air quality and surface water impacts). 9. Visual impacts. 10. … The public will have the opportunity to provide written comments at the public scoping meetings. Written comments may also be sent to Mr. O'Sullivan by fax, U.S. Postal Service mail, or e-mail.
74 FR 62298Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Jan 13, 2006
The FERC will use the EIS to consider the environmental impact that could result if the CEGT project is authorized under section 7 of the Natural Gas Act. … A 45-day comment period will be allotted for review of the draft EIS. We will consider all comments on the draft EIS and revise the document, as necessary, before issuing a final EIS.
71 FR 2213Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 21, 2008
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Impacts of air and noise emissions. Public Participation You can make a difference by providing us with your specific comments or concerns about the Rural Valley Project.
73 FR 70633Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 6, 2008
Please note that the scoping period will close on November 14, 2008. 1 Texas Gas' application was filed with the Commission under section 7 of the Natural Gas Act and Part 157 of the Commission's … The FERC will use the EA to consider the environmental impact that could result if the project is authorized under section 7 of the Natural Gas Act.
73 FR 58223Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Sep 12, 2024
Comments will be considered by the Commission in determining the appropriate action to be taken. Comments must be filed on or before the comment date. … Reese, Acting Secretary. [FR Doc. 2024-20312 Filed 9-11-24; 8:45 am] BILLING CODE 6717-01-P
89 FR 74161Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 20, 2015
Description: Carolina Gas Transmission's Annual Interruptible Sharing Filing for the period ending October 31, 2014. Filed Date: 1/9/15. Accession Number: 20150109-5065. … Description: Compliance filing per 154.203: PAL and Clean-up Filing Refile to Comply with Order to be effective 11/1/2014. Filed Date: 11/26/14. Accession Number: 20141126-5067.
80 FR 2690Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.