Documents

Briefs, oral arguments, agency decisions and the Federal Register.

10,000+ results

0.76s

  • Airworthiness Directives; Bombardier Model CL-600-2C10 (Regional Jet Series 700 & 701) Series Airplanes

    Federal Register · Rule · Nov 26, 2003

    Conclusion After careful review of the available data, including the comment noted above, the FAA has determined that air safety and the public interest require the adoption of the rule as proposed. … Surface cleaning and elaborate access procedures may be required.”

    68 FR 66321Transportation DepartmentFederal Aviation Administration
  • Airworthiness Directives; Boeing Model 747-100, -100B, -100B SUD, -200B, -200C, -200F, -300, -400, -400D, and -400F Series Airplanes; and Model 747SR Series Airplanes

    Federal Register · Rule · Aug 8, 2003

    This commenter suggests that the proposed grace period and repetitive inspection interval be changed to “1,200 flight cycles or 18 months, whichever occurs later,” which would allow the inspections to … Surface cleaning and elaborate access procedures may be required.

    68 FR 47218Transportation DepartmentFederal Aviation Administration
  • Hazardous Materials: Transportation of Lithium Batteries

    Federal Register · Rule · Aug 6, 2014

    However, nearly all other commenters opposed the 75-day period for compliance with the requirements outlined in the NPRM. … These commenters stated that a 12-18 month compliance period would be required if PHMSA adopted the provisions of the NPRM.

    79 FR 46012Transportation DepartmentPipeline and Hazardous Materials Safety Administration
  • Airworthiness Directives; Boeing Model 757 Series Airplanes

    Federal Register · Rule · Jun 17, 2005

    In addition, reducing the compliance time would necessitate (under the provisions of the Administrative Procedure Act) reissuing the notice, reopening the period for public comment, considering additional … for safety in air commerce.

    70 FR 35166Transportation DepartmentFederal Aviation Administration
  • Pilot Professional Development

    Federal Register · Rule · Feb 25, 2020

    The comment period for the NPRM closed on January 5, 2017, and the FAA received 44 unique comments. Only two of the comments opposed the rule, and 22 comments supported the rule without change. … The estimated cost of the rule to air carriers is $90.0 million over a 10-year period.

    85 FR 10896Transportation DepartmentFederal Aviation Administration
  • Elimination of Unnecessary and Duplicative Hazardous Materials Regulations

    Federal Register · Rule · Apr 29, 1996

    Sec. 174.57 Cleaning cars./Sec. 174.515 Cleaning cars; potassium permanganate./ Sec. 174.615(a) Cleaning cars. … McMurray, Acting Deputy Administrator. [FR Doc. 96-9555 Filed 4-26-96; 8:45 am] BILLING CODE 4910-60-P

    61 FR 18926Elimination of Unnecessary and Duplicative Hazardous MaterialsTransportation Department
  • Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register · Notice · May 12, 2008

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    73 FR 27012Transportation DepartmentFederal Highway Administration
  • Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register · Notice · Mar 12, 2009

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    74 FR 10802Transportation DepartmentFederal Highway Administration
  • Notice of Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register · Notice · Jul 24, 2007

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    72 FR 40358Transportation DepartmentFederal Highway Administration
  • Airworthiness Directives; Sikorsky Aircraft Corporation Helicopters

    Federal Register · Proposed Rule · Feb 23, 2022

    Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. … for safety in air commerce.

    87 FR 10115Transportation DepartmentFederal Aviation Administration
  • Airworthiness Directives; Airbus Model A300 B2 and B4 Series Airplanes

    Federal Register · Proposed Rule · Oct 5, 2004

    ACTION: Supplemental notice of proposed rulemaking; reopening of comment period. … Surface cleaning and elaborate procedures may be required.”

    69 FR 59557Transportation DepartmentFederal Aviation Administration
  • Notice of Final Federal Agency Action on Proposed Highway Project in Georgia, the Courtesy Parkway Extension From Old Covington Highway to Flat Shoals Road, Rockdale County, Georgia (Atlanta Metropolitan Area)

    Federal Register · Notice · Jun 17, 2021

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    86 FR 32305Transportation DepartmentFederal Highway Administration
  • Notice of Final Federal Agency Action on Proposed Interchange in Georgia, Interstate 20 (I-20) at County Road (CR) 249/Old Mill Road, Morgan and Walton Counties, Georgia

    Federal Register · Notice · Oct 10, 2023

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    88 FR 69982Transportation DepartmentFederal Highway Administration
  • Securement of Unattended Equipment

    Federal Register · Rule · Aug 6, 2015

    Please see the Privacy Act heading in the “Supplementary Information” section of this document for Privacy Act information related to any submitted comments or materials. … Accordingly, FRA does not believe it is necessary to either extend the comment period on this issue or recall the RSAC SWG for further discussion.

    80 FR 47350Transportation DepartmentFederal Railroad Administration
  • Notice of Final Federal Agency Actions on Proposed Highway in California

    Federal Register · Notice · Jun 26, 2015

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. … National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C.128] 2. Clean Air Act [42 U.S.C. 7401-7671(q)] 3.

    80 FR 36892Transportation DepartmentFederal Highway Administration
  • Department Regulatory and Deregulatory Agenda; Semiannual Summary

    Federal Register · Proposed Rule · Feb 22, 2023

    Comment Period 03/07/11 Second Extension of Comment Period 03/07/11 76 FR 12300 End of Second Extended Comment Period 07/05/11 Second NPRM 07/14/16 81 FR 45871 … Air Act.

    88 FR 11258Transportation DepartmentOffice of the Secretary
  • Airworthiness Directives; Eurocopter France Model AS355E, F, F1, F2, and N Helicopters

    Federal Register · Proposed Rule · Feb 10, 2005

    for safety in air commerce. … List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Safety.

    70 FR 7059Transportation DepartmentFederal Aviation Administration
  • Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Highway Project in Clark County, Nevada

    Federal Register · Notice · Mar 22, 2024

    Las Vegas Creek flows only briefly after rainfall and, therefore, may not be subject to sections 401 and 404 of the Clean Water Act. • Section 4(f) Resources. … FHWA welcomes comments on the expected impacts that it should analyze in the Draft EIS during the NOI comment period.

    89 FR 20530Transportation DepartmentFederal Highway Administration
  • Airworthiness Directives; Saab Model SAAB SF340A and SAAB 340B Series Airplanes

    Federal Register · Rule · May 17, 2005

    for safety in air commerce. … Surface cleaning and elaborate procedures may be required.

    70 FR 28184Transportation DepartmentFederal Aviation Administration
  • Final Federal Agency Actions on Proposed Highway in North Carolina

    Federal Register · Notice · Feb 17, 2009

    If the Federal law that authorizes judicial review of a claim provides a time period of less than 180 days for filing such claim, then that shorter time period still applies. … General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109]. 2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)]. 3.

    74 FR 7535Transportation DepartmentFederal Highway Administration

Ask Donna what matters in the record.

She can read the source against your case and show you exactly where the answer came from.

Ask Donna

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.