Respiratory Protection and Controls To Restrict Internal Exposures
Federal Register · Proposed Rule · Jul 17, 1998
DATES: Submit comments by September 30, 1998. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and 5 U.S.C. 553, the NRC is proposing to
63 FR 38511Nuclear Regulatory CommissionFederal Register · Notice · Apr 15, 2014
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
79 FR 21294Nuclear Regulatory CommissionFederal Register · Notice · Jul 29, 2024
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
89 FR 60930Nuclear Regulatory CommissionProposed Generic Communication; Degradation of Steam Generator Internals
Federal Register · Notice · Dec 31, 1996
DATES: Comment period expires January 30, 1997. … Comments submitted after this date will be considered if it is practical to do so, but assurance of consideration cannot be given except for comments received on or before this date.
61 FR 69116Nuclear Regulatory CommissionFederal Register · Notice · Feb 5, 2002
Laufer, Acting. … Munday, Acting.
67 FR 5323Nuclear Regulatory CommissionFederal Register · Notice · Jul 30, 1997
provision of section 189 of the Act. … and breathing air containment penetrations to remain open under administrative control during periods of core alterations or movement of irradiated fuel inside containment.
62 FR 40843Nuclear Regulatory CommissionBiweekly NoticeList of Approved Spent Fuel Storage Casks: (HI-STAR 100) Addition
Federal Register · Rule · Sep 3, 1999
The comment period ended on March 29, 1999. Nine comment letters were received on the proposed rule. … Comment No. 45: One commenter asked if the casks are checked in winter for ice and snow loads or ice around the base and if the pads will be kept clean.
64 FR 48259Nuclear Regulatory CommissionFederal Register · Proposed Rule · Nov 10, 2011
The NRC is not instituting a public comment period for these PRMs at this time. … Diane Curran, on behalf of Southern Alliance for Clean Energy PRM-51-16 ML11223A291 Watts Bar.
76 FR 70067Nuclear Regulatory CommissionFederal Register · Notice · Apr 24, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 18162Nuclear Regulatory CommissionFederal Register · Notice · Jul 30, 1997
provision of section 189 of the Act. … and breathing air containment penetrations to remain open under administrative control during periods of core alterations or movement of irradiated fuel inside containment.
62 FR 40843Nuclear Regulatory CommissionBiweekly NoticeEnvironmental Statements; Availability, etc.: Combustion Engineering, Inc.
Federal Register · Uncategorized Document · Mar 28, 1994
Air, soil, vegetation, surface water, and ground water samples are collected from various locations on or near the plant site. … The staff also contacted personnel from the State of Missouri, Department of Natural Resources, Air Pollution Control Program.
Nuclear Regulatory CommissionFederal Register · Notice · Apr 6, 2000
Exigent circumstances exist due to the need to repair an air leak on a pneumatic door seal on the inner main equipment access air lock. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
65 FR 18141Nuclear Regulatory CommissionFederal Register · Notice · Nov 26, 2013
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
78 FR 70589Nuclear Regulatory CommissionUnion Electric Company, dba Ameren Missouri; Callaway Plant, Unit No. 1
Federal Register · Notice · Nov 13, 2023
However, if circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
88 FR 77616Nuclear Regulatory CommissionFederal Register · Notice · May 15, 2025
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
90 FR 20689Nuclear Regulatory CommissionFederal Register · Rule · Oct 11, 2016
ML101040620), notes that for storage systems with internal air flow passages, the NRC has accepted periodic visual inspection of vents coupled with temperature measurements to verify proper thermal performance … That SER noted that in addition to the mandatory initial air temperature rise test when the system is first placed in service, the overpack air inlet and outlet vents would be periodically surveyed or
81 FR 70004Nuclear Regulatory CommissionFederal Register · Notice · May 15, 1997
The Auxiliary Building Exhaust Air Filtration and Switchgear and Penetration Area Ventilation systems (herein referred to as ``the subject HVAC [heating, ventilation, and air conditioning] systems'') are … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 26826Nuclear Regulatory CommissionFederal Register · Notice · Dec 7, 2000
The licensee will use a vacuum to clean the floor of the fuel transfer canal following the drying of the canal prior to installing the new fuel racks. … The state official had no comments.
65 FR 76672Nuclear Regulatory CommissionMark Edward Leyse; Receipt of Petition for Rulemaking
Federal Register · Proposed Rule · May 23, 2007
DATES: Submit comments by August 6, 2007. … of time and could cause the cladding to fracture during the reflood period and lose structural integrity.
72 FR 28902Nuclear Regulatory CommissionFederal Register · Rule · Aug 4, 1999
Registration Program Comment: One commenter noted that the language of the proposal did not call for a periodic registration program requiring reporting at least annually. … The commenter used the example of the cost for cleaning a steel mill contaminated by melting such a source.
64 FR 42269Nuclear Regulatory Commission