Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
0.48s
Federal Register · Notice · Dec 4, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 68206Nuclear Regulatory CommissionFederal Register · Notice · Nov 14, 2003
There may be minor, temporary impacts on air quality and noise during remediation activities. … Monitoring programs at the BWXT facility comprise effluent monitoring of air and water and environmental monitoring of various media (air, soil, vegetation, and groundwater).
68 FR 64665Nuclear Regulatory CommissionSouthern California Edison Company; San Onofre Nuclear Generating Station, Units 1, 2, and 3
Federal Register · Notice · Jul 27, 2016
The NRC confirmed its review of the SONGS, Units 2 and 3, PSDAR and addressed public comments in a letter dated August 20, 2015 (ADAMS Accession No. ML15204A383). … In the Statement of Considerations (SOC) for the final rulemaking, “Retention Periods for Records” (53 FR 19240; May 27, 1988), in response to public comments received during the rulemaking process, the
81 FR 49281Nuclear Regulatory CommissionFederal Register · Notice · Aug 16, 2011
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
76 FR 50759Nuclear Regulatory CommissionEntergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station
Federal Register · Notice · Dec 17, 2015
This time period is based on a heatup calculation, which uses several simplifying assumptions. … Among the changes, the definition of “hostile action” was added as an act directed toward a nuclear power plant or its personnel.
80 FR 78776Nuclear Regulatory CommissionFederal Register · Notice · Apr 4, 2002
In accordance with the February 8, 1996, staff position paper, the draft EA and finding of no significant impact is being published in the Federal Register with a 30-day public comment period. … DATES: The comment period expires May 6, 2002.
67 FR 16132Nuclear Regulatory CommissionEnergy Northwest; Columbia Generating Station
Federal Register · Notice · Jul 16, 2018
Removal of larvae and eggs of resident fish species could occur during collection periods for the entrainment study. … The State official had no comments. III. Finding of No Significant Impact The NRC is considering issuance of an amendment to Renewed Facility Operating License No.
83 FR 32916Nuclear Regulatory CommissionRegulatory Framework for Fusion Machines
Federal Register · Proposed Rule · Feb 26, 2026
Mailed comments must be received by the close of the comment period. … L.) 118-67, Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy of 2024 (ADVANCE Act of 2024) https://www.congress.gov/118/plaws/publ67/PLAW-118publ67.pdf.
91 FR 9476Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Feb 16, 1994
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
Nuclear Regulatory CommissionFederal Register · Notice · Aug 8, 1995
The comments made in the petition would apply at virtually any location in the Piedmont. … The 30 minutes cooling period flow is designed to be provided by gravity flow from the previously mentioned passive tank through two redundant fast acting, fail safe valves.
60 FR 40390Nuclear Regulatory CommissionFederal Register · Notice · Jan 30, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 4304Nuclear Regulatory CommissionFederal Register · Notice · Jan 6, 2011
During the period from the docketing of a COL application until the NRC makes a finding under 10 CFR 52.103(g) pertaining to facility operation, Union Electric Company, doing business as Ameren Missouri … With regard to potential non-radiological impacts, the proposed action does not have any foreseeable impacts to land, air, or water resources, including impacts to biota.
76 FR 800Nuclear Regulatory CommissionFederal Register · Notice · Apr 12, 1995
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
60 FR 18621Nuclear Regulatory CommissionFederal Register · Notice · Sep 11, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 47973Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Nov 8, 2024
As noted, ACO: (1) permanently ceased principal activities under SNM-7003 in 2016 and (2) has not carried out principal activities with radioactive material under the LCF license for a period of 24 months … The NRC received no comments on the EA. Section 106 of the National Historic Preservation Act (NHPA) requires Federal agencies to consider the effects of their undertakings on historic properties.
89 FR 88818Nuclear Regulatory CommissionFederal Register · Notice · Jul 11, 2008
The State agreed with the conclusions of the EA, and otherwise had no comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
73 FR 39991Nuclear Regulatory CommissionFederal Register · Notice · Mar 6, 2001
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … hearing is received, the Commission's staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment
66 FR 13598Nuclear Regulatory CommissionIndependent Spent Fuel Storage Installation, Department of Energy; Fort St. Vrain
Federal Register · Notice · Jun 11, 2015
For instance, Chapter 4, section 4.2.3.2.3 of the FSV ISFSI FSAR considered the potential for galvanic corrosion with the carbon steel FSC acting as the anode and the graphite fuel acting as the cathode … The failure of the redundant metallic seals (loss of confinement) can be considered a low probability event during the entire storage period.
80 FR 33299Nuclear Regulatory CommissionFederal Register · Notice · Sep 5, 2001
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … Tam, Acting.
66 FR 46473Nuclear Regulatory CommissionFederal Register · Rule · Sep 9, 2014
Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action. … A comment is adverse and significant if: (1) The comment opposes the rule and provides a reason sufficient to require a substantive response in a notice-and-comment process.
79 FR 53281Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.