Federal Register · Notice · Apr 8, 2024
Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. … Reese, Acting Secretary.
89 FR 24470Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 13, 1995
Environmental Protection Agency (EPA) pursuant to the Clean Water Act. … federal Clean Water Act.
60 FR 53360Energy DepartmentApplication for Presidential Permit; New England Clean Power Link Project
Federal Register · Notice · Jul 9, 2014
DATES: Comments or motions to intervene must be submitted on or before August 8, 2014. … Procedural Matters: Any person may comment on this application by filing such comment at the address provided above.
79 FR 38869Energy DepartmentFederal Register · Proposed Rule · Jul 29, 2022
(“FACA”) and the Negotiated Rulemaking Act (“NRA”) to negotiate proposed test procedures and amended energy conservation standards commercial unitary air conditioners and heat pumps (“CUACs and CUHPs” … This publication provides the required public notice and provides for a public comment period.
87 FR 45703Energy DepartmentFederal Register · Notice · Aug 31, 2007
However, comments received during the public comment period will be considered as input in the risk assessment process. … A 45-day comment period will be allotted for review of the draft EIS. We will consider all comments on the draft EIS and revise the document, as necessary, before issuing a final EIS.
72 FR 50356Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 9, 2021
Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 1 authorizes the U.S. … section must be reasonably designed to produce test results which reflect energy efficiency, energy use or estimated annual operating cost of a covered product during a representative average use cycle or period
86 FR 13530Energy DepartmentNotice of Availability of the Sutter Power Project Draft Environmental Impact Statement
Federal Register · Notice · Nov 6, 1998
Western and CEC will accept written and oral comments during the public review period. … Other concerns raised include air quality impacts, land use issues, impacts to agricultural operations, and the need for rezoning the site.
63 FR 59986Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Apr 14, 2015
Authority and Background Section 307(b) of the Energy Conservation and Production Act (ECPA, Pub. … DOE took into consideration the information it received during the public comment period, and published the final methodology in 2012. 2 This methodology, hereafter referred to as the “established
80 FR 19974Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Oct 18, 2018
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Clean Energy Future—Lordstown, LLC, et al. Filed Date: 10/11/18. … Comments Due: 5 p.m. ET 11/1/18. Docket Numbers: ER19-90-000. Applicants: Clean Energy Future—Lordstown, LLC.
83 FR 52826Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 6, 2021
Please keep the comment tracking number that http://www.regulations.gov provides after you have successfully uploaded your comment. Submitting comments via email. … Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 1 authorizes the U.S.
86 FR 17803Energy DepartmentFederal Register · Notice · Sep 28, 2007
A Final General Conformity Determination was also prepared by the FERC to assess the potential air quality impacts associated with construction and operation of the proposed Phoenix Expansion Project and … The OPS' authority is found under the Natural Gas Pipeline Safety Act of 1968 (49 U.S.C. 1671 et seq. ) and the Hazardous Liquids Pipeline Safety Act of 1979 (49 U.S.C. 2001 et seq.).
72 FR 55194Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 9, 2000
The No Action Alternative would not result in air emissions. All alternatives would comply with applicable air quality regulations. … higher for longer periods.
65 FR 48683Energy DepartmentFederal Register · Notice · Mar 12, 2026
period. 1 For tracking purposes under the National Environmental Policy Act, the unique identification number for documents relating to this environmental review is EAXX-019-20-000-1771401929 … Background On January 28, 2026, the Commission issued a Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Forza Pipeline Project (Notice of Scoping).
91 FR 12189Energy DepartmentFederal Energy Regulatory CommissionEnvironmental Management Site-Specific Advisory Board, Northern New Mexico
Federal Register · Notice · Aug 31, 2010
Public Comment Period 1:45 p.m. Old Business • Written Reports • Other Items 2 p.m. … Presentation on Air Monitoring at Los Alamos National Laboratory (LANL), Andrew Green 4:15 p.m. Storm Water Management at LANL 5 p.m. Dinner Break 6 p.m. Public Comment Period 6:15 p.m.
75 FR 53280Energy DepartmentFederal Register · Notice · Oct 3, 1997
In general, passive decontamination techniques, such as high-efficiency particulate air vacuuming, damp cloth wiping, and hand washing/scrubbing, were applied first. … Fiore, Acting Deputy Assistant Secretary for Environmental Restoration.
62 FR 51844Energy DepartmentCost Recovery Mechanisms for Modernization of Natural Gas Facilities
Federal Register · Rule · Apr 22, 2015
of 2011, 49 U.S.C.S. 60101 (2012) (Pipeline Safety Act). 5. … Clean Air Task Force Columbia Gas Transmission, LLC Deep Gulf Energy LP El Paso Municipal Customer Group Elizabeth Balogh Energy XXI Ltd.
80 FR 22366Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 19, 2015
Description: ISO New England Inc. submits Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the 2019/2020 Capacity Commitment Period. … Description: § 205(d) Rate Filing: Amendment to Oregon Clean Energy ISA No. 3876, Queue No. Y1-069 to be effective 5/9/2014. Filed Date: 11/12/15. Accession Number: 20151112-5153.
80 FR 72430Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 1, 2014
Score B (0-25) for Clean Energy System The Cleanness of the microgrid system is measured by the percent reduction in the annual marginal CO 2 emissions resulting from microgrid operation, as compared … data will be for the period of June 1, 2010 to May 31, 2011.
79 FR 37303Energy DepartmentFederal Register · Notice · Jul 2, 2004
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Air and Noise Quality: —Effects on local air quality and noise environment from construction and operation of proposed facilities.
69 FR 40366Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 27, 2002
A 15-day public review period following the publication of this statement of findings has been waived per 10 CFR part 1022.18(c). No comments were received on the notice. … If a spill were to occur it would be minor and could be readily contained and cleaned up.
67 FR 8963Energy DepartmentWestern Area Power Administration